Construction Update - Dec 2018

Page 2: The Presidential Tower - Construction Update - Dec …...the Dear Patron, We are delighted to share the construction update for The Presidential Tower, for the month of December 2018

the

The four tallest towers of Shanghai are a part of CNTC’s portfolio.

After transforming the Shanghai skyline, CNTC is now in Bengaluru, to launch the tallest tower of the city.

Page 3: The Presidential Tower - Construction Update - Dec …...the Dear Patron, We are delighted to share the construction update for The Presidential Tower, for the month of December 2018

the

Dear Patron,

We are delighted to share the construction update for The Presidential Tower, for the month of December 2018.

I N D E X

1. Podium Driveway

2. Side view with Aluminium Form Work in progress

3. Front view

4. Aluminium Form Work over the 6th Slab in progress

5. Concrete pouring on the 6th Slab

6. Imported German boom placer by Putzmeister

used for concrete pouring

7. Bending, cutting, and threading of Rebars

8. Preparation for Night Shift

9. Reinforcement work in progress on the 6th Slab

10. Specially threaded 30 MM Rebars joined with

heavy duty couplers

11. Supervision of laying of electrical conduits

12. Tying of Rebar structure over the 6th Slab

13. Supervision of rebar structure by experts from CNTC Hong Kong

14. Top view

The Presidential Tower. RERA approval number PRM/KA/RERA/1251/309/PR/171014/000565

With best wishes, CNTC Team

Page 4: The Presidential Tower - Construction Update - Dec …...the Dear Patron, We are delighted to share the construction update for The Presidential Tower, for the month of December 2018

These are the latest photographs of the progress at the construction site, to give you an insight into the work that has been completed in the last month.

We value your trust in CNTC and thank you for your support.

1. Podium Driveway

2. Side view with Aluminium Form Work in progress

Page 5: The Presidential Tower - Construction Update - Dec …...the Dear Patron, We are delighted to share the construction update for The Presidential Tower, for the month of December 2018

3. Front view

4. Aluminium Form Work over the 6th Slab in progress

Page 6: The Presidential Tower - Construction Update - Dec …...the Dear Patron, We are delighted to share the construction update for The Presidential Tower, for the month of December 2018

5. Concrete pouring on the 6th Slab

Page 7: The Presidential Tower - Construction Update - Dec …...the Dear Patron, We are delighted to share the construction update for The Presidential Tower, for the month of December 2018

6. Imported German boom placer by Putzmeister used for concrete pouring

Page 8: The Presidential Tower - Construction Update - Dec …...the Dear Patron, We are delighted to share the construction update for The Presidential Tower, for the month of December 2018

7. Bending, cutting, and threading of Rebars

8. Preparation for Night Shift

Page 9: The Presidential Tower - Construction Update - Dec …...the Dear Patron, We are delighted to share the construction update for The Presidential Tower, for the month of December 2018

9. Reinforcement work in progress on the 6th Slab

10. Specially threaded 30 MM Rebars joined with heavy duty couplers

Page 10: The Presidential Tower - Construction Update - Dec …...the Dear Patron, We are delighted to share the construction update for The Presidential Tower, for the month of December 2018

12. Tying of Rebar structure over the 6th Slab

11. Supervision of laying of electrical conduits

Page 11: The Presidential Tower - Construction Update - Dec …...the Dear Patron, We are delighted to share the construction update for The Presidential Tower, for the month of December 2018

14. Top view

13. Supervision of Rebar structure by experts from CNTC Hong Kong

Page 12: The Presidential Tower - Construction Update - Dec …...the Dear Patron, We are delighted to share the construction update for The Presidential Tower, for the month of December 2018

WELCOME TO THE WORLD OF INSIGNIA

Unlike regular referral programs, the referral program at CNTC is driven by our understanding of

what motivates customers and what is really important to them.

We believe, a community is shaped by the individuals that are part of it. Hence, it is imperative

that we bring together like-minded people to be a part of this community. Now, you can not only

choose who you want to be a part of your community, but also reap a referral bonus of 5 lakhs

when your referral gets converted into a sale.

The Presidential Tower. No. 8, Tumkur Road, Yeshwanthpur, Near Yeshwanthpur Metro Station,

Bangalore – 560 022. | Ph. +91 80 2347 9536 | www.cntcindiaprojects.com

RERA approval number PRM/KA/RERA/1251/309/PR/171014/000565