The first successful offshore slickline deployed ESP project in Asia Reducing risk and heavy ESP workover cost offshore Brunei European Union Artificial Lift Forum February 2021

The First Successful Offshore Wireline ESP in Brunei · 2021. 2. 18. · Four 0.125-in. slickline runs much faster, safer than pulling tubing Compatible with lower completion sand

  • Upload
    others

  • View
    3

  • Download
    1

Embed Size (px)

Citation preview

Page 1: The First Successful Offshore Wireline ESP in Brunei · 2021. 2. 18. · Four 0.125-in. slickline runs much faster, safer than pulling tubing Compatible with lower completion sand

The first successful offshore slickline deployed ESP project in Asia

Reducing risk and heavy ESP workover cost offshore Brunei

European Union Artificial Lift Forum

February 2021

Page 2: The First Successful Offshore Wireline ESP in Brunei · 2021. 2. 18. · Four 0.125-in. slickline runs much faster, safer than pulling tubing Compatible with lower completion sand

HSE moment: The upside of avoiding heavy workovers

Avoiding ESPHWOs means less POB for

far fewer days ➔ reduces risk

Avoiding ESPHWOs means

less diesel burn and less carbon➔ reduces GHG

Page 3: The First Successful Offshore Wireline ESP in Brunei · 2021. 2. 18. · Four 0.125-in. slickline runs much faster, safer than pulling tubing Compatible with lower completion sand

• Offshore Brunei

• Traditionally gas lifted

• Producing 40+ years

• 50 platforms

• 400+ wells

• Recent water flood project lifted withconventional tubing-deployed ESPs

• Chemical injection required

• Small platforms require rig-and-barge workovers between $3MM to $6MM

Situation

3

Page 4: The First Successful Offshore Wireline ESP in Brunei · 2021. 2. 18. · Four 0.125-in. slickline runs much faster, safer than pulling tubing Compatible with lower completion sand

Status quo tubing-deployed ESP vs GoRigless ESP System

4

Conventional ESP & heavy WO• Accepted, not changed in years• Pull tubing• More POB• Higher risk, more exposure• Limited jackup availability• Higher risk of failures• >$3 million intervention• 15 tons diesel/d ➔ 45 tons/d CO2

• High deferred production

GoRigless ESP & S/L workover• New, passed extensive qualification• Tubing install, then S/L WO• Much fewer POB• Reduced risk, less exposure• High slickline availability• > 6 years failure free• $100K to $200K intervention• Thousands of tons of CO2 emissions avoided• Much higher production, millions NPV added

Page 5: The First Successful Offshore Wireline ESP in Brunei · 2021. 2. 18. · Four 0.125-in. slickline runs much faster, safer than pulling tubing Compatible with lower completion sand

Key differences that drive higher performance and value

✓ 3.8 in. OD ➔ deployment/retrieval in 4.5-in. tubing, TRSSV and packer

✓ Live well deployable

✓ All components fit in standard lubricator with a maximum weight of 1,500 lbm

✓ Four 0.125-in. slickline runs much faster, safer than pulling tubing

✓ Compatible with lower completion sand screens and sand control packer

✓ Fullbore access enables coiled tubing cleanouts and other well work

✓ Full chemical injection flexibility

✓ Ultra-reliable, high power density PMM

3.8 in. ID

Page 6: The First Successful Offshore Wireline ESP in Brunei · 2021. 2. 18. · Four 0.125-in. slickline runs much faster, safer than pulling tubing Compatible with lower completion sand

Install once for life of well and retrieve/replace quickly and cheaply

6

❶ ❷ ❸ ❹

Permanent Completion Assembly Retrievable

Assembly

Page 7: The First Successful Offshore Wireline ESP in Brunei · 2021. 2. 18. · Four 0.125-in. slickline runs much faster, safer than pulling tubing Compatible with lower completion sand

Brunei and global track record

7

514

601 622680

0

100

200

300

400

500

600

700

800

Well #2 Well #1 Well #3 Well #4

Offshore Brunei GoRigless ESP Run Life (days)

2 live well interventions:

• Pack off and a planned ESP change out

4 wells failure free

25 wells, 6 years failure free

New ESP completions andgas lift conversions

Page 8: The First Successful Offshore Wireline ESP in Brunei · 2021. 2. 18. · Four 0.125-in. slickline runs much faster, safer than pulling tubing Compatible with lower completion sand

Inertia to change overcome through rigorous pre-qualification and business case

System efficiently and safely changed out with slickline avoids millions in HWO cost

• Much less POB

• Live well change out

• No change to completion design or chemical injection

• Standard lubricator, mast, crane and slickline

• Change out failed pump without pulling motor

• Resize pump to optimize drawdown

• Each HWO metric ton diesel not burned ➔ 3 metric tons CO2 not emitted

HWO costs avoided, higher uptime, higher production

Critical insights to achieving the technical limit in ESP performance

8

Page 9: The First Successful Offshore Wireline ESP in Brunei · 2021. 2. 18. · Four 0.125-in. slickline runs much faster, safer than pulling tubing Compatible with lower completion sand

For more information

Ed Sheridan Vice President Middle East North Africa (+971) 5823 [email protected]

9

Committed to reducing risk,lowering total cost of operations, cutting

greenhouse gas emissions and improving recovery by

achieving the technical limitin ESP performance.