13
The Future of Freight and High Speed Rail in Today’s Economy SASHTO Annual Conference – Biloxi, MS Shayne Gill Program Manager Aviation, Passenger Rail & Public Transportation

The Future of Freight and High Speed Rail in Today’s Economy SASHTO Annual Conference – Biloxi, MS Shayne Gill Program Manager Aviation, Passenger Rail

Embed Size (px)

Citation preview

Page 1: The Future of Freight and High Speed Rail in Today’s Economy SASHTO Annual Conference – Biloxi, MS Shayne Gill Program Manager Aviation, Passenger Rail

The Future of Freight andHigh Speed Rail in Today’s Economy

SASHTO Annual Conference – Biloxi, MS

Shayne GillProgram Manager

Aviation, Passenger Rail & Public Transportation

Page 2: The Future of Freight and High Speed Rail in Today’s Economy SASHTO Annual Conference – Biloxi, MS Shayne Gill Program Manager Aviation, Passenger Rail

Achieving the Vision

States

Lead the Way

In

Capital Investment

Federal

Partner

Begins

Investment

Federal/State

Role

Continues

Yesterday Today Tomorrow

Page 3: The Future of Freight and High Speed Rail in Today’s Economy SASHTO Annual Conference – Biloxi, MS Shayne Gill Program Manager Aviation, Passenger Rail

States Leading the Way15 States Partner with Amtrak

California

IllinoisWashington Maine

Missouri

Michigan

New York

Virginia

OklahomaTexas

Vermont

Oregon

Wisconsin

Pennsylvania

North Carolina

Page 4: The Future of Freight and High Speed Rail in Today’s Economy SASHTO Annual Conference – Biloxi, MS Shayne Gill Program Manager Aviation, Passenger Rail

Federal Partnership Established

FY ’08

Congress Appropriates $30 Million

• 50/50 Federal/State Matching Program• 22 States Apply for 25 Projects• 12 States Awarded 15 Projects

FY’09Congress Appropriates $90 million• 50/50 Federal/State Matching Program• Applications due August 24, 2009

American Recovery & Reinvestment Act

$8 Billion High Speed / Intercity Passenger Rail

$1.3 Billion – Amtrak

Page 5: The Future of Freight and High Speed Rail in Today’s Economy SASHTO Annual Conference – Biloxi, MS Shayne Gill Program Manager Aviation, Passenger Rail

High Speed/Intercity Passenger Rail Timeline

2009

AprilMay

JuneJuly

AugSept

Oct

President Obama Releases Strategic Plan

AASHTO/FRA Conference Calls &

7 FRA Regional Workshops

Track 1, Track 3 & Track 4 Applications Due August 24

Pre-Applications DueJuly 10

Track 2 Applications DueOctober 2

Page 6: The Future of Freight and High Speed Rail in Today’s Economy SASHTO Annual Conference – Biloxi, MS Shayne Gill Program Manager Aviation, Passenger Rail

Summary of Preapplication Requests - PRELIMINARY

Page 7: The Future of Freight and High Speed Rail in Today’s Economy SASHTO Annual Conference – Biloxi, MS Shayne Gill Program Manager Aviation, Passenger Rail

15% $1.404 Billion to Retire Debt

30% $2.949 Billion for Operating Grants

Passenger Rail Investment and Improvement Act 2008

AMTRAK Authorizes $9.7 Billion over 5 Years

55% $5.315 Billion for Capital Grants

Page 8: The Future of Freight and High Speed Rail in Today’s Economy SASHTO Annual Conference – Biloxi, MS Shayne Gill Program Manager Aviation, Passenger Rail

INTERCITY PASSENGER RAIL

• $1.9 Billion for State Capital Investment Grants

• FY 2009-2013

• $325 Million for Congestion Capital Grants

• FY 2010-FY 2013 (States and/or Amtrak)

• 80/20 Federal/State Cost Share

Page 9: The Future of Freight and High Speed Rail in Today’s Economy SASHTO Annual Conference – Biloxi, MS Shayne Gill Program Manager Aviation, Passenger Rail

• $1.5 Billion over 5 Years to States and/or Amtrak to develop high-speed rail (110 mph)

• Directs DOT to conduct RFP to develop, build and operate high-speed rail systems in 11 corridors, including NEC from Washington, DC to NYC

• $5 million for preliminary engineering for the best approach in each corridor

HIGH SPEED RAIL

Page 10: The Future of Freight and High Speed Rail in Today’s Economy SASHTO Annual Conference – Biloxi, MS Shayne Gill Program Manager Aviation, Passenger Rail

FUTURE FUNDING • FY 2010 President Obama’s Budget

includes $1 Billion per year for next 5 years

• House Appropriations Transportation Subcommittee

$4 Billion HSR/IPR $40 million Rail Line Relocation $1.48 Billion Amtrak

• Surface Transportation Authorization Act

$50 billion over 6 years Rail Relocation funding RRIF Loan Program

Page 11: The Future of Freight and High Speed Rail in Today’s Economy SASHTO Annual Conference – Biloxi, MS Shayne Gill Program Manager Aviation, Passenger Rail

AASHTO VISION• Authorize $35 billion for capital grant

program – equipment and infrastructure

• $13 billion for the Northeast Corridor State of Good Repair

• Authorize $55 million annually for High Speed Rail Highway-Rail grade crossing safety grants

• Provide dedicated, guaranteed funding for High Speed/Intercity Passenger Rail capital infrastructure

Page 12: The Future of Freight and High Speed Rail in Today’s Economy SASHTO Annual Conference – Biloxi, MS Shayne Gill Program Manager Aviation, Passenger Rail

State DOT’s Roles

Planning

Environmental

Design/Engineering

Grants/Contracts/Procurement

Safety

Equipment/Technology

Page 13: The Future of Freight and High Speed Rail in Today’s Economy SASHTO Annual Conference – Biloxi, MS Shayne Gill Program Manager Aviation, Passenger Rail

For More Information, Please Contact

Shayne [email protected]