The Northern Road upgradeBetween Mersey Road, Bringelly and Glenmore Parkway, Glenmore ParkProject updateRoads and Maritime Services | August 2019
The Australian and NSW governments are upgrading The Northern Road as a part of the $4.1 billion Western Sydney Infrastructure Plan to improve safety, increase road capacity and reduce travel times and congestion in the future. The Northern Road upgrade between Mersey Road and Glenmore Parkway covers about 16 kilometres and will provide access to Western Sydney International Airport at Badgerys Creek and the growth areas of South West and Western Sydney.
The project is being constructed in three stages. The project was fully approved in June 2018 and Roads and Maritime Services has now awarded major construction contracts for all three stages.
Major earthwork progressing on The Northern Road
MERSEY ROAD
EXISTING THE NORTHERN ROAD
EXISTING THE NORTHERN ROAD
PAR
K R
OA
D
VICAR
PAR
K L
AN
E CAMPBELL STREET
WILLOWDENE AVENUE
DW
Y
ER ROAD
VINEYARD ROAD
GA
TES RO
AD
GATES LINK R
OAD
BR
AD
LEY
STRE
ET
GLE
NM
OR
E PA
RK
WA
Y
NEW THE NORTHERN ROAD
THE NORTHERN ROAD
GROVER CRESCENT
EATON RO
AD
Western Sydney International Airport
Luddenham town centre
LON
GV
IEW
R
OA
D
LITTLEFIE
LDS
RO
AD
EX
ISTING
ELIZ
AB
ETH
DR
IVE
AD
AM
S RO
AD REA
LIGN
ED
ELIZABETH
DRIV
E
EATO
N
RO
AD
KIN
GS H
ILL R
OA
D
CH
AIN
-O-PO
ND
SR
OA
D
GLENMORE PARK
LUDDENHAM
BRINGELLY
BUS LANE
BUS LANE
BUSLANE
BUSLANE
BUSES EXCEPTED
BUSESEXCEPTED
BUSES EXCEPTED
BUSESEXCEPTED
BUS LANE
BUSLANE
BUSESEXCEPTED
BUSES EXCEPTED
BUSESEXCEPTED
BUSES EXCEPTED
BUS LANE
BUSLANE
Connects to the upgrade of The Northern Road between Glenmore Parkway, Glenmore Park and Jamison Road, South Penrith currently under construction
Connects to the upgrade of The Northern Road between Peter Brock Drive, Oran Park and Mersey Road, Bringelly currently under construction
At grade connection with the planned M12 Motorway. 300 metre wide corridor will be reduced to 100–150 metres during the during the EIS process
Future incident response facility
Access road
Left-in, left-out only
No access to The Northern Road
WaterNSW supply pipeline
Left-in, left-out onlyLeft-in, left-out onlyHeavy vehicle inspection bay
Left-in, left-out only
Left-in only
New road connection
Access to Defence Establishment Orchard Hills with tra�c lights and u-turn facility
KeyExisting The Northern Road
New The Northern Road:– Mersey Road to Eaton Road– Eaton Road to Littlefields Road– Littlefields Road to Glenmore Parkway
Bus priority
Shared path for cyclists and pedestrians on the western side of The Northern Road*
Median for future widening
Western Sydney International Airport site
*A footpath will be added to the eastern side of The Northern Road to safely connect passengers from tra�c light intersections to the nearest bus stops.
EXISTING THE NORTHERN ROAD
DWYER ROAD
EATO
N R
OA
DEA
TON
RO
AD
Left-in, left-out only
BUS LANE
BUSLANE
BUSES EXCEPTED
BUSESEXCEPTED
BUSESEXCEPTED
BUSES EXCEPTED
BUS LANE
BUSLANE
AD
AM
S RO
AD
THE NORTHERN ROADNEW
BUS LANE
BUSLANE
BUSES EXCEPTED
BUSESEXCEPTED
BUS LANE
BUSLANE
BUSESEXCEPTED
BUSES EXCEPTED
REALIG
NED
ELIZAB
ETH D
RIV
E EX
ISTI
NG
ELI
ZA
BE
TH D
RIV
E
EXISTING THE NORTHERN ROAD LITT
LEFI
ELD
S R
OA
D
GA
TES RO
AD
GATES LINK ROAD
KIN
GS H
ILL RO
AD
VINEYARD ROAD
LON
GV
IEW
RO
AD
GROVER CRESCENT
CH
AIN
-O-P
ON
DS
RO
AD
BR
AD
LEY
STR
EE
T
Southern service entry to the Western Sydney International Airport, with traffic lights and a u-turn bay
Western entry to Western Sydney International Airport with traffic lights
Access to the existing The Northern Road and Luddenham town centre with traffic lights
New four-way traffic light intersection providing access to Luddenham town centre
New four-way traffic light intersection at Elizabeth Drive, providing access to Luddenham town centre via the existing The Northern Road Littlefields Road intersection with traffic lights and roundabout for u-turns Kings Hill Road intersection with traffic lights and
roundabout for u-turns
Chain-O-Ponds Road intersection with new traffic lights and u-turn facility
Bradley Street intersection, upgraded traffic lights with u-turn bay
The Northern Road – Bringelly to Glenmore Park
Mersey Road to Eaton Road Eaton Road to Littlefields Road Littlefields Road to Glenmore Parkway
Mersey Road, Bringelly to Eaton Road, LuddenhamExpected completion 2021(the section of road required for the construction of the Western Sydney International Airport will be complete by April 2020)
Roads and Maritime awarded the major construction contract to a joint venture between Georgiou Pty Ltd and Ertech Pty Ltd in July 2018. Construction started on site in November 2018.
Progress so far includes:
• archaeological investigations
• installing concrete barriers along the roadway to create a safe work space behind the barriers
• setting up the main site compound on Eaton Road
• building two temporary roundabouts on The Northern Road at Bringelly and Luddenham to provide safe entry into construction compounds
• major earthwork to level the ground for the future road around the new airport site
• building new stormwater drainage.
Key features
• Constructing around 5.7 kilometres of a new four lane divided road with median, diverting the existing The Northern Road around the site of the Western Sydney International Airport.
• A left in/left out intersection at Dwyer Road.
• New traffic lights and u-turn controlled lights for access to the Leppington Pastoral Company and service entry to the Western Sydney International Airport.
• New traffic lights for the western entry to the Western Sydney International Airport.
• New traffic lights at the t-intersection with The Old Northern Road, north of Eaton Road.
• A left in/left out intersection for Eaton Road (East).
• Bus priority lanes at all traffic lights.
New temporary roundabout on The Northern Road for safe construction access
Construction under way to divert The Northern Road around the Western Sydney International Airport site
Road development in progress
Eaton Road, Luddenham to Littlefields Road, LuddenhamExpected completion 2021
Roads and Maritime awarded CPB Contractors Pty Ltd the contract to construct this section in March 2019.
A modification to the design for this section was proposed in September 2018. The modification was for the replacement of twin bridges over Adams Road with a set of traffic lights. Pedestrian and cyclist crossings were also included at the lights improving safety for road users.
Consultation took place with the community and a modification approval request was lodged with the Department of Planning and Environment in December 2018.
Planning approval for the modification was received in June 2019.
Key features
• Constructing around 2 kilometres of a new four lane divided road with median diverting the existing The Northern Road around Luddenham town centre.
• Upgrade around 2 kilometres of The Northern Road between Elizabeth Drive and Littlefields Road to a four-lane divided road with median.
• Realignment/upgrade of around 1.8 kilometres of Elizabeth Drive.
• Reconstructing around 1 kilometres of Adams Road to tie-in with the new traffic lights.
• New traffic lights at the realigned Elizabeth Drive.
• New traffic lights at the intersection of Adams Road and The Northern Road.
• Bus priority lanes at all traffic lights.
New traffic light intersection at Adams Road and The Northern Road
Geotechnical investigations under way Aboriginal archaeological salvage work under way
Adams Road
The
Nor
ther
n R
oad
Adams Road intersection – 1
Upgrade area
Shared path
Road batter
KEY
Privacy Roads and Maritime Services (“RMS”) is subject to the Privacy and Personal Information Protection Act 1998 (“PPIP Act”) which requires that we comply with the Information Privacy Principles set out in the PPIP Act. All information in correspondence is collected for the sole purpose of delivering this project. The information received, including names and addresses of respondents, may be published in subsequent documents unless a clear indication is given in the correspondence that all or part of that information is not to be published. Otherwise RMS will only disclose your personal information, without your consent, if authorised by the law. Your personal information will be held by RMS at 27 Argyle Street, Parramatta 2150 NSW. You have the right to access and correct the information if you believe that it is incorrect.
August 2019 RMS.19. 1327
If you have any questions or would like more information on The Northern Road upgrade please contact our project team:
1800 703 457
rms.nsw.gov.au/thenorthernroad
The Northern Road upgrade, Roads and Maritime Services, PO Box 973, Parramatta NSW 2124
If you need help understanding this information, please contact the Translating and Interpreting Service on 131 450 and ask them to call us on 1800 703 457.
Littlefields Road, Mulgoa to Glenmore Parkway, Glenmore ParkExpected completion 2022
Roads and Maritime awarded the contract for this section of the upgrade to CPB Contractors Pty Ltd in October 2018 with construction starting on site in February 2019.
Progress so far includes:
• archaeological investigations
• setting up the main site compound at The Northern Road/Littlefields Road with an entrance off The Northern Road
• removing some buildings and vegetation
• fencing private properties near construction areas including the Defence Establishment at Orchard Hills.
Roads and Maritime and Sydney Water Corporation collaborated to relocate and upgrade the water assets in the area in a timely manner so road construction could progress efficiently.
What will happen in the coming months?Construction will progress on all sections of the upgrade and information will be provided to those directly impacted by construction.
Construction hours will generally be between 7am and 6pm, Monday to Friday and 8am and 1pm on Saturdays.
To minimise the impact on road users and keep workers safe, some work will need to take place at night. We will notify residents and businesses in advance of any night work. Access to properties will be maintained.
Key features
• Upgrading around 7 kilometres of The Northern Road to:
– four lane divided road with median between Littlefields Road and Bradley Street
– six lane divided road with median and bus lanes between Bradley Street and south of Glenmore Parkway
• New traffic signals at Littlefields Road with a roundabout and link to Gates Road via new Gates Link Road.
• Left-in only at Gates Road.
• Left-in, left-out only at Longview Road.
• Left-in, left-out only at Grover Crescent.
• New traffic signals at Kings Hill Road.
• New traffic signals at Chain-O-Ponds Road with u-turn facility.
• Access to Defence Establishment Orchard Hills with traffic lights and u-turn facility.
• Upgraded intersection at Bradley Street.
• Bus priority lanes at all traffic lights.