Upload
sedatsh
View
221
Download
0
Embed Size (px)
Citation preview
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 1/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 2/529
The IT Professionals Guide to
Managing and Consulting
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 3/529
The IT Professionals Guide to Managing and Consulting
Page 2
Copyright © 2008
Notice of Rights
All rights reserved. No part of this book may be reproduced or transmitted in any
form by any means, electronic, mechanical, photocopying, recording, or otherwise,
without the prior written permission of the publisher.
Notice of Liability
The information in this book is distributed on an “As Is” basis without warranty. While
every precaution has been taken in the preparation of the book, neither the author
nor the publisher shall have any liability to any person or entity with respect to any
loss or damage caused or alleged to be caused directly or indirectly by the
instructions contained in this book or by the products described in it.
Trademarks
Many of the designations used by manufacturers and sellers to distinguish their
products are claimed as trademarks. Where those designations appear in this book,
and the publisher was aware of a trademark claim, the designations appear as
requested by the owner of the trademark. All other product names and services
identified throughout this book are used in editorial fashion only and for the benefit of
such companies with no intention of infringement of the trademark. No such use, or
the use of any trade name, is intended to convey endorsement or other affiliation
with this book.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 4/529
The IT Professionals Guide to Managing and Consulting
Page 3
TABLE OF CONTENTS
FOCUS INTERVIEWS – OVERVIEW ........................................................................5
FOCUS INTERVEW – THE FIVE WHYS .................................................................21
FOCUS INTERVIEW – IT FOCUS INTERVIEWS .................................................... 25
FOCUS INTERVIEW – MANAGEMENT INTERVIEW FORM.................................. 43
FOCUS INTERVIEW – IT INTERVIEW FORM.........................................................65
PROCESS ENGINEERING – PROCESS WALKTHROUGH ................................... 75
PROCESS ENGINEERING – WORKFLOW.............................................................77
PROCESS ENGINGEERING – CHANGE PROFILE..............................................101
PROCESS ENGINEERING – CLIENT ARCHIVE ANALYSIS................................105
PROCESS ENGINEERING – CUSTOMER REQUIREMENT ANALYSIS..............107
PROCESS ENGINEERING – OVERALL PROCESS CHARTING ......................... 109
PROCESS ENGINEERING – PROCESS ANALYSIS FORMS ..............................117
PROCESS ENGINEERING – VALUE CHAIN & TIME ANALYSIS.........................127
PROCESS ENGINEERING – BROWN PAPER CHARTING..................................131
PROCESS ENGINEERING – BROWN PAPER FAIR ............................................145
WORKGROUP SKILLS – EFFECTIVE MEETINGS...............................................149
WORKGROUP SKILLS – FACILITATION..............................................................159
WORKGROUP SKILLS – AFFINITY PROCESS....................................................165
WORKGROUP SKILLS – METAPLANNING..........................................................177
WORKGROUP SKILLS – PROBLEM SOLVING TEAM BUILDING.......................179
IT DIAGNOSTICS – OVERVIEW ...........................................................................195
IT DIAGNOSTICS – BUSINESS ALIGNMENT.......................................................199
IT DIAGNOSTICS – BUSINESS ALIGNEMENT FINANCIAL ANALYSIS ..............209IT DIAGNOSTICS – PROJECT BUSINESS CASE ................................................ 225
IT DIAGNOISTICS – INITIATIVES ASSESSMENT................................................231
IT DIAGNOSTICS – USER SATISFACTION..........................................................241
IT DIAGNOSTICS – IT SERVICE UNIT ANALYSIS...............................................253
IT DIAGNOSTICS – MANGEMENT PRACTICES..................................................263
IT DIAGNOSTICS – PROJECT REVIEW...............................................................271
IT DIAGNOSTICS – TOOLS, METHODS & TECHNIQUES...................................279IT DIAGNOSTICS – TECHNICAL ENVIROMENT..................................................285
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 5/529
The IT Professionals Guide to Managing and Consulting
Page 4
IT DIAGNOSTICS – SYSTEM ARCHITECTURE...................................................293
IT DIAGNOSTICS – SYSTEM FUNCTIONAL AND TECHNICAL QUALITY.......... 309
IT DIAGNOSTICS – ACTIVITY ANALYSIS ...........................................................327
IT DIAGNOSTICS – IT ORGANIZATION & PROCESS MANAGEMENT PRACTICES
FORM.....................................................................................................................339
IT DIAGNOSTICS – PROJECT REVIEW FORM ...................................................359
CHANGE MANAGEMENT – UNDERSTANDING CHANGE ..................................367
CHANGE MANAGEMENT – TASKED BASED TEAMS.........................................389
CHANGE MANAGEMENT – COACHING AND FEEDBACK..................................399
CHANGE MANGEMENT – OVERCOMING RESISTANCE TO CHANGE............. 415
GENERAL TECHNIQUES – BEST PRACTICES ...................................................429
GENERAL TECHNIQUES – BUSINESS IMPACT MATRICES, CAUSE & EFFECT
...............................................................................................................................437
GENERAL TECHNIQUES – CORE COMPETENCES & CRITICAL SUCCESS
FACTORS ..............................................................................................................441
GENERAL TECHNIQUES – DAY IN THE LIFE OF (DILO)....................................445
GENERAL TECHNIQUES – KPI ............................................................................461
GENERAL TECHNIQUES – ORGANISATION DEVELOPMENT...........................469
GENERAL TECHNIQUES – PARETO CHARTING & THE PDSA CYCLE ............ 473GENERAL TECHNIQUES – RACI .........................................................................485
GENERAL TECHNIQUES – SWOT & ROLE SPIDERS ........................................501
SOFTWARE TOOLS – BUSINESS MODELING & STIMULATION........................505
SOFTWARE TOOLS – TOOLS INTRODUCTION..................................................515
FURTHER INFORMATION ....................................................................................519
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 6/529
The IT Professionals Guide to Managing and Consulting
Page 5
FOCUS INTERVIEWS – OVERVIEW
Interviews• Confidential, one-to-one interviews with managers at all levels and across
functions• Gain views on current situation, organizational strengths and initial
opportunities for improvement• Tailored to the individual client’s situation
Objectives of the Interview• To gain thorough understanding of the individual’s role and responsibilities• To get individual perceptions of areas of opportunity and potential barriers to
improvement• To build commitment to and ownership of the change program• To ”make a friend” - gain support for additional assistance and involvement
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 7/529
The IT Professionals Guide to Managing and Consulting
Page 6
The interview process is based on hypothesizing key issues • Study or further develop the hypotheses• Change drivers => issues => ideal solution• Develop questions to verify the hypotheses• Test the interview• Refine the questionnaire• Carry out the interviews• Correlate results• Validate and complement the early hypotheses and develop new ones•
Present results to client
The interview helps to define opportunity • Provides team with initial direction for further studies• Helps to establish a theme - what kind of project is needed• War stories and testimonials provide proof that need for improvements exists• Provides opportunity to gain perceptual or job related data
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 8/529
The IT Professionals Guide to Managing and Consulting
Page 7
Expectations of the analyst / interviewer
• Level of detail must be sufficient
• Complete answers to all open ended questions
• Specifics for war story data (e.g., data, names, etc.)
• Bullets written in narrative form
• Logical and consistent perceptions
•
Get to the real issues• Format must be easy to review for findings
• Content must be meaningful and specific to interviewee’s department
and experience
• What is he/she really saying ?
• Capture direct quotes whenever possible
• Probe to examine real issues
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 9/529
The IT Professionals Guide to Managing and Consulting
Page 8
Continued…
• Essential to understand
• Departmental functions
• Departmental performance
•
Opportunities for improvement• Relation to broader project
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 10/529
The IT Professionals Guide to Managing and Consulting
Page 9
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 11/529
The IT Professionals Guide to Managing and Consulting
Page 10
There’s an endless list of reasons why an interview can fail
Interviewee demands information from you that you cannot give
Interviewee does not turn up
Interviewee runs out of time
Interviewee has brought 5 colleagues along
Client restricts interviewee list
Interviewee has just been interviewed
Interviewee is temporarily unstable
Interviewee ducks questions
Interviewee changes agenda
Interviewee does not want to do interview
Interviewee thinks you are assessing him (hire/fire decision)
Interviewee worried about confidentiality
Interviewee does not believe your reasons for interview
Interviewee wants to be your best friend
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 12/529
The IT Professionals Guide to Managing and Consulting
Page 11
The checklist should become second nature in all clients contacts
• Preparation of the interview
• Did you agree a location ?
• Did you agree a start time ?
• Did you check the hygiene factors ?( Interviewee had a cup of coffee etc)
• Did you check the name and position of the person being interviewed ?
• Execution of the interview - Introduction
• Did you introduce yourselves ?
• Did you explain the purpose of the interview ?
• Did you confirm/clarify the time contract ?
• Did you confirm interviewees position/capacity ?
• Did you outline the framework of the interview and explain roles ?
• Did you explain to what end the interview would be used ?
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 13/529
The IT Professionals Guide to Managing and Consulting
Page 12
Continued…
• Execution of the interview - Close
• Did you finish with an open question (is there anything else you would like
to tell me ?)
• Did you agree/clarify any next steps and timings ?
• Did you thank the interviewee ?
• Follow up
• Are your interview notes in a readable format?
• Do you have any quotes ?
• Are the key points summarized ?
• Do you know who and when to feedback your interview notes ?
• Have you quality checked the interview - do you think it’s honest and accurate
?
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 14/529
The IT Professionals Guide to Managing and Consulting
Page 13
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 15/529
The IT Professionals Guide to Managing and Consulting
Page 14
Objectives of the interview
• Introduce yourself and why you’re here
• Business assessment purpose: to lead an assessment effort by reviewing
processes, consolidating ideas and suggestions, analyzing and evaluating
the findings and to help develop a master plan and operating strategy
• This interview: to capture your perceptions, ideas and suggestions
• Confirm and expand our understanding of xxxx
• Understand your department, its role and major activities
• Capture your view of xxx strengths and opportunities for improvement
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 16/529
The IT Professionals Guide to Managing and Consulting
Page 15
In this your view of the business ?
(Company org chart here)
• Where are the strengths ?
• Where are the opportunities ?
• What role does your department play ?
(Probe: consistent across all product lines ?)
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 17/529
The IT Professionals Guide to Managing and Consulting
Page 16
Information
• Do you get the information you feel you need to plan/do/review these activities
?
• Where do you get this information ?
• Is it in the form you would like ?
• Is it available in a timely fashion ?
• What additional information do you need ?
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 18/529
The IT Professionals Guide to Managing and Consulting
Page 17
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 19/529
The IT Professionals Guide to Managing and Consulting
Page 18
What does ”PERFORMANCE” mean to you ?
• If we were to work together to remove these barriers to performance, what
percent increase in performance do you think would result
• 10% 20% 30% 40% 50% or more
• What would be the chances of success of a joint effort ?
• none poor fair good excellent
• If NONE/FAIR/POOR...Why ?
•
Is the climate right for a joint project?• If NO...Why ?
• What initiatives are currently under way to address performance ?
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 20/529
The IT Professionals Guide to Managing and Consulting
Page 19
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 21/529
The IT Professionals Guide to Managing and Consulting
Page 20
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 22/529
The IT Professionals Guide to Managing and Consulting
Page 21
FOCUS INTERVEW – THE FIVE WHYS
What is it?The Five Why’s is an interview technique that is used to drill down to the problem,rather than accept action around a symptom.
Background• Have you heard the story about the CES who called on a client who wanted to
hire a project manager, and walked out with a systems transformation?•
The Five Why’s is a technique to get there in one session, rather than severalmonths.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 23/529
The IT Professionals Guide to Managing and Consulting
Page 22
Example of Use – 2• Ensure that no sludge enters the system again and the problem is fixed.• Fixing the fuse would not fix the problem.
(Example after “Kaizen” by Masaaki Imai)
When to use it• When you want to solve a problem, and not a symptom.• Before initiating an action without a clearly understood outcome (see PDSA).• To focus limited resources on the most effective action.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 24/529
The IT Professionals Guide to Managing and Consulting
Page 23
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 25/529
The IT Professionals Guide to Managing and Consulting
Page 24
Critical Issues• Ensure that you remain objective. You are looking for data on the process,
not someone to blame.• Avoid an event oriented explanation. You are looking for the cause of the
event. “Because I did not tell him to,” is an event. Continue to ask “Why didyou not tell him to.”
• Do not try to solve the problem using this tool.
Conclusion• The Five Why’s focus on the identification of a problem, not its solution.• Ensure that the problem is identified in “Process” terms.• Select the most appropriate tool to solve the problem.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 26/529
The IT Professionals Guide to Managing and Consulting
Page 25
FOCUS INTERVIEW – IT FOCUS INTERVIEWS
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 27/529
The IT Professionals Guide to Managing and Consulting
Page 26
. . . however, they were quick to state the need for dramatic changes in IT • “We need to shape the IT mission based on business needs, not on
technology”• “We can't get systems delivered on time that do what we want or need.”• “They are a major contribution to cost - there are too many people for the
value that's being added”• “Corporate data is a major issue”• “The quality, timeliness, consistency of IT information needs to be improved”• “Systems that support our business are old, not user-friendly, and many of the
things we do are still done manually - without mechanization.”• “IT needs to treat end users like customers - they need to remember they are
a service organization”•
“We've got to get out of the box”
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 28/529
The IT Professionals Guide to Managing and Consulting
Page 27
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 29/529
The IT Professionals Guide to Managing and Consulting
Page 28
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 30/529
The IT Professionals Guide to Managing and Consulting
Page 29
What they said about . . . executive leadership/vision• “The problem is not lack of vision, it's executive leadership.”• “There is an inability to translate vision into an
action plan to actually achieve the vision.”• “We are told that we are empowered, but then we
are micromanaged.• “We have really great people, but I don't think our
management thinks that.”• “There is an emphasis on the hot cause of the moment - and that changes by
the minute.”• “We have a hell of a lot of smart people, but our management beats them up
for not accomplishing the impossible. We need a leader with practical
experience who will reward successes as well as honest failures.”• “Stuff comes out one month and gets canned the next.”• “I wish I knew what motivated senior management - we're so short-term
focused.”• “We have way too much management, but no leadership.”
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 31/529
The IT Professionals Guide to Managing and Consulting
Page 30
What they said about . . . performance goals/measurement
• “We're supposed to have a QAT looking at this,but they're focusing on the wrong things.”
• “We don't have a clear and consistent list of goalsto work from . . . we waste a tremendous amountof resources arguing about these goals.”
• “Most things are measured on the “noise level”from the users . . . we're certainly not measuredon schedules or budgets.”
• “We need to set the bar - people need to understandwhat's required - what is a good job.”
•
“Today, they (IT) seem to be measured on some sort of internal system-oriented format that has no correlation to what the end user perceives.”• “It is not clear to me what IS's goals are or how they measure it.”• “We don't have a clue whether we're doing a good job of developing systems.”• “If we don't have a goal, we can't have a plan.”• “IT doesn't appear to have goals that relate to the business success, but then
neither does anyone else.”
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 32/529
The IT Professionals Guide to Managing and Consulting
Page 31
Continued…
What they said about . . . team building
• “We've got a tough job of building a team in IT.It may not be possible with the management wehave today.”
• “You can't have team building without trust . . . andthere is no trust.”
• “Incentives encourage individual achievement vs.teamwork.”
• “People are too concerned with protecting their jobs to work together as a team.”
• “Teamwork extends to building customer/supplier relationships.”• “Teamwork starts at the top . . . and it doesn't exist there either.”• “We still look for who's responsible for failure . . . encourage teamwork.”• “We need to develop teamwork and trust, then empower people. It's okay to
fail on occasion.”• “We've built huge walls between the AVP organizations in IT.”
• “It's hard to partner with your customer when you're so busy fighting amongstyourselves.”
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 33/529
The IT Professionals Guide to Managing and Consulting
Page 32
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 34/529
The IT Professionals Guide to Managing and Consulting
Page 33
What they said about . . . funding for IT
• “IT budget is not linked with company operations.”• “Funding is based on the previous year — not tied to new work.”• “There is a large disconnect between resource requirements and the IT
budget.”• “. . . we need to get meaningful corporate priorities in place to drive IT
funding . . . and stick with the priorities.”• “I feel like we're on an allowance . . . it's crazy.”• “If IT is so important to this corporation, let's put some dollars behind it.”• “The 'no free lunch' saying applies.”• “We have no idea how much resource is enough or what's the right stuff to
be working on.”
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 35/529
The IT Professionals Guide to Managing and Consulting
Page 34
What they said about . . . IT vision• “We need a clear, more concise understanding of not just where we're going,
but how we'll get there . . . the 'how' is what has been really missed.”• “We don't have a clear vision, top to bottom, as to what our role is .”• “We do need to know where we think we're going.”• “Real lack of clarity . . . what is IT going to be?”• “I think there's a vision for IT, I just don't know what it is.”• “I haven't been given a good enough road map so I can tell my people where
we're going.”• “We need to drive IT strictly by business needs — driving down costs and
increasing functionality.”• “Have a consistent direction that everyone buys into. . . not only by IT, but
users as well, . . that is practiced daily.• “We don't know how to get there from here and we're not sure where 'there'
is.'”
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 36/529
The IT Professionals Guide to Managing and Consulting
Page 35
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 37/529
The IT Professionals Guide to Managing and Consulting
Page 36
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 38/529
The IT Professionals Guide to Managing and Consulting
Page 37
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 39/529
The IT Professionals Guide to Managing and Consulting
Page 38
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 40/529
The IT Professionals Guide to Managing and Consulting
Page 39
Similar views...different ways to get thereIT Said...
• “Make sure we're working on the right stuff.”• “Work efforts producing an end product that is effective for the business.”• “Developing systems quicker and better.”• “Reduced staff with full utilization of people.”• “Creativity, quality, enthusiasm, go extra mile.”• “Applications fit the user's needs the first time.”• “Improved use of funds.”• “A work environment that's relaxed and productive.”
IT Customer Said . . .
• “Ability to profitably serve our customers at a high level of service.”
• “Improved customer satisfaction.”• “Faster delivery of products and services to end customers.”• “Improved resource utilization . . . or value added activity”• “Quality.”• “Fewer gaps between requirements and deliverables.”• “Direct impact to earnings.”
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 41/529
The IT Professionals Guide to Managing and Consulting
Page 40
Underlying both optimism and pessimism is the need for change…Why Chances are Good
• “Only because last month would have been better.”• “ORG is a high cost company and losing ground.”• “Internal recognition of vulnerability to competition.”• “If we don't we're going to self-destruct.”• “The level of pain.”• “Tremendous dissatisfaction with IT.”• “While the wounds are still fresh.• “We have to be more innovative faster.”• “Assume support from top level officers.”• “I think our customers would help us if we made an honest effort.”
…Why Chances are Poor• “So many improvement programs have been implemented with no result. . .
people have a 'here we go again' attitude.”• “Budget constraints.”• “Organization is in turmoil, making it difficult to structure and implement.”• “People are becoming cynical . . . reorganization hasn't occurred yet.”• “Top management commitment is not there — attitude starts at OM level and
goes up.”• “There's too much anger and frustration in IT right now.”• “If we don't we're going to self-destruct.”
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 42/529
The IT Professionals Guide to Managing and Consulting
Page 41
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 43/529
The IT Professionals Guide to Managing and Consulting
Page 42
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 44/529
The IT Professionals Guide to Managing and Consulting
Page 43
FOCUS INTERVIEW – MANAGEMENT INTERVIEW FORM
IT Services
Executive Management InterviewsManagement Interview Form
Status: Draft
Version: 0.1
Release Date:
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 45/529
The IT Professionals Guide to Managing and Consulting
Page 44
Document Control
Author
Prepared by <name and / or department>
Document Source
This document is located on the LAN under the path:
I:/IT Services/Service Delivery/Functional Specifications/
Document Approval
This document has been approved for use by the following:
<first name, last name>, IT Services Manager
<first name, last name>, IT Service Delivery Manager
<first name, last name>, National IT Help Desk Manager
Amendment History
Issue Date Amendments Completed By
Distribution List
When this procedure is updated the following copyholders must be advised through
email that an updated copy is available on the intranet site:
<Company Name> Business Unit Stakeholders
IT
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 46/529
The IT Professionals Guide to Managing and Consulting
Page 45
Management Interview Form
CONFIDENTIAL
Interviewee: Title:
Years with the
Company:
Department:
Years in Management: Interviewer:
Time in Current
Position:
Date:
Executive opening comments:
Often the executive to be interviewed has some comment or question right up front.
These are to be encouraged as they set the stage for you as a good listener and you
can often find some key issue that they are vitally interested in. Or they just may
have some questions about the IT Diagnostics and how the information they provide
will be utilized.
Question 1 (R) Describe your Organization / Department / Mission /
Function
You may also ask them to sketch their organization chart or to list the activities
they are responsible for or the major groups of people. You need to understand
this executive’s place in the organization in order to better understand the context of
their answers. You can also gather descriptive statistics on the size of their
operation (number of people, growth, locations, etc.) to help you frame their problem
set.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 47/529
The IT Professionals Guide to Managing and Consulting
Page 46
Question 2a. (O) What’s the mission of the company (use actual name
here)?
This is more background information but is interesting to compare the answers givenby business executives and IT executives. Strategies you suggest should be either
directly supportive of or complementary to the business mission. There should be
good congruence of answers here and if not, leadership problems or at least
communications problems at the highest levels exist.
Question 2b (O) How does IT contribute to that mission?
This question seeks a clear definition of the business value of IT. It used to establish
in the minds of executives, especially business executives, the part IT plays in the
value chain and positions IT as being an essential piece of the product/service
delivered to the end customer.
Question 3a (R) What are your Business Strategic Imperatives (what are
your plans and why)?
You may also phrase this to ask for goals and objectives. The former language is
more appropriate to the business executive and the latter to IT. You are trying to
understand the drivers for the actions of this executive. This is a particularly
important question to see if IT is in sync with the business and where it’s headed.
And it helps XX understand about the future plans this organization has.
You are gathering information about this executive’s area of responsibility. He/she
may wish to talk about their goals within the bigger picture of the entire division or
company. Gather all the information you can about the larger entities but
concentrate this interview on this area of responsibility. Get all the hard copies you
can on goals and objectives as this helps frame your overall prescriptive strategies.
A question we also ask business executives is what are your customer’s major
business objectives; major performance improvement objectives. We are
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 48/529
The IT Professionals Guide to Managing and Consulting
Page 47
looking for an extension of the internal value chain to the customer of the business
executive. We want to find out if they know what is driving the customer and if they
are trying to meet those needs/expectations and ultimately if that will translate to
IT requirements. It’s a way of tracing demand and value offered by the IT function as
it supports the business executive’s desire to service their customer. We nearly
always use this particular question with business executives.
Question 3b (R) What’s critical to achieving these goals?
For the business executives, we are looking for the IT connection. Is IT on the
critical path for this executive to achieve his/her objectives? And specifically, is there
some aspect of IT that is vital? (Often technology in some form is part of this
answer.) For the IT executive, we are looking for a discussion of the
problems/constraints he/she feels is critical to meeting their goals. This can tell us
where to focus some of our other diagnostics.
You can also phrase this question around the information necessary to achieve their
objectives- or add this as a separate question or group of questions. You can ask
what critical information do you need to do your job and follow up with questions
on the data itself, what is the source of this information and is it always accurate
and timely.
Again, you’re looking for the IT connection to business and the internal IT reliance on
data from other areas of IT. This often points to problems in production services and
with data access, currency and reliability.
Question 3c (O) What are the most important things you personally do?
In trying to understand this executive’s role, you may wish to see how he/she
personally contributes to the value delivered to the customer. What an executive
spends their time on is the true indication of what they view as important. Careful
listening here can uncover possible re-engineering opportunities.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 49/529
The IT Professionals Guide to Managing and Consulting
Page 48
Question 4a (O) Do you have a formal (written) strategy?
This question is trying to see whether the client has committed to paper their
business/IT strategies. Most organizations are ad hoc in their planning (although
many have year by year MBOs). This presents opportunities for an ISP as well as
other means of formalizing the planning process.
Question 4b (O) Does it include IT?
This question is asked of business executives to see if they are devoting the
attention they need to IT or if they even see IT as a player in their plans for the
future. (We often make the point that business execs have no right to complain if
they don’t get involved in providing direction and resources for the IT area of their
business.)
A variation of this question is to ask what is the role of IT in executing your
business strategy. The focus is still how the business executives view IT - as a
partner, as a service organization, as an afterthought.
Question 4c (O) What percentage of your time is spent on IT issues?
Doing What?
This is even a more direct attempt to have business executives quantify the
importance of IT to their strategies. If the number is high, it could be either because
IT is considered a partner or because of IT problems which are draining executive
time to get resolved. That’s why you must follow up with how they spend their time
on IT issues.
Question 5a (O) Who are your major customers?
This question seeks to establish the value chain in an organization. Sometimes the
customers identified are external (e.g. if the question was directed to a Marketing
executive) and sometimes internal (IT executives nearly always answer with aninternal view but this is expanding with EDI and other technologies that link IT across
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 50/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 51/529
The IT Professionals Guide to Managing and Consulting
Page 50
ISP implications for IT and is also a question designed to determine if the allocation
of resources is correct and will stay correct for the planned future. It is also an
indictment of those reactive organizations that do not plan and can lead to numerous
opportunities in the planning area.
Question 6 (R) What measures do you use to assess client
satisfaction?
We are looking for written surveys (ask for a copy if they use them), focus groups,
random telephone surveys, anything that they use regularly to assess how well their
customers think they are doing. If the business executives have a program (and
often they do) can this be used (as least as the basic model) for a similar program
within IT - they should be linked. If a formal method does not exist (and this is often
the case in IT) this tells you about a break between customer and service provider
and provides us an opportunity in assessing customer satisfaction for the client.
If one exists for IT, get the results for the past few years and match those with the
comments made in the business management interview sessions. If they are in
sync, next item, but if not, and nearly all are not, you need to assess customer
satisfaction with IT using our survey form.
Question 7a (O) How is your group’s performance measured?
This question is asked to see if there is a real connection between stated objectives,
things like MBOs, and rewards. You are looking also for those verbal (non-
documented) measures of performance which exist in any organization. Solutions
you suggest should fit with the actual measurement/reward system (or you may even
recommend that they should change it).
This question can also be expanded to ask about the company as a whole or the IT
organization as a whole. It is sometimes valuable to gather the opinions of
executives on how things are done and how well they are going in areas not their
own.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 52/529
The IT Professionals Guide to Managing and Consulting
Page 51
Question 7b (O) How is your area doing against its objectives?
This is a sounding board question that sometimes elicits information on the fairness
of the measurement system itself or other constraints that stop an organization from
meeting its objectives. Sometimes the age and complexity of older legacy
applications stop development and maintenance groups from meeting service level
agreement objectives. This may point to another AM opportunity or perhaps a
conversion opportunity to be explored.
This question can also be expanded to ask about the company as a whole or the IT
organization as a whole. It is sometimes valuable to gather the opinions of
executives on how things are done and how well they are going in areas not their
own.
Question 7c (O) How are you personally measured?
For most executives, this question catches them off guard. Allow them time to think
without interruption. The most common answer is “I don’t know” or said a different
way, “I’m not sure”. The question is designed to make measurement a personal
issue. It gets the executive involved on a personal level and can also point out flaws
within the system that we may be able to address.
Question 8a (R) What are the three biggest strengths of your company
Strategies you suggest are always more easily agreed to when they are in line with
the strengths of the organization. And this question is to see if IT is supporting the
company at its strong (competitive differentiating) points. We look at the answer
here and compare that with where IT is spending its resources (time and money) to
see how they align.
You may also ask the question about the three biggest weaknesses to find out
problems and to again see if IT is aligning its resources behind what the corporation
needs.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 53/529
The IT Professionals Guide to Managing and Consulting
Page 52
Question 8b (R) What are the three biggest strengths of your group/area
This question is a build upon 8a with a more in depth look at the executive’s own
area of responsibility. Sometimes you can find that business executives feel that
areas of IT are very weak in certain services and you hear IT executives announce
that those areas are strengths. You can also see redundancies and internal
inconsistencies (e.g. our people are our greatest strength and greatest asset but you
find no career path, no training available and very high turnover). This question can
also be asked using weaknesses.
Question 9a (R) If you were the CEO (use the incumbent’s actual name
here), what would you do to improve the performance of IT at “client company
name”
You are looking for quick hits or long term fixes to performance problems. Often you
will get organizational suggestions when asking the question this way. The business
executives will tell you what they think IT needs to do to help them. IT executives
usually mention resources or some other IT department that constrains their
performance.
You can follow up this question (depending of course on the interviewee’s answer)
by asking would it be simple to implement such suggestions or how would they
implement such suggestions.
Question 9b (R) If you were the CIO (use the incumbent’s actual name
here), what would you do to improve the performance of IT at “client company
name”
This question is mainly for the IT executives but can be used on the business
executives as well (9a tends to work better on the business executives and the CIO)
and is designed to elicit similar responses as question 9a.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 54/529
The IT Professionals Guide to Managing and Consulting
Page 53
Question 10a (R) You have been away for a year (an extended vacation all
expenses paid), how would you determine if the IT function had improved
while you were away?
This question provides an avenue for determining and establishing the needed
metrics within IT to determine how well it is currently functioning.
Things that would be looked for are the efficiencies that can be developed in the IT
Departments and how to better align it to the needs of the greater organization.
Question 10b (R) what sources of information would you use? What
criteria?
This is one of the most powerful questions we use and it is always asked in some
form or another. If your interview time has been cut short, get to this question (10a,
10b).
We ask this to get at the core problems with IT as executives see them. We
determine what they want improved (what’s personally important to them) and
equally as important, what they consider improvement to be, and in the second part
(10b) what they would look at or who they would talk to) to make that determination.
Variations:
Sometimes we begin the question from the viewpoint of your customers. Again
we are attempting to establish the linkage of everything IT does to the customer.
Business executives treat this as meaning external customers and IT executives
usually answer in terms of their internal customers whether from the business areas
or from other areas of IT. Be sure to get an understanding of who they mean when
you ask the question this way.
A second variation changes the question from IT to business. You ask about a
specific area of the business instead of the IT function. This is for business
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 55/529
The IT Professionals Guide to Managing and Consulting
Page 54
executives who are trying to improve the way they do business. It captures their
thoughts on what’s wrong and what they view as improved performance.
Another common variation, one that is easier to tabulate but much less powerful in
extracting information and is therefore not recommended, is to ask the question as a
multiple choice of pre-provided answers.
You would say ...upon your return, which three of the following list of items
would you look at to determine if the IT function was more effective today.
Then you would create a list for the interviewee to mark off three (or two or four,
some small number of) items.
Sample categories:
IT meets budget and schedule commitments
IT costs (charge backs) are reduced
IT communicates effectively with its customers
IT takes the initiative and is a full business partner
Applications meet the needs of the business
Applications are accurate and dependable
On-line systems are always available
On-line systems have consistently good response
IT uses new technologies to serve its customers
IT meets customers’ requests promptly
Business costs are reduced
IT has made the business more competitive
Business effectiveness is increased
Question 11 (R) If you had the power to instantly fix one dysfunctional or
broken aspect of today’s IT organization, what would you do?
This question is designed to uncover quick hits. What’s the worst of the worst? As
you tabulate interviews you see patterns of problems and suggested solutionsemerging. You also see the “have not” departments within an organization express
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 56/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 57/529
The IT Professionals Guide to Managing and Consulting
Page 56
Question 14 (O) List the most important application systems for your
area (limit three to five).
The intent of this question is to begin tracking which systems serve which areas of
the business. The system names are matched with the application demographics
results and with the results from the technical and functional quality analytics to
determine if these systems are being maintained/enhanced at a level the business
executive needs and that the company has the resources to service. For XX this can
mean opportunities for Applications Management, new project development and/or
conversions.
Question 15a (O) What are the key software development projects for
your area? (Include those recently completed, those underway, and those
planned)
Like question 14, this question looks at the applications important to a specific
business or IT executive. The intent is to understand the pipeline of application
changes and how these new projects will impact the findings on the older systems
(Is a development project going to replace a system we see as being of poor quality,
etc.)
Question 15b (O) Are you aware of any specific IT initiatives underway at
the present time? Who is leading the effort?
This is directed at business executives. We are looking for IT infrastructure activities
beyond business as usual. The purpose is to examine the communications between
IT and the business. We often have recommendations about IT/business linkage
and the importance of ongoing communications. This is just to see if the business
people know that IT is retooling or moving data centers or is reorganizing, etc.
A version of that we ask IT executives Are you aware of any business initiatives
where IT is not a player. Again looking for communications but going further to see if
the business executives are proceeding on their own. This can mean that they will
“dump something off” to IT when they feel the time is right or perhaps that they willdeal with a third party to help them, not internal IT. As many business executives
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 58/529
The IT Professionals Guide to Managing and Consulting
Page 57
today have the freedom to directly choose their suppliers this could be an opportunity
for XX to partner with the business leaders for specific solutions but must be done
with caution as IT is very often our client and the one who puts us on preferred
vendor lists.
Question 15c (O) What IT projects not underway would provide significant
value to your organization?
This is the reverse side of the question designed to solicit unmet demand from the
business executives. It works as well with IT executives as they look at training and
retooling and organization moves that have not been made that they believe would
help significantly. For XX, the answers here speak of project work viewed by some
executives as valuable but that is not getting done so it represents a way for us to
partner with the internal shop to expand their resources to meet all critical customer
needs.
Question 16 (O) What other departments must do their jobs well in order
for your group to be successful? Which of their activities are important to
you?
This question is designed to uncover interdependencies and, in particular,
constraints. You can often find IT mentioned by business executives as a necessary
player but usually stated ...if they don’t... not stated in the sense of a business
partner. The answers given help establish the value chain all the way through to the
end customer.
We do not usually use this question with the company president.
Question 17 (R) What are the barriers, if any, to improving performance?
Usually this is worded to improving IT performance as our emphasis is on IT but if
is worded in the more open fashion to allow business executives to discuss their
ideas for their areas and these in turn would in the end have IT implications. Orsome will even just say that IT is the barrier. We are looking mostly for the political
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 59/529
The IT Professionals Guide to Managing and Consulting
Page 58
or organizational barriers. There are always real constraints that surface here but
most of the opposition to improvement is political as change threatens those in
charge of the existing way of operating.
This is an essential question but often you will get individuals reluctant to answer,
especially true if this is a joint interview. You need to prod a little and not blindly
accept, “there are no barriers” as a valid answer.
An alternative way to ask this question is Are there obstacles to full participation
by your group (or any group) in this improvement program. This makes it more
personal and puts the interviewee on record as saying that his/her group will fully
cooperate. If they identify obstacles or conditions then you must address those in
your recommendations - even if they are unreasonable, they must be addressed.
Question 18a (R) What does improvement mean to you?
In question 18c, you will ask for a stated improvement percentage but it’s first very
important to clarify just what this executive means when he/she talks about
improvement. In any improvement program the question of how to take the benefits
of improvement comes up but is not usually specifically addressed (lower costs, do
more work with the same cost, respond more rapidly, etc.). The answers here tell
you the expectations executives hold about how to harvest the benefits of an
improvement program.
An additional piece of information you may want to find out is what this executive
sees as good. Sometimes there is a particular company he/she had in mind
(perhaps a shop where they used to be employed) or sometimes it can even be a
particular computer software application they see as the utopia for their current
situation. You might ask what other companies have you looked at or thought
about as models for what you want to do. And if the conversation is leading you
this way, you might also inquire about what computer packages this executive
has in mind or has heard about and why he/she thinks they would help here
and now.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 60/529
The IT Professionals Guide to Managing and Consulting
Page 59
Question 18b (R) How would these improvements be measured?
Usually executives have some idea of what they want to happen but in order for us
to quantitatively help them; we need to be able to measure the effects of our
recommendations. The best place to start is with the executives themselves to see if
they have measures in mind which they would trust. This way we don’t impose a
measure they will have little faith in or may not even understand.
Question 18c (R) If we could remove the barriers that you identified to
improving performance, what would the resultant improvement % be? (Limit
to increments of 25%)
This question is asked because the answers can be easily tabulated and it makes a
convincing story about just how much room for improvement there actually is in this
organization.
Question 19 (O) If we embarked on this improvement program, what
would be the probability of our success?
Poor Fair Good Excellent
This is a question that is again easy to tabulate and report on and can be a powerful
indictment of a company in gridlock. This question is asked of lower level managers
and technicians in the audience analysis sessions to see if executives and workers
are in sync about the chances for success. Usually they are not in sync as
executives tend to be much more optimistic.
Question 20 (R) Can you identify improvement opportunities that can be
implemented quickly?
This question is strictly for quick hits, or what executives believe should be quick hits.
Business executives often identify areas of their business that they believe would
improve dramatically if they had a new computer system to do such and such or if
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 61/529
The IT Professionals Guide to Managing and Consulting
Page 60
improvements to the existing support systems could just.... IT executives usually
have a short list of items that are planned or in progress that just haven’t turned up
yet. You can use both sets of ideas to make recommendations. And even if they are
working on some ideas you can add value by restating or refining the ideas so that
they can be implemented much more quickly (or in stages), just so you can get some
value as soon as possible.
You should also ask what’s currently underway and how’s it progressing. This
is so you can add to what is already being done and don’t suggest to them a solution
that they have already embarked upon.
Question 21 (O) What areas of the software delivery process should we
pay closest attention to?
This question is asked of IT executives (and lower level IT managers in the audience
analysis sessions) and is meant to narrow our search for significant problems. A
pattern usually develops in the answers and this helps us to make sure we don’t
overlook a problem that is widely believed to be serious.
Question 22 (O) If you attended the annual stockholders meeting and
you had the opportunity to meet the CEO (use actual name here) and could
briefly say one thing to him/her, what would it be?
This is a true confessions question - what’s the most urgent issue or even what’s
going very well at this moment in time. This question is valuable only if a pattern
develops in the answers. If the comments are positive, we use that to talk about
strengths and how our recommendations fit with those strengths. If negative, how
our recommendations and next steps address the problem/concern that people want
the chairman to know about.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 62/529
The IT Professionals Guide to Managing and Consulting
Page 61
Question 23a (O) Circle five adjectives that describe the culture of your
organization today.
Flexible Rigid
People-oriented Task-oriented
Proactive Reactive
Participative Directive
Team-oriented Individualistic
Trusting Suspicious
Sensitive Insensitive
Results Driven Failure driven
Short term Long term
Close Minded Open Minded
Entrepreneurial Bureaucratic
Vacillating Decisive
Risk taking Cautious
Sociable Status Conscious
Finance Driven Technically Oriented
Question 23b (O) Circle five adjectives which you would use to describe
the culture of your group as you would like it to be.
Flexible Rigid
People-oriented Task-oriented
Proactive Reactive
Participative Directive
Team-oriented Individualistic
Trusting Suspicious
Sensitive Insensitive
Results Driven Failure driven
Short term Long term
Close Minded Open Minded
Entrepreneurial BureaucraticVacillating Decisive
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 63/529
The IT Professionals Guide to Managing and Consulting
Page 62
Risk taking Cautious
Sociable Status Conscious
Finance Driven Technically Oriented
We usually limit this question (23a and 23b) to IT executives or we change it to ask
the business executive about the culture of the IT organization. (It’s valid as-is for
the business executive if you are working strictly with them on some kind of
transformation.)
These are two separate sheets of paper we hand the interviewee and allow them to
circle their responses. The form needs enough white space to allow for that and it
should have nothing else on it but this question.
When embarking on an improvement program, culture is always an issue. There
can underlying reasons (environmental constraints) for the culture being the way it is
that we as a company can address - perhaps through better project management,
better training, delivering on time and on budget, agreed to maintenance service
levels - all concrete actions that can raise confidence and increase professionalism,
etc.
Question 24 (R) Tell me about _____
At nearly all the shops we visit, there is some major IT initiative going on or about to
begin. Usually an IT Diagnostics is done at the beginning or early on in the life of
one of these major IT infrastructure projects. Customize this question to ask about
the project. See what is known, what is supposed, what the expectations are, etc.
Use this to frame your recommendations. Ask of business leaders as well as IT
leaders.
A specific way to ask is what to you is a successful project. This determines what
they know and what they consider to be success for this major undertaking.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 64/529
The IT Professionals Guide to Managing and Consulting
Page 63
Question 25 (O) Prioritize the following management issues. List the top
five in rank order that you think we should focus our improvement efforts on.
Do each list separately, choosing five from each list
Business Management
____ Executive Leadership/Vision
____ Organization Structure
____ Communications
____ Information Technology
____ Operating Procedures
____ Delegation of Authority
____ Supervisory/Management Training
____ Clear Roles & Responsibilities
____ Team Building
____ Performance Goals/Measures
____ Other (Write In)
Technology Management
____ IT Vision
____ Funding for IT
____ Databases
____ Application Development Tools
____ Platform Architectures
____ Network Architectures
____ Standards
____ Consolidation of IT Functions
____ Decentralization of IT Functions
____ Application Development & Support
____ User Involvement
____ IT Planning
____ Life Cycle Methodology
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 65/529
The IT Professionals Guide to Managing and Consulting
Page 64
This question is asked by handing interviewees a piece of paper and letting them fill
in the numbers one through five in each section. We are looking for commonality
among answers. We don’t want to overlook areas where they believe they need
attention. We may suggest some fundamental changes need to made first but we
want to address what’s on the client’s mind.
Question 26 (O) Is there anyone else you think we ought to interview for
this project?
If the interview schedule is set, we don’t usually employ this question. We use this if
we feel we are not getting a broad enough cross section to arrive at valid
organizational conclusions. You will always get an answer to this question - most of
the time they volunteer this information without you asking for it.
When working in the business area or on a workflow engagement, this question
helps you follow the flow of work by identifying significant players in the process.
Question 27 (R) Is there anything you would like to add or do you have
any questions that I might be able to answer for you?
This is more of a courtesy but is also an opportunity for some follow on contact.
Always leave your business card and a local number if you have a desk at their site.
Encourage follow up and mention that you might call them if you need some
clarification on answers. Leave the channels of communication open as much as
you can.
If the interview is not one on one, you may not have the candid answers you need,
so the door opening at the end can be of vital importance.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 66/529
The IT Professionals Guide to Managing and Consulting
Page 65
FOCUS INTERVIEW – IT INTERVIEW FORM
IT Services
Focus InterviewIT Interview Form
Status: Draft
Version: 0.1
Release Date:
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 67/529
The IT Professionals Guide to Managing and Consulting
Page 66
Document Control
Author
Prepared by <name and / or department>
Document Source
This document is located on the LAN under the path:
I:/IT Services/Service Delivery/Functional Specifications/
Document Approval
This document has been approved for use by the following:
<first name, last name>, IT Services Manager
<first name, last name>, IT Service Delivery Manager
<first name, last name>, National IT Help Desk Manager
Amendment History
Issue Date Amendments Completed By
Distribution List
When this procedure is updated the following copyholders must be advised through
email that an updated copy is available on the intranet site:
<Company Name> Business Unit Stakeholders
IT
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 68/529
The IT Professionals Guide to Managing and Consulting
Page 67
Interviewee __________________
Phone # __________________
Department __________________
Ref # __________________
Title __________________
Interviewer __________________
Level __________________
Date __________________
Introduction
• Consultant • Interview Method • Time Frame
• • Note-taking
• Project Overview • Card Sort
• Purpose of Interview • Confidentiality
1. Client
• Years with company ____ • Years in mgmt ____ • Years in position
____
• Comments:
2. a. Please sketch out (draw) your group's organization chart and describe the
key activities performed by each of the groups or people. Include number
of people, locations, growth of function/area.
b. As a group, what are your goals and objectives?
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 69/529
The IT Professionals Guide to Managing and Consulting
Page 68
3. What are the three most important things (critical tasks) that you do?
4. What key pieces of information do you need to do your work? Where do you
get this information today? Is the information you need consistently accurate
and available on a timely basis?
5. Is there anything in your reporting system that is particularly beneficial (or
deficient) in assisting you in managing your responsibilities?
6. How is your group’s performance measured? How are you measured?
7. What do you see as the three biggest strengths of the company? Of your
area?
•
•
•
8. If you were in <PRESIDENT>‘s job, what three actions would you take to
improve the performance of information / information systems at the company?
•
•
•
9. If someone asked you to identify the one single critical issue or dysfunctional
("broken") aspect of the company information systems, what would you say?
Why?
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 70/529
The IT Professionals Guide to Managing and Consulting
Page 69
10. Imagine that you have been away for a year. Upon your return, what three of
the following ten items would you look at to determine if the IT function had
been effective while you were away? (When interviewing IT individuals, ask
them to put themselves in their customer's shoes when answering this
question.)
Process Quality
1. IT "takes the initiative"
_____
2. IT and customers communicate effectively
_____
Product Quality
3. Delivered applications meet customer needs
_____
4. Applications have low error and failure rates
_____
Service Quality
5. High system up-time, availability, and response time
_____
6. Customers can get service when needed
_____
Business Value
7. Business costs are reduced _____
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 71/529
The IT Professionals Guide to Managing and Consulting
Page 70
8. Business effectiveness is increased
(i.e., reduced business cycle time/better management info)
_____
Cost
9. IT meets schedule and budget commitments
_____
10. IT costs reduced
_____
11. Identify the specific departments within the company Information Systems that
your group depends on, and the specific things they must do well in order for
your group to meet its goals.
12. What are the five major systems that are critical to you? Rank the importance
of the system in the areas of strategic and operational importance as high,
medium, or low.
Strategic importance refers to the impact a system has on the competitive
positioning of the business.
Operational importance refers to the impact a system has on the actual
running of the business (i.e., the business cannot run without it).
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 72/529
The IT Professionals Guide to Managing and Consulting
Page 71
Strategic Operational
System Name Importance Importance
(high,med,low) (high,med,low)
_________________________ __________ __________
_________________________ __________ __________
_________________________ __________ __________
_________________________ __________ __________
_________________________ __________ __________
13. What do you perceive to be the mission of the company? How does IT
contribute to that mission?
Mission:
IT Contribution:
14. What IT-related initiatives are currently underway, and who are the individuals
responsible for each of the initiatives?
An initiative is considered to be any non-application development activity
above and beyond the normal scope of business activities, such as data
centre consolidations, special training programs, reorganization efforts,etc.
Initiative Person Responsible
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 73/529
The IT Professionals Guide to Managing and Consulting
Page 72
15. Are there any ongoing non-IT initiatives that you are aware of where IT can
add value?
Initiative Person Responsible
16. What major system development or enhancement projects are currently
under way?
17. Card Sort
I have a series of cards here to show you; each card has a management issue
printed on it. As you look at each card, think about how to significantly improve
competitive performance or financial performance. After looking at the cards, sort
them into two piles: 1) areas in which we could work to significantly improve
performance, and 2) areas in which smaller improvements could be achieved.
Then rank order the "significant" pile by priority of areas you think we should work
on first and dedicate the most effort toward improving.
For all individuals (Quotes for non-IT individuals only)
Priority Priority
Executive Leadership / Vision Supervisory/Management
Training
Organization Structure Better-Trained People
Communications Roles & Responsibilities
Information Systems Team Building
Operating Procedures Performance Goals / Measures
Delegation of Authority Other
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 74/529
The IT Professionals Guide to Managing and Consulting
Page 73
For IT individuals (Quotes for IT individuals only)
Priority Priority
Information Vision Consolidation of IT Functions
Funding for IT Decentralization of IT Functions
Database Architectures Applications & Applications
Support
CASE Tools "Owner" (User) Involvement
Platform Architectures Information System Planning
Network Architectures Classical Systems Development
vs. Iterative Prototyping
18. If we were able to work together to remove the barriers to improving
performance that you have identified, what % increase in performance do you
estimate would result?
10% 20% 30% 40% 50% 100%+
What does "performance" mean to you?
How would these improvements show up? How would they be measured?
19. If we entered a project together to remove these barriers to achieving
performance improvements, what would be the probability of our success?
NONE POOR FAIR GOOD EXCELLENT
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 75/529
The IT Professionals Guide to Managing and Consulting
Page 74
20. Is the climate right to enter into a joint improvement program at this time?
YES NO
Why or why not?
21. If you were riding up the elevator with <PRESIDENT> and could tell him one
thing, what would it be?
22. Say that one year from now you were telling me about the results of "a very
successful project" with XX. What would we have accomplished to make you
so satisfied?
CLOSING
23. Is there anything else you would like to add to what we have talked about?
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 76/529
The IT Professionals Guide to Managing and Consulting
Page 75
PROCESS ENGINEERING – PROCESS WALKTHROUGH
How to do a Process Walkthrough
• Step 1: Decide on the case that you are going to follow through the process
• Often different types of products are flowing through the same process
partly and have partly own process parts. For example, a mortgage for a
high amount of money will need more signing, and therefore more
operations and flow time than a mortgage for a low amount of money
• Step 2: Make all data needed to reflect the chosen case and, if necessary, fill
in the form(s) with which the process to be studied, starts
• Step 3: Walk through the process, starting at the point where the request
enters the clients organization
• At every operation ask
• What will you do now with this case? What data do you need? How long
will it take? Are all cases the same? When finished, where will you send
it? etc,
• Step 4: Document the process, for example in a process map
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 77/529
The IT Professionals Guide to Managing and Consulting
Page 76
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 78/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 79/529
The IT Professionals Guide to Managing and Consulting
Page 78
Managing the links is a first step towardsBUSINESS PROCESS AUTOMATION
Task - Task
• Captures and controls temporal and other dependencies between tasks.
• Manages the dynamic "flow of work" in the business process
Tasks - Applications
• Captures and controls how computer resources, software applications and
data will support the process
• Provides automation and "information logistics" (the right information to the
right person at the right moment)
People - Tasks
• Captures and controls how people work within the process
• Manages the computer support provided to individual for working on tasks
within business processes
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 80/529
The IT Professionals Guide to Managing and Consulting
Page 79
Workflow supports the claims process• It manages the flow of activities in accordance with defined business rules.
• It involves people in the process in accordance with the defined process
model, taking into account their roles in the organization.
• It provides individuals with information and access to computer resources as
needed in the process.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 81/529
The IT Professionals Guide to Managing and Consulting
Page 80
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 82/529
The IT Professionals Guide to Managing and Consulting
Page 81
The way to use WORKFLOW
• During AS-IS and TO-BE:
– to model the existing/future process, the way the processes interacts with and
use underlying IT. It is also used to model how measures are to be captured
from the processes.
• During DELIVERY:
– to build the IT run-time support system for the new processes.
• Later, during DEPLOYMENT and EXECUTION of the new processes:
– used as a central part of the IT system to manage the execution of processes
and to capture process measurements.
WORKFLOW is a good means to prototype TO-BE processes. A workflow prototype
of a process allows it to be animated in full scale, using multiple user workstations,
and can be used in role plays to gain insight in how the process will behave and be
perceived by the future users.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 83/529
The IT Professionals Guide to Managing and Consulting
Page 82
Understanding the benefits to our clients If your clients frequently ask themselves questions like:
• What is the status of Mr. Brown's request?
• Why did this take much longer than usually?
• What are the priorities?
• What has to be done with this report when I have finished it?
• Which is the proper procedure to handle this case?
• Who is available to do this?
• Where is the Black dossier - I need it now!
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 84/529
The IT Professionals Guide to Managing and Consulting
Page 83
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 85/529
The IT Professionals Guide to Managing and Consulting
Page 84
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 86/529
The IT Professionals Guide to Managing and Consulting
Page 85
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 87/529
The IT Professionals Guide to Managing and Consulting
Page 86
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 88/529
The IT Professionals Guide to Managing and Consulting
Page 87
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 89/529
The IT Professionals Guide to Managing and Consulting
Page 88
Implementation of workflowWORKFLOW can in principle be:
• manually implemented,
• coded as part of application software,
• managed by a dedicated system,
usually called workflow or process management system
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 90/529
The IT Professionals Guide to Managing and Consulting
Page 89
Workflow Case Study• Underwriting process
• Automation of As-Is
• Screen captures from this to a Visual Basic mock-up, found in the electronic
handbook
• Example of process prototyping with workflow
– suitable for "role games"
– hooks for IT to trigger your imagination
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 91/529
The IT Professionals Guide to Managing and Consulting
Page 90
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 92/529
The IT Professionals Guide to Managing and Consulting
Page 91
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 93/529
The IT Professionals Guide to Managing and Consulting
Page 92
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 94/529
The IT Professionals Guide to Managing and Consulting
Page 93
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 95/529
The IT Professionals Guide to Managing and Consulting
Page 94
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 96/529
The IT Professionals Guide to Managing and Consulting
Page 95
Workflow vs. GroupwareWorkflow
• pre-defined flows
• every case is an "instance" of a type case
• exchange of information according to flows
Groupware
• every case is unique
• all information available to everybody at all times
• notifications by mail
• sequencing controlled by the people in the process
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 97/529
The IT Professionals Guide to Managing and Consulting
Page 96
Summing up Workflow supports the dynamic aspects of business processes without hard-
wiring them into the IT-system.
Major benefits for our clients:
reduced cycle times
better control and visibility
information when needed
simplifies systems evolution (business, process and IT)
Major benefits for us:
rapid prototyping of process solutions
something "concrete" to deliver
provides starting point for implementation project: GET OUR FOOT IN
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 98/529
The IT Professionals Guide to Managing and Consulting
Page 97
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 99/529
The IT Professionals Guide to Managing and Consulting
Page 98
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 100/529
The IT Professionals Guide to Managing and Consulting
Page 99
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 101/529
The IT Professionals Guide to Managing and Consulting
Page 100
•
Workflow manager:• PROCESS WEAVER
• WEB server:
• low-range free-ware (e.g. CERN)
• middle-range (e.g. Netscape)
• high-range (e.g. CGS NOVA for Intranets)
• Document management:
• if needed: use WEB-enabled document database (ORACLE, Documentum,...)
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 102/529
The IT Professionals Guide to Managing and Consulting
Page 101
PROCESS ENGINGEERING – CHANGE PROFILE
Change Profile : Technique
• Change Profile can be used
• as a tool for Delta Analysis in a Process Development project
• in a general Transformation Design of a whole Programme
•
The change profile describes the AS IS situation, the Early Wins as well as theintermediate and final TO BEs
• It is developed in management workshop(s) in order to get management
commitment and mobilization for implementing the changes
• The main results are
• a overall view and agreement of the total change
• preliminary project portfolio
• consistency of the individual change activities
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 103/529
The IT Professionals Guide to Managing and Consulting
Page 102
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 104/529
The IT Professionals Guide to Managing and Consulting
Page 103
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 105/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 106/529
The IT Professionals Guide to Managing and Consulting
Page 105
PROCESS ENGINEERING – CLIENT ARCHIVE ANALYSIS
Client Archive Analysis
• How to use
• Step 1: Organize for archive analysis. Find out which data you need to
know and what data is recorded, either on paper or electronically, that
you can use
• Step 2: Decide on the test sampling method. If electronic data is
available: are you going to use all data or part? If data should be
gathered from a paper archive: how large should the test sample be?
Which procedure is used to select cases?
• Step 3: Gather data
• Step 3: Process data to get the needed information
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 107/529
The IT Professionals Guide to Managing and Consulting
Page 106
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 108/529
The IT Professionals Guide to Managing and Consulting
Page 107
PROCESS ENGINEERING – CUSTOMER REQUIREMENT ANALYSIS
How to Conduct Customer Requirements Analysis
• Step 1: Define characteristics of:
• products
• distribution
• customers (product/market combinations) etc.
• Step 2: Prioritize objectives:
• price
• quality
• delivery speed
• customer service etc.
• Step 3: Competitive Analysis
• position organization within the competitive field
• Step 4: Segmentation
•
Segment the customers of the organization into different product/marketcombinations and define the demand characteristics
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 109/529
The IT Professionals Guide to Managing and Consulting
Page 108
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 110/529
The IT Professionals Guide to Managing and Consulting
Page 109
PROCESS ENGINEERING – OVERALL PROCESS CHARTING
Why do we need overall process charting?
• Alignment of process development work
• Aligns terminology
• Maps / positions the work at hand
• Better communication
• Assists in bridging brown papers, streams and business processes
• Increases business management’s understanding of business drivers
• Describes how the business can be steered
• Demonstrates the inter-relationships of processes
• Mapping of information systems
• Provides a foundation to map systems against
• Helps to understand what areas are covered and what not
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 111/529
The IT Professionals Guide to Managing and Consulting
Page 110
What is a process, what is it good for? • A business process is flow of activities required to satisfy a business need
• A business process usually refers to the value added tasks
• A business process is driven by a customer demand
• A business process produces a service to its customer
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 112/529
The IT Professionals Guide to Managing and Consulting
Page 111
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 113/529
The IT Professionals Guide to Managing and Consulting
Page 112
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 114/529
The IT Professionals Guide to Managing and Consulting
Page 113
Processes have certain characteristics
• Processes have one or more clients
• The client is at highest level external (real customer, shareholder,
authority etc.)
• At lower levels, the sub processes may have internal customers (e.g.
other processes)
• Processes may cross organizational boundaries
• Everybody needed to produce the service is involved• Processes have interdependencies
• The success of processes depends on the performance of others
• Process can be measured from its customer’s point of view
• Customer satisfaction, response time, flexibility, effectiveness
• Process can also be measured from internal efficiency point of view
• Cost per order, margin per order
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 115/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 116/529
The IT Professionals Guide to Managing and Consulting
Page 115
Continued…
“Maintenance” related
• Up-time Management
• Managing Availability
• Lifetime Management
• Maintain Capacity etc.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 117/529
The IT Professionals Guide to Managing and Consulting
Page 116
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 118/529
The IT Professionals Guide to Managing and Consulting
Page 117
PROCESS ENGINEERING – PROCESS ANALYSIS FORMS
When to use Process Analysis Forms?
The main tools for gathering information about current processes are Focus
Interviews and Brown Paper (or other) Workshops
Process Analysis Forms can be effective, when
• It is difficult to get people together to workshops (e.g. wide geographic
spread)
• You want to gather a lot of information in advance and use the workshop only
to get a consensus
• You need a standardized way of working in team consisting of consultants
and client personnel
Don’t forget that Interviews and Workshops are always needed also for the
mobilization purposes, not only for getting the data!
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 119/529
The IT Professionals Guide to Managing and Consulting
Page 118
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 120/529
The IT Professionals Guide to Managing and Consulting
Page 119
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 121/529
The IT Professionals Guide to Managing and Consulting
Page 120
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 122/529
The IT Professionals Guide to Managing and Consulting
Page 121
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 123/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 124/529
The IT Professionals Guide to Managing and Consulting
Page 123
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 125/529
The IT Professionals Guide to Managing and Consulting
Page 124
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 126/529
The IT Professionals Guide to Managing and Consulting
Page 125
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 127/529
The IT Professionals Guide to Managing and Consulting
Page 126
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 128/529
The IT Professionals Guide to Managing and Consulting
Page 127
PROCESS ENGINEERING – VALUE CHAIN & TIME ANALYSIS
How to use the technique (steps)
Gather information
• Data sources for building a value chain are:
• structured interviews with management
• documents describing the processes and organization structure
• reports about the branch of industry the firm is in
Define relevant value activities
• disaggregate broad functions into activities
• isolate activities with discrete technologies and economics
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 129/529
The IT Professionals Guide to Managing and Consulting
Page 128
Continued…
Disaggregation stops when activities are isolated and separated that:
• have different economics
• have a high potential impact of differentiation
• represent a significant or growing proportion of costBuild value chain using the generic value chain model (next page)
• Analyze value activities
• linkages within the value chain
• vertical linkages (with suppliers and channels)
• value adding
Decide which activities are of strategic importance
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 130/529
The IT Professionals Guide to Managing and Consulting
Page 129
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 131/529
The IT Professionals Guide to Managing and Consulting
Page 130
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 132/529
The IT Professionals Guide to Managing and Consulting
Page 131
PROCESS ENGINEERING – BROWN PAPER CHARTING
WHAT IS A BROWN PAPER ?
It is a pictorial representation of an entire process, detailing the actual steps taken
and highlights all applicable interfaces, decision points and information sources.
WHY DO A BROWN PAPER ?
• Show the process’ areas of strength
• Show areas of opportunities
• Show the big picture: “forest and the trees”
• Provoke thought for improvement opportunities
• Promote common understanding - increased cross-department learning and
fewer knowledge gaps
• Tell a story
• Use as a training tool
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 133/529
The IT Professionals Guide to Managing and Consulting
Page 132
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 134/529
The IT Professionals Guide to Managing and Consulting
Page 133
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 135/529
The IT Professionals Guide to Managing and Consulting
Page 134
BROWN PAPERS CAN DEPICT SEVERAL STATES• Can be used in a variety of applications
• AS-IS (actual process in use today)
• SHOULD-BE (process according to procedures)
• COULD-BE (optional methods)
• TO-BE (model for implementation)
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 136/529
The IT Professionals Guide to Managing and Consulting
Page 135
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 137/529
The IT Professionals Guide to Managing and Consulting
Page 136
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 138/529
The IT Professionals Guide to Managing and Consulting
Page 137
Define activities down to the level of detail necessary to obtain comfort &understanding. Identify opportunities by drawing a red cloud around it
Participants can become confused when trying to simultaneously understand and
document several different flows - by choosing one similarities and differences can
be more readily identified
To ensure understanding of the flow ask one person to tell the story to the other
participants
Assign responsibility to a small group of people for finalizing the process flow
diagram
OTHER THINGS TO REMEMBER
• Identify one flow and discuss it start to finish, using pencil to capture the
information
• Integrate other flows with the first one
• Ask one person to step through the completed flow to check its accuracy
• Assign a subset of the group the responsibility for finalizing the Brown Paper
• Use colored “Post It” note to label:
• Strengths (green)
• Opportunities (yellow or pink)
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 139/529
The IT Professionals Guide to Managing and Consulting
Page 138
GUIDELINES FOR BUILDING A BROWN PAPER• Don’t create a finished brown paper from scratch
• Disagreement about how the function is completed is acceptable
• Make not knowing the answer to every question an acceptable situation
• Be sure participants understand that the steady stream of questions is not an
attempt to trick or humiliate them
• Ask for hard copy and completed examples
• No value judgments
• Identify one stream of activity and do it start to finish
• Write explanations directly on the brown papers
• Specify percentages “yes” or “no” for decision points
• Use arrows to show the flow
• Rule of thumb
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 140/529
The IT Professionals Guide to Managing and Consulting
Page 139
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 141/529
The IT Professionals Guide to Managing and Consulting
Page 140
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 142/529
The IT Professionals Guide to Managing and Consulting
Page 141
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 143/529
The IT Professionals Guide to Managing and Consulting
Page 142
HELPFUL HINTS• Bind the edges of the paper with tape
• Use icons where possible to tell the story
• Process boxes and diamonds have black outlines
• Use dark colored pens when writing boxes / diamonds
• Use black ink for all lines and arrow heads
• Strength boxes outlined in green; opportunity outlined in green
• Use Post-It Notes for comments; benefits (green) and opportunities (pink) are
different colors
• Opportunity flags should be placed on chart after comments have been
obtained and should be numbered
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 144/529
The IT Professionals Guide to Managing and Consulting
Page 143
BROWN PAPER SHOPPING LIST• Room requirements
• Big table
• Large continuous wall space
• “Tackable” or “tape-able” wall
• Supplies
• Brown paper or butcher paper (3 ft. wide / 50 lb. weight)
• Markers
• Thick and medium width• Permanent, non-bleeding, non-toxic (Sanford, “Mr. Sketch”)
• Masking tape
• Scotch tape, gluestick, spray mount and “tack a note” stick
• Scissors
• Post-it Pads (3x3 or 3x5)
• ICONS (including boxes and diamonds)
• Push pins
• Live documents• Blank paper
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 145/529
The IT Professionals Guide to Managing and Consulting
Page 144
ELEMENTS OF A GOOD PROCESS FLOW• High client involvement
• Capture process-formal; informal; emotional
• Highlights opportunities for improvement
• Details all critical activities (“As-Is”)
• Simple and self explanatory
• “Live” documentation
• Captures all perspectives
• Icons and humor help communicate
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 146/529
The IT Professionals Guide to Managing and Consulting
Page 145
PROCESS ENGINEERING – BROWN PAPER FAIR
You should always consider organizing Brown Paper Fair(s) as a part of a PD-
project
• Brown Paper Fair is a good tool to
• Validate and ensure ownership of all the work that has been done during
the project
• Ensure common understanding and consensus for change
• Mobilize management and organization for implementing the change
• Brown Paper Fairs can be organized at different milestones of the project
(after AS-IS, TO-BE, Delta analysis)
• In some cases Brown Paper Fairs are big events with hundreds of participants
creating a large-scale mobilization, but even very modest Fairs can be very
effective
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 147/529
The IT Professionals Guide to Managing and Consulting
Page 146
Brown Paper Fairs
“This is how you can help us to improve the brown paper further:”
• Write a yellow post-it note if the description is incorrect
• Write strengths on green post-it
• Write weaknesses on red post-it notes
• Stick your post-it notes on to the brown paper
• Sign your name on the list to the right
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 148/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 149/529
The IT Professionals Guide to Managing and Consulting
Page 148
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 150/529
The IT Professionals Guide to Managing and Consulting
Page 149
WORKGROUP SKILLS – EFFECTIVE MEETINGS
OBJECTIVES OF THIS CHAPTER
Develop a shared understanding of effective meeting criteria and Identify and review
the skills and techniques utilized to effectively manage meetings
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 151/529
The IT Professionals Guide to Managing and Consulting
Page 150
DO THIS BEFORE THE MEETINGGoals Identify your goals
Objective Define a written objective
Agenda Develop a timed agenda
Content / Process Plan content and process
Materials Prepare clear, concise and focused materials
Roles Define roles and responsibilities
Pre-position Assess need for pre-positioning
Logistics Determine location and support requirements
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 152/529
The IT Professionals Guide to Managing and Consulting
Page 151
MEETING OBJECTIVES• Problem solving
• Communication information sharing
• Review and discussion
• Expectations of participants
• Planning
• Decision making
• Selling
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 153/529
The IT Professionals Guide to Managing and Consulting
Page 152
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 154/529
The IT Professionals Guide to Managing and Consulting
Page 153
MEETING ROLES AND RESPONSIBILITIESLeader Meeting preparation
Decision making
Actions assignment
Meeting notice of logistics
Assigns role of meeting minutes
Facilitator Meeting preparation support
Controls the meeting process
Time keeper
Team Members Generate ideas/ provide
recommendations
Build on ideas of others
Add expertise to meeting
Recorder Takes minutes, notes of meeting
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 155/529
The IT Professionals Guide to Managing and Consulting
Page 154
REACHING CONSENSUS DECISIONS• Set a time contract
• Develop / post an agenda and objectives
• Clarify the roles and responsibilities (leader, facilitator, participants)
• Record comments and questions on flip charts
• Practice positive meeting behaviors
• Develop an action plan (what, who, when)
WHAT TO DO IN MEETINGS• Headline
• Be positive
• Listen actively
• Paraphrase
• Establish time contract
• Observe time contract
• Build on other’s ideas
• Use the “how to” (H2) action phrase
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 156/529
The IT Professionals Guide to Managing and Consulting
Page 155
Continued…
• Use the “I wish” (IW) action phrase
• Stay focused
• Stay in process
• Use “in and out” note taking
• Help ideas “over the wall”• Set up “win/win” situations
• Remember, no idea is a bad idea
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 157/529
The IT Professionals Guide to Managing and Consulting
Page 156
FLIP CHARTS IMPROVE GROUP MEMORY• Central point of attention focuses on task
• Instant recording of contents/process
• Data and information becomes knowledge
• Single source note taking
• Accurate recording and consensus
• All ideas are good ideas (everyone gets to play)
• Continuity - pick up where team left off
• Transfers idea ownership to team
• Visual reinforcement of accomplishments
• Facilitates accountability and agreement
• Team credibility is felt by everyone
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 158/529
The IT Professionals Guide to Managing and Consulting
Page 157
•
Members are sensitive to each other (empathy)• Team sessions flow smoothly
• No one loses or feels negative
• Hidden agendas become unnecessary
• Defensiveness is decreased - cooperation is promoted
• Team and individual goals are satisfied
• You, your team, and your enterprise WIN !
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 159/529
The IT Professionals Guide to Managing and Consulting
Page 158
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 160/529
The IT Professionals Guide to Managing and Consulting
Page 159
WORKGROUP SKILLS – FACILITATION
WHAT IF . . .
A Resource or Group of Resources Begins to Take Over the Meeting?
• Remind the group that the leader needs to be in charge.
• Be very tactful but interrupt the resource and ask others to comment.
• Don’t look at the individual when you are presenting a question.
• In a win/win manner, ask the resource to write down these ideas so you can
capture them later.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 161/529
The IT Professionals Guide to Managing and Consulting
Page 160
OrThe leader is unable to come up with an action plan?
• Take a break and discuss the matter with the leader.
• End the meeting at this point, establish a time to meet again, and ask the
leader to make a few assignments.
Or
The time contract is not being kept?
• Frequently remind the group of the time contract.
• Write the time contract on the flip chart.
• Ask someone to remind you what time it is at certain points.
• Establish times at which you expect the group to reach certain points in the
process.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 162/529
The IT Professionals Guide to Managing and Consulting
Page 161
What if…
Some resources do not appear involved with the team or process?
• Try to draw those members in by asking their ideas.
• Quote tactfully a statement the individual made to you outside the meeting.
• Site something his/her department has done as a good example.
• Ask everyone to spend a couple of minutes writing down ideas. later in the
process ask them what they wrote and include those ideas on the flip chart.
• Call on the shy individual by name to give an opinion but ask the question on
a familiar subject.
If Two or more resources engage in side discussion?
• Direct a question to one of the individuals.
• Ask those who are participating in side discussions to share their ideas with
the entire group.
•
Remind the team that there should be only one discussion in the meeting at atime.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 163/529
The IT Professionals Guide to Managing and Consulting
Page 162
OR…Two persons in the group who hold a grievance against each other begin to launch
into personal attacks?
• Remind the team that personal comments are not allowed in this process.
• Refocus the discussion on the group level topic or issue at hand.
• If the disruptive behavior persists, call for a break, and inform the individuals
that they will have to leave the meeting if they cannot stay focused on the
group-level topics or issues.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 164/529
The IT Professionals Guide to Managing and Consulting
Page 163
The group gets out of control with everyone talking at once?• Identify the person who “has the floor”.
• Indicate awareness that many persons have a point to make; put the group
“on hold” and recognize one person at a time.
• Paraphrase the key issues raised.
• Take a short break. If appropriate, use this time to identify the leader’s
wishes.
A false consensus has been reached by the group, with individuals “going
along” but not committed?
• Do a benefits and concerns analysis.
• Walk through the preceding steps and ask individuals to state what they
agreed upon.
• Ask each member individually for agreement or comment.
• State that a non-verbal communication is sending a message different from
what was stated.
•
Ask the leader, “Are you satisfied with the consensus of the group”?
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 165/529
The IT Professionals Guide to Managing and Consulting
Page 164
What If…New lines of thought have been initiated without adequate closure on previous
issues or ideas?
• Focus the group on the previous issue after acknowledging new issues;
get back to the new point as soon as the original is brought to closure.
• Ask the leader if the original issue needs to be brought to closure before
proceeding.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 166/529
The IT Professionals Guide to Managing and Consulting
Page 165
WORKGROUP SKILLS – AFFINITY PROCESS
What is it?
• The Affinity Process is a method for obtaining consensus on an issue that is
not fully understood by a group.
• The Interrelationship Process is a method for obtaining consensus on the
relationships among the topics presented in the Affinity Process. It will also
give insights on how to approach the issue.
When to use it?
• When the issue is not well understood or defined.
• When participation from the whole group is required.
• When time is limited.
• When a team based approach is desired.
• When the solution depends on team buy-in to the solution.
• When the power of a single group or person needs to be reduced.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 167/529
The IT Professionals Guide to Managing and Consulting
Page 166
Critical Issues• The group must be chosen so that all “owners” of the issue are represented,
but is not too large. Eight to ten people is optimum, although it works with
much larger groups.
• All members of the group must be familiar with the issue.
• The group as a whole must benefit because of the solution to the issue.
• All members of the group must buy-in to the aim of the session, as defined by
the “initial statement of the issue”.
• Ensure enough time is available. (One to two hours for Affinity, and one hour
for Interrelationship. Longer for larger groups.)
• Ensure that the facilitator is familiar with the process.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 168/529
The IT Professionals Guide to Managing and Consulting
Page 167
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 169/529
The IT Professionals Guide to Managing and Consulting
Page 168
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 170/529
The IT Professionals Guide to Managing and Consulting
Page 169
Examples of Issue Statement• What are the issues involved in engaging the workforce in accomplishing
organizational change?
• What are the barriers to engaging the workforce in a systems transformation?
• What are the attributes of an effective coach/manager?
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 171/529
The IT Professionals Guide to Managing and Consulting
Page 170
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 172/529
The IT Professionals Guide to Managing and Consulting
Page 171
Cluster Ideas (2)• The facilitator should check that everyone has read all the posted answers.
• The facilitator should check that everyone is clear about the meaning of the
posted answers.
• The facilitator should enable elaboration on each answer to ensure that the
written form is clear in a standalone manner.
Clusters Ideas (3)
• The whole team should now work to put answers together in a group or
cluster “where they seem to belong”.
• Silent disagreement as to where an answer belongs is allowed, and should
prompt thought about why this is being done - no fighting!
• If an answer is swapped backwards and forwards between groups it is usually
because it has been written ambiguously - the facilitator must act.
• Do not force fit a single answer into a group.
•
Stop the process only when consensus has been reached.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 173/529
The IT Professionals Guide to Managing and Consulting
Page 172
Conclusion• The process will normally result in between 5 and 9 clusters.
• It should result in a clear consensus that these are the main topics to be
understood in order to understand the issue.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 174/529
The IT Professionals Guide to Managing and Consulting
Page 173
Critical Issues• The same team must be involved. All members must be present.
• Break before continuing with the Interrelationship Process.
• Try to complete both sessions in one day.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 175/529
The IT Professionals Guide to Managing and Consulting
Page 174
•
Continue with the next topic.• Continue until all topics have been related together. The result should be
similar to the following example.
• Count and record the number of times the topic drives, and the number of
times it is driven. Record this number as (drives/is driven).
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 176/529
The IT Professionals Guide to Managing and Consulting
Page 175
Conclusion• Look for topics that drive other topics. These normally indicate where to start.
• Discuss this conclusion with the group and obtain consensus for action.
Further Action
• Identify the initial tasks.
• Identify group members that can take ownership for initial action. This may be
an individual from a single functional group, but more commonly it will be
more than one person from different functional groups.
• Ask them to go through the Affinity / Interrelationship Process with their teams
to further break down action and priorities so that a plan may be
communicated back to the original group.
• Don’t forget to agree a timescale.
• Continue to break down the issue until it becomes small enough to solve, with
the knowledge that the individual solutions will build back to an overall
solution, rather than just putting out fires.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 177/529
The IT Professionals Guide to Managing and Consulting
Page 176
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 178/529
The IT Professionals Guide to Managing and Consulting
Page 177
WORKGROUP SKILLS – METAPLANNING
Metaplan
• A democratic, participant-centered method
• Useful for
• Illustration of group processes
•
Clarification of complex or controversial issues• Problem-solving and idea-generation
• Decision-making process
• You should use the "Metaplan-technique"
• If you want the opinions of all group members
• If you need the buy-in of the group
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 179/529
The IT Professionals Guide to Managing and Consulting
Page 178
•
Headline clusters• Headline all clusters
• Group decides headlines
• Summarize picture
• Brief summary of the description
• Copy the headlines onto flipchart
• Have flipchart ready (7-10 lines)
• Build ranks to priorities
• Ask clear question (what is most important, urgent, best solution?)
• Hand out adhesive dots (Two dots per topic as a rule of thumb)
• Instruct participants to stick their dots onto the flipchart
• Plan actions/next steps
• What, who, until when
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 180/529
The IT Professionals Guide to Managing and Consulting
Page 179
WORKGROUP SKILLS – PROBLEM SOLVING TEAM BUILDING
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 181/529
The IT Professionals Guide to Managing and Consulting
Page 180
PS/TB is a formal, step-by-step structured approach to solving a problem whichinvolves a number of iterations as we work towards our goal.
Because it is a participative process, it draws on the experience and knowledge of all
of us, it gets better results than if a single person tried to solve the problem on their
own. And the participative approach serves to draw the team together by giving
them a shared goal.
Optional: If time allows, provide brief summary of history of PS/TB:
Brainstorming—Alex Osborn 1950’s—SUNY Buffalo
A.D. Little—1960’s
SYNETICS—1960’s–1970’s
David Teiger—Shearson V.P.—1960’s
URC—mid-70’s–
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 182/529
The IT Professionals Guide to Managing and Consulting
Page 181
The PS/TB methodology is a tool that is appropriate for many situations.Here are some guidelines for when it is appropriate to use the methodology.
Emphasize that PS/TB is a key technique used in Natural Work Teams.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 183/529
The IT Professionals Guide to Managing and Consulting
Page 182
As good as this methodology is, it cannot be used to solve all problems. If you try touse it where it is not appropriate, it will lead to a lot of frustration and no progress.
Here are some cases where it is not appropriate to use the PS/TB methodology.
Emphasize that PS/TB is NOT a cure-all!
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 184/529
The IT Professionals Guide to Managing and Consulting
Page 183
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 185/529
The IT Professionals Guide to Managing and Consulting
Page 184
Before we talk about the specific steps of the PS/TB process, we need to understandthe roles of the players who are involved in the process.
The client is the person who owns the problem and is therefore accountable for
ensuring that an appropriate solution is found.
The Resources are the people who are there to help the client solve the problem by
lending their knowledge, experience, and creativity.
The Facilitator also helps the client solve the problem, but he or she does so by
concentrating on the process of solving the problem rather than the content (which
the client and resources bring)
Draw:
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 186/529
The IT Professionals Guide to Managing and Consulting
Page 185
The Players Roles and Responsibilities—Facilitator
• The facilitator is a catalyst in the group. The key roles are:
• Initiating, assisting, orienting, clarifying, integrating, summarizing, and
developing others’ ideas
• Leading the group through the Problem Solving sequence
• Assisting the group in working together effectively
• Avoids making content contributions
• Concentrates on keeping group focused
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 187/529
The IT Professionals Guide to Managing and Consulting
Page 186
The ”problem solving attitude” means• Constantly looking for improvement opportunities
• Not being satisfied with the way things are
• Listening to what others have to say
• Looking for solutions rather than sources of “blame”
• Avoiding finding fault with others
• Avoiding hunches or assumptions
• Being sure of your facts
• Thoroughly defining the What, How, When and Where
• Organizing your findings in order to maximize understanding
• Keeping an “open mind”
• Knowing that your ideas are wanted by others
• Encouraging and supporting innovation from others
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 188/529
The IT Professionals Guide to Managing and Consulting
Page 187
Step 1 - State the Problem• Initial statement of:
• Problem
• Task
• Opportunity
• Challenge
• Must be a concise, accurate headline
• Should be action oriented, “how to”
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 189/529
The IT Professionals Guide to Managing and Consulting
Page 188
•
“Drop out triggers” that could generate “out listening” in the previousillustration
• “Remember what happened seven years ago . . .”
• “ . . . remember Joe Smith?”
• “ . . . 56A Program”
• “three months to recover”
• “new people can be good . . .”
• “ . . . mentor program . . .”
• A favorite “drop out trigger” is listening to stories used to illustrate a point. A
group tends to move away from the task at hand (i.e., making a decision) and
engage in the game, “Can you top this?”.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 190/529
The IT Professionals Guide to Managing and Consulting
Page 189
Step 3 - Generate Ideas• Creative thinking, new approaches
• Quantity over quality
• Triggering
• Good builds
• Synergy
Tips on Generating Ideas
• Headlining is key
• Quantity is needed
• “Free wheeling” is welcome
• Ideas are heard and understood
• Focus is on ideas only
• Criticism is inappropriate
• Ideas get combined and improved
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 191/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 192/529
The IT Professionals Guide to Managing and Consulting
Page 191
A Mini-Problem Solve• Overcomes critical part of the concern
• Is still connected to original problem
• Looks for ideas that are acceptable
• May require selected ideas to be modified or replaced
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 193/529
The IT Professionals Guide to Managing and Consulting
Page 192
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 194/529
The IT Professionals Guide to Managing and Consulting
Page 193
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 195/529
The IT Professionals Guide to Managing and Consulting
Page 194
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 196/529
The IT Professionals Guide to Managing and Consulting
Page 195
IT DIAGNOSTICS – OVERVIEW
IT Diagnostics is a process within ST Scope that varies depending on the
situation
Objective
• To analyze the IT AS-IS
• To discover potential improvement areas
• To deliver a foundation to Visioning and Transformation Design
•
To supply data for the Business CaseCategories of analysis
• Business-IT alignment
• Information systems
• Organization and processes
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 197/529
The IT Professionals Guide to Managing and Consulting
Page 196
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 198/529
The IT Professionals Guide to Managing and Consulting
Page 197
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 199/529
The IT Professionals Guide to Managing and Consulting
Page 198
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 200/529
The IT Professionals Guide to Managing and Consulting
Page 199
IT DIAGNOSTICS – BUSINESS ALIGNMENT
Objective
• To determine how well IT goals, objectives and activities are in alignment with
Company business strategies and objectives
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 201/529
The IT Professionals Guide to Managing and Consulting
Page 200
How the strategic alignment assessment supports the business case
• Primary purpose
• Understand how well the IT resources support the attainment of the
corporate strategy
• Support for the business case comes from
• Eliminating projects and initiatives that do not lead to the attainment of
the corporate goal
• Realigning or adjusting the IT strategy to more clearly support the
corporate strategy
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 202/529
The IT Professionals Guide to Managing and Consulting
Page 201
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 203/529
The IT Professionals Guide to Managing and Consulting
Page 202
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 204/529
The IT Professionals Guide to Managing and Consulting
Page 203
Approach
• Conducted executive interviews to determine business objectives and
priorities
• Attended employee update on Strategy projects currently underway
• Reviewed IT Strategy
• Conducted IT interviews to determine status of IT Strategy and to understand
IT priorities and strategies
• Conducted survey of 15 people in the Technology Planning organization
concerning the status of planning
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 205/529
The IT Professionals Guide to Managing and Consulting
Page 204
“Strategies” identified in July 1992 IT Strategy
1. Portability, inter-operability, reusability
2. Pursue open, integrated infrastructure
3. Provide reliable communications infrastructure
4. Consolidate work structure and functions
5. Implement corporate data plan
6. Partner with customers (internal)
IT Strategy assessment rating scale
•
Full conformance to world class standards• Partially implemented
• In planning or set-up
• Concept recognized and in discussion phase
• Does not exist today
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 206/529
The IT Professionals Guide to Managing and Consulting
Page 205
Which means IT may be creating their strategy in a vacuum
Was an IT Strategy constructed to support the corporate strategy?
• The team that developed the Plan had both IT and business expertise.
• A non-redundant model of business processes was used to develop the IT
Plan.
• The objectives and CSFs from the Business Plan are related to the business
model.
• Gaps in application support for business activities documented in the model
are identified.
• Gaps in the information needed to support business activities (as identified inthe business model) are identified.
• IT projects are prioritized based on their support of business objectives and
CSFs.
• IT project prioritization is approved by a cross-functional business team.
• A comprehensive migration plan is defined to address identified gaps in IT
support.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 207/529
The IT Professionals Guide to Managing and Consulting
Page 206
Key components of the plan appear to be missing. . .
Is the Plan of sufficient quality to guide the future of IT?
• The Plan addresses the need to respond to changes in business direction and
priorities.
• The Plan contains an application architecture, or blueprint of non-redundant
systems, required to support business processes.
• The Plan contains a data architecture to support sharing of data among
business processes.
• The IT planning process is supported by tools that integrate with lower life
cycle systems development processes.
• The Plan contains an evaluation of tools, methods and techniques and an
action plan to address weaknesses.
• The Plan contains an evaluation of IT skills and an action plan to address
weaknesses.
• The Plan contains an evaluation of the IT organization structure and an action
plan to address weaknesses.
• The Plan contains an evaluation of IT support and an action plan to address
weaknesses.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 208/529
The IT Professionals Guide to Managing and Consulting
Page 207
Information resource goals and objectives generally do not provide clear
vision and direction
• Is a corporate business plan available?
• Was an IT strategy constructed to support corporate strategy?
• Was a rigorous methodology used to construct the IT strategy?
• Is the IT strategy of sufficient quality to guide the future of IT?
• Has an environment been established for successful IT strategy execution?
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 209/529
The IT Professionals Guide to Managing and Consulting
Page 208
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 210/529
The IT Professionals Guide to Managing and Consulting
Page 209
IT DIAGNOSTICS – BUSINESS ALIGNEMENT FINANCIAL ANALYSIS
Objective
• Identify how much the IT organization and its customers are spending
• Determine controllable costs that could be eliminated and uncontrollable costs
that could be reduced
• Build functional organizational charts showing specific numbers of full time
equivalents (FTEs) supporting IT processes
• Develop a financial baseline which captures As-Is spending and capital levels
from which the business case can be derived from
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 211/529
The IT Professionals Guide to Managing and Consulting
Page 210
Method
• Team with client financial worksites identified by the project lead and the
senior client
• Working with them to gather information that will result in a completed
Financial Framework
• Three key components:
• Multi-Year Expense Summary
• Multi-Year Capital Expenditure Summary
• Headcount by Function
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 212/529
The IT Professionals Guide to Managing and Consulting
Page 211
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 213/529
The IT Professionals Guide to Managing and Consulting
Page 212
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 214/529
The IT Professionals Guide to Managing and Consulting
Page 213
The numbers were in flux during the period of our review
• Financials were gathered in the latter stages of next year's budget cycle
• Much of the data was in process of management review during our analysis
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 215/529
The IT Professionals Guide to Managing and Consulting
Page 214
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 216/529
The IT Professionals Guide to Managing and Consulting
Page 215
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 217/529
The IT Professionals Guide to Managing and Consulting
Page 216
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 218/529
The IT Professionals Guide to Managing and Consulting
Page 217
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 219/529
The IT Professionals Guide to Managing and Consulting
Page 218
Monthly run rate for 2nd half is forecast to be up by $M
• Y.T.D. spending $ Million
• Straight animalization of Y.T.D. $ Million
• Current view of total year $ Million
• Increase over Y.T.D. Run Rate $ Million
• Monthly run-rate 1st half $ Million
• Monthly run-rate 2nd half $ Million
• 2 nd half monthly IT spending run-rate up % from first-half
• Increase in run-rate $ Million
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 220/529
The IT Professionals Guide to Managing and Consulting
Page 219
Approach
• Reviewed actual and planned capital spending by project for yeara to yearb
• Reviewed Business Case support for major projects and classes of
expenditures
• Assessed returns attained on a sample of mainframe and minicomputer
expenditures
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 221/529
The IT Professionals Guide to Managing and Consulting
Page 220
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 222/529
The IT Professionals Guide to Managing and Consulting
Page 221
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 223/529
The IT Professionals Guide to Managing and Consulting
Page 222
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 224/529
The IT Professionals Guide to Managing and Consulting
Page 223
he benefits will be derived in three areas
Cost opportunities through improvement of operational efficiency & effectiveness
• Reduce application maintenance costs
• Drastically streamline new applications development environment
• Alignment/prioritization of IT efforts with business
• Improve operational effectiveness
• Avoidance of low value capital expenditures
Functional/Business enablers
Support the current ongoing joint initiatives
• Position IT for future initiatives
• Competitive Positioning
Step change potential
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 225/529
The IT Professionals Guide to Managing and Consulting
Page 224
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 226/529
The IT Professionals Guide to Managing and Consulting
Page 225
IT DIAGNOSTICS – PROJECT BUSINESS CASE
Approach
• IT Management identified 113 recently completed and 113 planned projects
• Statistics for these projects were gathered from associated IT managers
• Searched for business cases for surveyed projects
• For 8 larger projects, attempted to locate business cases and resulting actual
costs and benefits
•
For the 4 where adequate detail was available, analyzed the business casevs. actual costs and benefits
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 227/529
The IT Professionals Guide to Managing and Consulting
Page 226
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 228/529
The IT Professionals Guide to Managing and Consulting
Page 227
Business cases do not generally contain rigorous and measurable
deliverables
• “Ability to budget at a lower level”
• “Ability to download data to a PC for analysis; eliminates manual data entry to
spreadsheets”
• “. . . following objectives: reduce costs, provide more flexibility and reliability.”
• “. . . eliminate confusion and delay . . . greater editing capabilities”
• “Enhance market and product planning”
“The Review Committee has never rejected any projects and there are noformal approval criteria”
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 229/529
The IT Professionals Guide to Managing and Consulting
Page 228
Business cases alone do not ensure good investment decisions
• Business cases are not readily accessible
• Project priorities may not be driven by business case components
• Business case expectations are seldom realized
• Benefits and costs are rarely monitored to track against business cases
• Business cases lack trackable metrics
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 230/529
The IT Professionals Guide to Managing and Consulting
Page 229
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 231/529
The IT Professionals Guide to Managing and Consulting
Page 230
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 232/529
The IT Professionals Guide to Managing and Consulting
Page 231
IT DIAGNOISTICS – INITIATIVES ASSESSMENT
Objective
• Analyze and assess the alignment of the key IT initiatives with the business
and IT strategies
• Analyze and assess the purposes of the key IT initiatives
• Analyze and assess the management of the key IT initiatives from business
case development through implementation
How initiatives analysis supports the business case
• Addresses, together with the Strategic Alignment Assessment and ProjectInventory,
• whether the IT organization has focused its resources appropriately
• whether it is capable of delivering the value expected from IT initiatives
and projects.
• Current Initiatives provides intangible benefits, not quantifiable
• In environments where significant resources are devoted to initiatives, it
may be of value to further analyze potential quantifiable, tangible
benefits.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 233/529
The IT Professionals Guide to Managing and Consulting
Page 232
Approach
• Reviewed Information Handbook
• Reviewed Focus Interview results
• Identified 113 initiatives and activities
• Selected key IT initiatives with IT management
• Reviewed key IT initiatives with initiative champion and team leaders
• Analyzed key IT initiatives
• Purpose and Strategic Alignment
• Business Case and Initiative Management
• Critical Success Factors
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 234/529
The IT Professionals Guide to Managing and Consulting
Page 233
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 235/529
The IT Professionals Guide to Managing and Consulting
Page 234
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 236/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 237/529
The IT Professionals Guide to Managing and Consulting
Page 236
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 238/529
The IT Professionals Guide to Managing and Consulting
Page 237
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 239/529
The IT Professionals Guide to Managing and Consulting
Page 238
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 240/529
The IT Professionals Guide to Managing and Consulting
Page 239
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 241/529
The IT Professionals Guide to Managing and Consulting
Page 240
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 242/529
The IT Professionals Guide to Managing and Consulting
Page 241
IT DIAGNOSTICS – USER SATISFACTION
Objective
• Determine how well IT meets the application delivery needs of the customer
base
• Assess how satisfied the customer base is with the level of service being
provided by IT
• Identify opportunities for improving service by comparing customer
perceptions of importance with their degree of satisfaction
How customer satisfaction supports the business case?
• A qualitative assessment based on customer perceptions of how well their
needs are being met
• Building a business case requires the scores to be supplemented by other
quantitative data to more clearly identify opportunities for reducing cost
• Possibilities for supporting a business case could come from:
• Improving productivity by improving the testing and implementation
processes and the quality of documentation
• Improving user productivity by increasing the reliability and/or availability
of data and system support etc…
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 243/529
The IT Professionals Guide to Managing and Consulting
Page 242
What and how?
Purpose
• To better understand the user perceptions of IT services in terms of
responsiveness, quality, planning and ongoing support
Process
• Identified 104 users from across the organization
• Distributed the survey by mail
• Placed follow-up calls to recipients and faxed them a second copy
• Received an additional 5 responses
• Evaluated responses
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 244/529
The IT Professionals Guide to Managing and Consulting
Page 243
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 245/529
The IT Professionals Guide to Managing and Consulting
Page 244
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 246/529
The IT Professionals Guide to Managing and Consulting
Page 245
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 247/529
The IT Professionals Guide to Managing and Consulting
Page 246
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 248/529
The IT Professionals Guide to Managing and Consulting
Page 247
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 249/529
The IT Professionals Guide to Managing and Consulting
Page 248
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 250/529
The IT Professionals Guide to Managing and Consulting
Page 249
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 251/529
The IT Professionals Guide to Managing and Consulting
Page 250
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 252/529
The IT Professionals Guide to Managing and Consulting
Page 251
Opportunities
• How to get at the root causes of the apparent customer apathy
• How to deal with a major PR opportunity - perception is real, but not
necessarily fact
• How to have your customers feel at least a partial sense of ownership over
both applications and support processes
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 253/529
The IT Professionals Guide to Managing and Consulting
Page 252
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 254/529
The IT Professionals Guide to Managing and Consulting
Page 253
IT DIAGNOSTICS – IT SERVICE UNIT ANALYSIS
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 255/529
The IT Professionals Guide to Managing and Consulting
Page 254
Costs
Actual (last year) Budget• Salaries
• Social Costs
• Company cars
• Training
• Traveling
• Hardware and software licenses
• Leasing costs
• Maintenance
• Data communication
• Facilities
• External services
• Supplies
• Administration and office costs
• Other costs
• Depreciation
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 256/529
The IT Professionals Guide to Managing and Consulting
Page 255
Technology
• Areas to cover:
• Hardware
• System software
• Data communication
• Application software
• Facilities
• Volume of operation
• Ways to work
• Service level
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 257/529
The IT Professionals Guide to Managing and Consulting
Page 256
System software
• Software
• Main operating systems
• Compilers
• Data bases
• Data communication
• Software development toolkits
• Data center automation and control
• Other supporting software
• Maintenance / maintenance contracts
• Financing
• Vendors
• Short term development plans
• Development history
• Policies
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 258/529
The IT Professionals Guide to Managing and Consulting
Page 257
Application software
• Applications
• e.g. systems map
• Roll-out year
• Tools
• Written material
• User guides
• Technical descriptions and guides
• Data center guide
• Maintenance / maintenance contracts
• Business dependency of software
• Vendors
• Short term development plans
• Development history
• Policies
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 259/529
The IT Professionals Guide to Managing and Consulting
Page 258
Volume of operation - Data center operations
• Utilization rates of the central processors
• Utilization rate of disk space
• Amount of workstations connected to network
• Workstations
• Terminals
• Printers
• Other equipment
• Amount of contacts from users to data center
• Amount of printing
• Response times
• Service times
• Periodical variation due to business
• Expected development
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 260/529
The IT Professionals Guide to Managing and Consulting
Page 259
Way to work - Data center operations
• Practices
• problem management
• assignments
• backups
• capacity follow-up
• data security
• reporting
• Prioritization and scheduling
• Automation
• Invoicing / sharing costs
• Expected development
• Printing
• Descriptions and documentation
• Guides
• general guidelines
• information security
• roll-out practices
• mailing
• problem management
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 261/529
The IT Professionals Guide to Managing and Consulting
Page 260
Continued…
• Statistics
• capacity loads
• service level
• Plans
• scheduling batch jobs
• catastrophe
• shifts
• development plans
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 262/529
The IT Professionals Guide to Managing and Consulting
Page 261
Service level
• Functionality
• Sufficient information
• Sufficient characteristics
• Right characteristics
• Reliability
• Performance level
• Expandability
• Speed of completing the assignment
• Attitude towards customer service
• Ability to steer
• Development
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 263/529
The IT Professionals Guide to Managing and Consulting
Page 262
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 264/529
The IT Professionals Guide to Managing and Consulting
Page 263
IT DIAGNOSTICS – MANGEMENT PRACTICES
Objective
• Understand how effectively the organization uses standard practices to
manage business demand and assure alignment across the organization
• Determine whether the organization has standards that assure the use of a
repeatable and consistent application delivery process
• Identify "best of practice" delivery processes and opportunities for wide scale
use by assessing multiple organizational units• Select specific opportunities for further analysis using detailed project probes,
DILOs, and brown papers
• Measure the maturity of the organizations processes and practices
• Identify opportunities for improving alignment, delivery and support
productivity, and quality
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 265/529
The IT Professionals Guide to Managing and Consulting
Page 264
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 266/529
The IT Professionals Guide to Managing and Consulting
Page 265
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 267/529
The IT Professionals Guide to Managing and Consulting
Page 266
We assessed management practices within IT and user organizations
• Scope: 52 surveys distributed to representatives of:
• Network/Finance
• Billing
• Customer Information Services
• Approach:
• Distributed surveys - 41 returned (79%)
• Collected surveys and summarized data for performance, formality and
effectiveness of:
• Information Systems Planning
• Project Management
• Delivery Process
• Development/Production Interface
• Performance Assessment
• Conducted management practices workshops with 31 participants to
review summarized data, and identify current strengths and
opportunities for improvement
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 268/529
The IT Professionals Guide to Managing and Consulting
Page 267
IT planning: The front end of the delivery process is inconsistent and
ineffective
• Systems planning (e.g. staff planning process) is not integrated with business
and user needs
• The intermediate support groups are often removed from the end users and
may not have a clear understanding of their needs
• Other groups define requirements, assign priorities and “throw these over the
wall” to IT
• Priorities and requirements are constantly changing, resulting in chaos,
rework and throw away• IT is often viewed by end-users as unresponsive to their needs, yet IT doesn't
“own” the front-end of the process
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 269/529
The IT Professionals Guide to Managing and Consulting
Page 268
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 270/529
The IT Professionals Guide to Managing and Consulting
Page 269
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 271/529
The IT Professionals Guide to Managing and Consulting
Page 270
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 272/529
The IT Professionals Guide to Managing and Consulting
Page 271
IT DIAGNOSTICS – PROJECT REVIEW
Objective
• Determine the elapsed time and the level of effort expended
• Determine the risk that was undertaken and the way it was managed
• Determine the quality of the end product
• Determine the management techniques used
• Identify opportunities for improving productivity by
• increasing the use of automation
• improving the use of structured, life cycle methodologies
• enhancing training for IT professionals and users
• Identify opportunities for enhancing cost/benefit ratios by
• improving project management
• monitoring costs
• defining and obtaining projected benefits
•
delivering a higher quality product faster
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 273/529
The IT Professionals Guide to Managing and Consulting
Page 272
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 274/529
The IT Professionals Guide to Managing and Consulting
Page 273
Our analysis relied on detail project probes and brown papers
• Detailed Project Probe
• 10 detailed probes completed by the project teams
• Only 7 usable (data not available with sufficient rigor)
• Brown Papers
• 8 Brown Papers (Process flows) of recently implemented applications
projects completed by project team members
• Approach:
• Identified 8 recently implemented applications systems
• Guided key Project Team members through project process steps
and captured "as-is" process steps on brown paper
• Validated process with systems developers and users
• Analyzed systems, opportunities and findings
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 275/529
The IT Professionals Guide to Managing and Consulting
Page 274
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 276/529
The IT Professionals Guide to Managing and Consulting
Page 275
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 277/529
The IT Professionals Guide to Managing and Consulting
Page 276
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 278/529
The IT Professionals Guide to Managing and Consulting
Page 277
Even if we make schedule, we pay a price in implementation and beyond . . .
Users
• "It doesn't work in this site!"
• "Where is the documentation?"
• "The response time is 5 minutes, not 5 seconds!"
• "When are we going to get trained on this?"
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 279/529
The IT Professionals Guide to Managing and Consulting
Page 278
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 280/529
The IT Professionals Guide to Managing and Consulting
Page 279
IT DIAGNOSTICS – TOOLS, METHODS & TECHNIQUES
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 281/529
The IT Professionals Guide to Managing and Consulting
Page 280
• To answer this question, we worked with:
• Network/Finance• Billing
• Customer Information Services
• Key activities
• Questionnaires were sent to 48 PG5 managers
• Questionnaires were completed by the managers and their direct reports
• Questionnaire results were summarized and analyzed
• Findings were validated in workshops with representatives from the
various organizations
• We achieved:
• Response rate = 100%
• 100% representation at the workshops or follow-ups
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 282/529
The IT Professionals Guide to Managing and Consulting
Page 281
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 283/529
The IT Professionals Guide to Managing and Consulting
Page 282
Our analysis shows that less than 10% of the organization has access to
modern tools
• "We have the tools, but we aren't using the whole integrated approach – so
we lose most of the benefit."
• "We developed 25% of our code using a CASE tool – but now we only have
15% of that code running in production – The rest has been rewritten
manually to improve performance."
• "We bring in tools and expect people to know how to use them immediately –
when they can't, they get kicked."
• "You shouldn't use a new, untried tool to develop a mission-criticalapplication."
• "Tools and information get thrown over the wall."
• "If our management was running the department of defense, we'd be at war
before we hired the troops, and they would want to know who failed to
forecast the war."
• "My boss thought the term 'Tools' referred to plastic flowchart templates."
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 284/529
The IT Professionals Guide to Managing and Consulting
Page 283
Methods and techniques can be significant enablers
• How to establish performance measures and objectives for the standard
delivery process
• How to provide ongoing education and support for the standard delivery
process
• How to develop a standard delivery process that leverages state-of-the-art
methods and techniques
• How to continuously refine the standard delivery process based on
performance information
• How to develop roles and responsibilities to support the standard deliveryprocess
• How to develop and support consistent levels of usage of the standard
delivery process, both inside and outside IT
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 285/529
The IT Professionals Guide to Managing and Consulting
Page 284
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 286/529
The IT Professionals Guide to Managing and Consulting
Page 285
IT DIAGNOSTICS – TECHNICAL ENVIROMENT
Objective
• Identify and communicate the “As Is” Technical Environment and assess its
ability to enable applications software to meet changing business needs.
• Identify the quick-hit initiatives
• Identify findings restricting the technical environments ability to efficiently
and effectively enable applications to meet the needs of the business
Deliverables
• “As Is” Technical Environment, such as:
• Configurations
• Communications maps• Geographic Maps
• Applications running in the architectures
• Investments
• Support costs
• Vendors
• Architectures
• Standards
• Quick-Hit inventory of opportunities, associated initiatives, and identified
benefits• Findings and next steps
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 287/529
The IT Professionals Guide to Managing and Consulting
Page 286
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 288/529
The IT Professionals Guide to Managing and Consulting
Page 287
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 289/529
The IT Professionals Guide to Managing and Consulting
Page 288
"As Is" technical environment
• Identify and describe the make-up of the "As Is" technical environment
including, as appropriate:
• computing hardware and related costs, support staff, standards and
vendor agreements
• software and related costs, support staff, standards and vendor
agreements
• network hardware, software and related costs, support staff, standards
and vendor agreements
• Assess the effectiveness with which the "As Is" technical environment enablesthe fulfillment of existing and emerging business needs
• Identify quick hit initiatives that will provide near term benefits
• Recommend next steps to address technical environment improvement
opportunities
• The technical environment assessment effort is relatively short in duration.
While one of the results of the assessment is the identification of "quick hit"
opportunities, the real benefit will be realized only by fully pursuing the steps
identified as necessary to take advantage of the enhancement opportunities.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 290/529
The IT Professionals Guide to Managing and Consulting
Page 289
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 291/529
The IT Professionals Guide to Managing and Consulting
Page 290
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 292/529
The IT Professionals Guide to Managing and Consulting
Page 291
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 293/529
The IT Professionals Guide to Managing and Consulting
Page 292
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 294/529
The IT Professionals Guide to Managing and Consulting
Page 293
IT DIAGNOSTICS – SYSTEM ARCHITECTURE
System architecture clarification
• Objective
• Assess how effectively the architecture supports the value chain and the
business processes
• To find out the structural elements that lead into functional quality
perceptions
• Assess the quality of the corporate information architecture
• Identify the factors driving resource demand and consumption
• Method
• Interview for Policies etc.
• Brown Paper Systems Map
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 295/529
The IT Professionals Guide to Managing and Consulting
Page 294
Possible benefits
• Limiting the expenditure on applications with low functional and technical
quality
• Marketing those generic applications with high value to external organizations
• Standardizing the types of technologies used
• Limiting dependency on and cost of external vendors
• Reducing the cost of resolving application and data synchronization errors
• Reducing the level of functional and data redundancy within the value-chain
• Reducing application downtime resulting in user cost reductions or benefits
improvements (number of hours downtime times user population)
• Reducing or improving alignment of maintenance spending
• Improving operations due to rerun reduction (percent of reruns times
production costs)
• Reducing the cost of parallel application systems and data bases which have
extended conversion schedules and/or enhancements planned
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 296/529
The IT Professionals Guide to Managing and Consulting
Page 295
Potential tasks
• Complete the analysis of application, data base and network data.
• Determine how well specific applications meet the current and required
business needs
• Evaluate what specific business functions along the value chain are being
effectively supported by multiple applications
• Evaluate the level of functional and data redundancy specific to each area
within the value-chain
• Identify parallel application systems and data bases which have extended
conversion schedules and/or enhancements planned
• Identify business functions which are performed manually and not supportedby any application systems
• Identify existing process synchronization and data integrity issues
• Identify the level of dependency on external vendors within the value chain
• Identify the cost level of enhancements to existing application systems and
data bases
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 297/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 298/529
The IT Professionals Guide to Managing and Consulting
Page 297
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 299/529
The IT Professionals Guide to Managing and Consulting
Page 298
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 300/529
The IT Professionals Guide to Managing and Consulting
Page 299
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 301/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 302/529
The IT Professionals Guide to Managing and Consulting
Page 301
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 303/529
The IT Professionals Guide to Managing and Consulting
Page 302
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 304/529
The IT Professionals Guide to Managing and Consulting
Page 303
Approach
• 122 major applications selected from total application portfolio
• 47 key applications selected from the 122
• Key applications mapped against the value chain• Major information flows were noted
• Major databases identified
• Applications summarized by:
• Functions
• Interfaces
• Age
• Installed locations
• Hardware/software platforms
• Language
• Databases summarized by
• Contents
• DBMS
• Structure
• Size
• Installed locations
• Functional and data redundancy identified
Comb inat ion of addit ional data col lect ion and wo rk don e on previous analysis
streams
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 305/529
The IT Professionals Guide to Managing and Consulting
Page 304
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 306/529
The IT Professionals Guide to Managing and Consulting
Page 305
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 307/529
The IT Professionals Guide to Managing and Consulting
Page 306
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 308/529
The IT Professionals Guide to Managing and Consulting
Page 307
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 309/529
The IT Professionals Guide to Managing and Consulting
Page 308
Opportunities
• How to create a revolutionary, not evolutionary, approach towards IT
transformation and establish a long-term commitment to its attainment
• How to eliminate unnecessary "Fire Fighting" and focus on cross coordination
for resolving critical issues
• How to accelerate movement toward standard architectural platforms:
• Reduce the variety of hardware/software
• Eliminate the tendency to create "over engineered" system designs
• How to eliminate the unnecessary/undesirable functional and data
redundancy• How to develop a common approaches to system design/development
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 310/529
The IT Professionals Guide to Managing and Consulting
Page 309
IT DIAGNOSTICS – SYSTEM FUNCTIONAL AND TECHNICAL
QUALITY
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 311/529
The IT Professionals Guide to Managing and Consulting
Page 310
Objective
• Determine how well specific applications meet the current and required
business needs
• Evaluate how well specific business functions along the value chain are being
effectively supported by applications
• Identify opportunities for improving applications by comparing customer
perceptions of quality with benchmarks and internal scores
• Improve applications by understanding the specific quality drivers as
perceived by the customer
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 312/529
The IT Professionals Guide to Managing and Consulting
Page 311
Objective: Functional Quality (Users rating IT)
• Determine how users rate the quality of IT support in helping them work
faster, better, and smarter
• Data Accuracy
• Reliability
• Ease of Use
• Documentation/On-line help
• Data Currency
• Security
• Responsiveness/Timeliness
• Output
• Special Requests
• Functional Requirements
• Cost Effectiveness
• All Attributes rated on "Quality Provided" and "Importance"
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 313/529
The IT Professionals Guide to Managing and Consulting
Page 312
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 314/529
The IT Professionals Guide to Managing and Consulting
Page 313
Objective
• Determine how well a specific application meets current standards for quality
of technical architecture, ease of maintenance, and operational effectiveness
• Compare IT staff perceptions of quality with benchmarks and internal scores
resulting in opportunities for improvement
• Understand how applications can be improved by assessing specific drivers of
quality
Objective: Technical Quality (IT rating IT)
• Determine how IT professionals rate current systems technical structure
• Application Design (structure, complexity, adaptability. . . )• File/Database Design (low redundancy , synchronization, sharing . . .)
• Security & Quality Controls (security, standards, edits/audits . . .)
• Technology (tools & techniques, hardware utilization . . .)
• Documentation (complete, accurate, current . . .)
• Problem Recognition Recovery (change management, assess & test . . .)
• Efficiency & Ease of Operation (memory, I/O, network . . .)
• Outages & Reruns (downtime, reruns, abends . . .)
• Execution & Recovery (disaster recovery, documentation . . .)
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 315/529
The IT Professionals Guide to Managing and Consulting
Page 314
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 316/529
The IT Professionals Guide to Managing and Consulting
Page 315
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 317/529
The IT Professionals Guide to Managing and Consulting
Page 316
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 318/529
The IT Professionals Guide to Managing and Consulting
Page 317
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 319/529
The IT Professionals Guide to Managing and Consulting
Page 318
Approach
• IT identified key systems across all functional areas
• Distributed 72 Technical Quality questionnaires (68 returned) (94%) and 104
Functional Quality questionnaires (72 returned) (69%)
• Compared our results to a normative database to establish performance
comparisons
strengths
• Both users and IT professionals agree that appropriate security measures are
in place
• Users do not feel cost effectiveness is a key system concern• Response rates indicate that IT professionals desire to address the issues
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 320/529
The IT Professionals Guide to Managing and Consulting
Page 319
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 321/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 322/529
The IT Professionals Guide to Managing and Consulting
Page 321
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 323/529
The IT Professionals Guide to Managing and Consulting
Page 322
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 324/529
The IT Professionals Guide to Managing and Consulting
Page 323
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 325/529
The IT Professionals Guide to Managing and Consulting
Page 324
Three areas critical to technical quality need immediate attention
• Technical Quality Drivers Rating (65 = Standard)
• File/Database Design 56.2 *
• Documentation 60.4 *
• Problem Recognition Recovery 61.6 *
• Application Design 67.0
• Technology 67.2
• Execution & Recovery 68.4
• Efficiency & Ease of Operation 72.3
• Security & Quality Controls 79.4
• Outages & Reruns 82.8
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 326/529
The IT Professionals Guide to Managing and Consulting
Page 325
Summary findings
• Almost three quarters (71%) of the systems examined did not meet Functional
Quality performance criteria (55 systems examined)
• 80% of "systems" examined did not meet benchmark
• Majority failed to meet satisfactory levels for Functional Quality performance
criteria deemed "most important"
• Nearly half of the 68 systems reviewed failed to meet Technical Quality
benchmarks
• 13 systems were below standard in both Technical and Functional Quality
• Functional and Technical Quality issues significantly drive up developmentand maintenance costs as well as dramatically increase "time-to-perform"
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 327/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 328/529
The IT Professionals Guide to Managing and Consulting
Page 327
IT DIAGNOSTICS – ACTIVITY ANALYSIS
Objectives
• Provide quantifiable information on the use of IT staffing resources
• Identify functional redundancies and organizational overlaps
• For example
• Amount of time being spent on non-value or low-value activities
• The corresponding people equivalents for the time spent on non-value or
low-value activities
• The levels of redundant work caused by functional redundancies or
overlaps
• The actual dollars associated with the inappropriate time use
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 329/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 330/529
The IT Professionals Guide to Managing and Consulting
Page 329
Approach
• Purpose: Develop a time-usage profile across the IT organization
• Respondents came from all levels of the organization, from craft employees to
PG7 directors, creating a cross section of the IT organization
• Survey document was sent to more than 180 employees (160 returned)
• Responses were summarized by functional groupings, which frequently
crossed RC lines
• Planning
• Administration (management)
• Analysis & Programming
• Technical Support
• User Support
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 331/529
The IT Professionals Guide to Managing and Consulting
Page 330
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 332/529
The IT Professionals Guide to Managing and Consulting
Page 331
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 333/529
The IT Professionals Guide to Managing and Consulting
Page 332
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 334/529
The IT Professionals Guide to Managing and Consulting
Page 333
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 335/529
The IT Professionals Guide to Managing and Consulting
Page 334
“Day-In-The-Life-Of” (DILO) studies were done to validate the results
• Approach
• Experience a day with one individual from each of the following functional
groups
• Planning
• User Support
• Technical Support
• Application Development
• No evaluation of the individual - confidentiality assured
• Gain an understanding of:
• Time spent in each category
• Processes used
• People/culture
• Strengths and opportunities
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 336/529
The IT Professionals Guide to Managing and Consulting
Page 335
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 337/529
The IT Professionals Guide to Managing and Consulting
Page 336
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 338/529
The IT Professionals Guide to Managing and Consulting
Page 337
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 339/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 340/529
The IT Professionals Guide to Managing and Consulting
Page 339
IT DIAGNOSTICS – IT ORGANIZATION & PROCESS MANAGEMENT
PRACTICES FORM
IT Services
IT Diagnostics
IT Organization and Processes Management PracticesForm
Status: Draft
Version: 0.1
Release Date:
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 341/529
The IT Professionals Guide to Managing and Consulting
Page 340
Document Control
Author
Prepared by <name and / or department>
Document Source
This document is located on the LAN under the path:
I:/IT Services/Service Delivery/Functional Specifications/
Document Approval
This document has been approved for use by the following:
<first name, last name>, IT Services Manager
<first name, last name>, IT Service Delivery Manager
<first name, last name>, National IT Help Desk Manager
Amendment History
Issue Date Amendments Completed By
Distribution List
When this procedure is updated the following copyholders must be advised through
email that an updated copy is available on the intranet site:
<Company Name> Business Unit Stakeholders
IT
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 342/529
The IT Professionals Guide to Managing and Consulting
Page 341
Introduction
Purpose
Describe the purpose of the document. Describe the intent of the document and anydeliverables resulting from the document.
Scope
Include in this section the scope of the document. What will be in scope and out of
scope for this document?
Audience
This document is relevant to all staff in <company name>
Ownership
IT Services has ownership of this document.
Related Documentation
Include in this section any related documents and reference numbers and other
associated documentation
Management Processes Assessment
Purpose of this Analytic
• Determine the extent to which industry best practices are used.
• Determine the extent to which processes are defined and repeatable.
• Identify opportunities for improvement.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 343/529
The IT Professionals Guide to Managing and Consulting
Page 342
IT Business Management Processes
Process P F C Q Comments
Multi-Yr Strategic Plan
Staff Development Plan
Multi-Yr Technology Plan
Cost Accounting
Opportunities for Improvement:
_________________________________________________________
_________________________________________________________
_________________________________________________________
_________________________________________________________
________________________________________________________
Process Description References
Strategic Plan This plan will identify major business
issues, their IT implications and thestrategies (i.e., resource allocation) to be
employed by the IT organization to meet
the identified business needs. Look for
alignment of expenditures with business
needs. This plan should address cost
targets, service levels and improvement
targets for IT processes. Make vs. buy
(outsource) criteria should be addressed
by this plan.
Shaping the Future, Peter
Keen
Staff Development
Plan
This plan will identify the staffing
implications of the strategic and
technology plans and will indicate how the
organization intends to prepare staff to
meet the indicated requirements.
Typically this plan will include a skills
inventory and training and hiring
strategies.
Technology Plan This plan will address capacity planning,
platform standards and means to controlstandards compliance. Includes security,
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 344/529
The IT Professionals Guide to Managing and Consulting
Page 343
software distribution and recovery. Does
the plan support the strategy? Improve
development effectiveness? Manage
cost?
Cost Accounting Processes used to record and summarizemajor cost elements for budgetary and
customer chargeback. Should address
major elements such as computer usage,
development, enhancement, support,
overhead, telecom, etc. Does the cost
accounting system reveal detail to
support analysis of the strategy and the
staffing plan?
Demand Management Processes
Process P F C Q Comments
Work Request Process
Prioritization Process User Controlled?
Estimating Process
Commitment Mgmt
Opportunities for Improvement:
_________________________________________________________
_________________________________________________________
_________________________________________________________
_________________________________________________________
_________________________________________________________
_________________________________________________________
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 345/529
The IT Professionals Guide to Managing and Consulting
Page 344
Process Description References
Work Request Each request for IT services should be
approved by the paying customer.
Request should specify the category of
work (dev/enhancement/rework/support),estimated effort, expected benefit or
business reason, proposed schedule,
description of requirements and
significant risks.
Prioritization Work requests should be prioritized by
customers using a defined process.
Information Strategy &
Economics ; Rohm &
Haas Prioritization
Process
Estimating Estimates should be developed for allsignificant efforts using a defined process
which includes reality testing estimates
against past performance and/or industry
benchmarks.
Software Engineering
Economics; Applied
Software Measurement
Commitment
Management
The process by which the IT organization
makes (and changes) commitments to
customers, including management of
requirements changes and approvals
thereof.
Managing the Software
Process (5.1)
Project Management Processes
Process P F C Q Comments/Tools
Planning Process
Progress Review Process
Quality Assurance
Effort Accounting
Status Reporting
Scheduling
Devel. Methodology
Contract Management
Post-Implementation Review
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 346/529
The IT Professionals Guide to Managing and Consulting
Page 345
Opportunities for Improvement:
_________________________________________________________
_________________________________________________________
_________________________________________________________ _________________________________________________________
_________________________________________________________
_________________________________________________________
Process Description References
Planning An effective planning process is the
responsibility of the project manager and
will include identification of tasks to be
performed, definition of requireddeliverables, assignment of resources,
scheduling and definition of dependencies
with other tasks. The result is a formal,
documented plan which has been
reviewed and approved by the project
team, IT management and the customer.
Project Planning,
Scheduling & Control ,
James P. Lewis; Practical
Project Management ,Meilir Page-Jones
Progress Reviews Scheduled reviews and designated
participants; defined agenda.
Quality Assurance The plan and schedule must includeappropriate time and resources for
walkthroughs/inspections and for
consequent rework.
Effort Accounting The process for recording and verifying
effort expended against the plan.
Status Reporting The process for recording and verifying
task completion.
Scheduling Typically Gantt or Critical Path. Largeprojects should use critical path method.
Development
Methodology
May include Prototyping, Large Projects,
Small Projects, Information Engineering,
Object Oriented and Purchase Package.
Rate the organization in relation to those
methods which are relevant.
Contract
Management
Processes used to develop issue and
evaluate Requests for Proposal;
processes used to manage contractor
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 347/529
The IT Professionals Guide to Managing and Consulting
Page 346
performance after selection, including
quality assurance process, project
reviews, issue tracking and acceptance
process.
Post-ImplementationReview
The process used to capture lessonslearned and to evaluate business benefit
realized.
Development Standards
Process P F C Q Comments/Tools
Process Modeling
Data Modeling
Design
Programming
User Interface
Test Processes
Test Coverage
Regression Testing
Defect Tracking
Defect Causal Analysis
Configuration Mgmt.
Opportunities for Improvement:
_________________________________________________________
_________________________________________________________
_________________________________________________________
_________________________________________________________
_________________________________________________________
Process Description References
Process Modeling Typically Data Flow Diagrams or flow
charts
Data Modeling Entity Relationship Diagrams
Design Standards for complexity, documentation
standards
Measuring Software
Design Quality , Card &
Glass
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 348/529
The IT Professionals Guide to Managing and Consulting
Page 347
Programming Naming convention, style guide, control
structure standards
User Interface Common User Access (CUA) or
comparable
Test Processes Unit, integration, system, user
acceptance, performance, security, etc.
as appropriate.
Software Testing and
Quality Assurance, Boris
Beizer
Test Coverage see Beizer
Regression Testing Re-testing against a known baseline
when modifications are made to a system
previously tested. Test data, test results
and test scripts/procedures are
configuration controlled to permit re-use.
Beizer
Defect Tracking Recording of inspection and test defects Grady
Causal Analysis Promote prevention & early detection. Grady
Configuration Mgmt Identification & version control of
deliverables
Requirements Analysis
Process P F C Q Comments/Tools
Joint Appl. Design (JAD)
Process Modeling
Data Modeling
Event Modeling
Cost Benefit Analysis
Risk Analysis
Prototyping
Walkthroughs/Inspections
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 349/529
The IT Professionals Guide to Managing and Consulting
Page 348
Opportunities for Improvement:
_________________________________________________________
_________________________________________________________
_________________________________________________________ _________________________________________________________
_________________________________________________________
_________________________________________________________
Process Description References
JAD Facilitated sessions featuring trained
facilitator and extensive user participation
Joint Application Design,
Judy August
Process Modeling Typically Data Flow Diagrams or flowcharts
Data Modeling Entity Relationship Diagrams,
normalization
Event Modeling Modeling of complex transactions;
commonly used in real time systems
Cost Benefit
Analysis
Process used to identify & quantify
business benefits
Risk Analysis Process used to identify and manage
risks
Boehm (IEEE), Rohm &
Haas Prioritization
Process
Prototyping May be used as a specification discovery
process or evolved to an operational
system. Criteria governing which
approach when should be specified.
Structured Rapid
Prototyping , Connell &
Shafer
Walkthroughs/Inspe
ctions
In-process quality assurance techniques.
Inspections have been shown to be mosteffective.
Software Inspection
Process, Strauss &Ebenau
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 350/529
The IT Professionals Guide to Managing and Consulting
Page 349
Design Processes
Process P F C Q Comments/Tools
Joint Appl. Design (JAD)
Process Modeling
Data Modeling
Event Modeling
Risk Analysis
Prototyping
Complexity Analysis
Walkthroughs/Inspections
Defect Tracking
Defect Causal Analysis
Opportunities for Improvement:
_________________________________________________________ _________________________________________________________
_________________________________________________________
_________________________________________________________
_________________________________________________________
Process Description References
JAD Facilitated sessions featuring trained
facilitator and extensive user participation
Joint Application Design,
Judy August
Process Modeling Typically Data Flow Diagrams or flow
charts
Data Modeling Entity Relationship Diagrams,
normalization
Event Modeling Modeling of complex transactions;
commonly used in real time systems
Risk Analysis Process used to identify and manage
risks
Boehm (IEEE), Rohm &
Haas Prioritization Process
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 351/529
The IT Professionals Guide to Managing and Consulting
Page 350
Prototyping May be used as a specification discovery
process or evolved to an operational
system. Criteria governing which
approach when should be specified.
Structured Rapid
Prototyping , Connell &
Shafer
Complexity Analysis Limiting complexity has been shown toreduce defects, leading to higher
productivity
Measuring SoftwareDesign Quality , Card &
Glass; Grady
Walkthroughs/Inspe
ctions
In-process quality assurance techniques.
Inspections have been shown to be most
effective.
Software Inspection
Process, Strauss &
Ebenau
Defect Tracking Recording of inspection and test defects Grady
Causal Analysis Promote prevention & early detection. Grady
Construction Processes
Process P F C Q Comments/Tools
Code Generation
Structured Programming
Code Re-use
4th Generation Lang.
Defect Tracking
Defect Causal Analysis
Walkthroughs/Inspections
Complexity Analysis
Opportunities for Improvement:
_________________________________________________________
_________________________________________________________
_________________________________________________________
_________________________________________________________
_________________________________________________________
_________________________________________________________
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 352/529
The IT Professionals Guide to Managing and Consulting
Page 351
Process Description References
Code Generation Coverage refers to % of code generated
Structured
Programming
Standard control structures, absence of
GOTOs
Code Re-use Copybooks, etc.; coverage refers to % of
code re-used
4th GL Coverage refers to % of code in 4GL
Defect Tracking Recording of inspection and test defects Grady
Causal Analysis Promote prevention & early detection. Grady
Walkthroughs/Inspe
ctions
In-process quality assurance techniques.
Inspections have been shown to be mosteffective.
Software Inspection
Process, Strauss & Ebenau
Complexity Analysis Limiting complexity has been shown to
reduce defects, leading to higher
productivity. PathVu, Inspector, other
code analysis tools.
Measuring Software Design
Quality , Card & Glass;
Grady
Testing Processes
Process P F C Q Comments/Tools
Test Plans
Test Coverage Analysis
Regression Test
Defect Tracking
Defect Causal Analysis
Walkthroughs/Inspections
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 353/529
The IT Professionals Guide to Managing and Consulting
Page 352
Opportunities for Improvement:
_________________________________________________________
_________________________________________________________
_________________________________________________________ _________________________________________________________
_________________________________________________________
_________________________________________________________
Process Description References
Test Plans Unit, integration, system, user
acceptance, performance, security, etc.
as appropriate.
Software Testing and
Quality Assurance,
Boris Beizer
Test Coverage see Beizer
Regression Testing Re-testing against a known baseline
when modifications are made to a system
previously tested. Test data, test results
and test scripts/procedures are
configuration controlled to permit re-use.
Beizer
Defect Tracking Recording of inspection and test defects Grady
Causal Analysis Promote prevention & early detection. Grady
Walkthroughs/Inspe
ctions
In-process quality assurance techniques.
Inspections have been shown to be most
effective.
Software Inspection
Process, Strauss &
Ebenau
Implementation Processes
Process P F C Q Comments
User Acceptance Test
User Training
User Documentation
Help Desk
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 354/529
The IT Professionals Guide to Managing and Consulting
Page 353
Opportunities for Improvement:
_________________________________________________________
_________________________________________________________
_________________________________________________________ _________________________________________________________
_________________________________________________________
_________________________________________________________
Process Description References
User Acceptance
Test
User specified and user witnessed test to
demonstrate readiness for
implementation. May include production
parallels.
User Training
User Documentation
Help Desk Single point of contact for user questions
and problem reporting.
Development/Production Interface
Process P F C Q Comments/Tools
Turnover Process
Production Library Mgmt
Devel. Library Mgmt
Test Library Mgmt
Problem Tracking
Technology Version Ctl
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 355/529
The IT Professionals Guide to Managing and Consulting
Page 354
Opportunities for Improvement:
_________________________________________________________
_________________________________________________________
_________________________________________________________ _________________________________________________________
_________________________________________________________
_________________________________________________________
Process Description References
Turnover Process Method used to transition programs, JCL,
etc. from development libraries to
production libraries. Typically requires
documentation, recovery procedures, etc.
Production Library
Mgmt
Processes used to maintain version
control.
Development Library
Mgmt
Processes to maintain version control of
source and object libraries. May include
automated documentation control.
Test Library Mgmt Process used to maintain version control
of test data and results. Includes
regression test sets.
Problem Tracking Similar to defect tracking, but refers to
systems in production. May include both
defect history and status information such
as assigned to, due date, etc. to enable
problem status tracking.
Technology Version
Control
Process used to control testing and
distribution of new platform
versions/releases. Should include means
to assure testing of potential impactsbefore release and for fall-back/recovery
when problems are discovered.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 356/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 357/529
The IT Professionals Guide to Managing and Consulting
Page 356
Regression Testing Re-testing against a known baseline
when modifications are made to a system
previously tested. Test data, test results
and test scripts/procedures are
configuration controlled to permit re-use.
Beizer
Performance Assessment / Metrics
Process P F C Q Comments
Functional Quality
Technical Quality
Customer Satisfaction
Develop. Defect Density
Maint. Defect Density
Development Productivity
Maintenance Productivity
Cost of Quality
Support Rate
Opportunities for Improvement:
_________________________________________________________
_________________________________________________________
_________________________________________________________
_________________________________________________________
_________________________________________________________ _________________________________________________________
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 358/529
The IT Professionals Guide to Managing and Consulting
Page 357
Process Description References
FQ Survey
TQ Survey
Customer
Satisfaction
Survey
Devel. Defect
Density
Defects/KLOC or Function Point (first 12
months in production). Use whatever time
periods you can get and extrapolate to 12
months. Distinguish ABENDS from user
reported problems.
Maint. Defect
Density
Defects/KLOC or Function Point (last 12
months)
Development
Productivity - Effort
KLOC or Function Points / Person Month.
Again, use available periods.
Develop.
Productivity -
Schedule
KLOC or Function Points / Calendar
Month
Maint. Productivity KLOC or Function Points / Person Month
Cost of Quality Time accounting to reveal time spent on
Performance/Prevention/Appraisal/Rewor
k
Quality is Free, Philip
Crosby
Support KLOC or Function Points / Full Time
Equivalent (Support only - excludes
maintenance)
Process P F C Q Comments
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 359/529
The IT Professionals Guide to Managing and Consulting
Page 358
Opportunities for Improvement:
_________________________________________________________
_________________________________________________________
_________________________________________________________ _________________________________________________________
_________________________________________________________
_________________________________________________________
Process Description References
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 360/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 361/529
The IT Professionals Guide to Managing and Consulting
Page 360
Document Control
Author
Prepared by <name and / or department>
Document Source
This document is located on the LAN under the path:
I:/IT Services/Service Delivery/Functional Specifications/
Document Approval
This document has been approved for use by the following:
<first name, last name>, IT Services Manager
<first name, last name>, IT Service Delivery Manager
<first name, last name>, National IT Help Desk Manager
Amendment History
Issue Date Amendments Completed By
Distribution List
When this procedure is updated the following copyholders must be advised through
email that an updated copy is available on the intranet site:
<Company Name> Business Unit Stakeholders
IT
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 362/529
The IT Professionals Guide to Managing and Consulting
Page 361
Introduction
PurposeDescribe the purpose of the document. Describe the intent of the document and any
deliverables resulting from the document.
Scope
Include in this section the scope of the document. What will be in scope and out of
scope for this document?
Audience
This document is relevant to all staff in <company name>
Ownership
IT Services has ownership of this document.
Related Documentation
Include in this section any related documents and reference numbers and other
associated documentation
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 363/529
The IT Professionals Guide to Managing and Consulting
Page 362
SYSTEM MANAGER INTERVIEW
Interviewee: Title:
Years with the Company: Department:
Years in Management: Interviewer:Time in Current Position: Date:
Client
Years with company:
Years in position:
Your responsibilities:
Organisation chart:
What are the services of your department / group?
a. What are the strengths of your department?
What are the key systems that your organization is responsible for?
Name Purpose Technology Owner Age
Describe information management / IT environment
a. Main hardware used?
b. Network architecture?
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 364/529
The IT Professionals Guide to Managing and Consulting
Page 363
c. Draw or attach a picture?
d. Wide area connections?
e. Draw picture?
f. Does the architecture serve the operation and the development of it?
g. If not, what would you change? Why?
Where are the most important central systems located?
a. How are they accessible?
b. Is the arrangement correct? Economically? From service level
point of view?
c. What would you change?
Where are the most important repositories located?
a. How are they accessible?
b. Are the solutions right? If not, what would you improve?
How do the applications exchange information?
a. What is the application architecture?
b. Draw or attach a picture.
c. Where are the bottlenecks / shortcomings in this architecture?
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 365/529
The IT Professionals Guide to Managing and Consulting
Page 364
d. How would you improve the architecture? What would be the
benefits?
How would you rate the current infrastructure?
a. What services are received today?
wide area networking
internal mail
external e-mail
calendar
bulletin boards
replicated data bases
application platform
other: what?
b. What services would you need that are currently missing?
What are the IT recommendations from the corporate?
a. How would rate them?
b. How would you improve them?
Is there a valid IT strategy in your business unit?
a. How does it support the business and business strategy?
Organization and responsibilities in prioritizing development tasks
a. Organisation and responsibilities in developing / enhancing systems?
b. Organisation and responsibilities in running the systems andmaintaining them?
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 366/529
The IT Professionals Guide to Managing and Consulting
Page 365
c. Organisation and responsibilities in technology and architecture
development?
d. Organisation and responsibilities in infrastructure development?
e. Organisation and responsibilities in financial control of IT?
f. Organisation and responsibilities in skills development?
What is the IT cost structure?
a. What is the best way to analyse it?
How is information security managed?
a. What are the major issues of security?
What are the currently on-going major projects? What is the purpose?
What is your IT vision?
a. What are the barriers of getting there?
Should we see or hear other people? Who?
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 367/529
The IT Professionals Guide to Managing and Consulting
Page 366
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 368/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 369/529
The IT Professionals Guide to Managing and Consulting
Page 368
These are the characteristics of change. Ask group to respond to list using global issues as examples (e.g., countries,
governments, technology, etc.).
Key Messages
As human beings, we are always experiencing change, it is in fact how we develop.
What we will ultimately be addressing today is an individual’s response to planned
organizational change.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 370/529
The IT Professionals Guide to Managing and Consulting
Page 369
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 371/529
The IT Professionals Guide to Managing and Consulting
Page 370
Some things that we have talked about that seem to be universal truths aboutchange could be summarized in these words. Have group give some examples
(optional).
Key Messages:
We must distinguish between change at the organization level, the group level and
the individual level.
These levels are rarely clear cut but we must target interventions appropriately.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 372/529
The IT Professionals Guide to Managing and Consulting
Page 371
Characteristics of High Performance Organizations• Tom Peters, in Thriving on Chaos, says that a successful corporation in the
1990s and beyond will:
• Achieve flexibility by empowering people
• Create total customer responsiveness
• Pursue fast-paced innovation
• Learn to love change
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 373/529
The IT Professionals Guide to Managing and Consulting
Page 372
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 374/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 375/529
The IT Professionals Guide to Managing and Consulting
Page 374
Think back to a change situation (as a group) you’ve just recently experienced (local
election, changes to church procedures, etc.).
Remember how successful the change was. Were your feelings dealt with?
Did you feel you knew enough about it before it happened? It’s impossible to over
communicate, when you think you’ve told people as much as you can—tell them all
over again.
Did you feel confident enough about what to expect and what would and would not
be impacted? Help identify zones of stability for people. For example, develop
“What will be different” charts for people as they understand the strengths of the
current environment and being retrained.
Could you have done something to prevent this change? Reduce defensiveness
and any implied blame for creating the problems that now must be changed. For
example, emphasize that they have been successful but now must reach for the next
level of effectiveness.
Ask the group for any other techniques that would reinforce unfreezing (e.g., explain
changes clearly and in detail).
Key Messages:Your role as a change agent is to help shepherd each individual
through the change process.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 376/529
The IT Professionals Guide to Managing and Consulting
Page 375
Communicate a winning theme for change and emphasize the benefits to theindividual
(Ask the group: How to engage an individual in the change process who may not
feel he or she will personally benefit from change?)
Conduct regular ‘coffee talks,’ ‘personal touch’ sessions or other forums for people to
discuss change and their reactions to it with organizational leaders
Provide individuals with opportunities to express ideas or concerns, actively listen to
them, act on their ideas in a timely way and give feedback to them on the resultYour role is to ensure that at the end of every NWT meeting or implementation
workshop/coaching session, etc., that each individual is focused on next steps to
promote change
Ask for other techniques e.g., organizing a change management structure to
facilitate decision-making
Key Messages:Provide individuals with support mechanisms keep individuals
focused on the change and their specific role in the change
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 377/529
The IT Professionals Guide to Managing and Consulting
Page 376
If your goal was to implement high performing work teams then ensure that theindividuals compensation reflects team based performance.
Build self-confidence and self-esteem. Balance sense of loss with sense of gain.
Ensure that performance measurements are in place to highlight success and
underperformance. Also, coach individuals to effectively take corrective actions
Conduct major company-wide events and perhaps provide a momento of the change
process such as a T-shirt. You're dealing with “survivors” of the change and you
must be resistive to the perception of “dancing on the graves of the departed.Ask for other techniques, e.g. continue with Executive Steering Team to
manage refreezing process.
Key Messages
Ensure that individuals are reinforced for new behavior.
Continue to communicate successes and deal with feedback.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 378/529
The IT Professionals Guide to Managing and Consulting
Page 377
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 379/529
The IT Professionals Guide to Managing and Consulting
Page 378
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 380/529
The IT Professionals Guide to Managing and Consulting
Page 379
Anger
•
Individuals angry about the change may:• Sabotage the change efforts
• Play shoot the messenger
• You may coach the individual by:
• Acknowledging legitimacy of anger
• Distinguishing between feelings and inappropriate behavior
• Redirecting the blame on the change agent to being challenged by the
real reasons necessitating change
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 381/529
The IT Professionals Guide to Managing and Consulting
Page 380
Depression
•
An individual depressed about change may:• Express a loss of control over the work environment
• Increase absenteeism
• You may coach the individual by:
• Providing a series of specific next steps and following up frequently
• Reinforcing positive actions the individual takes
Acceptance
• Signs of individuals accepting change includes:
• Expressing ownership for solutions
• Being focused on achieving benefits
• You may encourage acceptance by:
• Providing recognition for his/her efforts
• Utilizing the individual as a coach or mentor for others
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 382/529
The IT Professionals Guide to Managing and Consulting
Page 381
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 383/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 384/529
The IT Professionals Guide to Managing and Consulting
Page 383
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 385/529
The IT Professionals Guide to Managing and Consulting
Page 384
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 386/529
The IT Professionals Guide to Managing and Consulting
Page 385
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 387/529
The IT Professionals Guide to Managing and Consulting
Page 386
Critical Success Factors for Implementing a Successful Major Change• Build a shared vision
• Set clear goals
• Involve participants
• Encourage cultural awareness
• Expect continuous communication
• Develop realistic resource requirements
• Recognize in timely fashion
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 388/529
The IT Professionals Guide to Managing and Consulting
Page 387
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 389/529
The IT Professionals Guide to Managing and Consulting
Page 388
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 390/529
The IT Professionals Guide to Managing and Consulting
Page 389
CHANGE MANAGEMENT – TASKED BASED TEAMS
The objectives of different types of teams
• Get the project work done well:
• Teams with the right people, right skills, right knowledge, and right
access.
• Get the work done quickly and efficiently.
• Develop and effectively leverage client team members.
• Obtain the full benefits of effective team work:
• Faster results.
• Shared experience.
• Leveraged management.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 391/529
The IT Professionals Guide to Managing and Consulting
Page 390
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 392/529
The IT Professionals Guide to Managing and Consulting
Page 391
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 393/529
The IT Professionals Guide to Managing and Consulting
Page 392
A Natural Work Team is a group of people who work together to solve aspecific problem and help implement the solution.
• Cross-functional client team with constant membership of 6–12, facilitated by
consultant (or trained client).
• Meets formally on a regular basis.
• Process driven, but not content free.
• Top-down specification of problems, bottom-up development of solutions.
• Action-oriented: champions the implementation of solutions.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 394/529
The IT Professionals Guide to Managing and Consulting
Page 393
Expected outcomes of a Natural Work Team• Realistic solutions based on team expertise.
• Solutions that address cross-functional requirements and integration issues.
• Client buy-in and ownership of recommendations and implementation.
• “Insider” information and influence available to identify and overcome
organizational resistance.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 395/529
The IT Professionals Guide to Managing and Consulting
Page 394
A Rapid Action Team is a small group of people who implement an obviousimprovement or “quick-hit” during the early stages of a program
• Full-time team (4–6) in action for 2–6 weeks:
• Finite, short term duration: avoid dissipating resources and impact by
over-running.
• Complementary to, and in parallel with, the ongoing work of other teams
developing longer term solutions
• Focused at lower management/supervisory level.
• One department at a time.
• Focus on tactical targets.
• Simple, easy to fix solutions spinning out of Scope and As-Is Analysis.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 396/529
The IT Professionals Guide to Managing and Consulting
Page 395
Expected outcomes of Rapid Action Teams• Early implementation to achieve measurable benefits and results.
• Develop and implement training tools and procedures.
• Promote top client buy-in through early successes.
• Build lower-level client enthusiasm through early opportunity to contribute.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 397/529
The IT Professionals Guide to Managing and Consulting
Page 396
Expected outcomes of a Joint Team• A cadre of fully trained change agents and general management “high fliers”.
• High visibility and promotion of positive effects of change project.
• Solutions from all streams of the project which will be integrated at
implementation.
• Progressive transfer of ownership of project and its outcome from xx to client
personnel.
• Set of champions at implementation stage.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 398/529
The IT Professionals Guide to Managing and Consulting
Page 397
The objectives of integration across teams• Plan and manage program work teams (and work streams) effectively , to
enable and encourage relevant information flows:
• Manage the critical path within program activities: this may only
gradually become apparent
• Communicate the right things at the right time
• Meet to discuss issues which impact more than one team
• Allow shifts of direction or emphasis to accommodate relevant
findings/hypotheses from other teams:
• Or to provide inputs needed by other work teams
• Ensure individuals or specific constituencies within organization hear
consistent or complementary messages
• Ensure the whole “vision” is more than the sum of the parts
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 399/529
The IT Professionals Guide to Managing and Consulting
Page 398
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 400/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 401/529
The IT Professionals Guide to Managing and Consulting
Page 400
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 402/529
The IT Professionals Guide to Managing and Consulting
Page 401
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 403/529
The IT Professionals Guide to Managing and Consulting
Page 402
Learning Is Most Effective, When an Individual ...• Can see the relevance and value to themselves and their work
• Builds upon existing experience
• Is ready to learn
• Learns actively—not passively
• Consolidates the learning by practice
• Can monitor their own progress
• Can see where things fit together
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 404/529
The IT Professionals Guide to Managing and Consulting
Page 403
A Good Mentor …• Treats people as equals
• Keeps an eye open for opportunities for his/her protégé to learn and accept
new responsibilities
• Makes culture explicit and understandable
• Assists protégé in understanding their power/limits
• Is not threatened by his/her protégé exceptional ability/skill
• Wants his/her protégé to succeed.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 405/529
The IT Professionals Guide to Managing and Consulting
Page 404
Counseling Tends to Be Problem Oriented• When an individual …
• Isn’t performing as well as usual
• Doesn’t improve performance after educating/coaching
• Asks for help to solve a personal issue
• Is unsure about what to do next
• Experiences failure or disappointment
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 406/529
The IT Professionals Guide to Managing and Consulting
Page 405
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 407/529
The IT Professionals Guide to Managing and Consulting
Page 406
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 408/529
The IT Professionals Guide to Managing and Consulting
Page 407
Plan: Preparing for Coaching• What is the behavior you think needs changing or strengthening
• What is the behavior (goal) you want
• Is the problem one of knowledge or willingness or both
• What resistance/reaction is likely
• What is my Action Plan—How will I make it ours
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 409/529
The IT Professionals Guide to Managing and Consulting
Page 408
Do: Conducting the Coaching Session• Set the climate
• Set expectations
• Get/give feedback
• Develop the action plan
• Reinforce
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 410/529
The IT Professionals Guide to Managing and Consulting
Page 409
Do: Set Expectations• How long session will last
• Why hold the session
• What is desired outcome
• What do you wish to achieve
• What does the other person expect from the session
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 411/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 412/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 413/529
The IT Professionals Guide to Managing and Consulting
Page 412
There is Two Types of FeedbackPositive and Constructive
I’d Like to Receive Positive Feedback When I …
• Exceed performance standards by a noticeable degree
• Assist others in meeting their standards
• Volunteer for a difficult or unpopular job
• Consistently perform well for a long period of time
• Offer suggestions on ways to improve procedures or product quality
• Make an effort to improve
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 414/529
The IT Professionals Guide to Managing and Consulting
Page 413
Constructive Feedback Must Be Handled with Care• Often negative experience for both parties
• Can alienate:
• Hostile
• Angry
• Generally non-cooperative
To Minimize Resistance/Conflict, Ensure That Constructive Feedback …
• Is motivated by an honest attempt to help both the individual and the
organization
• Is based on dialogue, not monologue—talk to the individual, not at him/her
• Is given at time/place individual is ready to receive
• Results in a consensus about the problem
• Focuses on behavior/performance not personality
• Offers specific suggestions for improvement
• Concludes with specific action plans
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 415/529
The IT Professionals Guide to Managing and Consulting
Page 414
In Summary, Positive Coaching Behaviors Include …• Focusing on behavior—not personality
• Focusing on small, manageable pieces of behavior change
• Listening to and trying to understand the other person’s opinion
• Explaining fully and specifically what the other person needs to do
• Agreeing on an Action Plan but having them “take the A” for execution
• Catching people winning
• Involving the other person in developing the solution
• Assuring commitment to the Action Plan
• Transferring ownership for implementation
• Communicating and following up until the action is complete
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 416/529
The IT Professionals Guide to Managing and Consulting
Page 415
CHANGE MANGEMENT – OVERCOMING RESISTANCE TO CHANGE
50 Reasons Why It Won’t Work
1. We tried that before.
2. Our systems are different
3. It costs too much.
4. That’s beyond our responsibility.
5. That’s not my job.6. We’re all too busy to do that.
7. It’s too radical a change.
8. There’s not enough help.
9. We’ve never done it before.
10. We don’t have the authority.
11. There’s not enough time.
12. Let’s get back to reality.
13. That’s not our problem.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 417/529
The IT Professionals Guide to Managing and Consulting
Page 416
Continued…
14. Why change it? It’s still working OK.
15. I don’t like that idea.
16. You’re right, but …
17. You’re two years ahead of your time18. It isn’t in the budget.
19. We’re not ready for that.
20. Sounds OK but impractical.
21. Let’s give it some more thought.
22. That’s my bowling day.
23. That doesn’t affect me or my child.
24. Nobody cares about that.
25. We’ve always done it this way.
26. It might not work.
27. Not that again!
28. Where’d you dig that one up?
29. We did all right without it.
30. It’s never been tried before.
31. Let’s shelve it for the time being.
32. I don’t see the connection.
33. What you are really saying is …
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 418/529
The IT Professionals Guide to Managing and Consulting
Page 417
Continued…
34. Let’s not be the first.
35. Maybe that would work in your department but not in mine.
36. The administration will never go for it.
37. It can’t be done.38. It’s too much trouble.
39. It’s impossible.
40. You’re not here to think.
41. Can’t teach an old dog new tricks.
42. Let me think about that and I’ll get back to you.
43. Let’s wait until the next generation.
44. Legislation says (I can’t remember) we can’t do that.
45. We can’t fight city hall.
46. That’s old/new business and can’t be discussed now.
47. That’s too serious a subject.
48. No one is interested.
49. It’s too early to think about it.
50. It’s too late to start.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 419/529
The IT Professionals Guide to Managing and Consulting
Page 418
Why Do People Resist Change?
• The phrase, “overcoming resistance,” indicates an adversarial relationship …
since resistance is an emotional process, the key is understanding it
• People resist change because the change is:
• Perceived by them to be negative , and
• They do not want to deal with the reasons for it
• Resistance is a way of expressing feelings of concern about making a
change
•
These concerns tend to be:• Concerns over loss of control
• Concerns over vulnerability
• Your task is to help the person who is resisting change to express these
concerns directly
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 420/529
The IT Professionals Guide to Managing and Consulting
Page 419
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 421/529
The IT Professionals Guide to Managing and Consulting
Page 420
Acknowledging Resistance: Hints for the Right Words• How you feel:
• Your perceptions of how they feel
• Authentic:
• Encourages person to do the same
• Assertive:
• Direct, without putting anyone down
• Use “I” statements
• Descriptive, not evaluative
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 422/529
The IT Professionals Guide to Managing and Consulting
Page 421
“Identify the resistance”: mind over matter Form of Resistance Sounds Like…
Intellectualizing "But how would this compare to test
standards commonly employed at…"
"When we project this into our global
strategy for the year stardate 2073.5…"
Moralizing "Of course, that's the way they do it in
the West Cupcake office, but here…"
"You could do it that way, but we have a
firm belief here that we will not…"
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 423/529
The IT Professionals Guide to Managing and Consulting
Page 422
“Identify the resistance”: if I say yes, will you go away? Form of Resistance Sounds Like…
Flight into health "Your study showed that as a big
problem so we took care of it"
"That's slowed us down for years and
now it's fixed. Who could want
anything else?"
Compliance "OK, if you think we might be better off
with an entirely new organization
structure, we can do that"
"I can shorten the design cycle by 45%.
No problem"
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 424/529
The IT Professionals Guide to Managing and Consulting
Page 423
“Identify the resistance”: three golden oldies Form of Resistance Sounds Like…
Confusion "I know we've gone through this several
times now, but I just don't understand
how…"
"To Be or not To Be? Is that the
question?"
Silence " …"
Attack "How many of these…have you built?"
"When this project ends, you get to
move on, but I have to…"
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 425/529
The IT Professionals Guide to Managing and Consulting
Page 424
Five Steps for Dealing with Resistance
1. Identify the form the resistance is taking
2. Acknowledge the resistance
3. Be quiet, listen, let the person respond
4. Don’t take it personally
5. Remember the “two good faith responses” rule
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 426/529
The IT Professionals Guide to Managing and Consulting
Page 425
Acknowledge the Resistance• Tell the person your perception of the resistance
• Do it in a neutral, nonaggressive way with WIN/WIN words: “What I think I
hear you saying is …”
• Tell the person how the resistance is making you feel:
• Use “I” statements
• Be specific, clear, authentic
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 427/529
The IT Professionals Guide to Managing and Consulting
Page 426
Don’t Take It Personally• Remember, their behavior is not a reflection on you
• Let them air their defenses without responding defensively
• Do NOT defend your actions—this encourages “looking for holes”
• Do NOT counterattack head on
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 428/529
The IT Professionals Guide to Managing and Consulting
Page 427
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 429/529
The IT Professionals Guide to Managing and Consulting
Page 428
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 430/529
The IT Professionals Guide to Managing and Consulting
Page 429
GENERAL TECHNIQUES – BEST PRACTICES
What are Best Practices?
• Best Practice is a way of performing a given task that is most likely to
consistently produce superior results
• “Benchmarking” refers to an external search, whereas Best Practices are
existing company-internal ways of working
• Best Practices exist broadly across an organization and they are constantly
evolving
• The company that can effectively identify, capture, share and apply Best
Practices, will perform better than its competitors
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 431/529
The IT Professionals Guide to Managing and Consulting
Page 430
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 432/529
The IT Professionals Guide to Managing and Consulting
Page 431
Best Practices can produce two forms of performance improvement• Bring more individuals up closer to the top performers
• Skills transfer
• Methods, tools etc.
• Capture proactively on-going innovations and enhancements in the
organization, validate them and share across the group
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 433/529
The IT Professionals Guide to Managing and Consulting
Page 432
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 434/529
The IT Professionals Guide to Managing and Consulting
Page 433
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 435/529
The IT Professionals Guide to Managing and Consulting
Page 434
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 436/529
The IT Professionals Guide to Managing and Consulting
Page 435
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 437/529
The IT Professionals Guide to Managing and Consulting
Page 436
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 438/529
The IT Professionals Guide to Managing and Consulting
Page 437
GENERAL TECHNIQUES – BUSINESS IMPACT MATRICES, CAUSE
& EFFECT
• Description of technique
• The matrix has opportunities and issues as one axis and different aspects
on the other. The boxes are filled with values (e.g.. high, normal, low).
• How to use the technique (steps)
• Step 1: Prepare a matrix with opportunities and issues on one axis and
aspects that are considered to be important on the other axis.
• Step 2: In a team meeting fill the boxes with values. As the goal is to gain
agreement in the group about the evaluation, be sure all key players are
present in the meeting.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 439/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 440/529
The IT Professionals Guide to Managing and Consulting
Page 439
Cause and Effect DiagramClassification
• Quality management, also known as Ishikawa or fishbone diagram, Masaaki
Imai, 1986, Kai-zen (Ky’zen), 1986, McGraw Hill
Abstract
• In a cause and effect diagram a problem is related to its causes, which again
can be related to their causes, thus giving an overview of the cause-effect
chain.
When to use
• When analyzing AS-IS models, a cause and effect diagram can be used to
depict the decomposition of the problem.
Description
• Cause and effect are related through an arrow (see Sample Deliverable)
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 441/529
The IT Professionals Guide to Managing and Consulting
Page 440
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 442/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 443/529
The IT Professionals Guide to Managing and Consulting
Page 442
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 444/529
The IT Professionals Guide to Managing and Consulting
Page 443
How to use the technique (steps)
• Step 1: Describe the strategy of the organization.
• Step 2: Assess the strategy and define CSFs
• Step 3: Give highest priorities to those projects that support the critical
success factors
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 445/529
The IT Professionals Guide to Managing and Consulting
Page 444
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 446/529
The IT Professionals Guide to Managing and Consulting
Page 445
GENERAL TECHNIQUES – DAY IN THE LIFE OF (DILO)
Approach
• Experience a day with...
• Managers
• Non-managers
• Key line personnel (outside sales, inside sales, customer service reps, product
managers)
• Non-evaluative of the individual, confidentiality assured
• Gain an understanding of...
• Activities
• Processes
• People/culture
• Interfaces
• Time spent by category
• Strengths and opportunities
• Next Steps
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 447/529
The IT Professionals Guide to Managing and Consulting
Page 446
•
Numbers must be accurate, and are to be by the minute• Occurrences do not happen in 5 minute increments in real life
• Interfaces should be minimally disruptive to subject’s normal daily schedule
• You may want some descriptions / job overview at start of day
• Look for brown paper candidates
• Flows
• Work-with
• Document major themes, implications in bullet form
• Be descriptive and attach pertinent info, forms, examples
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 448/529
The IT Professionals Guide to Managing and Consulting
Page 447
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 449/529
The IT Professionals Guide to Managing and Consulting
Page 448
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 450/529
The IT Professionals Guide to Managing and Consulting
Page 449
• Behavior (how to do it)
• Document on a pad (carrying a manila folder may help)
• Capture extensive detail while being sensitive to your audience; obtain
part numbers, est.. .
• Look for problems that can be fixed;
• Planning
• Coordination
•
Clear expectations• Follow up
• Missing parts
• Communications etc…
• Remember, not only are you searching for problems substantiated by
detail, but you’re also winning a friend. Be friendly, relax.
• Complete a Meeting Effectiveness Assessment sheet for each
scheduled and unscheduled meeting attended
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 451/529
The IT Professionals Guide to Managing and Consulting
Page 450
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 452/529
The IT Professionals Guide to Managing and Consulting
Page 451
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 453/529
The IT Professionals Guide to Managing and Consulting
Page 452
DILO objective / approach• Objective
• To understand first-hand what activities jobs entail
• To assess the impact of xxxx
• To build enthusiasm for the change process
• Approach
• Experienced 17”Day In the Life Of’s”
• 7 Retailer Positions
• 4 Direct Field positions
• 6 Field Support positions
• Observed and tracked activities to understand time allocation -how do
people spend their time
• Track activities using pre-set time categories
• Criteria for value-added versus lower-value-added activities developed for
each functional group
• Encouraged shadowing of normal days
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 454/529
The IT Professionals Guide to Managing and Consulting
Page 453
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 455/529
The IT Professionals Guide to Managing and Consulting
Page 454
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 456/529
The IT Professionals Guide to Managing and Consulting
Page 455
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 457/529
The IT Professionals Guide to Managing and Consulting
Page 456
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 458/529
The IT Professionals Guide to Managing and Consulting
Page 457
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 459/529
The IT Professionals Guide to Managing and Consulting
Page 458
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 460/529
The IT Professionals Guide to Managing and Consulting
Page 459
Implications for implementation• Break down cultural barriers which are reinforcing ”old” behaviors
• Fear
• Lack of trust
• Streamline XXXX processes which are driving significant rework on retailer
side
• Better align XXXX’s retailer facing functions with customer (retailer) needs
• Significantly improve internal retailer processes to maximize leverage of
XXXX’s reengineering efforts
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 461/529
The IT Professionals Guide to Managing and Consulting
Page 460
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 462/529
The IT Professionals Guide to Managing and Consulting
Page 461
GENERAL TECHNIQUES – KPI
WHAT IS A KPI?
• KPI´s are related to results
• KPI´s show quantities which represent things which can be changed
• Structured to represent complete parts of a process
• I.e. if you introduce ”sales visits” also introduce actual results of sales visits.
• Representation of thinking of the various levels of management and workforce
• Installed in all key competence areas
• Allows you to calculate the levels of performance necessary to meet the
budget or a specific level of improvement
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 463/529
The IT Professionals Guide to Managing and Consulting
Page 462
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 464/529
The IT Professionals Guide to Managing and Consulting
Page 463
Useful hints
Design the KPI system on paper and test
• Relate programme results to different KPI´s
• Put in as-is figures for base lining
• Establish to-be (and intermediate) levels
• What-if analysis
• Which are the build-in incentives for different groups of people
Build the ”system” for collecting KPI´s
• Assign responsibility to the persons in charge for the result. Do NOT
delegate it to the finance department or quality• Collect and aggregate data for the system
Check if the KPI´s are working on a regular basis
• Relevant measures
• Valid data
• Deviations from expected results analyzed
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 465/529
The IT Professionals Guide to Managing and Consulting
Page 464
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 466/529
The IT Professionals Guide to Managing and Consulting
Page 465
Use two types of - Performance Tracking mechanisms
• Performance Achievement Reporting:
• Monitor and feed back programme results (actual performance vs.
baseline vs. target)
• Financial Benefit Achievement Reporting:
• Converts the performance improvement into a $ figure
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 467/529
The IT Professionals Guide to Managing and Consulting
Page 466
Results must be communicated clearly
• Assign dedicated resources to performance tracking
• Set up a special “war room” and cover the walls with displays of all
improvement programmes
• Bring people in the war room and “give them a tour” (seeing other people’s
successes is very often contagious)
• Publish results on billboards in public areas (e.g. the cafeteria), or in the
respective departments
• Communicate regularly to avoid surprises:
• Progress reports
• Meetings
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 468/529
The IT Professionals Guide to Managing and Consulting
Page 467
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 469/529
The IT Professionals Guide to Managing and Consulting
Page 468
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 470/529
The IT Professionals Guide to Managing and Consulting
Page 469
GENERAL TECHNIQUES – ORGANISATION DEVELOPMENT
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 471/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 472/529
The IT Professionals Guide to Managing and Consulting
Page 471
Job Description and Skills required (2)...List the skills required to carry out the job described.
Now, make an assessment of the skill level required to do the job correctly under the
following conditions:
• as a starter who needs training to begin doing the job
• as a beginner who can do it, but needs guidance or supervision
• as a competent practitioner
• as an expert who could teach others
Then write up a sort description of how you could measure or assess performance
in this role.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 473/529
The IT Professionals Guide to Managing and Consulting
Page 472
The Personal Development planNow we are ready for the personal planning stage - review what we have now:
• a RACI chart which shows how the job fits into the business area
• a role and responsibility description for a defined job
• a job description and skills requirement which shows objectives
• a gap analysis for the jobholder
• detail of processes we developed
The next step is to create a plan for how to bridge the gaps
A good way of doing this is to appoint a coach or mentor to help build the action
plan and to follow up each action.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 474/529
The IT Professionals Guide to Managing and Consulting
Page 473
GENERAL TECHNIQUES – PARETO CHARTING & THE PDSA
CYCLE
• How to use the technique (steps)
• Identify the problems of the current process
• Gather quantitative data about the cost associated with each problem
• Make a Pareto chart based on the costs of the different problems
• A Pareto chart of the to-be situation might be used to visualize the
performance improvement
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 475/529
The IT Professionals Guide to Managing and Consulting
Page 474
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 476/529
The IT Professionals Guide to Managing and Consulting
Page 475
Where there is no problem there can be no improvement.Definitions
• Prediction is the ability to forecast, to tell beforehand.
• Standardization is a way of spreading the benefits of improvement throughout
the organization.
(Kenzo Sasaoka)
Both are integral parts of the PDSA process.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 477/529
The IT Professionals Guide to Managing and Consulting
Page 476
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 478/529
The IT Professionals Guide to Managing and Consulting
Page 477
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 479/529
The IT Professionals Guide to Managing and Consulting
Page 478
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 480/529
The IT Professionals Guide to Managing and Consulting
Page 479
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 481/529
The IT Professionals Guide to Managing and Consulting
Page 480
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 482/529
The IT Professionals Guide to Managing and Consulting
Page 481
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 483/529
The IT Professionals Guide to Managing and Consulting
Page 482
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 484/529
The IT Professionals Guide to Managing and Consulting
Page 483
When to use it?• As a framework for any change, large or small.
• When knowledge is desired as a result of action.
• When it is important to act quickly without wasting resource.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 485/529
The IT Professionals Guide to Managing and Consulting
Page 484
Conclusion• The PDSA framework works in all circumstances.
• It will allow data to be turned into competitive advantage more quickly.
• It is about prediction, and hence effective action and use of resources.
• It can be used in any situation, and is compatible with any tools, techniques
and other methods.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 486/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 487/529
The IT Professionals Guide to Managing and Consulting
Page 486
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 488/529
The IT Professionals Guide to Managing and Consulting
Page 487
GUIDELINES• Remember new culture philosophy when defining roles and responsibilities
• Eliminate “checkers checking checkers”
• Encourage teamwork
• 100% accuracy not always required
• Place accountability (A) and responsibility (R) at the level closest to the action
or knowledge
• There can be only one accountability per activity
• Authority must accompany accountability
• Minimize the number of consultants (C) and informs (I)
• All roles and responsibilities must be documented and communicated
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 489/529
The IT Professionals Guide to Managing and Consulting
Page 488
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 490/529
The IT Professionals Guide to Managing and Consulting
Page 489
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 491/529
The IT Professionals Guide to Managing and Consulting
Page 490
PROCESS STEPSResponsibility charting is completed in a six step process:
1. Introductory meetings are conducted to inform key management of the
purpose and requirements of the process
2. Decision and function lists are developed, analyzed and collated into a master
function list.
3. Responsibility workshops are conducted to agree upon function definitions
and to assign codes that describe the type of participation each role will have toward
each function. The output is a responsibility chart.
4. The responsibility charts are documented and reproduced to distribute to all
participants and interfacing organizations.
5. The communication and reinforcement of the new role definitions are
accomplished through meetings with all individuals and departments involved.
6. Follow-up is conducted to ensure that relationships defined in the process are
being adhered to and to encourage participants to live the roles.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 492/529
The IT Professionals Guide to Managing and Consulting
Page 491
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 493/529
The IT Professionals Guide to Managing and Consulting
Page 492
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 494/529
The IT Professionals Guide to Managing and Consulting
Page 493
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 495/529
The IT Professionals Guide to Managing and Consulting
Page 494
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 496/529
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 497/529
The IT Professionals Guide to Managing and Consulting
Page 496
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 498/529
The IT Professionals Guide to Managing and Consulting
Page 497
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 499/529
The IT Professionals Guide to Managing and Consulting
Page 498
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 500/529
The IT Professionals Guide to Managing and Consulting
Page 499
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 501/529
The IT Professionals Guide to Managing and Consulting
Page 500
GET FEEDBACK AND BUY-IN• The RACI chart is shown to representative groups of people covering the
roles on the chart
• Their builds are captured and the chart is revised as appropriate
• The RACI may be validated in conjunction with the other products of the
Project Team
BENEFITS
• Increased productivity through well defined accountability
• Reduced scrap and rework because need specifications are clarified
• Increased capacity by eliminating overlaps and redundancies
• Streamlined organization structure by collapsing unneeded layers and placing
accountability where it belongs
• Better trained people by involving them in workshops where fellow workers
discuss all roles and functions
•
Better planning process because of more participation of team members as aresult of building communication interfaces (consult and inform)
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 502/529
The IT Professionals Guide to Managing and Consulting
Page 501
GENERAL TECHNIQUES – SWOT & ROLE SPIDERS
SWOT Analysis
• When to use this technique
• Competitive analysis, when formulating a strategy for the client.
• Description of technique
• The internal analysis assesses the company’s performance in different
areas relative to its competitors. The external analysis discusses trends
in the environment of the company. Each trend is described as an
opportunity or a threat.
How to use the technique (steps)
• Step 1: Assess the company’s performance relative to the competition.
Describe in terms of strengths and weaknesses.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 503/529
The IT Professionals Guide to Managing and Consulting
Page 502
Continued…
• Step 2: Describe the trends that are shaping competition. Trends can have
different nature, e.g.., (not limited to) competition, demographical, technical,
(government) regulation, social.
• Step 3: Assess whether the trend will be a opportunity or a threat. Most trends
have both sides and can be turned into an opportunity if the company takes
action and if the trend can be addressed with a strength.
• Step 4: Assess the internal strengths and weaknesses of the firm. Relate the
performance of (parts of) the firm to the performance of its competitors and
describe the strengths and weaknesses.
• Step 5: Confront the external analysis with the internal analysis. Pay specialattention to opportunities that relate to strengths and threats that address
weaknesses.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 504/529
The IT Professionals Guide to Managing and Consulting
Page 503
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 505/529
The IT Professionals Guide to Managing and Consulting
Page 504
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 506/529
The IT Professionals Guide to Managing and Consulting
Page 505
SOFTWARE TOOLS – BUSINESS MODELING & STIMULATION
Learning Objectives
• To understand how Modeling and simulation can assist in Process
Development
• To understand the concepts of dynamic simulation
• the problem statement
• business Modeling for simulation
•
performing simulation experiments• Modeling and simulation tools
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 507/529
The IT Professionals Guide to Managing and Consulting
Page 506
How Modeling and Simulation assists in Process Development
• Modeling and Simulation is a technique that gives insight in qualitative and
quantitative aspects of the behavior and performance of current or future
processes. Therefore it is a powerful technique to use in a Process
Development Project.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 508/529
The IT Professionals Guide to Managing and Consulting
Page 507
Designing the TO-BE
• Modeling of the TO-BE plays a major role in the design process. It documents
the design in an unambiguous way, it helps in communication in the design
team.
• Simulation of the TO-BE helps in evaluating design alternatives, by comparing
the performance indicators that are measured in the simulation. It enables a
formal and objective comparison of design alternatives.
• Simulation and animation enables to get a better understanding of what is
going on in the new situation. It reveals problems that where overlooked in the
design. It activates creativity and helps in finding new alternatives.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 509/529
The IT Professionals Guide to Managing and Consulting
Page 508
Why Modeling and Simulation Client Perspective
Understanding and assessing all aspects of today’s business is not a simple task.
The sheer magnitude and complexity of business processes means the implications
of proposed changes are rarely easily predictable. Yet the financial and disruptive
cost of direct experimentation would be enormous.
Simulation techniques allow us to build a model showing the behavior of your
organization - now or in the future - and imitate its operation. Uses range from
Modeling a specific manufacturing process to Modeling the flow of operation for
business process re-engineering.
Though simple physical models are sometimes useful, most simulations are set up
on a computer, allowing dynamic calculations of the consequences of different
actions or even visual, interactive representations of the workplace. Through
simulation we bring the model to life, providing an objective way to test and evaluate
potential changes in operational methods and gather quantitative data on
performance indicators and the chances and risks involved.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 510/529
The IT Professionals Guide to Managing and Consulting
Page 509
Business Process Modeling for Simulation
In order to be able to perform a numerical dynamic analysis, we have to build a
formal model describing the behavior of the business process.
But we have to start by defining the purpose of the model and the goal of the study.
This means that we have to decide what the key performance indicators (KPI’s) are
for the process, what we want to measure as output parameters of the simulation.
This depends on the context in which the simulation study takes place. Typical
examples of KPI’s are capacity, throughput time, cost and utilization.
When we know for which aspects the model should be valid, we can start
constructing the model, which means that we decide which parts of reality have to be
described in the model.In the model we typically describe the flow of work, the different activities that take
place, the resources necessary to carry out the work and the relevant numerical
parameters like timing and volumes.
Such models can be relatively simple or very large and complex, they can contain
descriptions of (heuristic) decision making processes and scheduling activities; they
can contain an enormous variety of real historical or stochastic described data.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 511/529
The IT Professionals Guide to Managing and Consulting
Page 510
Main Deliverables
• Numerical analysis of the clients’ problem, for instance evaluation of design
alternatives on capacity, cost or cycle time
• Analysis and data that support or drive the business case
• Insight in behavior and performance of (as-is, should-be, could-be and to-be)
business processes
• Formal descriptions of business processes, for documentation,
communication and analysis
• Speed-up of the redesign effort
• Risk reduction of investment decisions
• An implementation check and tuning instrument
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 512/529
The IT Professionals Guide to Managing and Consulting
Page 511
Further Reading
• Simulation Modeling and Analysis,
Law M.D., Kelton W.D.,
McGraw-Hill, New York (1982).
• Computer Simulation
A practical perspective,
McHaney R.,
Academic Press (1991),
ISBN 0-12-484140-6.
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 513/529
The IT Professionals Guide to Managing and Consulting
Page 512
Spotting Opportunities for Modeling and Simulation
• In situations where the client’s processes are redesigned (by us or by the
client), it is likely that
• Modeling can help for documentation and communication of the process
designs
• At a certain moment, the need for numerical analysis rises, usually for
decision support
• A business case could be required (supported by simulation)
• Simulation could be used for mobilization purposes
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 514/529
The IT Professionals Guide to Managing and Consulting
Page 513
Selling Modeling and Simulation in Process Development
• Often, the Modeling and simulation work will be an integral part of the Process
Development work, but sometimes it will be sold separately. A simulation
study can also lead to a Process Development opportunity.
• After spotting an opportunity, we often arrange a presentation and
demonstration for the client.
• Bring in a sales-oriented simulation expert.
• Consider offering a simulation assessment
or a scoping phase.
• Consider a simulation workshop
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 515/529
The IT Professionals Guide to Managing and Consulting
Page 514
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 516/529
The IT Professionals Guide to Managing and Consulting
Page 515
SOFTWARE TOOLS – TOOLS INTRODUCTION
Why Tools?
• Tools are necessary for certain components of the offering (e.g. simulation,
numerical analysis, prototyping)
• The tools increase the quality of what we offer
• Clients expect us to use tools
• Tools enable us to deliver a wider offering, e.g. workflow will take us a step
further towards implementation• Tools enable the reuse of data and knowledge
• Tools support commonality across SBA’s
• Differentiator from competitors
• Delivery efficiency
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 517/529
The IT Professionals Guide to Managing and Consulting
Page 516
• Drawing tools enable to create pictures. PowerPoint for creating slideshows is
a typical example. They also enable for instance the capturing of brown
papers. Drawing tools are not strong in performing any formal analysis
• Process Flowcharting tools are used to describe the flow of work and activities
performed in the process. Sometimes they can also be used to describe the
association between resources and activities. They also allow numerical
modeling of some parameters which results in the capability of performing
some static analysis. Some of them expand to two sides: towards business
modeling and (upper) CASE
• Simulation tools allowing for formal process modeling and dynamic numerical
analysis
• Process Prototyping tools are capable of showing prototypes of future user
interfaces and simulate the flow of work in the TO-BE process in real time
(some workflow tools have this capability)
• Communication & mobilization tools are used for supporting the change
process, typically they show in some way the future situation (for instance
video, animated simulation, HyperCard and multimedia systems)
• Workflow tools are used operationally to manage the flow of work through a
process, typically electronic documents in an administrative process
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 518/529
The IT Professionals Guide to Managing and Consulting
Page 517
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 519/529
The IT Professionals Guide to Managing and Consulting
Page 518
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 520/529
The IT Professionals Guide to Managing and Consulting
Page 519
FURTHER INFORMATION
For more information on other products available from The Art of Service, you can
visit our website: http://www.theartofservice.com
If you found this guide helpful, you can find more publications from The Art of
Service at: http://www.amazon.com
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 521/529
The IT Professionals Guide to Managing and Consulting
Page 520
INDEX*
A accountability 156, 487, 500Achievement Reporting 465action plan 29, 154, 160, 206, 407, 410-11, 413-14, 472
activities, noted List 410activities , low-value 327address weaknesses 206, 502adjectives 61Affinity Process 3, 165analysis, external 501-2answers 45-9, 51-3, 55, 57-60, 64, 138, 171, 280
posted 171application systems 56, 295
parallel 294-5applications 56, 69, 78, 251, 285, 294-5, 303, 310, 313architecture 293, 363-5Art of Service 519as is 288
as-is process steps 273attainment 200, 308automation 77-8axis 437
B barriers 18, 57, 59, 73, 169, 365baseline 347, 352, 356, 465behavior 376, 399, 407, 414, 426, 506, 508-10Beizer 347, 352, 356benchmarks 310, 313benefits 2, 58, 77, 82, 96, 142, 163, 166, 190, 223, 225, 231, 282, 364, 375, 389 [1]Boehm 348-9boxes 104, 142-3, 437
story Process 142break 50, 160, 162, 175BROWN PAPER 3, 131, 138, 143, 145-6Brown Paper Fairs 145-6budget 30, 33, 54, 62, 227, 254, 416, 461business 4, 15, 26, 34, 39, 46-9, 53-4, 56, 59, 62, 70, 96, 109-10, 200, 231, 342 [10]
changing 285required 295, 310
business activities 71, 205BUSINESS ALIGNEMENT FINANCIAL ANALYSIS 3, 209BUSINESS ALIGNMENT 3, 199business areas 53, 64business benefits 346, 348
business cases 195, 225, 241, 512business costs 69business executives 46-50, 52-3, 56-7, 59business functions 295, 310business leaders 57, 62Business Management Processes 342business model 205Business Modeling & Stimulation 4, 505business objectives 46, 49, 203, 205Business Plan 205business plan, corporate 207BUSINESS PROCESS AUTOMATION Task 78business processes 77-8, 96, 110, 205-6, 293, 508-10business processes 510
Business Strategic Imperatives 46business strategy 48, 364
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 522/529
The IT Professionals Guide to Managing and Consulting
Page 521
Business Unit Stakeholders 44, 66, 340, 360business value 46, 69
C capability 516capacity 115, 509-10Card & Glass 346, 350-1, 355cards 72category Processes 334Causal Analysis Promote prevention 347, 350-2, 355champions 392, 396change 4, 40, 50, 58, 62, 363, 368, 370, 373-6, 379-80, 386, 415-16, 418, 483change agent 374, 379CHANGE MANAGEMENT 4, 313, 367change process 373-6, 516change process Approach 452change profile 3, 101, 104characteristics, common 441Characteristics of High Performance Organizations 371chart 142, 160-1, 470, 500
CIO 52claims process 79client 5-6, 21, 48, 50, 57, 64, 67, 82, 96, 113, 184, 210, 362, 501, 510, 512-13Client Archive Analysis 3, 105client personnel 117, 396clients organization 75Close Minded Open Minded Entrepreneurial Bureaucratic 61closure 164clusters 171-2, 178coach 379-80, 472coaching 4, 399, 407, 411code 282, 351, 490code analysis tools 351, 355Comments/Tools 347, 349-51, 353, 355Comments/Tools Planning Process 344Comments/Tools Process Modeling 346Common User Access (CUA) 347company 2, 45-6, 50-1, 55-6, 58-9, 62, 67-8, 71, 362, 429, 501-2company business strategies 199company name 44, 66, 340-1, 360-1company name 52competences 441
core 4, 441competition 40, 501-2competitors 429, 501-2complex transactions 348-9Complexity Analysis 349-50, 355
Complexity Analysis Limiting 350-1, 355configuration 347, 352, 356connection 47, 416Connell & Shafer 348, 350consensus 117, 145, 163, 171, 175, 413
obtaining 165Construction Processes 350Constructive Feedback 413Consulting Business cases 227-8Consulting Business Process Modeling for Simulation 509Consulting CHANGE MANAGEMENT 389, 399Consulting Design Processes 349Consulting GENERAL TECHNIQUES 429, 437, 441, 445, 461, 473, 485, 501Consulting Maintenance Processes 355
Consulting Objective 310-11, 313Consulting Opportunities for Improvement 345, 352-4, 358
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 523/529
The IT Professionals Guide to Managing and Consulting
Page 522
Consulting Process 75, 77, 105, 107, 109, 117, 127, 131, 145Consulting Process Description References 344Consulting Process Engingeering 101Consulting Question 46, 48, 51-3, 56, 59, 61, 63Consulting Selling Modeling and Simulation in Process Development 513Consulting WORKGROUP SKILLS 149, 159, 165, 177contents/process Data 156Contract Management 344-5Cost Accounting Processes 343Cost Benefit Analysis 347-8costs 26, 34, 54, 58, 70, 128, 225, 227-8, 254, 288, 294, 343, 415, 473, 509-10CSFs 205CUA (Common User Access) 347culture 61-2, 403customer base 49, 241customer perceptions 241, 310Customer Requirement Analysis 3, 107customer satisfaction 39, 50, 241, 356-7customer service reps 445customer service Ability 261
customers 26, 31, 39-40, 46-50, 53-4, 57, 69, 107, 110, 113, 204, 209, 251, 310, 344-5, 459customers 54
D data, summarized 266data bases 294-5Data Modeling 346-7, 349Data Modeling Entity Relationship Diagrams 346, 348-9data redundancy 294-5, 303Defect Causal Analysis 346, 349-51, 355Defect Density 356-7Defect Tracking Recording of inspection 347, 350-2defects 350-1, 355Defects/KLOC 357delivery process 267
consistent application 263software 60standard 283
Demand Management Processes 343department 14-15, 44-5, 49, 52-3, 57, 66-7, 70, 282, 340, 360, 362, 394, 417, 490design 346, 349, 463, 507
File/Database 313, 324design alternatives 507, 510design process 507designations 2detection, early 347, 350-2, 355Devel 344, 353, 357
Development Productivity 356-7Diagnostics 3-4, 45, 55, 62, 195, 199, 209, 225, 241, 253, 263, 271, 279, 285, 339, 359 [3]diamonds 142-3DILO 4, 263, 334, 445, 452document 44, 66, 75, 77, 137, 340-1, 360-1, 507documentation 241, 313, 341, 354, 361, 510, 512dots 178
E economics 127-8effect diagram 439effectiveness Process 113Effort Accounting 344-5environment 207, 231, 362, 374, 501
technical 288Estimating Process 343
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 524/529
The IT Professionals Guide to Managing and Consulting
Page 523
evaluation 206, 334, 437event 24, 145Event Modeling Modeling of complex transactions 348-9execution 81executives 46, 48-53, 56-7, 59-60, 62existing/future process 81experience 29, 180, 184
F facilitator 154, 166, 171, 184-5
trained 348-9failure 31, 61feedback 12, 375-6, 412flipchart 178flow 64, 137-8, 508-9, 516flow charts 346, 348-9focus 22, 24, 47-9, 63, 308Focus Interviews 3, 25, 43, 65, 232Formal descriptions of business processes 510formal process modeling 516
FTEs (full time equivalents) 209full time equivalents (FTEs) 209Function Points 357functional groups 175, 334, 452Functional Quality 311, 318, 356functions 5, 45, 47, 53-4, 63, 69, 127, 138, 204, 210, 459, 490
G GENERAL TECHNIQUES 4, 469goals 30, 46-7, 67, 70, 150, 157, 180, 199, 207, 376, 407, 437, 509Grady 347, 350-2, 355group 45, 47, 57-8, 61, 67-8, 70, 137, 159-66, 171, 175, 177, 185, 188, 267, 362, 374-5 [7]Group of Resources 159group processes Clarification 177group's performance 50guide 206-7, 519
H he/she 7, 46-7, 58High Performance Organizations 371history 180, 256-7
defect 354-5
I idea-generation Decision-making process 177ideas 14, 57, 60, 153-6, 159, 161, 164, 185-6, 189, 191, 375IEEE 348-9
implementation 134, 231, 277, 353, 392-3, 396, 459, 510implementation processes 241, 352implications 57, 342, 446, 459, 508improvement 5-6, 14, 53, 58-9, 72-3, 223, 266, 313, 341-3, 345-6, 348-50, 352-6, 358, 394,
461, 475improvement program 40, 58-9, 62In-process quality assurance techniques 348, 350-2incumbent 52individuals 58, 69, 71-3, 79, 161-3, 375-6, 380, 397, 431, 490initiatives 18, 54, 56, 62, 71-2, 200, 231-2, 288inspection 347-8, 350-2intermediate support groups 267Interrelationship Process 165, 173, 175interview 5-6, 10-12, 14, 46, 55, 64, 67, 117, 203
Interview Form 3, 65interview notes 12
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 525/529
The IT Professionals Guide to Managing and Consulting
Page 524
interview process 6interview Interviewee 10interviewee 11-12, 45, 49, 52, 54, 58, 62, 64, 362Involvement Platform Architectures Information System Planning 73Is Technical Environment 285
J JAD (Joint Appl. Design) 347, 349JAD Facilitated sessions 348-9 job 6, 30-1, 47, 57, 68, 415, 471-2Joint Appl 347, 349Joint Appl. Design (JAD) 347, 349Joint Application Design 348-9Judy August 348-9
K Key Messages 368, 370, 374-6KLOC 357knowledge 175, 180, 184, 407, 483KPI 4, 461, 463, 509
L last name 44, 66, 340, 360leader 29, 62, 154, 159-60, 163-4liability 2life cycle systems development processes, lower 206list 10, 45, 54, 56, 63, 146, 368, 471
M Maint 356-7maintenance 49, 254, 257, 313, 357management 29, 31, 45, 225, 231, 266, 282, 329, 344-5, 362, 396, 461, 485
business processes Increases business 109problem 259
Management Processes Assessment 341matrix 437Measuring Software Design Quality 346, 350-1, 355meeting 47, 51, 149-50, 153-4, 159-62, 412, 437, 490meeting process Time keeper 153members 161, 163, 166, 173methodology 181-2, 207, 344milestones 145, 410Million 218mind 46, 58-9, 64, 421mission 26, 45-6, 71model 58, 81, 134, 205, 373, 508-9
defined process 79
Modeling 505-6, 508, 512-13modifications 347, 352, 356money 51, 75Monthly run-rate 218mortgage 75
N name 7, 11, 44, 46, 52, 60, 66, 114, 146, 161, 340, 360
first 44, 66, 340, 360Natural Work Teams 181, 392-3normalization 348-9numerical analysis 512, 515
O
objectives 5, 14, 46-7, 50-1, 67, 149, 199, 205, 207, 227, 283, 327, 389, 397operation 45, 75, 258, 313, 324, 363, 508
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 526/529
The IT Professionals Guide to Managing and Consulting
Page 525
data center 258-9Opportunities for Improvement 342-3, 346, 348-50, 355-6Organisation 364-5organization 45-6, 48-51, 53-4, 57, 59, 61-2, 79, 107, 145, 209, 231, 263, 282, 329, 342, 344-5
[11]Organization & Process Management Practices Form 4, 339Organization and Processes Management Practices 339organization chart, group's 67organization structure 63, 206, 422Organization Structure Better-Trained People Communications Roles 72organization Survey document 329organizational change 169
planned 368organizational strengths 5organizations processes 263ownership 5, 145, 156, 175, 251, 341, 361, 393, 396
P Pareto chart 473participants 77, 137-8, 145, 151, 154, 178, 266, 386, 490
participation 58, 165, 490, 500participative process 180partner 31, 48, 57, 204path 44, 47, 66, 340, 360, 397PDSA process 475People-oriented Task-oriented Proactive Reactive Participative Directive 61perceptions 5, 14, 251, 376, 420, 425performance 18, 50, 52, 57, 68, 72-3, 113, 266, 282, 344, 347, 352, 404, 461, 465, 501-2 [3]
improving 57, 59, 73performance indicators 507-8permit re-use 347, 352, 356person 2, 137, 162-3, 165, 175, 184, 409, 414, 418, 420, 424-5, 463, 470Person Month 357Person Responsible 71-2phrase 46-7, 418picture 49, 131, 178, 363, 516pink 137, 142plan 30, 46, 48-50, 175, 205-6, 342, 345, 407, 410, 472planning 48-9, 63, 151, 203-4, 242, 267, 345
Systems 267planning process, effective 345players 48, 56-7, 64, 184of practice delivery processes, best 263practices, best 4, 341, 429, 431priorities 33, 72, 82, 175, 178, 203, 206, 267, 441Prioritization Process 343Priority Priority 72-3
problem solving 151, 185PROBLEM SOLVING TEAM BUILDING 3, 179Problem Tracking 353, 355problems 21-2, 24, 29, 47-8, 51, 54-5, 60, 180, 182, 184, 187, 353-5, 392, 422, 439, 449 [7]process charting 3, 109Process Description References 342, 345-6, 348-9, 351-5, 357-8process designs 512Process Development Project 506Process Engingeering 3PROCESS FLOW 144, 273process flow diagram 137process management system 88process map 75process measurements 81
Process Modeling Typically Data Flow Diagrams 346, 348-9process names 114
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 527/529
The IT Professionals Guide to Managing and Consulting
Page 526
process prototyping 89PROCESS STEPS 490process synchronization 295Process Walkthrough 3, 75process Manages 78processes 3, 75, 78-9, 81, 95-6, 113, 131, 134, 160-2, 171-2, 184, 195, 341-57, 490, 505-6,
509 [18]defined 344acceptance 346administrative 516core 441emotional 418manufacturing 508refreezing 376retailer 459step 490
Processes Management Practices 339processes Mapping 109product/market combinations 107production 282, 354-5, 357
Production Library Mgmt 353-4productivity 350-1, 355, 357products 2, 39, 49, 75, 114, 441, 500, 519products Step 441professionals 271, 318Progress Review Process 344PROJECT BUSINESS CASE 3, 225Project Management Processes 344project probes 263, 273project process steps 273Project Review Form 4, 359project work 49, 57, 389projects 6, 8, 56-7, 62, 64, 73, 145, 200, 205, 210, 219, 225, 227, 231, 365, 396 [3]
Information Systems Planning xf0b7 266protégé, his/her 403prototype TO-BE processes 81Prototyping 345, 347, 349Prototyping May 348, 350PS/TB 180-2PS/TB methodology 181-2PS/TB process 184publisher 2
Q quality 12, 26, 39, 56, 190, 206-7, 241-2, 263, 271, 293, 310-11, 313, 356-7, 463, 515
technical 4, 294, 309, 313, 318, 324-5, 356Quality Assurance 344-5, 347, 352
quality assurance process 346quality drivers 310, 313
R RACI 4, 485, 500rate 218, 345, 364
processors Utilization 258Re-Engineering Processes 355Re-testing 347, 352, 356real time systems 348-9recommendations 56, 58-60, 62, 147, 153, 364, 393redundancies, functional 327Regression 346-7, 352, 355-6reliability 47, 227, 241, 355
remind 160request 75, 344
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 528/529
The IT Professionals Guide to Managing and Consulting
Page 527
resistance 4, 415, 418, 420, 424-5Resistance Sounds Like 421-3resistance 421-3resources 30, 33, 48-52, 56-7, 159, 161, 184, 231, 345, 410, 483-4, 509, 516
computer 78-9responsibilities 46, 52, 68, 137, 153-4, 185, 283, 345, 362, 364-5, 415, 463, 470, 485, 487Responsibilities Information Systems Team Building 72responsibility charting 485, 490responsibility charts 490retailer 459retooling 56-7Risk Analysis 347, 349Risk Analysis Process 348-9risks 61, 271, 344, 348-9, 508Rohm & Haas Prioritization Process 344, 348-9roles 5, 11, 14-15, 34, 47-8, 79, 81, 150, 153-4, 184, 283, 374-5, 411, 470-2, 490, 500 [2]
S sales 445, 461schedule 30, 70, 277, 344-5, 357
extended conversion 294-5scheduling 344-5scope 341, 361scores 241, 310, 313security 313, 342, 347, 352, 365self-destruct 40service organization 48service organization xf0b7 26services 2, 39, 43, 47, 49, 52, 56, 65, 69, 110, 113, 242, 339, 361-2, 364, 519 [3]
customer 107sessions 21, 166, 173, 375, 409, 411
audience analysis 59-60business management interview 50
shops 57-8, 62simulation 505-9, 512-13, 515skills 149, 206, 471Sociable Status Conscious Finance 61-2Software Inspection Process 348, 350-2Software Process 344Software Testing and Quality Assurance 347, 352SOFTWARE TOOLS 4solutions 24, 50, 57, 60, 165-6, 175, 184, 186, 190, 363, 392-3specification discovery process 348, 350staff 39, 341-2, 361Staff Development Plan 342staff planning process 267standards 63, 263, 288, 313
steps 12, 78, 127, 131, 137, 163, 184, 187, 189-90, 285, 288, 373, 375, 380, 424, 472-3 [4]story 21, 59, 131, 137, 188Strategic Alignment Business Case 232strategies 46, 48, 51, 200, 203-5, 207, 231, 342-3, 364, 443, 501
business/IT 48corporate 200, 205, 207
Strauss & Ebenau 348, 350-2strengths 14-15, 51-2, 60, 68, 146, 266, 318, 362, 374, 410, 501-2Structured Programming 350-1Structured Rapid Prototyping 348, 350stuff, right 33, 39support 26, 40, 49, 73, 78, 200, 205-7, 223, 242, 283, 311, 343, 357, 364, 443, 510support business activities 205support business processes 206
support staff 288symptom 21-2
8/10/2019 The Ultimate IT Professional's Guide to Managing and Consulting - Getting the Job Done-1921573147
http://slidepdf.com/reader/full/the-ultimate-it-professionals-guide-to-managing-and-consulting-getting 529/529
The IT Professionals Guide to Managing and Consulting
sync 46, 50, 59System Architecture 4, 293systems 4, 22, 26, 39, 49, 51, 55-6, 68, 70, 77, 81, 325, 347, 352, 354-6, 363-4 [4]
key 318, 362operational 348, 350
systems transformation 21, 169
T tasks 68, 77-8, 188, 345, 418, 429, 508team 6, 31, 117, 156-7, 161-2, 165, 171, 173, 175, 180, 205, 376, 389, 394, 397team building 31, 63Team-oriented Individualistic Trusting Suspicious Sensitive Insensitive 61teamwork 31, 487Technically Oriented 61-2techniques 21, 101, 127, 149, 206, 283, 313, 374-6, 437, 443, 473, 484-5, 501, 506technologies 47-8, 54, 77, 255, 294, 365, 368Technology Plan 342Technology Planning organization 203Test Coverage 346-7, 352Test data 347, 352, 354, 356