The Van Ness Campus
Weekly Construction Bulletin #195
1200 Van Ness Avenue San Francisco, CA 94109 General Information (415) 762-7447
Construction Update Week of June 26, 2017 The Van Ness Campus Weekly Bulletins are intended to help inform members of the community about upcoming construction activities.
1. Reference Weekly Construction Activities Log (attached) 2. Reference Six Week Construction Activities Log (attached) 3. Submit written questions or comments at http://cpmc2020.org/contact-us 4. For additional project information visit our project website at http://cpmc2020.org 5. General Information (415) 762-7447 6. Emergency Phone Numbers
a. For police, fire or ambulance emergencies dial 911 b. Van Ness Campus Construction Hotline – (415) 762-7477. Please note this is for
urgent construction related concerns at the Van Ness Campus only. For non-emergency communication associated with the Van Ness Campus Construction please contact us via our project website or the General Information phone line.
Weekly Construction Activities Sutter Health CPMC Van Ness Campus Hospital - Week Starting Monday, June 26, 2017 The purpose of the Weekly Construction Activity Log is to identify operations that may generate traffic congestion, noise, dust, vibration, extraordinary light after sunset, utility disruptions, mass transit and pedestrian route changes, or other such activities or disturbances.
Potential Impact
Traf
fic
Noi
se/D
ust
Even
ing
Wor
k
Pede
stria
n/M
uni R
oute
Util
ity
Inte
rrup
tion
Vibr
atio
n
Ref.
No.
&
Map
Key
Construction Activity Estimated Start Date
Daily Work Hours
Special Work Hours
Esti9mated End Date
New Activities None
Ongoing Activities X X
1 Delivery of Construction Materials
• Post Street delivery lane. • Commercial trucking will deliver construction materials to site.
6/26/17 7a-5p, M-F
None 11/24/17
Reference attached Site Logistics Map for general location of Construction Activities.
Six Week Construction Activities Sutter Health CPMC Van Ness Campus Hospital - Week Starting Monday, June 26, 2017 The purpose of the Six Week Construction Activity Log is to identify operations that may generate traffic congestion, noise, dust, vibration, extraordinary light after sunset, utility disruptions, mass transit and pedestrian route changes, or other such activities or disturbances.
Potential Impact
Traf
fic
Noi
se/D
ust
Even
ing
Wor
k
Pede
stria
n/M
uni R
oute
Util
ity
Inte
rrup
tion
Vibr
atio
n
Ref.
No.
&
Map
Key
Construction Activity Estimated Start Date
Daily Work Hours
Special Work Hours
Estimated End Date
New Activities None
Ongoing Activities X X 1 Delivery of Construction Materials
• Post Street delivery lane.• Commercial trucking will deliver construction materials to site.
6/26/17 7a-5p, M-F None 11/24/17
X X X 3 Removal of Tower Crane • Delivery, assembly and use of mobile crane.• Commercial trucking will remove tower crane sections.• Post Street from Franklin to Van Ness will be shut down.
7/27/17 7a-5p, Th-M
None 7/31/17
Reference attached Site Logistics Map for general location of Construction Activities.
Weekly Construction Activities Sutter Health CPMC Van Ness Campus MOB - Week Starting Monday, June 26, 2017 The purpose of the Six Week Construction Activity Log is to identify operations that may generate traffic congestion, noise, dust, vibration, extraordinary light after sunset, utility disruptions, mass transit and pedestrian route changes, or other such activities or disturbances.
Potential Impact
Traf
fic
Noi
se/D
ust
Even
ing
Wor
k
Pede
stria
n/M
uni R
oute
Util
ity
Inte
rrup
tion
Vibr
atio
n
Ref.
No.
&
Map
Key
Construction Activity Estimated Start Date
Daily Work Hours
Special Work Hours
Estimated End Date
New Activities X X 2 Concrete Pour
• Cedar Street delivery lane.• Concrete will be poured for structure.• There may be some disruption of traffic on Cedar.
6/28/17 7a-5p, W None 6/28/17
X X 2 Concrete Pour • Cedar Street delivery lane.• Concrete will be poured for structure.• There may be some disruption of traffic on Cedar.
6/30/17 7a-5p, F None 6/30/17
Ongoing Activities X X 2 Delivery of Construction Materials.
• Delivery of materials with commercial trucking on Cedar St.• Occasional rerouting of traffic on Cedar St.
6/26/16 7a-5p, M-F None 12/30/17
Reference attached Site Logistics Map for general location of Construction Activities.
Six Week Construction Activities Sutter Health CPMC Van Ness Campus MOB - Week Starting Monday, June 26, 2017 The purpose of the Six Week Construction Activity Log is to identify operations that may generate traffic congestion, noise, dust, vibration, extraordinary light after sunset, utility disruptions, mass transit and pedestrian route changes, or other such activities or disturbances.
Potential Impact
Traf
fic
Noi
se/D
ust
Even
ing
Wor
k
Pede
stria
n/M
uni R
oute
Util
ity
Inte
rrup
tion
Vibr
atio
n
Ref.
No.
&
Map
Key
Construction Activity Estimated Start Date
Daily Work Hours
Special Work Hours
Estimated End Date
New Activities X X
2 Concrete Pour
• Cedar Street delivery lane. • Concrete will be poured for structure. • There may be some disruption of traffic on Cedar.
7/6/17 7a-5p, Th None 7/6/17
X X
2 Concrete Pour • Cedar Street delivery lane. • Concrete will be poured for structure. • There may be some disruption of traffic on Cedar.
7/11/17 7a-5p, Tu None 7/11/17
X X
2 Concrete Pour • Cedar Street delivery lane. • Concrete will be poured for structure. • There may be some disruption of traffic on Cedar.
7/13/17 7a-5p, Th None 7/13/17
X X
2 Concrete Pour • Cedar Street delivery lane. • Concrete will be poured for structure. • There may be some disruption of traffic on Cedar.
7/18/17 7a-5p, Tu None 7/18/17
Ongoing Activities X X
2 Delivery of Construction Materials.
• Delivery of materials with commercial trucking on Cedar St. • Occasional rerouting of traffic on Cedar St.
6/26/16 7a-5p, M-F
None 12/30/17
X X
2 Concrete Pour • Cedar Street delivery lane. • Concrete will be poured for structure. • There may be some disruption of traffic on Cedar.
6/28/17 7a-5p, W None 6/28/17
X X
2 Concrete Pour • Cedar Street delivery lane.
6/30/17 7a-5p, F None 6/30/17
Six Week Construction Activities Sutter Health CPMC Van Ness Campus MOB - Week Starting Monday, June 26, 2017 The purpose of the Six Week Construction Activity Log is to identify operations that may generate traffic congestion, noise, dust, vibration, extraordinary light after sunset, utility disruptions, mass transit and pedestrian route changes, or other such activities or disturbances.
Potential Impact
Traf
fic
Noi
se/D
ust
Even
ing
Wor
k
Pede
stria
n/M
uni R
oute
Util
ity
Inte
rrup
tion
Vibr
atio
n
Ref.
No.
&
Map
Key
Construction Activity Estimated Start Date
Daily Work Hours
Special Work Hours
Estimated End Date
• Concrete will be poured for structure. • There may be some disruption of traffic on Cedar.
Reference attached Site Logistics Map for general location of Construction Activities.
GEARY BOULEVARD
MYRTLE ST.
FRA
NK
LIN
STR
EE
T
VA
N N
ESS
AVE
NU
E PO
LK S
TRE
ET
CEDAR STREET
POST STREET
HEMLOCK ST.
AY
Y
O'FARREL ST.
GEARY STREET
N
MOB Work Area Boundary
Construction Access Gate
MOB Truck RoutesHospital Truck Routes
2.4
Fence
MUNI Electric Lines
LEG
EN
D
VERSIONDATE Sept 08, 2010
BUILDING
SCALE Not to Scale
CAMPUS VNC
NUMBER D1
Hospital, MOB
Office Tower
Directions of Demolition
Loading dock for abatement activities
Court Yard
Entrance
Hotel Tower
Staging area for interior/soft demolition
Loading dock for abatement activities