The Grengine™Smart Switch

Connie Stacey,

President,

Growing Greener Innovations

www.grengine.com

Page 2: The Grengine™ Smart Switch€¦ · M Smart Switch Mid-Peak Time, 7 - 11 am & 5-7 pm Use Stored Energy High-peak Time am - 5 pm 23.4C/kWh High-peak Time 11 am Use Stored Energy Cost

Renewable Energy Challenges

MORE POWER!!!

Variable generation.

Grid transformers load.

Energy interruptions / energy security.

High costs and time of days fees.

The problem worsens with electric cars and advanced manufacturing.

Page 3: The Grengine™ Smart Switch€¦ · M Smart Switch Mid-Peak Time, 7 - 11 am & 5-7 pm Use Stored Energy High-peak Time am - 5 pm 23.4C/kWh High-peak Time 11 am Use Stored Energy Cost

Modular Energy Storage System

The three keys:

PLUG N’ PLAY SCALABLE PORTABLE

Low cost

IFC Average Installed Cost $2100/kWh

Grengine average installed cost $400/kWh

*US Patent Granted*

Page 4: The Grengine™ Smart Switch€¦ · M Smart Switch Mid-Peak Time, 7 - 11 am & 5-7 pm Use Stored Energy High-peak Time am - 5 pm 23.4C/kWh High-peak Time 11 am Use Stored Energy Cost

Demand-Side Load Management

Intelligent Automatic Transfer Switching Paired with Modular Energy Storage

Decentralized Energy Storage

Time of Use Management

Peak Shaving

Voltage Optimization

Uninterrupted Power Supply

Page 5: The Grengine™ Smart Switch€¦ · M Smart Switch Mid-Peak Time, 7 - 11 am & 5-7 pm Use Stored Energy High-peak Time am - 5 pm 23.4C/kWh High-peak Time 11 am Use Stored Energy Cost

How It Works: Energy Flow

Page 6: The Grengine™ Smart Switch€¦ · M Smart Switch Mid-Peak Time, 7 - 11 am & 5-7 pm Use Stored Energy High-peak Time am - 5 pm 23.4C/kWh High-peak Time 11 am Use Stored Energy Cost

Cost Incentive: Time of Use

Page 7: The Grengine™ Smart Switch€¦ · M Smart Switch Mid-Peak Time, 7 - 11 am & 5-7 pm Use Stored Energy High-peak Time am - 5 pm 23.4C/kWh High-peak Time 11 am Use Stored Energy Cost

Cost Incentive: Peak Shaving

Page 8: The Grengine™ Smart Switch€¦ · M Smart Switch Mid-Peak Time, 7 - 11 am & 5-7 pm Use Stored Energy High-peak Time am - 5 pm 23.4C/kWh High-peak Time 11 am Use Stored Energy Cost

A Unique Solution

A behind the fence solution!

15-30-minute install by ANY electrician.

Little, or no, paperwork or regulations.

Modular. Start small and grow as needed.

*PATENTED*Modular Energy Storage

US20180006470A1