24
The Idaho The Idaho Department of Department of Environmental Environmental Quality Quality Mark Mason, P.E., Engineering Manager Mark Mason, P.E., Engineering Manager Idaho DEQ - Boise Regional Office Idaho DEQ - Boise Regional Office 1445 North Orchard 1445 North Orchard Boise, ID 83706 Boise, ID 83706 208-373-0266 tel 208-373-0266 tel 208-373-0287 fax 208-373-0287 fax [email protected] [email protected]

The Idaho Department of Environmental Quality Mark Mason, P.E., Engineering Manager Idaho DEQ - Boise Regional Office 1445 North Orchard Boise, ID 83706

Embed Size (px)

Citation preview

The Idaho Department The Idaho Department of Environmental Qualityof Environmental Quality

Mark Mason, P.E., Engineering ManagerMark Mason, P.E., Engineering ManagerIdaho DEQ - Boise Regional OfficeIdaho DEQ - Boise Regional Office

1445 North Orchard1445 North OrchardBoise, ID 83706Boise, ID 83706208-373-0266 tel208-373-0266 tel208-373-0287 fax208-373-0287 fax

[email protected]@deq.idaho.gov

Infrastructure RequirementsInfrastructure Requirements

• Drinking Water – Source, treatment, distribution

• Wastewater – Collection, treatment, disposal

• Septic Systems – Individual, Community, Large Soil Absorption Systems

General Requirements - ProcessGeneral Requirements - Process

• Rules and Guidance: Take the time to read it all first!– http://adm.idaho.gov/adminrules/rules/

idapa58/58index.htm - link to all DEQ rules on Dept. of Admin. website

– http://www.deq.state.id.us/water/assist_business/engineers/checklists.cfm - submittal checklists

General Requirements - ProcessGeneral Requirements - Process

• Rules and Guidance - continued– http://www.deq.idaho.gov/water/prog_issues/

drinking_water/overview.cfm - Drinking Water Program overview

– http://www.deq.idaho.gov/water/prog_issues/waste_water/overview.cfm - Wastewater Program overview

General Requirements - ProcessGeneral Requirements - Process

1. Facilities Planning Study – required DEQ review and approval.

2. Preliminary Engineering Report - required DEQ review and approval.

3. Engineering Design Plans and Specifications - required DEQ review and approval.

4. Record Documents – required submittal

General Requirements - ProcessGeneral Requirements - Process

• Lifting Sanitary Restrictions– All mechanical portions of drinking water and

wastewater systems must be constructed and operational prior to lifting sanitary restrictions.

– Water and sewer piping must have designs approved by DEQ prior to lifting sanitary restrictions.

General Requirements - ProcessGeneral Requirements - Process

• Other Requirements also can apply – read the rules and then call for assistance– Permits – Septic (HD), Reuse (DEQ), NPDES

(EPA)– Water Quality Impact Analyses (NP)– Well site approvals, water quality testing,…– Technical, Financial and Managerial

documentation– Operation and Maintenance Manuals

Drinking Water Sources / Drinking Water Sources / TreatmentTreatment

• Surface Water: – DEQ Drinking Water Rules– Surface Water Treatment Rule– Slow Sand Filters– Rapid Sand Filters– Pressure Filters– Disinfection and disinfection by-product rule

Drinking Water Sources / Drinking Water Sources / TreatmentTreatment

• Wells: – DEQ Drinking Water rules– Groundwater under the direct influence of

surface water (GWUDI)– Arsenic, Nitrate, Uranium…– Disinfection and disinfection by-product rule

Drinking Water Sources / Drinking Water Sources / TreatmentTreatment

• Springs:– DEQ Drinking Water Rules– Groundwater under the direct influence of

surface water (GWUDI)– Potential to seal and use Spring Box– Arsenic, Nitrate, Uranium…– Disinfection and disinfection by-product rule

Drinking Water DistributionDrinking Water Distribution

• DEQ Drinking Water Rules– Fire flows?– Redundancy (largest source out of service,

standby power,…)– Lead, copper rule

Wastewater CollectionWastewater Collection

• DEQ Wastewater Rules– New systems– Simple extensions of gravity sewers– Lift stations

Wastewater TreatmentWastewater Treatment

• Lagoons– Primary and secondary treatment

• Mechanical (secondary) treatment– Activated sludge– Trickling filters– Sequencing Batch Reactors (SBRs)

Wastewater TreatmentWastewater Treatment

• Tertiary treatment– Filtration

• MBRs = membrane bioreactors• Other filtration technologies (sand, cloth)

– Disinfection• Chlorine• Ultra-violet light

Wastewater DisposalWastewater Disposal

• Discharge to Surface Water – NPDES permit required from EPA; 401 certification required from DEQ

• Total Containment Lagoons: not applicable everywhere

• Land Application / Reuse: DEQ permit required

ReuseReuse

• Highly treated effluent (Reclaimed Water)

• http://adm.idaho.gov/adminrules/rules/idapa58/0117.pdf - link to “Reuse Rules”– Class A: groundwater recharge; residential

landscape irrigation (zero buffer distances); toilet flushing; dust control;

– Class B: rapid infiltration basins; landscape irrigation (parks, schools, golf courses…) with buffer distances; toilet flushing; dust control;

Septic SystemsSeptic Systems

• Individual Systems

• Central Systems

• Large Soil Absorption Systems

Individual Septic SystemsIndividual Septic Systems

• Health Department jurisdiction

Central Septic SystemsCentral Septic Systems

• Sizing: >2500 gpd; waste from two dwellings or building under separate ownership

• Health Department jurisdiction

• DEQ assistance

Large Soil Absorption Systems Large Soil Absorption Systems (LSAS)(LSAS)

• Sizing: > 2500 gpd in 2500 gpd modules (can be one building)

• Health Department jurisdiction

• DEQ engineering assistance

Solid WasteSolid Waste

• Rules – http://adm.idaho.gov/adminrules/rules/

idapa58/58index.htm - link to all DEQ rules on Dept. of Admin. website

– http://adm.idaho.gov/adminrules/rules/idapa58/0106.pdf - Solid Waste Management Rules

– 40 CFR part 258 – minimum requirement– If Ground Water contamination is detected, go

to full Subtitle D requirements

Solid WasteSolid Waste

• Municipal Solid Waste – Small Exempt Landfills (exempt from design

and GW monitoring)• < 20 tons per day• < 25 inches precip per year• Other

– Site Certification– “Arid” design (allowed in Idaho)

• < 25 inches precip per year• Other requirements

Solid WasteSolid Waste

– Liner requirements– Leachate collection requirements– Cover requirements – soil or subtitle D– Operational reporting requirements – HD– Ground Water reporting - DEQ

Questions??Questions??