Researched byErik CaldwellBryan Fisher
Advised byChris Caplice
Sponsored byC. H. Robinson Worldwide, Inc. 21 May 2008
The Impact of Tender Lead Timeon Truckload Transportation Rates
• Introduction
• Data Profile
• Transportation Cost Model
• Management Insights
Agenda
Caldwell and Fisher 21 May 2008 2
Does the amount of time between when a load is tendered and when it must be picked up by the carrier affect the overall cost?
Research Question
Caldwell and Fisher 21 May 2008 3
Caldwell and Fisher 21 May 2008 4
0.00
1.00
2.00
3.00
4.00
5.00
6.00Av
erag
e Lea
d Tim
e (D
ays)
Average Lead Time by Customer
Caldwell and Fisher 21 May 2008 5
Median 2.8 DaysMean 3.4 Days
Caldwell and Fisher 21 May 2008 6
$1.35
$1.40
$1.45
$1.50
$1.55
$1.60
$1.65
$1.70
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Aver
age R
ate
($/m
ile)
Lead Time (Days)
Average Rate by Lead Time
1313
0202OthersOthers
Industry Comparison
Caldwell and Fisher 21 May 2008 7
Critical Baseball Factors
Caldwell and Fisher 21 May 2008 8
Sold OutSold Out Home TeamHome Team Away TeamAway Team SignificanceSignificance
YESYES
NoNo
Critical Transportation Factors
Caldwell and Fisher 21 May 2008 9
OriginOriginDestinationDestination Lead TimeLead Time
Less Than
One Day
Less Than
One Day
Greater Than Ten
Days
Greater Than Ten
Days
VolumeVolume
Ship Weekly
Ship Weekly
Ship Monthly
Ship Monthly
CarrierCarrier
Large National Carrier
Large National Carrier
Example Routing Guide
Caldwell and Fisher 21 May 2008 10
Sequence Carrier Name Carrier Size Cost1 Carrier A Medium $9002 Carrier B Extra Large $9503 Carrier C Medium $1,2004 Carrier D Extra Large $1,2255 Carrier E Small $1,500
Lane: Memphis - Boston
• Shippers typically send the tender in sequence to the carriers in the routing guide.
• The first carrier rejects the tender 22% of the time and the shipper is forced to resort to more expensive carriers.
Impact of Lead Time
Caldwell and Fisher 21 May 2008 11
0.85
0.90
0.95
1.00
1.05
1.10
1.15
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Cost
per
Mile
Inde
x (Ac
tual
CPM
/Lan
eAvg
CPM
)
Lead Time (days)
Cost per Mile Index by Lead Time
90th Percentile75th Percentile50th Percentile25th Percentile10th Percentile
Modeling Transportation Costs
Caldwell and Fisher 21 May 2008 12
Contribution of Model Variables
Caldwell and Fisher 21 May 2008 13
Variable % ContributionMiles 64.68%Destination 12.45%Constant 12.23%Origin 9.71%Lead Time 0.20%Tender Day of Week 0.20%Pickup Day of Week 0.20%Carrier Size 0.18%Frequency 0.16%Total 100.00%
• The controllable variables accounted for 0.94% of the predicted cost of loads.
< 1%
Impact of Model Scenarios
Caldwell and Fisher 21 May 2008 14
Best Bonus Worst PenaltyCorridor Volume Daily -$ Annually 61.51$ Carrier Small/Medium -$ Extra Large 77.91$ Tender Day Wednesday (2.07)$ Saturday 49.23$ Pick Up Day Friday (1.54)$ Saturday 22.98$ Lead Time 12 Days or More (47.10)$ Less than 18 Hours 24.26$ Total (50.71)$ 235.89$
• These two extremes combined to make a $287 difference on a load that costs an average of $1019.
• Lead time differences between the best and worst customers accounted for an average of $42 per load – or 4.2% of the customer’s annual transportation spend.
Lead Time Effect in Transportation
Caldwell and Fisher 21 May 2008 15
Variable Criteria Impact P Value0 to 8 hours 24.26$ 0.0099 to 16 hours 17.48$ 0.00717 to 59 hours Base Case3 to 5 days (15.34)$ 0.0006 to 8 days (24.51)$ 0.0009 to 11 days (38.68)$ 0.00012 or more days (47.10)$ 0.000
0.905
Transportation Model
Lead Time
Adjusted R2 Goodness of Fit
Caldwell and Fisher 21 May 2008 16
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.00
0.50
1.00
1.50
2.00
2.50
3.00
2007
-120
07-3
2007
-520
07-7
2007
-920
07-1
120
07-1
320
07-1
520
07-1
720
07-1
920
07-2
120
07-2
320
07-2
520
07-2
720
07-2
920
07-3
120
07-3
320
07-3
520
07-3
720
07-3
920
07-4
120
07-4
320
07-4
520
07-4
720
07-4
920
07-5
1
Aver
age
Sequ
ence
Dep
th
Mor
gan
Stan
ley
Frei
ght I
ndex
Carrier Availability Impact on Sequence
Index (Left Axis) Average Sequence (4 Week Moving Average)
1.7
1.6
1.5
1.4
1.3
1.2
1.1
202007 Data
January June December
Impact of Carrier Availability
Management Insights
Caldwell and Fisher 21 May 2008 17
Mitigating Lead Time Impact
Caldwell and Fisher 21 May 2008 18
• Forecasting Transportation Requirements- Average Corridor Volume is 350 loads a year or 1.5 loads per work day. - High volume lanes substantially higher than the average with less deviation.
• Reducing Time between Tenders-Time between first and second tender averaged 10 hours.- Substantial loss of time due to end of work day after first tender sent.
Strategic Fleet Management
Caldwell and Fisher 21 May 2008 19
• Strategic Approach to Exception Management- Private Fleet - Spot Market
• Carrier Tender Acceptance Performance Review
0.85
0.90
0.95
1.00
1.05
1.10
1.15
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Cost
per
Mile
Inde
x (Ac
tual
CPM
/Lan
eAvg
CPM
)
Lead Time (days)
Cost per Mile Index by Lead Time
90th Percentile75th Percentile50th Percentile25th Percentile10th Percentile
Conclusion
Caldwell and Fisher 21 May 2008 20
• What do you call someone who comes into a company and quickly saves 4.1% of transportation spend by simply modifying a business policy with little risk and no capital investment?
Where I worked we would call that person a Hero.
Researched byErik CaldwellBryan Fisher
Advised byChris Caplice
Sponsored byC. H. Robinson Worldwide, Inc. 21 May 2008
The Impact of Tender Lead Timeon Truckload Transportation Rates