19
The INTERLINK Approach - Using open standards for road asset information management 16 May 2017 Bart Luiten, Aonghus O'Keeffe 1 THE INTERLINK APPROACH - USING OPEN STANDARDS FOR ROAD ASSET INFORMATION MANAGEMENT CitA - Dubliln, 16th May 2018 | Bart Luiten, Aonghus O'Keeffe PRESENTATION OVERVIEW 1. Welcome, introduction 2. Understanding the industry’s needs 3. Technical Solution: the INTERLINK Approach 4. Discussion 5. Testing the approach in three test cases 6. Vision and take away points 7. Q&A 16 May 2017 2 | The INTERLINK Approach - Using open standards for road asset information management

THE INTERLINK APPROACH - USING OPEN STANDARDS FOR … › static › media › CitA_Dublin_2018... · 2018-11-20 · The INTERLINK Approach - Using open standards for road asset information

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: THE INTERLINK APPROACH - USING OPEN STANDARDS FOR … › static › media › CitA_Dublin_2018... · 2018-11-20 · The INTERLINK Approach - Using open standards for road asset information

The INTERLINK Approach - Using open standards for road asset information management

16 May 2017

Bart Luiten, Aonghus O'Keeffe 1

THE INTERLINK APPROACH - USING

OPEN STANDARDS FOR ROAD ASSET

INFORMATION MANAGEMENTCitA - Dubliln, 16th May 2018 | Bart Luiten, Aonghus O'Keeffe

PRESENTATION OVERVIEW

1. Welcome, introduction

2. Understanding the industry’s needs

3. Technical Solution: the INTERLINK Approach

4. Discussion

5. Testing the approach in three test cases

6. Vision and take away points

7. Q&A

16 May 20172 | The INTERLINK Approach - Using open standards for road asset information management

Page 2: THE INTERLINK APPROACH - USING OPEN STANDARDS FOR … › static › media › CitA_Dublin_2018... · 2018-11-20 · The INTERLINK Approach - Using open standards for road asset information

The INTERLINK Approach - Using open standards for road asset information management

16 May 2017

Bart Luiten, Aonghus O'Keeffe 2

1. CEDR-INTERLINK PROJECT

CEDR – Conference of European Directors of Roads

Objective: develop and apply way to define, link, manage infra asset info

Focus on Roads

Using W3C Linked Data approach

Allign with parallel standardisation initiatives

Share best practice between NRAs

September 2016 – Autumn 2018

Deliverable: European Road Object Type Library (OTL)

To be tested in three test cases: Nordic countries, Germany, Netherlands

www.roadotl.eu

16 May 20173 | The INTERLINK Approach - Using open standards for road asset information management

TNO – ROD – RHDHV – AEC3 – Trimble – Semmtech – ii – p&b4.0

OVERVIEW CURRENT STATE

16 May 20174 | The INTERLINK Approach - Using open standards for road asset information management

WPAIM Requirements

WPC Principles EU

Road OTL

WPD1 Basic EU Road OTL

WPD2 PoC IM Tools

go /

no

-go

WPE Project Coordination

WPF Dissemination and Implementation

WPD3 IM Test Cases

WPB IM Solutions

Sept 16 Sept 17 May Sept 18

Today

Today

Today

Page 3: THE INTERLINK APPROACH - USING OPEN STANDARDS FOR … › static › media › CitA_Dublin_2018... · 2018-11-20 · The INTERLINK Approach - Using open standards for road asset information

The INTERLINK Approach - Using open standards for road asset information management

16 May 2017

Bart Luiten, Aonghus O'Keeffe 3

System strategy

prepared or revised

NR

A C

apit

al

Pro

ject

s

Prioritise funding

The Typical As-Is Condition for the Business Processes involving Information Flow through the Life-Cycle of Road Infrastructure Assets

(assuming higher BIM-maturity countries, outsourced maintenance operations with fixed-term contracts, design-and-build construction contracts, and all assets owned by the NRA)

NR

A

NR

A M

ain

ten

ance

Prepare feasibility

study

Wo

rks

Co

ntr

acto

r

NR

A’s

Sp

ecia

list

Co

nsu

ltan

ts /

Su

pp

liers

Need identified for capital

works

Prepare options report and select preferred option

Prepare preliminary

design

Complete statutory

processes (planning, etc.)

Prepare contracts &

procure contractor

Monitor and approve design,

construction and commissioning

Receive as-built records

Identify contract

opportunity

Asset information

received

Assets inspected

and surveyed

Asset information verified and

supplemented

Asset information reformatted to meet information

requirements

New assets handed over

Asset management database(s)

NRA’s project database(s)

Selected asset information

Closeout and final account

Prepare tender

design and bid price

Manage detailed design

Construct and

commission scheme

Collate as-built records

Handover, closeout and final account

Contractor’s project

database(s)

Commence services

Prepare contributions to

NRA’s activities at each stage

Funding approval

Apply for funding approval at each

stage

Business case and funding application

Stage gate intermediate

process Outsource selected activities

End services

NRA consultants’ and suppliers’

databases

NRA requirements Consultant

deliverables

Quality, contractual and commercial

documentation (bi-directional)

As-built records, health &

safety file

Inspection and maintenance strategy prepared or revised

Asset information requirements

Asset accepted for addition to inventory

Final information requirements (based on updated

department best practice)

Maintenance type?

Apply for routine or emergency

funding, or advise capital works

Expenditure review

feedback loop

Funding approval

Funding application or capital

works advice

Determine most economic

management system for asset type

NR

A N

etw

ork

O

per

atio

ns

Monitor traffic using physical

systems

Thir

d P

arti

es (

loca

l an

d r

egio

nal

au

tho

riti

es, u

tilit

y co

mp

anie

s, e

tc.)

Commence engagement

Advise requirements at each stage and approve interfaces

with assets

Engage with third-parties

End engagement

Authorities’ databases

NRA proposals

Third-party requirements and approvals

Resulting network

effectiveness

Intelligent transport control centre with decision making system and database

Manage traffic using

communications systems

Pavement and bridge management systems

Other asset types

Predictive

Reactive

Closeout and final account

Prepare fixed-term contracts

& procure contractors

Monitor and approve

maintenance

Receive as-maintained

records

Updated asset information with inspection and maintenance records

Mai

nte

nan

ce

Co

ntr

acto

r

Identify contract

opportunity

Prepare bid price

Review existing asset information, resurvey assets, and supplement if necessary

Maintain assets

Collate as-maintained

records

Handover, closeout and final account

Contractor’s project

database(s)

Network operations strategy prepared or revised

Tender requirements and tender

submissions

Organisation information

requirements

Initial information requirements (based on department best practice)

Apply for operations

funding or advise capital works

Initial information requirements (based on department best practice)

Final information requirements

(based on updated

department best practice)

Predominantly a document based-system with silo databases and inconsistent information requirements

2. UNDERSTANDING THE INDUSTRY’S NEEDS

16 May 20175 | The INTERLINK Approach - Using open standards for road asset information management

Preliminary Needs Statements

Literature review

Interviews

Surveys

Analysis

Final Needs Statements

16 May 20176 | The INTERLINK Approach - Using open standards for road asset information management

AS-IS: NETWORK OPERATIONS

Page 4: THE INTERLINK APPROACH - USING OPEN STANDARDS FOR … › static › media › CitA_Dublin_2018... · 2018-11-20 · The INTERLINK Approach - Using open standards for road asset information

The INTERLINK Approach - Using open standards for road asset information management

16 May 2017

Bart Luiten, Aonghus O'Keeffe 4

16 May 20177 | The INTERLINK Approach - Using open standards for road asset information management

AS-IS: INVESTMENT DECISION MAKING

16 May 20178 | The INTERLINK Approach - Using open standards for road asset information management

AS-IS: CAPITAL WORKS PROJECTS

Page 5: THE INTERLINK APPROACH - USING OPEN STANDARDS FOR … › static › media › CitA_Dublin_2018... · 2018-11-20 · The INTERLINK Approach - Using open standards for road asset information

The INTERLINK Approach - Using open standards for road asset information management

16 May 2017

Bart Luiten, Aonghus O'Keeffe 5

16 May 20179 | The INTERLINK Approach - Using open standards for road asset information management

AS-IS: HANDOVER

16 May 201710 | The INTERLINK Approach - Using open standards for road asset information management

AS-IS: ASSET MANAGEMENT

Images from Statens Vegvesen

Page 6: THE INTERLINK APPROACH - USING OPEN STANDARDS FOR … › static › media › CitA_Dublin_2018... · 2018-11-20 · The INTERLINK Approach - Using open standards for road asset information

The INTERLINK Approach - Using open standards for road asset information management

16 May 2017

Bart Luiten, Aonghus O'Keeffe 6

INDUSTRY’S NEEDS AND NEXT STEPS

Needs statements, e.g.

Publish information requirements

Gather information through life cycle using best available format

Open standards

Access info through GIS or BIM

Information management functionality based on use cases

Recommendations to NRAs

Linked data & standardisation – active contribution, sharing, open

Capital works and maintenance contracts – validate, certify, scale

Project and asset managers – start small – top five

Learn from each other – UK, DE, NL, NO, SE, FI

Recommendations to Supply chain

Software companies – extension to LD/SW

Engage with INTERLINK consortium 16 May 201711 | The INTERLINK Approach - Using open standards for road asset information management

3. TECHNICAL SOLUTION

The basis of Linked data

The value of linked data

The European Road OTL

The INTERLINK approach

Practical example

16 May 201712 | The INTERLINK Approach - Using open standards for road asset information management

Page 7: THE INTERLINK APPROACH - USING OPEN STANDARDS FOR … › static › media › CitA_Dublin_2018... · 2018-11-20 · The INTERLINK Approach - Using open standards for road asset information

The INTERLINK Approach - Using open standards for road asset information management

16 May 2017

Bart Luiten, Aonghus O'Keeffe 7

WHAT IS LINKED DATA?

16 May 201713 | The INTERLINK Approach - Using open standards for road asset information management

subject objectpredicate

Gantry#123 (123.3,-6.2)Has_location

Gantry 2D_Coordinates

type type

Infra asset

subClassOf

Location

subClassOf

url

url

url

url

url

url

Linked

data

Semantic

Web

FROM ONE STAR TO FIVE STAR LINKED OPEN DATA: THE HYBRID APPROACH

16 May 201714 | The INTERLINK Approach - Using open standards for road asset information management

Page 8: THE INTERLINK APPROACH - USING OPEN STANDARDS FOR … › static › media › CitA_Dublin_2018... · 2018-11-20 · The INTERLINK Approach - Using open standards for road asset information

The INTERLINK Approach - Using open standards for road asset information management

16 May 2017

Bart Luiten, Aonghus O'Keeffe 8

WHY LINKED DATA / SEMANTIC WEB?

(Open) Data: data common denominator in life-cycle and over supply-chain;

data liberated from applications

Linked: data from multiple sources connected

Web: based on common W3C technology

Semantic: adding meaning to data to make it computer interpretable

16 May 201715 | The INTERLINK Approach - Using open standards for road asset information management

LD / SW is a powerful (the only?) technology that can help to meet

the business needs

CEDR-INTERLINK video on the European Road OTL

https://youtu.be/gczSTEyif5Y16 May 201716 | The INTERLINK Approach - Using open standards for road asset information management

Page 9: THE INTERLINK APPROACH - USING OPEN STANDARDS FOR … › static › media › CitA_Dublin_2018... · 2018-11-20 · The INTERLINK Approach - Using open standards for road asset information

The INTERLINK Approach - Using open standards for road asset information management

16 May 2017

Bart Luiten, Aonghus O'Keeffe 9

EUROPEAN ROAD OTL (EUROTL)

Framework of harmonised and linked existing OTLs on European level for

Road Asset Management Data

The EUROTL is a set of recommendations for National Road Authorities

Tested in three test cases: Nordic, Germany, Netherlands

After the project, road authorities can:

Gradually evolve from document- to data-driven, in a hybrid solution

Make data sets uniform using Modelling & Linking Guide

Reuse OTLs from the EUROTL and connect to national OTLs

16 May 201717 | The INTERLINK Approach - Using open standards for road asset information management

EUROPEAN ROAD OTL FRAMEWORK

16 May 2017

Meta Data

Modelling & Linking Guide

Traffic

Location Time

(Transport)

NetworkInspection

Asset

Lifecycle…Maintenance

Quantity/Unit

NL classification DE classification18 | The INTERLINK Approach - Using open standards for road asset information management

Road

Network

NO classification SE classification

Page 10: THE INTERLINK APPROACH - USING OPEN STANDARDS FOR … › static › media › CitA_Dublin_2018... · 2018-11-20 · The INTERLINK Approach - Using open standards for road asset information

The INTERLINK Approach - Using open standards for road asset information management

16 May 2017

Bart Luiten, Aonghus O'Keeffe 10

16 May 201719 | The INTERLINK Approach - Using open standards for road asset information management

Links to existing

international

OTLs

Links to existing

national OTLs

LINKING EUROPEAN ROAD OTL TO OTHER STANDARDS

roadNode:1234_5678

roadNode:1234_8765

roadLink:1234_3928

TN:endNode

roadNetwork:1234_4920

TN:startNode

TN:inNetwork

belysning:1234_3019

rdf:type

60.385298,10.567319

eurotl:hasLocation

rdf:type

5

rdfs:label

nvdb:junctionNumber

rdfs:subPropertyOf

eurotl:Asset

nvdbOTL:belysning

rdfs:subClassOf

eurotl:hasProperties

Specification.pdf eurotl:functional

Perspectiverdf:type

E4, Jaren, Norway(from Nordic Test Case)

Asset data instantiation

INSPIRE transport network ontology

Norwegian Road Database OTL

EUROTL

W3C ontologies

belysning = lighting

Example query:List all lighting columns on the E4 between Junctions 4 and 5(in SPARQL)

SPIN rules

20 | The INTERLINK Approach - Using open standards for road asset information management 16 May 2017

Page 11: THE INTERLINK APPROACH - USING OPEN STANDARDS FOR … › static › media › CitA_Dublin_2018... · 2018-11-20 · The INTERLINK Approach - Using open standards for road asset information

The INTERLINK Approach - Using open standards for road asset information management

16 May 2017

Bart Luiten, Aonghus O'Keeffe 11

USE OF THE EUROTL

1. Use M&LG to (re)model internal OTLs

2. Re-use OTL(s) that are part of EUROTL

3. Share national OTLs for reuse by others

4. Define best practice

5. Harmonise

6. Standardise: prescribe the use of a part of the EUROTL

16 May 201721 | The INTERLINK Approach - Using open standards for road asset information management

National

European

4. DISCUSSION

In small groups, please, discuss the following:

If you were advising the government or a public body with a large stock of

infrastructure assets, what recommendation would you provide for

improving their asset information management?

16 May 201722 | The INTERLINK Approach - Using open standards for road asset information management

Page 12: THE INTERLINK APPROACH - USING OPEN STANDARDS FOR … › static › media › CitA_Dublin_2018... · 2018-11-20 · The INTERLINK Approach - Using open standards for road asset information

The INTERLINK Approach - Using open standards for road asset information management

16 May 2017

Bart Luiten, Aonghus O'Keeffe 12

LESSONS FROM THE NETHERLANDS

Based on experiences with Rijkswaterstaat, Dutch national road authority

AIM started in 2011, since 2014 applied in major road reconstruction project

Now for all new projects, starting with large maintenance contracts

Some achievements have been brought into international standardisation

Lessons

Synchronous developments in departments

Strive for sharing data

Use linked data power

Align with supply chain partners and other authorities

Slice your OTL up in manageable domain OTLs

16 May 201723 | The INTERLINK Approach - Using open standards for road asset information management

5. THREE TEST CASES

NRA use cases and data

Nordic (Sweden & Norway) – Trimble, Triona

Germany – AEC3, interactive instruments, planen bauen 4.0

The Netherlands – RHDHV, TNO, Semmtech

Use case-based definition of EUROTL requirements (bottom-up)

Demonstrate that business needs can be met with INTERLINK Approach

Use existing commercially-available software

Help NRAs and industry to understand implementation

16 May 201724 | The INTERLINK Approach - Using open standards for road asset information management

Page 13: THE INTERLINK APPROACH - USING OPEN STANDARDS FOR … › static › media › CitA_Dublin_2018... · 2018-11-20 · The INTERLINK Approach - Using open standards for road asset information

The INTERLINK Approach - Using open standards for road asset information management

16 May 2017

Bart Luiten, Aonghus O'Keeffe 13

NORDIC CASE – ROAD LIGHTING IN JAREN

16 May 201725 | The INTERLINK Approach - Using open standards for road asset information management

NORDIC CASE – ROAD LIGHTING IN JAREN

16 May 201726 | The INTERLINK Approach - Using open standards for road asset information management

Based on NVDB and NRA

Asset ID, functional and

technical requirements

Equipment ID, fulfilment of

requirements

Automated validation of data

against AIR

Mimic future RDF-based

NVDB asset data

Lighting object type

Design stage instance data

Construction stage instance data

Handover process

NVDB instance data

Page 14: THE INTERLINK APPROACH - USING OPEN STANDARDS FOR … › static › media › CitA_Dublin_2018... · 2018-11-20 · The INTERLINK Approach - Using open standards for road asset information

The INTERLINK Approach - Using open standards for road asset information management

16 May 2017

Bart Luiten, Aonghus O'Keeffe 14

NORDIC CASE – ROAD LIGHTING IN JAREN

16 May 201727 | The INTERLINK Approach - Using open standards for road asset information management

Gather life-cycle data with asset object, easing future access

Record design and construction history (e.g. approval)

Structured and unstructured => hybrid, gradual transition

Extended existing BIM software to query triple store and read Linked Data

GERMAN CASE – BRIDGE IN HAMBURG

16 May 201728 | The INTERLINK Approach - Using open standards for road asset information management

Three perspectives

Traditional approach

BIM pilot study (BIM4INFRA2020)

INTERLINK Approach

Pilot

Detailed EIR

Open standards

IFC

OKSTRA

Page 15: THE INTERLINK APPROACH - USING OPEN STANDARDS FOR … › static › media › CitA_Dublin_2018... · 2018-11-20 · The INTERLINK Approach - Using open standards for road asset information

The INTERLINK Approach - Using open standards for road asset information management

16 May 2017

Bart Luiten, Aonghus O'Keeffe 15

GERMAN CASE – BRIDGE IN HAMBURG

16 May 201729 | The INTERLINK Approach - Using open standards for road asset information management

Detailed model

Buildings objects (IFC Bridge not yet standardised)

RDF not efficient for 3D

Tool from buildingSmart

German road classification system used for asset

information management

Model in Revit

Export to IFC (67 MB)

Filter to IFC without 3D (64 KB)

Convert to IFC RDF

Link with ASB-ING

Widerlager (ASB-Ing)

GERMAN CASE – BRIDGE IN HAMBURG

16 May 201730 | The INTERLINK Approach - Using open standards for road asset information management

Improve ease of information handover to existing databases

Link inspection records to bridge objects (e.g. condition rating)

Query objects by ASB-ING class in triple store

Visualise in IFC viewer (Desite)

Page 16: THE INTERLINK APPROACH - USING OPEN STANDARDS FOR … › static › media › CitA_Dublin_2018... · 2018-11-20 · The INTERLINK Approach - Using open standards for road asset information

The INTERLINK Approach - Using open standards for road asset information management

16 May 2017

Bart Luiten, Aonghus O'Keeffe 16

DUTCH CASE – REPAIR AND INSPECTION IN SOUTH HOLLAND

16 May 201731 | The INTERLINK Approach - Using open standards for road asset information management

Maintenance contractor

Barrier inspection

Info. delivery manual

3 month delay from inspection to

NRA system update

Affects validity of KPIs

Duplicate asset information

DUTCH CASE – REPAIR AND INSPECTION IN SOUTH HOLLAND

16 May 201732 | The INTERLINK Approach - Using open standards for road asset information management

Page 17: THE INTERLINK APPROACH - USING OPEN STANDARDS FOR … › static › media › CitA_Dublin_2018... · 2018-11-20 · The INTERLINK Approach - Using open standards for road asset information

The INTERLINK Approach - Using open standards for road asset information management

16 May 2017

Bart Luiten, Aonghus O'Keeffe 17

DUTCH CASE – REPAIR AND INSPECTION IN SOUTH HOLLAND

16 May 201733 | The INTERLINK Approach - Using open standards for road asset information management

Load from NRA system with condition data

Relationship through network model

Mobile plugin to ArcGIS Online

Real-time condition update

Permissions based, suitability = ‘for information’

Contractual data handover = ‘for approval’

Linking data from multiple domains to derive asset

management value

Identify assets

Book road space

Inspect, record, update system

Submit FYI and formal approval

Overlay with accident records

6. VISION FOR ASSET INFORMATION MANAGEMENT

Data should be liberated and shared

Big-mama, Mother-of-all-Models doesn‘t exist: Combine existing (open)

standards in separate modules, with network model as a core

The actual ICT landscape is hybrid and will be so for a long time

Linked Data is the glue

Develop your OTLs from the bottom up and reuse where possible

16 May 201734 | The INTERLINK Approach - Using open standards for road asset information management

Page 18: THE INTERLINK APPROACH - USING OPEN STANDARDS FOR … › static › media › CitA_Dublin_2018... · 2018-11-20 · The INTERLINK Approach - Using open standards for road asset information

The INTERLINK Approach - Using open standards for road asset information management

16 May 2017

Bart Luiten, Aonghus O'Keeffe 18

ROADMAP FOR YOUR ORGANISATION

Choose strategically for data-orientation using (open) data standards

Accept multiple formats / levels of information and use linked data as glue

Select your modelling (& linking) guide, pref. harmonised with business

partners, KISS

Define your modular OTL framework , pref. harmonised with business

partners

Select, develop, implement your separate OTLs; starting small, reusing

where possible

Implement in object-based systems, visualise data

16 May 201735 | The INTERLINK Approach - Using open standards for road asset information management

SUGGESTIONS FOR JOINT EFFORTS

Just-do-it on a small scale, learning by doing

Experiment with Linked Data / Semantic Web

Share knowledge and experiences

Leadership

Shared vision on asset information management

Collaboration between public – industry – academia

National Proof of Concept project, demonstrating added value & feasibility

Share, harmonise, standardise modular OTLs

Stay in touch with European / international developments

CEDR BIM group

Learn from / influence Building Smart, OGC, CEN, ISO, …

INTERLINK partners16 May 201736 | The INTERLINK Approach - Using open standards for road asset information management

Page 19: THE INTERLINK APPROACH - USING OPEN STANDARDS FOR … › static › media › CitA_Dublin_2018... · 2018-11-20 · The INTERLINK Approach - Using open standards for road asset information

The INTERLINK Approach - Using open standards for road asset information management

16 May 2017

Bart Luiten, Aonghus O'Keeffe 19

THANK YOU FOR YOUR ATTENTION

Take a look:WWW.ROADOTL.EU