The planned new system Tom Himel Dec 1, 2010 1

The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

Embed Size (px)

Citation preview

Page 1: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

The planned new system

Tom Himel

Dec 1, 2010

1

Page 2: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

Outline

• Controls has multiple related projects• Decided to use mainly µTCA architecture• Description of µTCA• Advantages of µTCA• Pros and Cons and our decision making

process• Summary

2

Page 3: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

Controls has multiple related projects

• Upgrade LLRF for 1 LCLS RF station– Funded for $1.8M from AIP– Requirements mostly done, design started

• Upgrade 10 sectors (80 RF stations) of LLRF (could be 21-30 or 11-20)– Will be proposed when above prototype is finished at cost of

~$25k per station = $2M• Develop and industrialize the new µTCA standard and

use it to instrument ILC 10 MW klystron - interlocks and feedbacks– Funded for $2M from ILC about 60% done– Standard nearly signed, companies producing shelves and

modules3

Page 4: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

Controls has multiple related projects• “station node project”

– Upgrade multiple systems near a single RF station: stripline BPM, toroid, vacuum, motion control?, temperatures? Profile monitors?

– Proposed $2.8M AIP– This project is immediate cause of this review.

• Upgrade sectors 11-20– Will be proposed at cost of ~$10M when above prototype is

done– Another ~8M needed for related non-controls upgrades:

SSSB, magnet PS, modulator PLC• Build LCLS-II• Want to coordinate these projects to take advantage of

synergies (sharing of module types and space in crates)

4

Page 5: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

Why upgrade the linac?

• If that isn’t obvious to you after the last talk, we have invited the wrong reviewers.

• Want better reliability and maintainability• Want components for which we can get

repair parts • Want mostly commercially available

components

5

Page 6: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

The architecture choice

• We have spent considerable time and many group meetings deciding on the architecture to use.

• Decided on µTCA• Will first describe µTCA to you• Then explain its advantages• Then share the pros and cons matrix that

went into our decision making process

6

Page 7: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

Genealogy of µTCA• ATCA (Advanced TeleCommunications

Architecture) is a standard developed for the telecommunications industry.– Emphasis was on high availability and high

bandwidth.– There are many commercial modules

available– Modules are physically large (~fastbus size)

• Connections to smaller daughter boards are part of the standard.

7

Page 8: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

Genealogy of µTCA• These daughter boards are called AMC

(Advanced Mezzanine Cards).– Several can be mounted on an ATCA carrier

card.– Often the carrier card must be customized for

the particular AMCs used to route in the necessary I/O from the cables that go to the RTM (Rear Transition Module) attached to the ATCA card.

• Some small projects can be done with ONLY AMC cards.

8

Page 9: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

Genealogy of µTCA• This led to first the µTCA standard and then to the µTCA for

physics standard. – The physics standard is twice the size of the minimum sized

µTCA (AMC) card and has a connector for an RTM. It is backplane compatible with a standard µTCA card and simply defines the use of some spare lines on the backplane.

• It is the µTCA for physics we plan to use and it will hereafter be referred to simply as µTCA.

• The µTCA standard was developed as an international industry/lab committee under the auspices of PICMG.

• The standard is virtually complete, but final signatures are still awaited.

• A small but growing number of commercial products are available.

9

Page 10: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

µTCA features• IPMI: Standard out-of-band network to monitor

temperatures, fan speeds, voltages of both crates and modules. Allows remote control of power to individual modules. Standard software available to implement all of this.

• Redundant hot-swappable fans allowing this most commonly failing component to be replaced without program interruption

• Ability to have redundant power supplies and network hubs

• Timing distribution provided on backplane10

Page 11: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

µTCA features• Truly hot swappable modules and RTMs.

– Allows bad modules to be swapped without added degradation of the control system.

– This in turn allows more modules to be in a crate and hence fewer crates without degrading system availability.

• Split between AMC and RTM allows an AMC module to be used for several purposes by having different relatively simple RTM cards. E.g put the ADC on the AMC module and have RTM cards with different signal shaping for BPMs and toroids.

• Uses point-to-point communications instead of busses. Allows for high bandwidth and avoids subtle bus problems where a problem in one module causes problems in another.

• Low noise environment suitable for analog electronics.• Solid, well tested mechanical and connector designs 11

Page 12: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

µTCA backplane

12

Page 13: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

AMC & µRTM Modules – µTCA.4

13

µRTMAMCPowerSystem Mgmt

Keying

Standard AMC Connector and Backplane

User I/O

Page 14: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

Industry Prototypes:6-Payload Shelf

14

µRTM

µRTM

Development Shelf 6-Slot

Physics Backplane

Non-Redundant MCH, Fans, Power Module

Page 15: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

µTCA.4 Development Platform

15

SLAC Linac controls upgrade

6-Slot Prototype Shelf w/ MCH, Processor, Interim Timing System, power module, built-in fans

PMC Event Receiver (EVR) on double µTCA Adapter

Shelf non-redundant

All rear I/O access

Page 16: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

12-Payload Shelf

16

Full µTCA.4 Compatibility

Fully redundant MCH, power, fans

Page 17: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

Courtesy K. Rehlich DESY

DESY XFEL will use µTCA in the tunnel

17

Page 18: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

Prototype for XFEL. We have one.

18

+ 2 16 bit DACS

Page 19: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

Slow I/O can be done with IP cards

19

There is also a PMC carrier that we presently use for our timing card

Page 20: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

µTCA summary• Scaleable modern architecture

– From 5 slot μTCA …full mesh ATCA• Gbit serial communication links

– High speed and no single point of failure– Standard PCIe, Ethernet communication– PCIe and Ethernet is part of Operating System

• Redundant system option– Up to 99.999% availability

• Well defined management– A must for large systems and for high availability

• Hot-swap– Safe against hardware damage and software

crashes

20

Page 21: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

Our Architecture decision

• We briefly looked at many standards• Carefully compared network attached

devices (rack mounted chassis with Ethernet ports), VME and µTCA.

• We expect to end up with a mixed system, so really deciding what standard to use for new and improved things.

21

Page 22: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

Why not simply clone what we just did for LCLS-I

• Some parts not done at all (linac LLRF)• Unhappy with other parts (stripline BPM) –

more later• We likely will clone some of the parts like

PLC system for vacuum and perhaps Beckhoff for temperatures and misc I/O

22

Page 23: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

LCLS BPM rack

23

Front Rear

Page 24: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

LCLS BPM rear close-up

24

Page 25: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

LI20 LCLS network rack

25

Page 26: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

BPM chassis• Each has:

– 4 signal cables (unavoidable)– A trigger at beam time cable– A calibration trigger cable– An ethernet port for channel access– An ethernet port used to pass raw data at 120 Hz

to a VME IOC for processing as the internal CPU is too slow

– A serial connection to a terminal server to allow viewing of the IOC console

– A power cable to an ethernet controlled power strip so power can be cycled to perform a remote reset. 26

Page 27: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

BPM chassis• This was a design kludged together from

available parts in 4 months when originally planned design for LCLS failed.

• Was then propagated to 10 linac sectors as didn’t have time to do a proper redesign and wanted its improved analog performance.

• It works! Physicists are quite happy. But REALLY don’t want to propagate this again! Needs a design using a crate e.g. µTCA. 27

Page 28: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

BPM in µTCA• Each module has:

– 4 signal cables (unavoidable)– A trigger at beam time cable– A calibration trigger cable– An ethernet port for channel access– An ethernet port used to pass raw data at 120 Hz

to a VME IOC for processing as the internal CPU is too slow

– A serial connection to a terminal server to allow viewing of the IOC console

– A power cable to an ethernet controlled power strip so power can be cycled to perform a remote reset. 28

On backplane

On backplane

PCIe on backplane to CPU

PCIe on backplane to CPU

Only CPU has one

IPMI handles this

Page 29: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

VME situation

• VME is almost 30 years old: our system should operate for another 20-30 years.

• Number of new developments is decreasing, sales are still constant

• Bus technology has speed limitations• Wide busses create a lot of noise in analog channels• No standard management on crate level• No management on module level• So far no extension bus survived• One damaged bus line stops a whole crate• Address and interrupt misconfigurations are hard to find

29

Page 30: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

Reasons for choosing µTCA• Use an industry standard to share with

others• Redundant fans and hot swappable fans

and modules allows for troubleshooting and maintenance during user runs and improving reliability

• Cable plant reduction compared to network attached devices

• Systems can share crates with minimal impact

30

Page 31: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

Reasons for choosing µTCA• Firmware can be remotely loaded

(presently we bring each module to the lab for this)

• Standard system to monitor temperatures and voltages

• A new standard rather than one nearing retirement

• Modular so pieces of it can be upgraded• Allows use of new technology that allows

us to challenge and keep good engineers.31

Page 32: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

Decision spreadsheet• The presentation so far has been one-

sided, listing the advantages of µTCA and no disadvantages.

• We were much more balanced in our decision making process.

• The spreadsheet at the same site as this talk contains the detailed pros and cons list that was a key part of our decision making process. https://

slacspace.slac.stanford.edu/sites/reviews/ad/linaccontrol_dec_2010/Pages/default.aspx

32

Page 33: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

A few design details• Having made the major architectural

decision, there are still many design decisions to be made.

• We have a proposed AIP project which is mostly R&D where most of those decision will be made.

• This review doesn’t really have time to go into design details anyway, but I’ll list some of the next level decisions we have made.

33

Page 34: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

A few design details• We will have 1 µTCA shelf near each

klystron that will have the LLRF, 0-3 BPMs and whatever else needs handling that is nearby.

• It will be a 12 slot shelf.• There will be an air to water heat

exchanger in the rack with air that circulates through it and the crate.

• We will reuse the current racks but bring them up to today’s standards

34

Page 35: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

A few design details• We are working with Struck and Vadatech to

modify existing ADC designs they have to meet our requirements for LLRF and BPM

• We expect all our AMCs to be commercial but we will design a variety of RTMs

• There will be some rack mounted chassis to handle large cable plants, high power or high voltage.

• We have a list of all our systems and how we plan to handle them. Some plans are tentative depending on availability of resources.

35

Page 36: The planned new system Tom Himel Dec 1, 2010 1. Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of

Summary• The linac control system clearly needs

upgrading• It would be missed opportunity to not do it

during FACET era with runs of only 4 months per year

• µTCA is the best choice for the architecture• We should get started as there is a lot of

work to do.• If we go fast enough, most of the LCLS-II

upgrade can also be done with µTCA36