THE UNIVERSITY OF TEXAS HEALTH SCIENCE CENTER
- SAN ANTONIO -
MEDICAL SCHOOL ROOF REPLACEMENT
UTHSCSA PROJECT # 745-18-P11
PLEASE SILENCE CELL PHONES
Project Contacts
University of Texas Health Science Center:
• John V. Amos, AIA, LEEP AP ~ Campus Architect
• Joseph Zatopek~ Project Manager
• Andrea Parks Stahl, CPPO ~ Procurement Contact
Wiss, Janney, Elstner Associates, Inc.
• Erik Murray, AIA ~ Project Manager
• Greg Spatz, RRO ~ Project Administrator
• Daly Yates ~ Project Administrator
Location
Site Map
Disclaimer
• Bidders are responsible for their own site investigation.
• Proposal to be based on bid and construction documents only.
• Reliance on consultant oral statements is at Bidder’s own risk.
• Submit questions in writing.
Building Overview
Looking North
Looking South
Looking East
Looking West
Roof System Types
• MBR-1: Gravel Surfaced Coat Tar Pitch or Asphalt BUR Roofing System – Structural Concrete Deck
• MBR-2: Gravel Surfaced Coat Tar Pitch Roofing System –Lightweight Concrete over Metal Deck
• MBR-3: Gravel Surfaced Coat Tar Pitch Roofing System –Concrete Canopies
• MBR-4: Gravel Surfaced Coat Tar Pitch Roofing System –Lightweight Concrete over Concrete Deck
Roof Schedule and Types
Roof System –Typical Details
Scope of Work Summary
• Remove existing roofing system down to deck
• Remove all abandoned mechanical curbs, cover openings with heavy gauge sheet metal anchored to surrounding concrete deck.
• Raise through wall flashing at all masonry perimeter walls.
• Raise or install new curbs at mechanical equipment to achieve minimum 8 inch flashing height above finished roof height of new roofing system.
• Clean and prime existing concrete roof decks and install a base ply of modified bitumen sheet torched down the concrete decks.
• Install 4.5 inches of polyisocyanurate insulation and ½-inch thick gypsum roof cover board with low rise foam. All layers secured in accordance with wind uplift requirements.
Scope of Work - Continued
• Install new wood blocking and nailers as required by manufacturer and to achieve minimum 8 inch base flashing height.
• Install a new, two-ply SBS Modified Bitumen Roofing System, top ply to be granular surfaced.
• Install new unit, edge metals and counter flashings.
• Install new overflow scuppers at locations shown on Drawings.
• Install new life safety guardrails and access ladders as shown on Drawings.
• The Contractor shall provide all labor, plant, supplies, equipment, services, facilities, and appurtenances which are indicated or reasonably implied by the Drawings, or as specified, or that are required for the work described in the Contract Documents.
Staging Concepts
Roof DeckType Plan
Roof Wind Resistance Charts
Roof Alternates
Typical Details
New Copings and Overflow Scuppers
New Masonry Through-Wall Flashing
Existing Receiver to Remain
Existing Receiver at Windows
Mechanical Screen Walls
New Skylight
Expansion Joint at Coping
HVAC Curbs – Equipment to be Raised
Pipe and Conduit Penetrations
Equipment Support Platform
Electrical Disconnects
Plumbing Vent Flashings
New Supports for Stairs and Platforms
New Supports for Stairs and Platforms
New Curbs at Plenum Intake Doors
Method of Selection
COMPETITIVE SEALED PROPOSAL
• Capability to perform work (Firm and Team)
• Past Performance (Quality of Work, Willingness to Follow Construction Documents)
• Demonstrated Technical and Management Competence with Roof Replacement Projects as Prime Contractor.
• Demonstrated Ability to Meet Schedule and Budget.
• Safety Record
Bid Schedule
• All questions are to be submitted in writing and e-mail by 3:00 PM, local time; Friday, November 17, 2017. Submit questions to: [email protected]
• No questions will be answered verbally.
• Proposal Submittal Deadline: Monday, December 4, 2017; 3:00 pm, local time
• HUB Subcontracting Plan (HSP) Submittal Deadline: Tuesday, December 5, 2017; 3:00 pm, local time
• RFP Proposals publicly opened and read 3:00 pm; Wednesday, December 6, 2017
• Hand Deliver ALL Proposals, HSP, and attend public reading of RFP Proposals at:
Purchasing Dept.; North Campus, Research Admin. Bldg., Rm. 4.110, 8403 Floyd Curl
Dr., San Antonio, Texas 78229.
THE UNIVERSITY OF TEXAS HEALTH
SCIENCE CENTER – SAN ANTONIO
MEDICAL SCHOOL ROOF REPLACEMENT
UTHSCSA PROJECT # 745-18-P11
THANK YOU FOR BIDDING