THE SUPPORT OF THE LABORATORIES TO

PLACE PROJECTS IN SERVICE

Dr. Jaime TamaritDirector del Laboratorio de interoperabilidad Ferroviaria

CEDEX

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

THE RAILWAY INTEROPERABLE SYSTEM OFFERS A MULTI-SUPPLIER FRAME IN AN OPEN MARKET

EUROPE SPAIN

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

Feature (~ 650):A feature is a group of requirements, which fulfilment can be tested at theavailable interfaces. Features shall be characteristics expected from asystem by the operator and therefore outwardly visible.

Test cases (~ 1.600):These are the formal functional and technical descriptions of the testcases needed to prove interoperability. It is expected that for tracksidetest cases due to lack of technical description of interfaces onlyfunctional test case descriptions are possible.

Test sequence (~ 90):Test sequences are used for automatic execution of the test cases,namely by grouping test cases into scenarios which are sensible from anoperations point of view and which can be run on the test environmentsgenerally used in industry

Testing strategy for the certification of generic constituents

(Subset-076 of the European Interoperability Directive)

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

Reference Testing Architecture(Subset-094 of the European Interoperability Directive)

ON BOARDINDUSTRIALEQUIPMENT

TIU

EURORADIOBTM

STM

JRU ODODMI

DRIVEROR

EMULATOR

LOOP

EURORADIO COM.SIMULATOR

RCS

FFFIS (wired)

ETCS L2 TRACKSIDESIMULATOR

L2TS

EUROLOOP SIGNALGENERATOR

LSG

FFFIS

ETCS LEVEL STMTRACKSIDE SIMULATOR

LSTMTS

STM CODING &COMMUNICATION

STMCC

FFFIS

FFFIS

DATA EXCHANGE

ETCS L1 TRACKSIDESIMULATOR

L1TS

EUROBALISE SIGNALGENERATOR

BSG

FFFIS

SCENARIOCONTROLLER

SC

MODULE EVENT RECORDERMER

SCENARIOGENERATOR

SG

JRU DOWNLOADEVALUATION MODULE

DEM

TRIP ANALYSIS &VALIDATION

TAV

DMI EVENTRECORDER

DER

SPEED SENSOR SIMULATOR

SSSSPEED

TIU Signals

TIUSIMULATOR

TIUS

ODOADAPTOR

TIUADAPTOR

TRAIN MOTIONSIMULATOR

TMS

Air gap is used

Equipment to be tested

Laboratory Modules

ADAPTOR FFFIS

ADAPTOR FFFIS

ON BOARDINDUSTRIALEQUIPMENT

TIU

EURORADIOBTM

STM

JRU ODODMI

DRIVEROR

EMULATOR

LOOP

EURORADIO COM.SIMULATOR

RCS

FFFIS (wired)

ETCS L2 TRACKSIDESIMULATOR

L2TS

EUROLOOP SIGNALGENERATOR

LSG

FFFIS

ETCS LEVEL STMTRACKSIDE SIMULATOR

LSTMTS

STM CODING &COMMUNICATION

STMCC

FFFIS

FFFIS

DATA EXCHANGE

ETCS L1 TRACKSIDESIMULATOR

L1TS

EUROBALISE SIGNALGENERATOR

BSG

FFFIS

SCENARIOCONTROLLER

SC

MODULE EVENT RECORDERMER

SCENARIOGENERATOR

SG

JRU DOWNLOADEVALUATION MODULE

DEM

TRIP ANALYSIS &VALIDATION

TAV

DMI EVENTRECORDER

DER

SPEED SENSOR SIMULATOR

SSSSPEED

TIU Signals

TIUSIMULATOR

TIUS

ODOADAPTOR

TIUADAPTOR

TRAIN MOTIONSIMULATOR

TMS

Air gap is used

Equipment to be tested

Laboratory Modules

ADAPTOR FFFIS

ADAPTOR FFFIS

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

EUROPEAN DIRECTIVE SIGNED BY ALL ACTORS (RAILWAYS & INDUSTRY)MADRID 1999

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

1. Creation of specific operational scenarios:

2. Analysing the scenario results

3. Validation of the laboratory

4. The way forward

Generic test cases (what to test)Specific operational scenarios (where to test it)

TRANSLATING INFRASTRUCTURE DATA TO A COMMON FORMAT

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

PROJECT DATA LOAD TRACK DATA

STATIC ELEMENTS: SIGNALS, BALISES, TRACK CIRCUITS, POINTS,

… : identity and location.

TRACK DESCRIPTION: GRADIENTS & SPEED LIMITS TABLE.

ETCS DATA

FIX AND SWITCHABLE TELEGRAMS

MOVEMENTS TABLE: relationship between the signalling state and

the ETCS telegrams.

LAB COMMON FORMAT(Excel Sheet)

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

Structure of a Generic Operational Test Case provided by INECO

Identifier

Target

Starting Conditions

End Conditions

Case

Case […]

Additional steps

Additional steps

Identifier

Target

Starting Conditions

End Conditions

Case

Case […]

Additional steps

Additional steps

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

Creation of an specific operational scenarioin the format of the Scenarios Generator of the Reference Laboratory

using the Automatic Scenarios Generator (CEDEX GAE Tool)

LAB COMMON FORMAT(Excel sheet)

EXCEL GAE TOOLReal scenarios design

LAB SCENARIO GENERATOR

TEST RUN IN EVC TEST BENCH

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

Case 4.4SR → (FS) → OS Entry in OS in further location. The driver does not acknowledgeCase 6.4Eurobalise loss in a linked group not included in the linking informationCase 10.3DMI verification. Showing the max speedCase 4.16Overriding a signal in OS modeCase 4.26Management of TSR in SR mode

Creation of an scenario for the Madrid-Levante line:Test cases concatenated in the Scenario 203

Seg_02

Seg_03

Seg_07

Seg_11

D2

D4

4.26

D8

D12 D11

D7D3

D11

Madrid – Valencia lineMigration scenario

Pozorrubielos station

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

Creation of an Scenario with the CEDEX GAE Tool

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

Creation of an Scenario with the CEDEX GAE Tool (III)

Gradient Profile Speed Profile

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

Analysing tools: Explorer tool for Juridical Unit Records

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

JRU Decoder Tool Descriptor files

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

Use of the tool JRU Analyser Scenario 232 / BG 2322: OS Mode Profile

(Source: CEDEX records from Madrid-Levante line)

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

VALIDATION OF THE LABORATORY

Operational scenario for validation

between Valdemoro & Villarubia stations

on the Madrid – Levante line

Track design: Invensys/Dimetronic

EVC: Bombardier (Talgo train S-130)

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

SB SRPT SR

FS TRFS

D_LRBG D_LRBGL_DOUBTOVERSB SR

PT SR

TR

Distance

Spee

d

FS

MRSPBraking Curve

L_DOUBTUNDERSB SR

PT SR

FS TRFS

D_LRBG D_LRBGL_DOUBTOVERSB SR

PT SR

TR

Distance

Spee

d

FS

MRSPBraking Curve

L_DOUBTUNDERSB SR

PT SR

FS TRFS

D_LRBG D_LRBGL_DOUBTOVERSB SR

PT SR

TR

Distance

Spee

d

FS

MRSPBraking Curve

L_DOUBTUNDER

VRUPCA

637 - 640

SES PCA

713 - 716

E4

E2

E1

E3

S1/1 S2/1

S1/3 S2/3

S1/2 S2/2

S1/4 S2/4

E4

E2

E1

E3

640

638

637

639

716

714

713

715

E4

E2

E1

E3

S1/1 S2/1

S1/3 S2/3

S1/2 S2/2

S1/4 S2/4

FS SR FS

VLD VRUPCA

637 - 640

SES PCA

713 - 716

E4

E2

E1

E3

S1/1 S2/1

S1/3 S2/3

S1/2 S2/2

S1/4 S2/4

E4

E2

E1

E3

640

638

637

639

716

714

713

715

E4

E2

E1

E3

S1/1 S2/1

S1/3 S2/3

S1/2 S2/2

S1/4 S2/4

FS SR FS

VRUPCA

637 - 640

SES PCA

713 - 716

E4

E2

E1

E3

S1/1 S2/1

S1/3 S2/3

S1/2 S2/2

S1/4 S2/4

E4

E2

E1

E3

640

638

637

639

716

714

713

715

E4

E2

E1

E3

S1/1 S2/1

S1/3 S2/3

S1/2 S2/2

S1/4 S2/4

FS SR FS

VLD VRUPCA

637 - 640

SES PCA

713 - 716

E4

E2

E1

E3

S1/1 S2/1

S1/3 S2/3

S1/2 S2/2

S1/4 S2/4

E4

E2

E1

E3

640

638

637

639

716

714

713

715

E4

E2

E1

E3

S1/1 S2/1

S1/3 S2/3

S1/2 S2/2

S1/4 S2/4

FS SR FS

Definition of the Operational scenario between Valdemoro and Villarubia stations

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

STARTING SIGNAL PK(m) DIRECTION SIGNAL

ASPECT END SIGNAL

S22VLD 42704 LEV Proceed Signal 638VLD

Point 1 D5VLD+ Point 2

Point 1 D1VLD+ Point 2

E3VLD 43860 MAD Stop Signal E3VLD

Point 1 Point 2

E2SES 51277 LEV Proceed Signal 714VRU

E3SES 53117 MAD Stop Signal E3SES

Point 1 Point 2

638VLD 63735 LEV Proceed Signal 714VRU

639VLD 63759 MAD Stop Signal 639VLD

Point 1 Point 2

714VRU 71481 LEV Stop Signal 714VRU

715VRU 71505 MAD Stop Signal 715VRU

E2VRU 83217 LEV Proceed Signal 962VRU

Point 1 D2VRU- Point 2 D4VRU-

Point 1 D8VRU- Point 2 D12VRU+

S13VRU 84341 MAD Stop Signal S13VRU

S23VRU 84832 LEV Proceed Signal E4SCZ

Point 1 D11VRU+ Point 2 D7VRU-

Point 1 D3VRU+ Point 2

E1VRU 85957 MAD Stop Signal E1VRU

Creation of the Operational Scenario

using the CEDEX GAE Tool

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

Permitted Speed

0

50

100

150

200

250

300

40000 45000 50000 55000 60000 65000 70000 75000 80000 85000 90000

DTeórica (m)

Vper

miti

ca (k

m/h

)

Permitted Speed Vía

Permitted Speed Lab

Comparison of permitted speeds recorded on the track and in the lab

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

Comparison of positions related to LRBGs As recorded on the track and in the lab

X(i)X(i)

D_L

RB

G(m

)

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

CONCLUSIONS (i)

The laboratory complements the tests on track, do not replace them. The laboratory is limited for the verification of dynamic issues (Braking distances, odometry errors, etc) and layout verification (Eurobalise position, track elements, etc)

Thanks to the confidence and support of the companies1. The laboratory allow verification off-line during the infrastructure

design phase. It provides excellent support at early implementation phases (the earlier is the better), mainly for:

2. The reference format allows the verification of multi-supplier infrastructure projects as a single project (corridors)

3. The connection of real equipment simplifies the integration train-track

• Verification of interoperability• Verification of engineering rules• Verification of exploitation rules

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

CONCLUSIONS (ii)

4. The validation of the laboratory makes acceptable by the safety departments laboratory tests results

5. The laboratory provides a controlled environment more efficient (in time and cost) and reliable than the line. It does not interfere with installation and maintenance tasks

6. The use of the Scenarios Generator format approaches the certification and the placing into service processes guaranteeing the analysis of test results

7. The laboratory has been used with success to put is service:• Commuter lines of Madrid (Invensys & Thales Track / Alstom & Invensys Board) • Madrid-Levante HS line (Invensys Trackside / Siemens & Bombardier Onboard)

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

National Environment; Putting projects in service

Tools Development

European Networking: Consolidation

CorridorsDeployment

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

The way forward in four steps:

1. MANAGEMENT OF DMI IMAGES

2. SYNCHRONISATION AND UNIFICATION OF TEST RECORDS

3. DEFINITION OF OBSERVABLES

4. AUTOMATION OF THE ANALYSIS OF TEST RESULTS

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

DEM (DMI Event Manager by Multitel)

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

Synchronization and Integration of DMI

records with current laboratory

Synchronisation & Integration of Test RecordsDatabase with integrated test records

(Proposal by Multitel)

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

Observables creation (by Multitel)

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

Semi Automatic Trip Analysis and Validation (SATAV) (by Multitel)

1) Navigation frame by

frame

2) Detection & Recognition of Icons, Buttons, Colours,

Text, etc

3) Events in relation with the selected frame

4) Manual Editione.g.: To add events,

annotations …

5) … as long as Video is processing.

I RAIL TECHNOLOGICAL FORUM FOR INTERNATIONALIZATION

THANKS FOR YOUR ATTENTION