The IDB and Green Infrastructure in Latin America and the Caribbean Raul Munoz Castillo Sr. Water Specialist, INE/WSA Division August, 2018

The IDB and Green Infrastructure in Latin America and the Caribbean · 2018. 8. 28. · Volcán Cotopaxi . 15,000 14,000 13,000 12,000 11,000 10,000 9,000 8,000 Grafico Oferta - 201S

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: The IDB and Green Infrastructure in Latin America and the Caribbean · 2018. 8. 28. · Volcán Cotopaxi . 15,000 14,000 13,000 12,000 11,000 10,000 9,000 8,000 Grafico Oferta - 201S

The IDB and Green Infrastructure in Latin America and the Caribbean

Raul Munoz Castillo

Sr. Water Specialist, INE/WSA Division

August, 2018

Page 3: The IDB and Green Infrastructure in Latin America and the Caribbean · 2018. 8. 28. · Volcán Cotopaxi . 15,000 14,000 13,000 12,000 11,000 10,000 9,000 8,000 Grafico Oferta - 201S

Foto de El Alto

Page 4: The IDB and Green Infrastructure in Latin America and the Caribbean · 2018. 8. 28. · Volcán Cotopaxi . 15,000 14,000 13,000 12,000 11,000 10,000 9,000 8,000 Grafico Oferta - 201S
Page 5: The IDB and Green Infrastructure in Latin America and the Caribbean · 2018. 8. 28. · Volcán Cotopaxi . 15,000 14,000 13,000 12,000 11,000 10,000 9,000 8,000 Grafico Oferta - 201S

Our contribution to LAC: Science and policy gaps

•Building data and information •Modeling and decision support tools (i.e. HydroBID + RIOS)•Green solutions “engineering”•Financing and enabling mechanisms and incentives (Water Funds)•Piloting projects and experiences

Page 6: The IDB and Green Infrastructure in Latin America and the Caribbean · 2018. 8. 28. · Volcán Cotopaxi . 15,000 14,000 13,000 12,000 11,000 10,000 9,000 8,000 Grafico Oferta - 201S

QUITO: Water supply vulnerability

Page 7: The IDB and Green Infrastructure in Latin America and the Caribbean · 2018. 8. 28. · Volcán Cotopaxi . 15,000 14,000 13,000 12,000 11,000 10,000 9,000 8,000 Grafico Oferta - 201S

EMAAP-Q Master plan (Hazen and Sawyer 2011)

Observations:

• The Supply situation is already stressed with supplies in periods lower than the projected demand

• Groundwater extraction increased in near future.

• Demand reducing measures suggested.

Page 8: The IDB and Green Infrastructure in Latin America and the Caribbean · 2018. 8. 28. · Volcán Cotopaxi . 15,000 14,000 13,000 12,000 11,000 10,000 9,000 8,000 Grafico Oferta - 201S

Development Plan Adapted to Climate change

Page 9: The IDB and Green Infrastructure in Latin America and the Caribbean · 2018. 8. 28. · Volcán Cotopaxi . 15,000 14,000 13,000 12,000 11,000 10,000 9,000 8,000 Grafico Oferta - 201S

Hydro-BID: Regional Dataset for WRM

Page 10: The IDB and Green Infrastructure in Latin America and the Caribbean · 2018. 8. 28. · Volcán Cotopaxi . 15,000 14,000 13,000 12,000 11,000 10,000 9,000 8,000 Grafico Oferta - 201S

Casos de Estudio

Análisis

Page 11: The IDB and Green Infrastructure in Latin America and the Caribbean · 2018. 8. 28. · Volcán Cotopaxi . 15,000 14,000 13,000 12,000 11,000 10,000 9,000 8,000 Grafico Oferta - 201S

Remote Sensing: Operational Support and Infra

Page 12: The IDB and Green Infrastructure in Latin America and the Caribbean · 2018. 8. 28. · Volcán Cotopaxi . 15,000 14,000 13,000 12,000 11,000 10,000 9,000 8,000 Grafico Oferta - 201S

Remote sensing for water quality management

Page 13: The IDB and Green Infrastructure in Latin America and the Caribbean · 2018. 8. 28. · Volcán Cotopaxi . 15,000 14,000 13,000 12,000 11,000 10,000 9,000 8,000 Grafico Oferta - 201S
Page 14: The IDB and Green Infrastructure in Latin America and the Caribbean · 2018. 8. 28. · Volcán Cotopaxi . 15,000 14,000 13,000 12,000 11,000 10,000 9,000 8,000 Grafico Oferta - 201S

RESULTS: Change in Ecosystem Dynamics

Page 15: The IDB and Green Infrastructure in Latin America and the Caribbean · 2018. 8. 28. · Volcán Cotopaxi . 15,000 14,000 13,000 12,000 11,000 10,000 9,000 8,000 Grafico Oferta - 201S

Thank you!

[email protected]