The German National Project ICONAV

Chart 1 ICNS Conference > The German National Project ICONAV > 23.04.2013

M. Schnell1, U. Epple1, D. Shutin1, N. Schneckenburger1, Thomas Bögl2

1)German Aerospace Center (DLR) 2)Rohde & Schwarz GmbH & Co. KG

Page 2: The German National Project ICONAV - LDACS · The German National Project ICONAV Chart 1 ICNS Conference > The German National Project ICONAV > 23.04.2013 ... Schmidl-Cox Synchronization

What is ICONAV?

Chart 2 ICNS Conference > The German National Project ICONAV > 23.04.2013

ICONAV = Integrated COmmunication and NAVigation functionality for sustainable L-band use

Basis: LDACS1 Additional features HW implementation

Navigation interface Interface implementation DLR project LDACS-NAV

Page 3: The German National Project ICONAV - LDACS · The German National Project ICONAV Chart 1 ICNS Conference > The German National Project ICONAV > 23.04.2013 ... Schmidl-Cox Synchronization

Outline

LDACS1 System Overview LDACS1 Extension Towards Navigation (LDACS-NAV) The ICONAV Project Conclusions and Future Work

Chart 3 ICNS Conference > The German National Project ICONAV > 23.04.2013

Page 4: The German National Project ICONAV - LDACS · The German National Project ICONAV Chart 1 ICNS Conference > The German National Project ICONAV > 23.04.2013 ... Schmidl-Cox Synchronization

LDACS1 System Overview Main System Characteristics

- L-band Digital Aeronautical Communication System, Type 1 - One of two proposals for the future A/G communications link

- LDACS1 is a broadband system based on OFDM (4G technology) - LDACS2 is a narrowband, single-carrier system (2G technology)

- Possibility for inlay system between DME channels - Centralized communication via ground station - Cellular deployment concept - Duplex scheme is FDD - Multiple-access schemes

- Forward link: pure OFDM - Reverse link: OFDMA combined with TDMA

- LDACS1 supports data and voice communication

GS

Chart 4 ICNS Conference > The German National Project ICONAV > 23.04.2013

Page 5: The German National Project ICONAV - LDACS · The German National Project ICONAV Chart 1 ICNS Conference > The German National Project ICONAV > 23.04.2013 ... Schmidl-Cox Synchronization

LDACS1 System Overview Inlay Concept

- Preferred deployment scenario – LDACS1 as inlay system for L-band

- OFDM as used within LDACS1 is well-suited for inlay approach

- 500 kHz per LDACS1 FL/RL channel - Minimize interference to and mitigate

interference from other systems - Compatibility testing with DLR lab demonstrator

- First tests @ DFS labs are very promising - Additional tests @ DFS labs during SESAR P15.2.4

- European wide cell planning considering DME interference onto LDACS1 - Cells can cover twice the expected 2020 traffic - Only half of available channels required - Lowest data rate considered (robustness)

DMEL-DACS1

DMEL-DACS1

Chart 6 ICNS Conference > The German National Project ICONAV > 23.04.2013

Huge potential for future growth

Page 6: The German National Project ICONAV - LDACS · The German National Project ICONAV Chart 1 ICNS Conference > The German National Project ICONAV > 23.04.2013 ... Schmidl-Cox Synchronization

LDACS1 System Overview LDACS1 Potentials

- LDACS1 enables high-capacity aeronautical communications - Min. net data rate (FL+RL=overall): 291+270 = 561 kbit/s - Max. net data rate (FL+RL=overall): 1.32+1.27 = 2.59 Mbit/s - Well suited to serve modern ATM application and future needs

- Comparison with LDACS2 (overall): 115 kbit/s (70 kbit/s)

- LDACS1 foresees quality-of-service - Fast access to resources, both forward and reverse link - Low delays for application - Different priorities for different applications

- Highly flexible solution with “Long-term Evolution” capability of LDACS1 - Like LTE, extension towards higher performance - Scalability of physical layer design (OFDM)

- Integration of navigation functionality into LDACS1

Chart 7 ICNS Conference > The German National Project ICONAV > 23.04.2013

Page 7: The German National Project ICONAV - LDACS · The German National Project ICONAV Chart 1 ICNS Conference > The German National Project ICONAV > 23.04.2013 ... Schmidl-Cox Synchronization

Extension Towards Navigation Basic Concept

- The LDACS1 communication system is a cellular network

- Ground stations (GS) are separated in frequency

- GS are synchronized to each other

GS1

GS4

GS3

GS2

Continuously transmitting LDACS1 ground stations

act as pseudolites

GNSS Back-up (APNT)

Chart 8 ICNS Conference > The German National Project ICONAV > 23.04.2013

DLR Project LDACS-NAV

Page 8: The German National Project ICONAV - LDACS · The German National Project ICONAV Chart 1 ICNS Conference > The German National Project ICONAV > 23.04.2013 ... Schmidl-Cox Synchronization

0 5 10 15 20 25

100

101

102

103

104

Carrier to Noise Ratio [dB]

Mea

n R

ange

Erro

r [m

]

Schmidl-Cox SynchronizationFreq. Domain: Synchronization SymbolsTime Domain: Synchronization SymbolsCRLB: Synchronization Symbols

Extension Towards Navigation Performance Bounds on Ranging With LDACS1

~4.1 m

~4.1 m

~230 m

Chart 9 ICNS Conference > The German National Project ICONAV > 23.04.2013

Page 9: The German National Project ICONAV - LDACS · The German National Project ICONAV Chart 1 ICNS Conference > The German National Project ICONAV > 23.04.2013 ... Schmidl-Cox Synchronization

Extension Towards Navigation Flight Measurement Campaign

Distance, km

from/to B C D

A 60 50 30

B 30 28

C 43

02000400060008000

1000012000

0 20 40 60 80 100Flight Time [min]

Ele

vatio

n [m

]

<960MHz 962MHz 965MHz 975MHz

LD

AC

S C

LD

AC

S B

LD

AC

S D

LD

AC

S A

f

Power

Chart 10 ICNS Conference > The German National Project ICONAV > 23.04.2013

Page 10: The German National Project ICONAV - LDACS · The German National Project ICONAV Chart 1 ICNS Conference > The German National Project ICONAV > 23.04.2013 ... Schmidl-Cox Synchronization

Extension Towards Navigation Ranging Results for Station A

Estimated Range Flight Segment

210870 210900 210930 210960

14

16

18

20

22

24

GPS seconds

Ran

ge, k

m

Estimated rangeFiltered estimateInterpolated GPS rangeGPS range measurement

Chart 11 ICNS Conference > The German National Project ICONAV > 23.04.2013

Page 11: The German National Project ICONAV - LDACS · The German National Project ICONAV Chart 1 ICNS Conference > The German National Project ICONAV > 23.04.2013 ... Schmidl-Cox Synchronization

Extension Towards Navigation Ranging Results for Station A – Zoom-in

Estimated Range (Zoom-in)

210896,7 210897,7 210898,7 210899,7

15950

16000

16050

16100

16150

16200

16250

16300

16350

16400

GPS seconds

Ran

ge, m

eter

s

Estimated rangeFiltered estimateInterpolated GPS rangeGPS range measurement

Chart 12 ICNS Conference > The German National Project ICONAV > 23.04.2013

Page 12: The German National Project ICONAV - LDACS · The German National Project ICONAV Chart 1 ICNS Conference > The German National Project ICONAV > 23.04.2013 ... Schmidl-Cox Synchronization

Extension Towards Navigation Ranging Results for Station A – Error Distribution

Filtered OFDM ranges Snapshot length: 80s Traveled distance: 9 km Ranging performance:

σ = 10 m µ = 4.1 m

-40 -30 -20 -10 0 10 20 30 400

1000

2000

3000

4000

5000

6000

Range error, meters

Cou

nts

99,3%

Chart 13 ICNS Conference > The German National Project ICONAV > 23.04.2013

Page 13: The German National Project ICONAV - LDACS · The German National Project ICONAV Chart 1 ICNS Conference > The German National Project ICONAV > 23.04.2013 ... Schmidl-Cox Synchronization

The ICONAV Project Project Facts

Chart 14 ICNS Conference > The German National Project ICONAV > 23.04.2013

- German national project co-funded by Ministry of Economy

- Time frame: Jan 2012 – March 2015

- Project Partners - Rohde & Schwarz (project lead, HW implementation, frontend design) - Rohde & Schwarz SIT (R&S subsidiary, security branch) - German Aerospace Center (DLR, knowledge transfer) - University Passau (Institute of IT-Security and Security Law) - iAd GmbH (SME, HW implementation) - BPS GmbH (SME, RF frontend design)

- Strong relation to DLR internal project LDACS-NAV

Page 14: The German National Project ICONAV - LDACS · The German National Project ICONAV Chart 1 ICNS Conference > The German National Project ICONAV > 23.04.2013 ... Schmidl-Cox Synchronization

The ICONAV Project Project Goals

Chart 15 ICNS Conference > The German National Project ICONAV > 23.04.2013

- Transfer LDACS1 knowledge (research, specification) into industry

- Optimize existing LDACS1 specification with respect to performance and industry requirements

- Supplement LDACS1 with additional features, e.g. data security

- Adjust LDACS1 specification to enable integration of navigation services (interface to navigation functionality)

- Develop and implement an industrial LDACS1 HW demonstrator

Page 15: The German National Project ICONAV - LDACS · The German National Project ICONAV Chart 1 ICNS Conference > The German National Project ICONAV > 23.04.2013 ... Schmidl-Cox Synchronization

The ICONAV Project Hardware Implementation

Chart 16 ICNS Conference > The German National Project ICONAV > 23.04.2013

- Reuse existing R&S Waveform Development Environment (WFDE) - WFDE – Digital Unit:

FPGA based baseband processing - WFDE – Transceiver Unit:

New development for L-band

- Transceiver unit - details: - Full duplex transceiver - Forward link 960-1009 MHz - Reverse link 1048-1164 MHz - Transmit power 500 W (peak) - Optimization for protection against interference, robust receiver - Optimization for protection of other systems, low-noise transmitter

Page 16: The German National Project ICONAV - LDACS · The German National Project ICONAV Chart 1 ICNS Conference > The German National Project ICONAV > 23.04.2013 ... Schmidl-Cox Synchronization

The ICONAV Project Hardware Implementation – WFDE Digital Unit

Chart 17 ICNS Conference > The German National Project ICONAV > 23.04.2013

Page 17: The German National Project ICONAV - LDACS · The German National Project ICONAV Chart 1 ICNS Conference > The German National Project ICONAV > 23.04.2013 ... Schmidl-Cox Synchronization

The ICONAV Project Current Status ICONAV and LDACS-NAV

Chart 18 ICNS Conference > The German National Project ICONAV > 23.04.2013

ICONAV Project - Knowledge transfer almost finalized - Optimize specification almost finalized - Data security concept ongoing - Interface to navigation functionality ongoing - Demonstrator development ongoing LDACS-NAV Project - Prepare flight measurements finalized - Perform measurement campaign finalized - Evaluation of results ongoing - Develop integrity concept ongoing

Page 18: The German National Project ICONAV - LDACS · The German National Project ICONAV Chart 1 ICNS Conference > The German National Project ICONAV > 23.04.2013 ... Schmidl-Cox Synchronization

Conclusions

- Combining communications with a navigation functionality in LDACS1 enables sustainable use of aeronautical L-band spectrum

- LDACS1 is well-suited to serve modern ATM application and future needs

- The German national project ICONAV is a big step towards industrialization of LDACS1 for combined Com/Nav functionality

- First results of the flight measurement campaign within the LDACS-NAV project are very promising

- Intensive exchange of results between the two projects

Chart 19 ICNS Conference > The German National Project ICONAV > 23.04.2013

Page 19: The German National Project ICONAV - LDACS · The German National Project ICONAV Chart 1 ICNS Conference > The German National Project ICONAV > 23.04.2013 ... Schmidl-Cox Synchronization

Thank You !