Le Management des Grands ProjetsManagement and Engineering for Major Projects
THE S3000L STANDARD FOR LOGISTIC
SUPPORT ANALYSIS (LSA)
BUSINESS DRIVERS AND IMPLEMENTATION
PARIS, NOVEMBER 10, 2016
STÉPHANE MICHEL – THROUGH-LIFE SUPPORT TECHNICAL MANAGER
Management and Engineering for Major Projects
2PDT Europe, Paris, November 10, 2016
A GROUP OF SPECIALISED COMPANIES IN MANAGEMENT AND ENGINEERING ACTIVITIES FOR
HIGH-TECH SYSTEMS
LGM foreign branches
Germany: LGM GmbH
Belgium: LGM Belgium SPRL
Canada: LGM Management & Conseil Inc.
India: LGM Engineering Private Limited
United Kingdom: LGM (UK) Limited
The Netherlands: Axone BV
Spain: LGM
LGM Process
Management and QA for
oil and gas
LGM Pharma
Pharmaceutical processes
LGM LGM Ingénierie
Specialist in electronics
engineering & software
activities
Specialist in management
and technical consulting
activities
NMJ Services
Specialist in technical
publication, training and
telecoms activities3 Specialized
companies offeringexpertise
An international and sectorial expansion
Management and Engineering for Major Projects
3PDT Europe, Paris, November 10, 2016
LGM ACTIVITIES
System Engineering
Requirements management
System Architecture, Model-Based Systems Engineering (MBSE)
Configuration management (system and software)
Product Life Management (PLM)
Industrialisation, production control and optimization
Program Management
PMO/Project management
Contract management
Risk management
Optimization of industrial performance
Lower tier subcontrators management
Support Engineering & CLS
Integrated Logistics Support (ILS)
Contractor Logistics Support (CLS)
Optimization of Life Cycle Cost/Availability (LCC, LoRA)
Logistic Support Analysis
Modelling and optimization of flows (SCM)
Logistics Information System (ILS, PLCS)
RAMS (Reliability, Availability, Maintainability, Safety)
Reliability analysis and management of reliability program
Safety analysis
Assessment of RAMS performance for software, electronics, mechanics (RAMS-T)
Industrial risks assessment (HAZOP, ATEX, SEVESO…)
Nuclear safety and dismantling engineering
Quality
Definition and deployment of new standards for process improvement
Management and support in operational quality
(project/product quality, supplier quality, software quality)
Deployment of Lean, Six Sigma, ITIL, CMMI
Management and Engineering for Major Projects
4PDT Europe, Paris, November 10, 2016
INTEGRATED LOGISTICS SUPPORT
LSA process
Management and Engineering for Major Projects
5PDT Europe, Paris, November 10, 2016
THE « 1388 » HISTORIC REFERENTIAL
• A pertinent process (part 1A) but no practical guide published
• A data model from the ‘80s (part 2B):
–Codified data base (mixed business & machine data)
–Not enough performance regarding the complexity of support representation
–Defense oriented
Need to make Logistic Support Analysis evolve !
Management and Engineering for Major Projects
6PDT Europe, Paris, November 10, 2016
S3000L, A PROCESS IN THE SAME LINE…
• First version in 2010 integrated into a larger ILS context
• A “ready to use” handbook:
– Checklists
– Examples
– Illustrations
• A self-supporting guide with all necessary methodology for analysts
Management and Engineering for Major Projects
7PDT Europe, Paris, November 10, 2016
… BUT A TECHNOLOGICAL BREAKTHROUGH FOR DATA
First version of the maintenance plan
Product configuration update
RCM or RAMT justification update
New product variant
New operational context. New project / customer for a product.
Management and Engineering for Major Projects
8PDT Europe, Paris, November 10, 2016
VIEWS AND BASELINES
Design office
RAMT
Logistics
In-service
Baseline 1 Baseline 2 Baseline 3 Baseline 5 Baseline 6
Definition Design Prod. Installation Maintenance
Baseline 4
Management and Engineering for Major Projects
9PDT Europe, Paris, November 10, 2016
Lifting cable periodic test
Wear of the Lifting cable
Periodic inspection of the
lifting cable
JUSTIFICATION RECORDING
Regulation
FMEA
Safety analysis iss. A
Inspection requirement
Safety level control
requirement
Lifting cable
Procedure of periodic inspection
Safety analysis iss. B
Safety level control
requirementiss. B
Procedure of periodic inspection
Procedure of periodic inspection
Management and Engineering for Major Projects
10PDT Europe, Paris, November 10, 2016
SUPPORT BASELINE COMPLEXITY
Applicable support baseline
Mission profiles
Operational organizations
Supportability Characteristics (Reliability,
Maintainability, …)
Product & Variants
Influence
Tasks / procédures
Consistent with
Justify
Management and Engineering for Major Projects
11PDT Europe, Paris, November 10, 2016
CONSISTENCY AND PRODUCTIVITY
Product Baseline Task requirement Tasks Maintenance Resources
Mission profiles
Operational organizations
Management and Engineering for Major Projects
12PDT Europe, Paris, November 10, 2016
ASD STANDARDS DATA REPRESENTATION
Maintenance applicable
Ressources applicables
Config. applicable
Applicabilité au contexte
Applicabilité au contexte Modules
textuels
Illustrations
Données articles
Données d’appro.
Config. appliquée /
modif.
Gestion de flotteCR
maintenance
Management and Engineering for Major Projects
13PDT Europe, Paris, November 10, 2016
ELSA : A TOOL FOR DATA PRODUCTION
Central repository
PDM Product ERP
Technical publication
Provisioning data Economic analysis
Quotations
Feedback
RAMS
LIS / CMMS
LSA
Trainingis dedicated to produce
and analyse ILS data using« user friendly » interfaces.
Le Management des Grands ProjetsManagement and Engineering for Major Projects
THANKS FOR YOUR ATTENTION!
STÉPHANE MICHEL – THROUGH-LIFE SUPPORT TECHNICAL MANAGER
+33 (0)2 85 67 20 06+33 (0)6 33 42 76 87