The Game Changing Environmentally Superior Alternative that Improves Air Quality with Zero Emissions Goods Movement
Global Trade’s 50 year solutions to increased container volumes
Thousands of acres in landfill development Millions of increased freeway truck deliveries
Longer trains up to two miles in length Vastly larger container ships and cranes 2
Terminal Operator
HIP Consolidated
Terminal Operator
On Dock Rail YardSH
IP
“Busier than it looks”
City of Commerce & DTLA
On Dock Rail YardSH Consolidated
Freight Service(CFS) FacilityTerminal Operator
On Dock Rail YardSH
IP
ALAMEDA
Terminal Operator
On Dock Rail YardSH
IP
Terminal Operator
On Dock Rail YardSH
IP
RAIL TRAFFICCHOKE POINT
R E
AS
T
Near Dock Rail YardIntermodal ContainerTransfer Facility (ICTF)
ALAMEDATerminal Operator
On Dock Rail YardSH
IP
O oc a a dS
Terminal Operator P
WAYOVER 6MILLION OR
RID
OR
710 FREEWAY
Transfer Facility (ICTF)
Terminal Operator
On Dock Rail YardSH
IP
Terminal Operator
On Dock Rail YardSH
IP
FREEWAY TRAFFICCHOKE POINT ONLY
60
0 FR
EE
WOVER 6MILLIONTRUCK TRIPSEACH YEAR ONTHESE FREE-
ME
DA
CO
Consolidated Freight Service
Terminal Operator
HIP
Terminal Operator
On Dock Rail YardSH
IP
TRUCKTRAIN
CHOKE POINT ONLYSOLUTION IS TO WIDEN F
WY
10WAYS
ALA
M
Freight Service(CFS) Facility
INLAND EMPIRE
On Dock Rail YardSH
Terminal Operator (EXPANSION)
2 MORE On Dock Rail YardSH
IP
TRUCK
3
All top row logistics occur redundantly at 12 Container Terminals
YARD On Dock RAILYARD
IF Not enough containers in yard to justify train delivery Truck delivers
MachineTransferRequired
Millions of Rail Container freeway trips for rail designated cargo each year
OFF DOCK RAILYARD (ICTF) ALAMEDA CORRIDOR
Trains meet to be Connected Trains fully built from Terminals
U.S. City of Destination
F ll P fil d T i B ilt f Cit D ti ti T i T Ti f Full Profiled Train Built for City Destination Train Turn Time from Port to Rail Terminal 36 – 42 Hours
4
Ship to SuperDock
City of Destination
ALAMEDA CORRIDOR
With Rail Fully Profiled Train Built for City With Rail Designated Containers
Fully Profiled Train Built for City of U.S. Destination
Train Turn Time from SuperDock Terminal to Railroad custody
2 – 4 hours
5
What happens when Alameda Corridor is over capacity?
S f GS f GStart thinking of expanding the GRIDStart thinking of expanding the GRID6
Improved Logistics p gReplacing the Freeway Trucking Component to the Container Supply Chain through Transshipment
ALAMEDA CORRIDOR
ALAM
ZERO EMISSIONS RIGHT OF WAY (R.O.W.)
SUPERDOCKSUPERDOCK
MED
A COR
SURFACE & UNDERGROUND FREIGHT PIPELINE
RR
IDO
R EAS
NETWORKNETWORKINLANDINLAND
ST (ACE)
FUTURE EXTENSIONOPPORTUNITIES
7
1
2
I-710 Widening Project EST. $6.8B
Union Pacific ICTF $0.5B
13
4
BNSF SCIG ICTF $0.5B
POLA Expansion $1B2
53
POLB Mid-Harbor Project $0.75B
ALL PROJECTS LINKED TO FUTURE
45
ALL PROJECTS LINKED TO FUTURECONTAINER TRAFFIC CAPACITY
8
The GRID SuperDock will reduce truck trips off of the freeways
Most profound effects to Logistics results from the same electrified truck performing multiple deliveries due to the rapid turn time involving delivery because average distance of delivery has been reduced by over 80% 80%
Data from 2008 METRANS Project #07-01 “Integrating Inland Ports into the Intermodal Goods Movement System for Ports of Los Angeles and Long Beach”
9
Beyond GRID : Guideway Opportunities
ZERO EMISSIONSTRUCK DELIVERY
ZONES
Freight guideway opportunities using existing rights-of-way (ROW):
R il d id• Railroad corridors• Under utilized freeway ROW• Flood Control Channels
P T i i Li• Power Transmission Lines• Combination of all the above• No demolition of homes or businesses to build 10
An additional freight guideway using pipeline construction
Cost –effective to build with similar costs to that of a Water TransmissionP j t i d t t bli h 21st C t Project in order to establish a 21st Century Green freight guideway when built along the river corridor.
11
GRID Project (Legacy)GRID Project (Legacy)Burial of Power Transmission Towers
Transferring overhead power lines underground yielding thousands of acres of So. California prime real estate for smarter
land usage12
Imagine beyond…g y
13
Beyond GRID / SuperDocky
14
Questions/CommentsQuestions/Comments
David Alba, Project Designer [email protected] or info4grid @[email protected] or info4grid @gmail.com
15
TC-GRID-12c-2011-12-23-SuperDockPPT-byJerardWright-FasanaPresentation.pptx www.transitcoalition.org