Whenever possible, the Fairfield County Engineer’s Office applies for grant money to assist in repairing the roads and bridges in our County. 2016 was a busy year for this office. Five bridges were replaced for a total construction cost of $2,161,234.39. Thanks to both federal and state grants, our office was able to construct these projects for our local share of $652,038.78, with grant monies paying $1,509,195.61. An additional $39,232.00 in federal grant money was awarded to our office for a No Passing Zone Study and to assist with purchasing federal mandated retro-reflectivity signage. Once again this year, the Fairfield County Engineer’s Office teamed up with another local entity in order to improve our roadways for the traveling public. The City of Lancaster was able to obtain federal funding for a bridge replacement on Columbus Street. The County Engineer’s Office assisted with inspection during the construction of this project. Obtaining these extra funds when available gives us the ability to apply funds to more projects throughout the year. It is our mission to continue applying for grant money as it becomes available so that we can keep our roadways safe for the traveling public. 2016 Annual Report THE FAIRFIELD COUNTY ENGINEER’S OFFICE ANNUAL REPORT Did you know the Fairfield County Engineer’s Office: Is responsible for over 363 miles of road. Is responsible for approximately 342 bridges located on county, township, and city roadways. Assists Township Trustees with local needs. Assigns house numbers Issues free permits for anyone working in the right-of-way or hauling oversized/ overweight equipment Reviews surveys and approves lot splits Reviews subdivision plans Jeremiah D. Upp, P.E., P.S. Fairfield County Engineer 2016 Road & Bridge Projects BUD’s Inc. of Nashport, Ohio replaced our Milnor Road culvert (pictured left), widened shoulders, and improved the ditches for a total construction cost of $128,403.38. Amanda-Northern Road over Muddy Praire Run is the site for our Amanda 11 Bridge (pictured right). Designed by the Fairfield County Engineer, a corrugated metal pipe was replaced with a 16’ span x 10’ rise box culvert for a total construction cost of $327,990.52

THE FAIRFIELD COUNTY ANNUAL REPORT · PDF fileKokosing Construction Co., Inc ... Dave Frazier Gary Harvey Jeffrey ... Wayne Leach Travis Liff Sean Meachem Phil Neff Robert Notestone

Embed Size (px)

Citation preview

Page 1: THE FAIRFIELD COUNTY ANNUAL REPORT · PDF fileKokosing Construction Co., Inc ... Dave Frazier Gary Harvey Jeffrey ... Wayne Leach Travis Liff Sean Meachem Phil Neff Robert Notestone

Whenever possible, the Fairfield County Engineer’s Office applies for grant money to assist in

repairing the roads and bridges in our County. 2016 was a busy year for this office. Five bridges were

replaced for a total construction cost of $2,161,234.39. Thanks to both federal and state grants, our

office was able to construct these projects for our local share of $652,038.78, with grant monies paying

$1,509,195.61. An additional $39,232.00 in federal grant money was awarded to our office for a No

Passing Zone Study and to assist with purchasing federal mandated retro-reflectivity signage.

Once again this year, the Fairfield County Engineer’s Office teamed up with another local entity

in order to improve our roadways for the traveling public. The City of Lancaster was able to obtain

federal funding for a bridge replacement on Columbus Street. The County Engineer’s Office assisted

with inspection during the construction of this project.

Obtaining these extra funds when available gives us the ability to apply funds to more projects

throughout the year. It is our mission to continue applying for grant money as it becomes available so

that we can keep our roadways safe for the traveling public.

2016 Annual Report

THE FAIRFIELD COUNTY

ENGINEER’S OFFICE

ANNUAL REPORT

Did you know the Fairfield County Engineer’s

Office:

Is responsible for over

363 miles of road.

Is responsible for

approximately 342

bridges located on

county, township, and

city roadways.

Assists Township

Trustees with local

needs.

Assigns house

numbers

Issues free permits for

anyone working in the

right-of-way or

hauling oversized/

overweight equipment

Reviews surveys and

approves lot splits

Reviews subdivision

plans

Jeremiah D. Upp, P.E., P.S.

Fairfield County Engineer

2016 Road & Bridge

Projects

BUD’s Inc. of Nashport, Ohio replaced our Milnor Road

culvert (pictured left), widened shoulders, and improved

the ditches for a total construction cost of $128,403.38.

Amanda-Northern Road over

Muddy Praire Run is the site for

our Amanda 11 Bridge (pictured

right). Designed by the Fairfield

County Engineer, a corrugated

metal pipe was replaced with a 16’

span x 10’ rise box culvert for a

total construction cost of

$327,990.52

Page 2: THE FAIRFIELD COUNTY ANNUAL REPORT · PDF fileKokosing Construction Co., Inc ... Dave Frazier Gary Harvey Jeffrey ... Wayne Leach Travis Liff Sean Meachem Phil Neff Robert Notestone

2

2016 Road & Bridge Projects

Our Bloom 08 Bridge (pictured left) on Winchester Road

was replaced by BUD’s, Inc. of Nashport, Ohio for a

construction cost of $413,425.44. Designed by Jobes

Henderson & Associates, this single span reinforced

concrete slab was replaced by a reinforced concrete box

culvert. An OPWC grant helped to fund this project.

The Hocking 28 Bridge on Duncan Road (pictured

right) was designed by the Fairfield County Engineer’s

Office. This simple span steel beam bridge was replaced

with an 8’ span x 6’ rise box culvert. BUD’s, Inc. of

Nashport, Ohio replaced this bridge for a total

construction cost of $309,949.36. An OPWC grant

helped to fund this project.

Landis Road over Clear Creek is the site for our

Madison 34 Bridge (pictured left). 0.09 miles of

county road was improved by the replacement of a

box beam bridge with a new concrete slab bridge

while improving alignment, regrading ditches, and

adding new guardrail. The Righter Company of

Columbus, Ohio replaced this bridge for a

construction cost of $544,663.00. A federal aid

grant helped to fund this project.

Designed by the Fairfield County Engineer’s Office,

our Hocking 26 Bridge on Duncan Road (pictured

right) was replaced by Eagle Bridge Co. of Sidney,

Ohio for $565,206.07. The steel beam simple span

bridge was replaced with a prestressed concrete box.

A federal aid grant helped to fund this project.

Page 3: THE FAIRFIELD COUNTY ANNUAL REPORT · PDF fileKokosing Construction Co., Inc ... Dave Frazier Gary Harvey Jeffrey ... Wayne Leach Travis Liff Sean Meachem Phil Neff Robert Notestone

3

CULVERT PROJECTS County forces replaced 17 culverts in 2016 for a total cost

of $197,684.26.

2016 PAVEMENT MARKING PROGRAM A&A Safety, Inc. of Amelia, Ohio received the 2016

Pavement Markings Contract on various county roadways

for a construction cost of $69,179.40.

2016 RESURFACING Kokosing Construction Co., Inc. of Westerville, Ohio received the 2016 Resurfacing Contract for a total construction cost of

$1,120,345.66. Resurfacing took place on sections of the following roadways: Pleasantville Road, Marcy Road, and Leonard/Basil

Road.

2016 REVENUE SOURCE $9,494,160

TOTAL REVENUE W/GRANTS $11,081,846

2016 OPERATION EXPENSES

$10,744,543

2016 Major Equipment Purchases

Total: $344,280.00

Dump Trucks (2) ................ $293,010.00

Brush Chipper ...................... $51,270.00

ICE AND SNOW

CONTROL

Approximately $428,199 was spent on salt, grits, and brine for the 2015-2016 winter season. Road crews purchased approximately

2821 tons of grits and 5372 tons of salt to keep the county road system open. Such treatment is applied at intersections, hills and

curves as first priority. Depending on weather conditions and effectiveness, brine is also used on our arterial routes and some

collector routes.

All Other Motor Vehicle Funds

4% $410,767 Motor Vehicle—Fuel

25% $2,338,616

Real Property Tax 14% $1,333,466

All Other Levy 4% $420,515

Permissive Motor Tax 18% $1,712,021

Motor Vehicle—License 35% $3,278,775

Salary & Benefits

40% $4,301,919

Project Costs 35% $3,710,870

Facility Operation Costs 8% $907,851

Supplies & Services 16% $1,677,303

Court House Costs

1% $146,600

AMA-07 Westfall Road Bridge

GRE-27 Mt. Zion Road Bridge

RIC-13 Pleasantville Road Bridge

BLO-14 Winchester Road Bridge

GRE-38 Rauch Road Bridge

Milnor Road Resurfacing

Stoudertown Road Resurfacing

Hamburg Road Resurfacing

Amanda-Clearport Road Resurfacing

CONSTRUCTION PROJECTS

SCHEDULED FOR 2017

CRACK SEAL Scodeller Construction of Wixom, Michigan crack sealed

portions of Basil-Western Road, Winchester Road, and

Coonpath Road for a total construction cost of $62,553.68.

Page 4: THE FAIRFIELD COUNTY ANNUAL REPORT · PDF fileKokosing Construction Co., Inc ... Dave Frazier Gary Harvey Jeffrey ... Wayne Leach Travis Liff Sean Meachem Phil Neff Robert Notestone

4

3026 West Fair Avenue

Lancaster, OH 43130

Phone: 740-652-2300

FAX: 740-687-7055 E-mail:

[email protected] Hours: 7:00 a.m. to 3:30 p.m.

Monday thru Friday

THE FAIRFIELD COUNTY

ENGINEER’S OFFICE

The Fairfield County Engineer’s Office Staff “Working Together for Tomorrow”

Visit us on the web at

www.co.fairfield.oh.us/Engineer

Administrative Division Jeremiah Upp County Engineer Eric McCrady Deputy Engineer Bill Maravy Deputy Engineer Jeff Camechis Admin. Assistant Larry Sheppard Director of Safety Todd May Subdivision Engineer Nora Getz Admin. Secretary Cheryl Downour Fiscal Officer/Admin. Tech Services Cheryl Slone Accounting Clerk Tim Anderson Rd/Bridge Inspector Mike Arter Roadway Services Tech. Dustin Matthews Engineer Tech I Jennifer Donley Engineer Tech II Robert Lape Subdivision DMD Tech I Cody Good Custodian Maintenance Division Jason Grubb Superintendent Jay West Asst. Superintendent Dave Stalder Road/Maint. Supervisor Bill Putnam Road/Maint. Supervisor Brent Emmert Road/Maint. Supervisor Chris Nye Road Sign Maint. Supervisor Henry Hill Mechanic Supervisor Gary Haney Clerk Specialist

Dan Ash Matthew Bader Chad Berry Corey Bibler Leo Brown Jeremy Cain Jesse Cavinee Charles Cochran Steve Cozart Tim Ebert Chuck Elick Shane Ellis Dave Frazier Wendell Good Gary Harvey Jeffrey Hursey Lance Hutchison John Kilbarger Bob Knotts Bob Lanier Wayne Leach Travis Liff Sean Meachem Phil Neff

Robert Notestone Kevin Rinehart Gene Schultz Jeff Smith Terry Smith Roger Tipton Robert Tooill Jonathon VanAtta Robert Walters John Webb Chris Westfall

Road Crew

COUNTY FORCES CHIP & SEAL

County Forces seal coated approximately 27.82 miles along the following

county roads for an approximate cost of $342,785.

RD # RD NAME BEGIN END MILES

9 Wright Road Franklin Co. Line Pickerington Corp. 1.011

19 Richland Road SR 188 Elder Road 2.869

19 Elder Road Richland Road Richland Road 0.499

19 Richland Road Elder Road Coonpath Road 2.370

33 Old Rushville Road SR 664 County Line Road 1.936

49 Marietta Road SR 664 County Line Road 3.222

51 Schwilk Road Duffy Road SR 37 1.031

51 Duffy Road Schwilk Road Lake Road 1.388

66 West Rushville Road SR 37 US 22 3.024

66 West Rushville Road US22 West Rushville Corp. 0.047

70 Jerusalem Road Marietta Road SR37 2.697

72 County Line Road SR 37 Perry Co. Line 1.989

76 Tschopp Road Coonpath Road SR 37 2.635

88 Pleasant View Road SR 664 Mt. Zwingli Road 0.847

88 Mt. Zwingli Road Pleasantview Road Bremen Road 2.252