The road of success for implementing a multi-vendor GSM-R ERTMS network
2
Turkey, a multi-vendor region linking Asia with Europe
Extensive multi-annual rollout of GSM-R lines* Picture source: Wikipedia
3
What is a multi-vendor GSM-R network?
Core Network (NSS) •NSS vendor 1
Access Network (BSS)•BSS vendor 2
Teminals•OPH, GPH, Dispatchers… (additional vendors)
MSC(NS)
BSC(HW)
BTS(HW)
M2000(HW)
HLR(NS)
DBS(HW)
OPH GPH
A i nterface
Um I nterface
OPH GPHGPHGPH
SCP(NS)
More competition Variety to rail
customers Assurance for system
integrators Flexibility &
innovations in
solutions Protecting
investment …
4
Latest multi-vendor GSM-R Projects in Turkey
Eskisehir-Kutahya-
Balikesir ETCS L2 Alstom GSM-R core (R99): NSN Macro & Distributed BTS:
Huawei Full SDH Network: Huawei Outdoor trackphones and PBX Mobile and fixed GSM-R
terminals 464 km, 42 tunnels
Alsancak-Cumaovası ETCS L2: Thales GSM-R core (R99): NSN Macro & Distributed BTS:
Huawei Full SDH Network: Huawei Mobile and fixed GSM-R
terminals 51 km, 1 tunnel
Kayas-Kayseri GSM-R core (R99): NSN Macro and Distributed BTS:
Huawei Full SDH Network: Huawei 366 km, 23 tunnels GSM-R design: ETCS L2 ready
A true multi-vendor GSM-R/ERTMS architecture for Turkey
5
The path to multivendor GSM-R networks
Clear public standards Appointed Notified
Bodies Conformity
Assessments Intermediate Statement
of Verification “ISV”
Test Specification (NoBo
specific) Harmonised Test
Specification (EU/global) Availability of Test
laboratories
DBS BTS+DBSDBS
tunnel mountain Shunting yard
BTS
6
The history of a harmonised GSM-R Test Specification
* From B.Wendler, DB-Systel presentation at ERA CCRCC 25th October 2011
7
DB Test Specification published in 2011
Number of test cases 360 NoBo validated for completeness Including EIRENE traceability matrix:
* From B.Wendler, DB-Systel presentation at ERA CCRCC 25th October 2011
8
ERA drives Interoperability
ERA published final DB test specification Draft Network Assessment specification
for review by stakeholders
Set process to arrive at a
“Harmonised GSM-R Test
Specification”
9
The BSS integration into GSM-R NSS of Turkey
Test Specification: source ERA server, DB-Systel Test
Specification Applicable Test Cases according to Test Specification:
136 BSS integration test period: 4 months Test execution and correctness witnessed by Alstom
Legacy R99 NSS
BSS
10
Multi-vendor GSM-R integration results
Huawei BSS system was successfully integrated to
TCDD’s GSM-R Core Network. The final test report was issued 30th April 2013 and
ratified in May 2013 Press Release : “The completion of the multivendor GSM-R
integration is an important project milestone for the
Eskisehir-Alayunt-Kutahya-Balikesir (EKB) European Rail
Traffic Management System (ERTMS) Line. … Stringent GSM-
R specifications and equipment guidelines enable railways
globally to setup multivendor systems such as the one now
fully integrated for the EKB High Speed line with a total
length of 464 km.“With the integration completed TCDD takes benefits of an open, feature-rich and competitive GSM-R multivendor market.
11
Turkey, an integrated IT rail network
Pehlivanköy Pythion SDH OMC Equipment implementation Maintenance Training
Ankara – Eskisehir IP Cameras Video Analysis DWDM Switch Geo-redundant Storage OMC Equipment implementation Maintenance Training
Ankara Sincan North
Line SDH OMC Equipment
implementation Maintenance Training
12
NEWS flash LTE for Rail Zhengzhou Metro
Now under passenger operation
(26th December 2013)
Article 5th December 2013
13
Conclusion
Strong demand and
utilization of GSM-R outside
of Europe UIC vital role to promote
GSM-R and its evolution Promotion campaigns in
Central Asia, South America
and Africa would help the
continuation of this successTaken from UIC Asset & Evolution
Management conference Sept 2013
Copyright©2014 Huawei Technologies Co., Ltd. All Rights Reserved.The information in this document may contain predictive statements including, without limitation, statements regarding the future financial and operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results and developments to differ materially from those expressed or implied in the predictive statements. Therefore, such information is provided for reference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.
HUAWEI ENTERPRISE ICT SOLUTIONSA BETTER WAY