47
The Southampton (UK) District Energy Scheme An Integrated Energy Scheme using Geothermal Energy

The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

The Southampton (UK) District Energy Scheme

An Integrated Energy Scheme using Geothermal Energy

Page 2: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Introductions

Mike Smith

Non-Executive Director &

Public Sector Advisor

Cofely District Energy

Page 3: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Presentation

•Southampton,UK •Geothermal exploration and resource •Partnership with city council •Growth & expansion of the scheme •Network and consumers •Pump replacement •Future proofing

Page 4: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Southampton - location

Page 5: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

City of Southampton – aerial view

Page 6: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Geothermal Resources in the UK

Wessex Basin

Southampton

Geothermal Aquifers

Wessex Basin

Geothermal Resources

Page 7: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Drilling Rig in City Centre

Page 8: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

1800m of drill stem in Toys R Us Car Park !

Page 9: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Southampton Borehole - Geology

Page 10: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Triassic Sherwood Sandstone

Page 11: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

The Well Head

Page 12: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Well Head – insulation and noise attenuation

Page 13: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Well Head in Toys “R” Us car park

Page 14: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

The turbine pump

Page 15: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Lowering the pump into position

Page 16: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Geothermal wellhead & downhole

pump

How the pumping system works

Page 17: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Heat Exchanger

Page 18: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

12 February 2010

Energy Centre in the heart of the city

Energy

Centre

Page 19: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

12 February 2010

Consumer interface/meter

Buried Pre-insulated distribution mains

Centralised Heat Sources CHP, Boilers etc

The Southampton Energy

Centre

Page 20: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Southampton - A City Wide Sustainable Community

and

a partnership between

Southampton - an effective partnership

District Energy

Page 21: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Southampton - Key Features

• Largest commercially developed CHP/district energy scheme in the UK

• Started 25 years ago

• Built on Joint Co-Operation Agreement with Southampton City Council

• £5M Energy Sales

• £0.6M p.a. cost savings to consumers.

• 12,000 tons of CO2 emissions saved p.a.

• 8 MW of CHP, geothermal well, and 1 MW biomass in 2012

• Supplying heating, cooling and electricity

• 14 km pipe network

• Project built on 20 year energy supply contracts

• Capital cost to date £13M

Page 22: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

12 February 2010

Commercial Arrangements

Works through a Joint Co-operation Agreement between City Council and Cofely The City Council commits to facilitate success of scheme by: • Taking heat where practicable • Promote scheme to potential users • Support development of network • Provide land for heat station • Treat Cofely as a statutory utility within city

Page 23: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

12 February 2010

The 5.7 MW CHP Engine being delivered

Page 24: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

-

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

0 1000 2000 3000 4000 5000 6000 7000 8000

Hours

kW

CHP output

Heat demand

Annual Heat Duration Curve

Page 25: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

1MW Biomass Boiler

Page 26: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Southampton Energy Centre

Page 27: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

12 February 2010

Network area

Page 28: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

The Heating Network

Page 29: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Who do we serve ?

Consumers include:

Civic Centre

5 Hotels

Royal South Hampshire Hospital

Offices Complexes

Southampton Solent University

Olympic Size Swimming & Diving Complex

Entire 53 Acre West Quay Shopping Centre

Public and Private Sector Housing

……….. and many more

Page 30: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

BBC TV Studios –

Heating 1990, Cooling 2000

The Civic Centre – The first consumer

Heating 1986, Cooling 2007

SCC, BBC & Solent University

Page 31: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Retail

53 Acre West Quay Shopping Centre & IKEA - heated & chilled by our scheme

Page 32: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

The Quays Swimming and Diving Complex (including Olympic Swimming Pool)

Leisure

Page 33: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

DeVere 5* Grand Harbour Hotel - Connected 1994 via 600m „energy link‟ - all heating and cooling from

scheme

Hotels

Page 34: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Offices

Skandia, SCC, Carnival Cruise HQ

Page 35: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Barratt‟s Park View and the Dell developments

• both connected to the scheme

• circa 300 dwellings

• no flues/gas in dwellings

Housing

Independent Study on Customer Satisfaction and

Cost Effectiveness

Page 36: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Orien‟s Point - 400 bedrooms,

Key Worker Housing

Page 37: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

New for 2010/11

Police HQ Regional Business Centre

Page 38: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

New for 2013 West Quay Phase 3 – „Watermark‟

Page 39: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Associated British Ports - power

•Financing for Wartsila engine was based on 10 year Non Pooled Generation contract with PowerGen

•As contract reached end alternative options were explored

•Agreement reached with ABP for “private wire” link between port and Heat •Station

•Cable laid and energised in Spring 2009

•Circa 50% of supplies for port are now generated by SGHC

Page 40: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

BBC TV Studio‟s

Parkview

RSH

Hospital

Civic Centre

Southampton Solent University

Skandia Life

DeVere

Hotel

Quays

West Quay The Heat Station

IKEA

Carnival

ABP

Page 41: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Piping heating & potentially cooling to buildings – “Energy Linking” Heat Losses - 1°C per km Reliability ~ 100% (99.98% for Southampton)

District Energy

Page 42: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Future Proofing - Integrating technologies

New technologies being actively considered:-

•Biomass – woodchip

•Energy from Waste

•Anaerobic Digestion

•Fuel Cells

...and several others

Page 43: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Pump replacement 2011

Page 44: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Geothermal Pump Extracted from 600m

Page 45: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Cofely District Energy

Manchester

Alexandra Park & Longsight Estates

Media City

South Coast Southampton Geothermal Heating Co

Eastleigh

West Midlands Birmingham District Energy Co

Berryfields Estate

Nationally – No.1 in District Energy ~ 35 MW of low carbon electricity generation

Operation & management of over 300 MW of boiler plant

and 50 km of district heating and cooling pipework

London

Olympic Park and Stratford City

Bloomsbury Heat & Power

Whitehall

Comet Square, Hatfield

Greenwich Millennium Village

Page 46: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Olympic Delivery Authority Energy Centres for London 2012

£100 million investment

40 year concession

16 km of energy network

2 energy centres

(district heating & cooling)

Page 47: The Southampton (UK) District Energy Scheme An Integrated ... · •£5M Energy Sales •£0.6M p.a. cost savings to consumers. •12,000 tons of CO 2 emissions saved p.a. •8 MW

Contact

• Mike D Smith

• Non-Executive Director, Cofely District Energy and Public Sector Advisor

• E-mail: [email protected]

• Tel: +44(0)1425 475370

• Mobile: +44(0)7976 606858