5
The Northern Road upgrade Between Mersey Road, Bringelly and Glenmore Parkway, Glenmore Park Project update Roads and Maritime Services | August 2019 The Australian and NSW governments are upgrading The Northern Road as a part of the $4.1 billion Western Sydney Infrastructure Plan to improve safety, increase road capacity and reduce travel times and congestion in the future. The Northern Road upgrade between Mersey Road and Glenmore Parkway covers about 16 kilometres and will provide access to Western Sydney International Airport at Badgerys Creek and the growth areas of South West and Western Sydney. The project is being constructed in three stages. The project was fully approved in June 2018 and Roads and Maritime Services has now awarded major construction contracts for all three stages. Major earthwork progressing on The Northern Road

The Northern Road upgrade - Roads and Maritime …...• New traffic lights for the western entry to the Western Sydney International Airport. • New traffic lights at the t-intersection

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: The Northern Road upgrade - Roads and Maritime …...• New traffic lights for the western entry to the Western Sydney International Airport. • New traffic lights at the t-intersection

The Northern Road upgradeBetween Mersey Road, Bringelly and Glenmore Parkway, Glenmore ParkProject updateRoads and Maritime Services | August 2019

The Australian and NSW governments are upgrading The Northern Road as a part of the $4.1 billion Western Sydney Infrastructure Plan to improve safety, increase road capacity and reduce travel times and congestion in the future. The Northern Road upgrade between Mersey Road and Glenmore Parkway covers about 16 kilometres and will provide access to Western Sydney International Airport at Badgerys Creek and the growth areas of South West and Western Sydney.

The project is being constructed in three stages. The project was fully approved in June 2018 and Roads and Maritime Services has now awarded major construction contracts for all three stages.

Major earthwork progressing on The Northern Road

Page 2: The Northern Road upgrade - Roads and Maritime …...• New traffic lights for the western entry to the Western Sydney International Airport. • New traffic lights at the t-intersection

MERSEY ROAD

EXISTING THE NORTHERN ROAD

EXISTING THE NORTHERN ROAD

PAR

K R

OA

D

VICAR

PAR

K L

AN

E CAMPBELL STREET

WILLOWDENE AVENUE

DW

Y

ER ROAD

VINEYARD ROAD

GA

TES RO

AD

GATES LINK R

OAD

BR

AD

LEY

STRE

ET

GLE

NM

OR

E PA

RK

WA

Y

NEW THE NORTHERN ROAD

THE NORTHERN ROAD

GROVER CRESCENT

EATON RO

AD

Western Sydney International Airport

Luddenham town centre

LON

GV

IEW

R

OA

D

LITTLEFIE

LDS

RO

AD

EX

ISTING

ELIZ

AB

ETH

DR

IVE

AD

AM

S RO

AD REA

LIGN

ED

ELIZABETH

DRIV

E

EATO

N

RO

AD

KIN

GS H

ILL R

OA

D

CH

AIN

-O-PO

ND

SR

OA

D

GLENMORE PARK

LUDDENHAM

BRINGELLY

BUS LANE

BUS LANE

BUSLANE

BUSLANE

BUSES EXCEPTED

BUSESEXCEPTED

BUSES EXCEPTED

BUSESEXCEPTED

BUS LANE

BUSLANE

BUSESEXCEPTED

BUSES EXCEPTED

BUSESEXCEPTED

BUSES EXCEPTED

BUS LANE

BUSLANE

Connects to the upgrade of The Northern Road between Glenmore Parkway, Glenmore Park and Jamison Road, South Penrith currently under construction

Connects to the upgrade of The Northern Road between Peter Brock Drive, Oran Park and Mersey Road, Bringelly currently under construction

At grade connection with the planned M12 Motorway. 300 metre wide corridor will be reduced to 100–150 metres during the during the EIS process

Future incident response facility

Access road

Left-in, left-out only

No access to The Northern Road

WaterNSW supply pipeline

Left-in, left-out onlyLeft-in, left-out onlyHeavy vehicle inspection bay

Left-in, left-out only

Left-in only

New road connection

Access to Defence Establishment Orchard Hills with tra�c lights and u-turn facility

KeyExisting The Northern Road

New The Northern Road:– Mersey Road to Eaton Road– Eaton Road to Littlefields Road– Littlefields Road to Glenmore Parkway

Bus priority

Shared path for cyclists and pedestrians on the western side of The Northern Road*

Median for future widening

Western Sydney International Airport site

*A footpath will be added to the eastern side of The Northern Road to safely connect passengers from tra�c light intersections to the nearest bus stops.

EXISTING THE NORTHERN ROAD

DWYER ROAD

EATO

N R

OA

DEA

TON

RO

AD

Left-in, left-out only

BUS LANE

BUSLANE

BUSES EXCEPTED

BUSESEXCEPTED

BUSESEXCEPTED

BUSES EXCEPTED

BUS LANE

BUSLANE

AD

AM

S RO

AD

THE NORTHERN ROADNEW

BUS LANE

BUSLANE

BUSES EXCEPTED

BUSESEXCEPTED

BUS LANE

BUSLANE

BUSESEXCEPTED

BUSES EXCEPTED

REALIG

NED

ELIZAB

ETH D

RIV

E EX

ISTI

NG

ELI

ZA

BE

TH D

RIV

E

EXISTING THE NORTHERN ROAD LITT

LEFI

ELD

S R

OA

D

GA

TES RO

AD

GATES LINK ROAD

KIN

GS H

ILL RO

AD

VINEYARD ROAD

LON

GV

IEW

RO

AD

GROVER CRESCENT

CH

AIN

-O-P

ON

DS

RO

AD

BR

AD

LEY

STR

EE

T

Southern service entry to the Western Sydney International Airport, with traffic lights and a u-turn bay

Western entry to Western Sydney International Airport with traffic lights

Access to the existing The Northern Road and Luddenham town centre with traffic lights

New four-way traffic light intersection providing access to  Luddenham town centre

New four-way traffic light intersection at Elizabeth Drive, providing access to Luddenham town centre via  the existing The Northern Road Littlefields Road intersection with traffic lights and roundabout for u-turns Kings Hill Road intersection with traffic lights and

roundabout for u-turns

Chain-O-Ponds Road intersection with new traffic lights and u-turn facility

Bradley Street intersection, upgraded traffic lights with u-turn bay

The Northern Road – Bringelly to Glenmore Park

Mersey Road to Eaton Road Eaton Road to Littlefields Road Littlefields Road to Glenmore Parkway

Page 3: The Northern Road upgrade - Roads and Maritime …...• New traffic lights for the western entry to the Western Sydney International Airport. • New traffic lights at the t-intersection

Mersey Road, Bringelly to Eaton Road, LuddenhamExpected completion 2021(the section of road required for the construction of the Western Sydney International Airport will be complete by April 2020)

Roads and Maritime awarded the major construction contract to a joint venture between Georgiou Pty Ltd and Ertech Pty Ltd in July 2018. Construction started on site in November 2018.

Progress so far includes:

• archaeological investigations

• installing concrete barriers along the roadway to create a safe work space behind the barriers

• setting up the main site compound on Eaton Road

• building two temporary roundabouts on The Northern Road at Bringelly and Luddenham to provide safe entry into construction compounds

• major earthwork to level the ground for the future road around the new airport site

• building new stormwater drainage.

Key features

• Constructing around 5.7 kilometres of a new four lane divided road with median, diverting the existing The Northern Road around the site of the Western Sydney International Airport.

• A left in/left out intersection at Dwyer Road.

• New traffic lights and u-turn controlled lights for access to the Leppington Pastoral Company and service entry to the Western Sydney International Airport.

• New traffic lights for the western entry to the Western Sydney International Airport.

• New traffic lights at the t-intersection with The Old Northern Road, north of Eaton Road.

• A left in/left out intersection for Eaton Road (East).

• Bus priority lanes at all traffic lights.

New temporary roundabout on The Northern Road for safe construction access

Construction under way to divert The Northern Road around the Western Sydney International Airport site

Road development in progress

Page 4: The Northern Road upgrade - Roads and Maritime …...• New traffic lights for the western entry to the Western Sydney International Airport. • New traffic lights at the t-intersection

Eaton Road, Luddenham to Littlefields Road, LuddenhamExpected completion 2021

Roads and Maritime awarded CPB Contractors Pty Ltd the contract to construct this section in March 2019.

A modification to the design for this section was proposed in September 2018. The modification was for the replacement of twin bridges over Adams Road with a set of traffic lights. Pedestrian and cyclist crossings were also included at the lights improving safety for road users.

Consultation took place with the community and a modification approval request was lodged with the Department of Planning and Environment in December 2018.

Planning approval for the modification was received in June 2019.

Key features

• Constructing around 2 kilometres of a new four lane divided road with median diverting the existing The Northern Road around Luddenham town centre.

• Upgrade around 2 kilometres of The Northern Road between Elizabeth Drive and Littlefields Road to a four-lane divided road with median.

• Realignment/upgrade of around 1.8 kilometres of Elizabeth Drive.

• Reconstructing around 1 kilometres of Adams Road to tie-in with the new traffic lights.

• New traffic lights at the realigned Elizabeth Drive.

• New traffic lights at the intersection of Adams Road and The Northern Road.

• Bus priority lanes at all traffic lights.

New traffic light intersection at Adams Road and The Northern Road

Geotechnical investigations under way Aboriginal archaeological salvage work under way

Adams Road

The

Nor

ther

n R

oad

Adams Road intersection – 1

Upgrade area

Shared path

Road batter

KEY

Page 5: The Northern Road upgrade - Roads and Maritime …...• New traffic lights for the western entry to the Western Sydney International Airport. • New traffic lights at the t-intersection

Privacy Roads and Maritime Services (“RMS”) is subject to the Privacy and Personal Information Protection Act 1998 (“PPIP Act”) which requires that we comply with the Information Privacy Principles set out in the PPIP Act. All information in correspondence is collected for the sole purpose of delivering this project. The information received, including names and addresses of respondents, may be published in subsequent documents unless a clear indication is given in the correspondence that all or part of that information is not to be published. Otherwise RMS will only disclose your personal information, without your consent, if authorised by the law. Your personal information will be held by RMS at 27 Argyle Street, Parramatta 2150 NSW. You have the right to access and correct the information if you believe that it is incorrect.

August 2019 RMS.19. 1327

If you have any questions or would like more information on The Northern Road upgrade please contact our project team:

1800 703 457

[email protected]

rms.nsw.gov.au/thenorthernroad

The Northern Road upgrade, Roads and Maritime Services, PO Box 973, Parramatta NSW 2124

If you need help understanding this information, please contact the Translating and Interpreting Service on 131 450 and ask them to call us on 1800 703 457.

Littlefields Road, Mulgoa to Glenmore Parkway, Glenmore ParkExpected completion 2022

Roads and Maritime awarded the contract for this section of the upgrade to CPB Contractors Pty Ltd in October 2018 with construction starting on site in February 2019.

Progress so far includes:

• archaeological investigations

• setting up the main site compound at The Northern Road/Littlefields Road with an entrance off The Northern Road

• removing some buildings and vegetation

• fencing private properties near construction areas including the Defence Establishment at Orchard Hills.

Roads and Maritime and Sydney Water Corporation collaborated to relocate and upgrade the water assets in the area in a timely manner so road construction could progress efficiently.

What will happen in the coming months?Construction will progress on all sections of the upgrade and information will be provided to those directly impacted by construction.

Construction hours will generally be between 7am and 6pm, Monday to Friday and 8am and 1pm on Saturdays.

To minimise the impact on road users and keep workers safe, some work will need to take place at night. We will notify residents and businesses in advance of any night work. Access to properties will be maintained.

Key features

• Upgrading around 7 kilometres of The Northern Road to:

– four lane divided road with median between Littlefields Road and Bradley Street

– six lane divided road with median and bus lanes between Bradley Street and south of Glenmore Parkway

• New traffic signals at Littlefields Road with a roundabout and link to Gates Road via new Gates Link Road.

• Left-in only at Gates Road.

• Left-in, left-out only at Longview Road.

• Left-in, left-out only at Grover Crescent.

• New traffic signals at Kings Hill Road.

• New traffic signals at Chain-O-Ponds Road with u-turn facility.

• Access to Defence Establishment Orchard Hills with traffic lights and u-turn facility.

• Upgraded intersection at Bradley Street.

• Bus priority lanes at all traffic lights.