The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User: 1100/yr (~1000 from outside) Member of Helmholtz Community The GSI UNILAC Upgrade Program for FAIR Requirements

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

Embed Size (px)

Citation preview

Page 1: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

Staff: 1,100 (~ 50% permanent)Accelerators: UNILAC; SIS; ESRUser: 1100/yr (~1000 from outside)

Member of Helmholtz Community

The GSI UNILAC Upgrade Program for FAIR Requirements

Page 2: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

Unilac

SIS18

ESR

Present accelerators

UNILAC: Universal Linear Accelerator, 12.5 MeV/u

SIS: Heavy Ion Synchrotron, 1-2 GeV/u

ESR: Experimental Storage Ring

Accelerated Ions: p to U

Page 3: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

Primary beams

1012/s; 1.5-2 GeV/u; 238U28+

1011/s 238U73+

100-1000 fold intensities4x1013/s 30 GeV Protons

Sekundary beams

wide range of radioactive beamsup to 1.5 - 2 GeV/u; intensity gain of factor 10 000 Antiprotons 3 - 30 GeV

•Cooled beams•Fast ramped super conducting magnets

Key technologiesStorage and cooler rings

Radioactive beams

e – A(RIB) Collider

1011 stored and cooled 3 - 15 GeV pbars

SIS100/SIS300

HESR

NESRCR

SIS18

FAIR Beam Data

UNILAC

SFRS

p-linac

ESR

Page 4: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

FAIR beam intensity and beam quality requirements

SIS space charge limit is reached by four 100 µs injections with each fifteen Multiturns. Uranium reference beam intensities:

Page 5: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

High Current Injector Alvarez Single Gap Resonators

The UNILAC

11.4 MeV/u

1.4 MeV/u

Page 6: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

Example of three beam pulse-to-pulse operation

Page 7: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

Transverse emittance growth along the UNILAC

Page 8: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

Space charge forces along the UNILAC

Calculated by PARMILA and PARMTRA codes

Page 9: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

MUCIS & MEVVA- Ion Sources

MUCIS(Multi Cusp Ion Source)

(Emission Current Density 150 mA/cm²)

MEVVA(MEtal Vacuum Vapor Arc Ion Source)

(Emission Current Density 150 mA/cm²)

Page 10: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

0

2

4

6

8

10

12

14

16

18

20

beam

cu

rren

t [e

mA

]

LE

BT

HS

I

Ga

ss

trip

pe

r

Alv

are

z

Sin

gle

Ga

pR

es

on

ato

rs

Fo

il S

trip

pe

r

SIS

-In

jec

tio

n

Dez 01 Okt 02

Oct-03 Design

U4+ U28+ U73+

1.3 emA3.7 emA

Status of Uranium intensity in 2003

Page 11: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

Unilac measures since 2003

• Improvement of the Mevva high current ion source

•RFQ-Upgrade: exchange of RFQ minivanes, modified IRM

• Increased stripper gas density

•Matching to the Alvarez DTL under space charge conditions

• Increase of Alvarez DTL transverse phase advance

•High current beam diagnostics, measurement of long. emittance

•Machine investigations: frontend, Alvarez matching, transfer line long. and transv. emittance measurements

•New charge state separator in the transfer channel to SIS18 for U73+

Page 12: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

RFQ-Upgrade: Modified Input Radial Matcher

30.000 mm X 15.000 mrad

30.000 Deg X 100.00 keV

10.000 mm X 100.000 mrad

30.000 Deg X 100.00 keV NP1= 1 NP2= 9 80.00 mm (Horiz) 30.0 Deg (Long.)

80.00 mm (Vert) Length= 2722.65mm

1

2 Q

3

4 Q

5

6 Q

7

8 Q

9

H A=-0.45000 B= 1.6300 V A= -2.2300 B= 5.6400

Z A= 1.00000E-04 B= 1.00000E+06

BEAM AT NEL1= 1 H A= 1.0500 B= 0.11301 V A= 1.0501 B= 0.11301

Z A= 3.09881E-04 B= 1.00000E+06

BEAM AT NEL2= 9 I= 0.0mA W= 0.1300 0.1300 MeV

FREQ= 36.16MHz WL=8290.73mm EMITI= 145.000 145.000 0.00 EMITO= 145.000 145.000 0.00

N1= 1 N2= 9 PRINTOUT VALUES PP PE VALUEMATCHING TYPE = 8

DESIRED VALUES (BEAMF) alpha beta x 1.0500 0.1130 y 1.0500 0.1130 MATCH VARIABLES (NC=4) MPP MPE VALUE 1 2 -2.62989 1 4 5.29843 1 6 -7.57860 1 8 9.22129

CODE: TRACE3D v61L FILE: Quadruplet_uran.t3d DATE: 06/18/2004 TIME: 12:57:09

30.000 mm X 15.000 mrad

30.000 Deg X 100.00 keV

10.000 mm X 100.000 mrad

30.000 Deg X 100.00 keV NP1= 1 NP2= 9 80.00 mm (Horiz) 30.0 Deg (Long.)

80.00 mm (Vert) Length= 2722.65mm

1

2 Q

3

4 Q

5

6 Q

7

8 Q

9

H A=-0.45000 B= 1.6300 V A= -2.2300 B= 5.6400

Z A= 1.00000E-04 B= 1.00000E+06

BEAM AT NEL1= 1 H A= 0.75310 B= 5.26217E-02 V A= 0.72360 B= 5.50181E-02

Z A= 3.09881E-04 B= 1.00000E+06

BEAM AT NEL2= 9 I= 0.0mA W= 0.1300 0.1300 MeV

FREQ= 36.16MHz WL=8290.73mm EMITI= 145.000 145.000 0.00 EMITO= 145.000 145.000 0.00

N1= 1 N2= 9 PRINTOUT VALUES PP PE VALUEMATCHING TYPE = 8

DESIRED VALUES (BEAMF) alpha beta x 0.9000 0.0538 y 0.9000 0.0538 MATCH VARIABLES (NC=4) MPP MPE VALUE 1 2 0.00000 1 4 3.17745 1 6 -7.69094 1 8 11.28580

CODE: TRACE3D v61L FILE: Quadruplet_uran.t3d DATE: 06/18/2004 TIME: 12:51:12

Matching 1999

Matching 2004

Page 13: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

LEBT emittance measurements with U4+ beam of 8 emA

horizontal vertical

1999

2004

Emittance Growth: -19 % (3 %)

Transmission: 70 % (84 %)

beforeQuadrupole

Quartet

2006: Mevva ion source: 37 emA of U4+ and 18 emA of U3+ beam

Page 14: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

RFQ-upgrade: new RFQ-rods in 2004

After 5 years of operation

New RFQ-rods

After copper- plating

February 2003

Inp

ut

rf-P

ow

er [

kW

]

December2001

Commissioning 1999

rf-voltage [V]

Two reasons: improved input matching (Stepan Yaramishev)

high power consumption , dark currents

Page 15: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

HSI RFQ commissioning (7/2004)

I = 16 emA, (Ar1+)

10

20

30

40

50

60

3,0 4,0 5,0 6,0 7,0

RFQ-Amplitude [V]

RF

Q-T

ran

smis

sio

n [

%]

April 2004

July 2004

wo

rkin

g p

oin

t

Page 16: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

GSI Nitrogen gas stripper section at 1.4 MeV/u

Page 17: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

Increase of pressure and pumping capacity

• Hugh roots pump and four 1,000 l/s turbo pumps

• 50 % gas density increase

• approx. 1 µg/cm2 gas density

• 4,500 mbar at nozzle

• 50 % enlarged beam aperture

Page 18: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

Charge-Spectrum(after stripping of 238U4+)

0.0

0.2

0.4

0.6

0.8

1.0

B*l [Tm]

Inte

ns

ity

[%

]

28+ 27+26+

25+

24+

29+

30+

31+

32+

33+

Charge state spectrum of an Uranium beam

14 % of particles within charge state 28+

Page 19: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

Alvarez-Matching

Periodicity FDDF, interrupted by the intertank sections

Emittance Measurementbefore DTL, 3.5emA U28+

Betafunction (before Matching)

Betafunction (afterMatching)

Alvarez DTL-Transmission:92% (before)99%. (after)

Page 20: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

Experimental Set-up for Alvarez DTL matching

• set beam current to 7.1 mA of 40Ar10+ (equiv. to FAIR design of 15 mA of 238U28+)

• measure hor., ver. emittance and long. rms-bunch length at DTL entrance

• set DTL transverse phase advance to values from 35° to 90°

• tune depression varied from 21% (90°) to 43% (35°)

• measure transmission, hor., and ver. rms-emittance at DTL exit

rms-bunch length measurement

Page 21: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

Transverse emittance growth in Alvarez DTL

40Ar10+ beam, 7.1 emA, equivalent to 15 emA U28+ beam

Page 22: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

• The achieved ratio current / rms-emittance at DTL exit is too low for FAIR

• Design: 15.5 mA / 0.25 µm; Achieved: 4.4 mA / 0.43 µm

• One measure of improvement → reduction of emittance growth along DTL

• Exp. and simulation: possible by increasing DTL quad strengths

0,3

0,4

0,5

0,6

0,7

30 40 50 60 70 80 90

Transverse Phase Advance (zero current) [deg]

No

rm. t

ran

sv

. rm

s-E

mit

tan

ce

[m

m*m

rad

]

7.1 mA 40Ar10+ ≙ 15.5 mA 238U27+

meas. transv. emittance @ DTL exit

todays PS current limit

New Power Supplies for the Alvarez dc-Magnets

Page 23: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

Present Uranium beam intensity

0

2

4

6

8

10

12

14

16

18

20

beam

cu

rren

t [e

mA

]

LE

BT

HS

I

Ga

ss

trip

pe

r

Alv

are

z

Sin

gle

Ga

p

Re

so

na

tors

Fo

il S

trip

pe

r

SIS

-In

jec

tio

n

Dez 01 Okt 02

Oct-03 June_07

Design

U4+ U28+ U73+

2.7 emA

5.7 emA

Page 24: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

Normalized emittances along the UNILAC

0.0

0.5

1.0

1.5

2.0

2.5

3.0

LEBT HSI Gasstripper Alvarez Single GapResonators

Foil Stripper

90

%-t

ot.

em

itta

nc

e [

mm

*mra

d]

Horizontal Vertikal

U4+

U28+

U73+

horizontal SIS-Acceptance

vertical SIS-acceptance

Page 25: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

Front-end upgrade (2009-2011)

• Test bench for the investigation of high current ion sources and

acceleration gap.

Optimization of extraction and gap geometry for highest beam

brilliance.

•New RFQ minivane design for enlarged acceptance and higher beam

brilliance.

•Dedicated high intensity beam LEBT (Compact LEBT) to transport

37 emA of U4+ beam into the RFQ.

Page 26: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

Old and new design of RFQ minivanes

New DesignExisting

Design

Voltage, kV 155.0 125.0

Average radius, cm 0.6 0.52-0.77

Electrode width, cm 0.84 0.9-1.08

Maximum field, kV/cm 312.0 318.5

Modulation 1.012-1.93 1.012-2.09

Synch. Phase, degree -90 to -28 -90 to -34

Aperture, cm 0.41 0.38

Min. transverse phase advance, rad

0.56 0.45

Norm. transverse acceptance, cm mrad 0.086 0.73

Output energy, MeV/u 0.120

Electrode length, mm 9208.4

Designed by

Andrej Kolomiets

Page 27: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

Advantages of new RFQ minivanes

• Higher transverse acceptance and phase advance

• New input radial matcher design improved beam matching

• Improved beam dynamics for gentle buncher, optimized for rapid and uniform separatrix filling

• Resonant frequency shift with increased average radius and reduced electrode thickness can easily be compensated

• Beam dynamics studied with DYNAMION& PARMTEQ-M

• Beam intensity at HSI-RFQ output (18 mA of U4+ ions) meets the FAIR requirement

Page 28: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

Compact LEBT

HSI-LEBT

Pre investigations

- High current test bench measurements

Upgrade I

- Switching magnet with increased aperture

- Quadrupole quartet with increased apertures (proper matching to the RFQ)

Upgrade II (Compact LEBT)

- sc solenoids for straight line

injection of 37 emA of U4+ beam

into the RFQ

Page 29: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

Summary

• An extended upgrade program at the UNILAC resulted in a Uranium beam intensity of up to

5.7 emA (28+) for the injection into the synchrotron SIS18.

• High current UNILAC-upgrade measures: improved ion source performance, increase of

stripper gas density, improved Alvarez-DTL-matching, increased phase advance in the DTL,

compact charge state separator behind the foil stripper.

• The UNILAC-upgrade will be continued with a new front end comprising a compact LEBT,

a new RFQ minivane design, and beam diagnostics devices, sufficient for the operation with

megawatt heavy ion beams (until 2011). Thus the FAIR requirements will be approached.

• BUT: The UNILAC is in operation since 35 years. In long term perspective the substitution

of the Alvarez DTL by more efficient high current heavy ion accelerators for low frequent

beam pulses for FAIR injection is necessary.

• AND: The UNILAC experimental program should be decoupled from the FAIR injection

linac by a new independent sc cw-linac up to 7.5 MeV/u.

Page 30: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

Longterm plans for Alvarez DTL substitution

SIS 100

Page 31: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

New cw linac up to 7.5 MeV/u

1.4 MeV/u 7.3 MeV/u

Page 32: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

Prototyp of a sc CH-cavity

CH-prototype cavity, 19 cells,

IAP University of Frankfurt

1.4 MeV/u 7.3 MeV/u

Page 33: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

New charge state separator behind foil stripper

Beam Energy 11.4 MeV/u

Page 34: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

Beam dynamics

Page 35: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

Foil stripping modes

high current beamno stripping

low current beam

quadrupole

foil deposit

Page 36: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

Commissioning with Uranium beam

horizontal vertical

Uranium charge states

71 - 75+

Page 37: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

Carbon foils 200 – 600 µg/cm2

Page 38: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

Fish eye view of the charge state separator

Page 39: The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009 Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:

The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, 12.6.2009

co-workers

Winfried Barth

Gianluigi Clemente

Peter Gerhard

Lars Groening

Michael Kaiser

Michael Maier

Sascha Mickat

Anna Orzhekhovskaya

Bernhard Schlitt

Hartmut Vormann

Stepan Yaramishev

Ludwig Dahl

LINAC group of the GSI accelerator division: