Document of The World Bank FOR OFFICIAL USE ONLY Report No: 66820-CN PROJECT APPRAISAL DOCUMENT ON A PROPOSED LOAN IN THE AMOUNT OF $100 MILLION TO THE PEOPLE’S REPUBLIC OF CHINA FOR THE GANSU QINGYANG URBAN INFRASTRUCTURE IMPROVEMENT PROJECT April 30, 2012 China and Mongolia Sustainable Development Unit Sustainable Development Department East Asia and Pacific Region This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

Document of

The World Bank

FOR OFFICIAL USE ONLY

Report No: 66820-CN

PROJECT APPRAISAL DOCUMENT

ON A

PROPOSED LOAN

IN THE AMOUNT OF $100 MILLION

TO THE

PEOPLE’S REPUBLIC OF CHINA

FOR THE

GANSU QINGYANG URBAN INFRASTRUCTURE IMPROVEMENT PROJECT

April 30, 2012

China and Mongolia Sustainable Development Unit

Sustainable Development Department

East Asia and Pacific Region

This document has a restricted distribution and may be used by recipients only in the

performance of their official duties. Its contents may not otherwise be disclosed without World

Bank authorization.

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

CURRENCY EQUIVALENTS

(Exchange Rate Effective Date: December 12, 2011)

Currency Unit = RMB (Yuan)

RMB Yuan 6.20 = US$1

FISCAL YEAR

July 1 – June 30

ABBREVIATIONS AND ACRONYMS

DA Designated Account PDO Project Development Objective

EIA Environment Impact

Assessment

PIU Project Implementation Unit

EMP Environmental Management

Plan

PLG Project Leading Group

FIRR Financial Internal Rate of

Return

PMO Project Management Office

FSR Feasibility Study Report PP Procurement Plan

GoC Government of China QMG Qingyang Municipal Government

GSFB Gansu Provincial Finance

Bureau

QUIIP Gansu Qingyang Urban

Infrastructure Improvement Project

IBRD International Bank for

Reconstruction and

Development

QWSSC Qingyang Municipal Water Supply

and Sewage Company

ICB International Competitive

Bidding

QYFB Qingyang Municipal Finance

Bureau

M & E Monitoring and Evaluation RAP Resettlement Action Plan

MOF Ministry of Finance TA Technical Assistance

NCB National Competitive Bidding WWTP Waste Water Treatment Plant

NPV Net Present Value WACC Weighted Average Cost of Capital

OP Operational Policy XDG Xifeng District Government

ORAF Operational Risk Assessment

Framework

XFFB Xifeng District Finance Bureau

Regional Vice President: Pamela Cox

Country Director: Klaus Rohland

Sector Director: John Roome

Sector Managers: Paul Kriss

Vijay Jagannathan

Task Team Leader: Ji You

Page 3: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

TABLE OF CONTENTS

Page

I. STRATEGIC CONTEXT .................................................................................................... 1

A. COUNTRY CONTEXT............................................................................................................. 1

B. SECTORAL AND INSTITUTIONAL CONTEXT ........................................................................... 1

C. HIGHER LEVEL OBJECTIVES TO WHICH THE PROJECT CONTRIBUTES ................................... 3

II. PROJECT DEVELOPMENT OBJECTIVES ................................................................... 3

A. PDO..................................................................................................................................... 3

B. PROJECT BENEFICIARIES ...................................................................................................... 3

C. PDO LEVEL RESULTS INDICATORS ...................................................................................... 4

III. PROJECT DESCRIPTION ................................................................................................. 4

A. PROJECT COMPONENTS ........................................................................................................ 4

B. PROJECT FINANCING ............................................................................................................ 5

C. LESSONS LEARNED AND REFLECTED IN THE PROJECT DESIGN ............................................. 6

IV. IMPLEMENTATION .......................................................................................................... 6

A. INSTITUTIONAL AND IMPLEMENTATION ARRANGEMENTS .................................................... 6

B. RESULTS MONITORING AND EVALUATION ........................................................................... 6

C. SUSTAINABILITY .................................................................................................................. 6

V. KEY RISKS AND MITIGATION MEASURES ............................................................... 7

A. RISK RATINGS SUMMARY TABLE......................................................................................... 7

B. OVERALL RISK RATING EXPLANATION ................................................................................ 7

VI. APPRAISAL SUMMARY ................................................................................................... 8

A. ECONOMIC AND FINANCIAL ANALYSES ............................................................................... 8

B. TECHNICAL ........................................................................................................................ 10

C. FINANCIAL MANAGEMENT ................................................................................................. 11

D. PROCUREMENT .................................................................................................................. 11

E. SOCIAL (INCLUDING SAFEGUARDS) .................................................................................... 11

F. ENVIRONMENT (INCLUDING SAFEGUARDS) ........................................................................ 12

ANNEX 1: RESULTS FRAMEWORK AND MONITORING .............................................. 14

ANNEX 2: DETAILED PROJECT DESCRIPTION .............................................................. 16

ANNEX 3: IMPLEMENTATION ARRANGEMENTS ......................................................... 19

ANNEX 4: OPERATIONAL RISK ASSESSMENT FRAMEWORK (ORAF) ................... 29

ANNEX 5: IMPLEMENTATION SUPPORT PLAN ............................................................. 32

ANNEX 6: MAP .......................................................................................................................... 34

Page 4: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,
Page 5: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

CHINA

GANSU QINGYANG URBAN INFRASTRUCTURE IMPROVEMENT

PROJECT APPRAISAL DOCUMENT

.

EAST ASIA AND PACIFIC REGION

(EASCS)

Basic Information

Date: April 30, 2012 Sectors: General Transport (60%)

and General

Water/Sanitation/Flood

(40%)

Country Director: Klaus Rohland Themes: Other Urban

Development

Sector Managers: Paul Kriss/Vijay

Jagannathan

EA Category: B

Sector Director: John Roome

Project ID: P123133

Lending Instrument: SIL

Team Leader(s): Ji You

Does the project include any CDD component? No

Joint IFC:

Borrower: People’s Republic of China

Responsible Agency: Qingyang Project Management Office, Qingyang Municipal Government

Contact: Zhihu Yan Title: PMO Director

Telephone no.: 86-0934 8888918 Email: [email protected]

Project Implementation

Period:

Start Date: July1, 2012 End Date: June 30, 2017

Expected Effectiveness

Date:

November 30, 2012

Expected Closing Date: December 31, 2017

Page 6: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

Project Financing Data(US$M)

[X] Loan [ ] Grant [ ] Other

[ ] Credit [ ] Guarant

ee

For Loans/Credits/Others

Total Project

Cost : (US$M) 192.35

Total Bank

Financing : (US$M) 100

Total

Cofinancing : (US$M) 92.35 Financing Gap : (US$M) 0

Financing Source Amount(US$M)

BORROWER/RECIPIENT 92.35 million

IBRD 100 million

IDA: New

IDA: Recommitted

Others

Financing Gap

Total 192.35 million

Expected Disbursements (in USD Million)

Fiscal Year 2013 2014 2015 2016 2017 2018

Annual 3 15 30 25 15 12

Cumulative 3 18 48 73 88 100

Project Development Objective(s)

The proposed Project Development Objective (PDO) is to assist Qingyang Municipality to improve

selected urban infrastructure services including urban roads and urban environmental services.

Components

Component Name Base Cost (USD

Millions)

Component 1: Urban Infrastructure Improvement

Sub-component 1.1: Urban Bypass

163.68

82.26

Sub-component 1.2: Integrated Road Corridor 11.53

Sub-component 1.3: Drainage and Sewage 37.58

Sub-component 1.4: Wastewater Treatment Plant 32.31

Component 2: Institutional Strengthening and Capacity Building

3.30

Page 7: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

Compliance

Policy

Does the project depart from the CAS in content or in other significant

respects?

Yes [ ] No [●]

Does the project require any exceptions from Bank policies? Yes [ ] No [●]

Have these been approved by Bank management? Yes [ ] No [●]

Is approval for any policy exception sought from the Board? Yes [ ] No [●]

Does the project meet the Regional criteria for readiness for implementation? Yes [●] No [ ]

Safeguard Policies Triggered by the Project Yes No

Environmental Assessment OP/BP 4.01 ●

Natural Habitats OP/BP 4.04 ●

Forests OP/BP 4.36 ●

Pest Management OP 4.09 ●

Physical Cultural Resources OP/BP 4.11 ●

Indigenous Peoples OP/BP 4.10 ●

Involuntary Resettlement OP/BP 4.12 ●

Safety of Dams OP/BP 4.37 ●

Projects on International Waters OP/BP 7.50 ●

Projects in Disputed Areas OP/BP 7.60 ●

Legal Covenants

Name

Execution of the QWSSC Agreement

Legal Opinion Confirming the Qingyang Agreement

Financial Performance Improvement Plan of QWSSC

Financial Covenant of QWSSC (break-even

requirement)

Project Management and Supervision Assistance

Recurrent

As condition of the

disbursement for

Part I. 4 of the

Project

As condition of the

disbursement for

Part I.4 of the

Project

N/A

Starting January 1,

2015

Due Date

December

31, 2012

Not more

than three

months after

the Effective

Frequency

N/A

N/A

N/A

N/A

N/A

Page 8: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

Independent Monitoring of EMP and RAP

Transport Action Plans

N/A

N/A

N/A

Date or prior

to the

commencing

of the

bidding

process for

any works to

be procured

under the

Project,

whichever

occurs first

March 15,

2012

Not later

than twelve

(12) months

after the

Effective

Date

Semi

Annual

N/A

Description of Covenant

Disbursement Condition: For Part I. 4 of the Project (Wastewater Treatment Plant)

The QWSSC Agreement has been executed and delivered on behalf of Xifeng District and

QWSSC and is legally binding upon the parties thereto in accordance with its terms.

A legal opinion satisfactory to the Bank from counsel acceptable to the Bank has been received

by the Bank confirming that the QWSSC Agreement has been duly authorized or ratified by

Xifeng District and QWSSC, and is legally binding on such parties in accordance with its terms.

Financial Covenants for QWSSC:

Not later than December 31, 2013, submit a financial performance improvement plan of QWSSC

satisfactory to the Bank.

Except as the Bank shall otherwise agree, ensure that, commencing with the calendar year starting

January 1, 2015, the sum of QWSSC's operating revenues and non-operating revenues will be no

less than equal to the sum of its operating costs, including depreciation and taxes; debt service

requirements; and funds required for other necessary operating investments, calculated in a

manner satisfactory to the Bank.

Covenants Applicable to Project Implementation:

Page 9: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

Project Management and Supervision: Gansu shall, not more than three months after the Effective

Date or prior to the commencing of the bidding process for any works to be procured under the

Project, whichever occurs first, employ or cause to be employed under terms of reference

satisfactory to the Bank, qualified consultants acceptable to the Bank to assist Qingyang

Municipality, Xifeng District and the Project participants in Project management and supervision.

Independent Monitoring of EMP and RAP: Qingyang shall maintain and cause to be maintained

policies and procedures adequate to enable it to monitor and evaluate, in accordance with

guidelines acceptable to the Bank, the implementation of the EMP and RAP and the achievement

of the objectives of said plans and by March 15 and September 15 of each year, commencing on

March 15, 2013, furnish to the Bank semi-annual reports of such monitoring and evaluation

activities with respect to the EMP and RAP, together with any revisions proposed to be

introduced into said plans in order to achieve their respective objectives.

Transport Action Plans including 1) Parking Action Plan; 2) Public Transportation Action Plan;

and 3) Traffic Safety, Education and Enforcement Action Plan should be prepared and furnished

to Bank for its comments not later than twelve (12) months after the Effective Date, and promptly

thereafter carry out such plans taking into account the comments if any made by the Bank in

accordance with schedule included in such plans.

Team Composition

Bank Staff

Name Title Specialization Unit UPI

Ji You Urban Specialist Task Team Leader EASCS 108727

Zhi Liu Lead Infrastructure

Specialist

Urban Planning

and Urban Road

EASTS 19222

Luquan Tian Transport Specialist Roads and Traffic

Engineering

EASCS 354488

Zhefu Liu Senior Social Development

Spec.

Social Safeguards EASCS 171201

Feng Ji Environmental Spec. Environmental

Safeguards

EASCS 252836

Haixia Li Senior Financial

Management Spec.

Financial

Management

EAPFM 259270

Jingrong He Procurement Analyst Procurement EAPPR 183511

Marta Elena Molares-

Halberg

Lead Counsel Project Lawyer LEGES 13064

Wenyan Dong Operations Analysis Risk Assessment EASCS 174039

Xin Chen Senior Program Assistant Operations

Administration

EASCS 77978

Page 10: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

Vel Fernandes Program Assistant Document

Processing

EASIN 32562

Non Bank Staff

Name Title Office Phone City

Rufei Zhang Urban Planning and

Operations Specialist 86-021-53013701 Shanghai, China

Gladys Frame Urban Road and Traffic

Management Specialist +44-131-446-9528 Edinburgh, UK

Geoffrey Read Municipal Engineering

Specialst London, UK

Ning Wu Financial Analyst Beijing, China

Kezhi Dai Municipal Sanitation

Engineer Shanghai, China

Locations

Country First Administrative

Division

Location Planned Actu

al

Comme

nts

China Gansu Qingyang

Page 11: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

1

I. STRATEGIC CONTEXT

A. Country Context

1. Over the last ten years, the Government of China (GoC) has made significant efforts to

address the disparity between the relatively developed coastal region and the lagging region of

western China. Implementation of the Western Regional Development Initiative has achieved

remarkable outcomes. There is an accelerating trend of the country’s manufacturing industries

shifting from coastal cities towards the western hinterland. Since 2008, there has been

unprecedented GDP growth in many western provinces, surpassing growth in coastal provinces.

2. Encouraged by these trends, GoC further upgraded the Western Regional Development

Initiative in the 12th

Five Year Plan to be a top priority national agenda in the country’s regional

development strategy. While implementation of this Initiative in the previous ten years was

largely concentrated in promoting the development of regional large city anchors in the western

region (such as Chengdu, Chongqing, and Xi’an), the focus under the 12th

FYP has been fine-

tuned to five sub-areas with rich oil and coal resources.

3. Most of these five sub-areas suffer from significant poverty, and so targeting them has an

additional benefit of poverty reduction. The central government plans to trigger the process of

industrialization, urbanization and urban-rural integration in these areas with a particular focus

on the central cities and selected large towns. The selected project city of Qingyang is of national

strategic importance as an energy production base, due to its rich oil and coal resources.

B. Sectoral and Institutional Context

4. To reduce the pressure of massive rural-urban migration towards the coastal cities, China

aims for cities in western China to accommodate local rural-urban migrants. Substantial urban

infrastructure developments are needed for western cities to fulfill this task. 2009 indicators

showed a significant gap in urban infrastructure services between western cities and coastal

cities, in terms of: urban road space per urban resident (western cities averaged of 11.6

m2/person, eastern cities averaged 14.1 m

2/person); length of drainage pipes per km

2 of urban

built-up area (western cities 6.8 km/km2, eastern cities 10.9 km/km

2); percentage of wastewater

treated (western cities 58.5%, eastern cities 72.6%); and percentage of solid waste collected and

treated (western cities 72.3%, eastern cities 81.4%). Moreover, this gap is still expanding. In

2009, investment in urban infrastructure per urban resident in western cities was 17% less than in

eastern cities. In response to this gap, the Government has assigned a high priority under the

Western Regional Development Initiative to the development of urban infrastructure in western

cities, particularly in medium and small cities.

5. While many coastal cities and large inland cities have had vast construction programs of

primary road infrastructure in the past, and have now shifted their investment priority towards

public transport and urban environmental infrastructure, cities in the west are still struggling for

adequate investment in basic road infrastructure. In 2009, investments in public transport

(subway/LRT) and in urban road construction accounted for 6% and 57% of total urban

infrastructure capital investment respectively in western cities (compared to 24% for public

transport and 41% for road constructions in coastal cities). Constrained by their limited funding

Page 12: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

2

capacities, local governments of western cities consider road construction as a priority sector for

capital investment, and fail to address the far more pressing needs of environmental

infrastructure (drainage, wastewater, and solid waste). In 2009, per capita capital investment of

urban road construction in western cities actually was 16% higher than that in coastal cities

(western cities averaged RMB917/person, eastern cities averaged RMB788/person), but

investment of environmental infrastructure in western cities averaged 42% lower than in coastal

cities (western cities RMB141/person, eastern cities RMB244/person). Under-investment in

environmental infrastructure has resulted in severe deterioration of the urban environment in

China’s western cities, leading to the cities’ limited water resources being contaminated by

untreated wastewater in the northwest region.

6. Local governments in western areas are eager to build livable and competitive cities to

attract external investment. Urban infrastructure investments are usually at the core of the efforts

to achieve this goal. But experience in more developed Chinese cities has shown that: (a) livable

and competitive cities need to be supported by cross-sectoral, balanced urban infrastructures; and

(b) development of road infrastructure alone is not sufficient to avoid traffic problems and

achieve sustainable, equitable, and efficient transport. Bank experience in China’s western region

suggests that supporting cities to improve their urban infrastructure in a cross-sectoral balanced

manner and to improve the urban transport service through a comprehensive transport

management approach remains a considerable challenge.

7. Measured by per capita GDP, Gansu Province ranked almost at the bottom among the 31

provinces in mainland China. Constrained by a long narrow corridor shaped territory, Gansu

relies heavily on a few regional central cities along the corroder, including Qingyang, to drive its

economic development. Recently, Gansu Provincial Government further upgraded the

development profile of Qingyang in its provincial territory development strategy, and defined the

city as a provincial industrial base for energy supply and petrochemicals.

8. Qingyang Municipality is located in the eastern most part of Gansu Province on the Loess

Plateau and has a population of 2.64 million. Qingyang’s development has been held back by: (a)

its relative isolated location and limited access to strategic markets in the region; (b) the

monopoly of two key industries, petroleum exploitation and coal mining, by state-owned

enterprises; (c) the low level of urbanization; and (d) severe shortage of water resources. With its

abundant deposits of oil and coal resources, Qingyang is positioned by the central government as

an emerging energy base of national significance, and is targeted by the central government’s

initiatives of supporting and vitalizing the economies in the country’s western lagging areas.

9. Qingyang Municipality consists of one urban district and seven rural counties. The

proposed Qingyang project would be focused on the municipality’s capital of Xifeng District.

QMG’s efforts to improve the city’s livability and profile in order to attract and retain external

investments have been constrained by the shortage of essential urban infrastructure services in

Xifeng District. Public capital investments in Xifeng over the last few years have been

concentrated mainly on constructing roads and widening the major streets in the existing urban

area. Pressing needs for improving environmental infrastructure in the existing urban area have

not been addressed.

Page 13: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

3

C. Higher Level Objectives to which the Project Contributes

10. The proposed Gansu Qingyang Urban Infrastructure Improvement Project is consistent

with the 2006-2010 Country Partnership Strategy (approved by the Board on May 23, 2006),

which seeks among other objectives, to improve the competitiveness of the various regions of

China and the overall investment climate, and to address the needs of disadvantaged groups and

underdeveloped areas by financing infrastructure. The project serves three of the five pillars

defined in the CPS: (a) reducing poverty, inequality, and social exclusion; (b) managing resource

scarcity and environmental challenges; and (c) improving public and market institutions.

11. The objectives of the project are also expected to be consistent with the new CPS for

FY2013-FY2016, which will be presented to the Board in 2012 in alignment with China’s 12th

Five Year Plan, covering 2011-2015, by focusing on infrastructure investments in small towns.

II. PROJECT DEVELOPMENT OBJECTIVES

A. Project Development Objective

12. The proposed Project Development Objective (PDO) is to assist Qingyang Municipality

to improve selected urban infrastructure services including urban roads and urban environmental

services.

B. Project Beneficiaries

13. Project beneficiaries include:

(a) About 190,000 residents in Xifeng’s old urban area (47.4 % of whom are women,

and 20 % are migrants), and 10,000 projected rural residents in Xifeng’s suburban

settlements will be served by adequate storm water and wastewater infrastructures.

(b) 21 % of urban residents in Xifeng’s urban area, and 5,000 rural residents who rely

on untreated groundwater from individual small wells for their water supply, will benefit

from the reduction of wastewater pollution to the city’s rivers and groundwater.

(c) 11,000 existing bus riders and 26,000 projected new public transport users

traveling on the three corridors that are likely to achieve significant improvement in

mobility and accessibility.

(d) 60,000 of users of all transport modes in Xifeng District who are likely to achieve

travel time savings.

Page 14: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

4

C. PDO Level Results Indicators

14. Achievement of the PDO will be measured through a series of indicators, including: (a)

journey time saved for through traffic (freight); (b) share of through traffic (freight) on two

corridors increased; (c) service speed of buses during rush hour on Nan Bei Street corridor; (d)

percentage of built-up area serviced by storm water/wastewater networks increased; and (e)

wastewater pollution reduction (BOD, COD, SS).

III. PROJECT DESCRIPTION

A. Project Components

Component 1: Urban Infrastructure Improvements

(a) Sub-component 1: Urban Bypass (Total Base Cost: US$82.26 million), including (i)

construction of bypass roads of the southern section of Xifeng’s West Ring Road and the

northern section of Xifeng’s East Ring Road with installation of associated pipes; (ii)

construction of three connection roads to the two bypass corridors of West Ring Road

and East Ring Road (connection road from West Ring Road to Provincial Highway 202;

section of Anding Xi Road linking to West Ring Road; section of Guxiang Road linking

to East Ring Road) with installation of associated pipes.

(b) Sub-component 2: Integrated Road Corridor (Total Base Cost: US$11.53 million),

including: (i) improvement of three selected main road corridors (Nan Bei Street, Anding

Dong Xi Road, West Ring Road), including road pavement, traffic channelization, and

lighting and greening, along with drainage and sewage system improvements; (ii)

rehabilitation of three selected backstreets and small lanes for slow traffic (Nanyuan,

Tianhe and Xifeng lanes); and (iii) carrying out, as part of the design of the integrated

road corridor, the Parking Action Plan, the Public Transport Action Plan, and the Traffic

Safety, Education and Enforcement Action Plan.

(c) Sub-component 3: Drainage and Sewage (Total Base Cost: US$37.28 million),

including: (i) construction of drainage and sewer mains for a section each of the West

Ring Road, the Anding East Road and the Anding West Road; (ii) rehabilitation of

sewage collection pipes in Xifeng District and associated improvements of road

pavement, street lighting and greening along these roads.

(d) Sub-component 4: Wastewater Treatment Plant (Total Base Cost: US$32.31

million), including construction of (i) a new wastewater treatment plant in the eastern

area of Xifeng; (ii) a wastewater pumping station in Xifeng District’s northern area; and

(iii) wastewater trunks and collectors associated to the investments in (i) and (ii) above.

Component 2: Institutional Strengthening and Capacity Building (Total Base Cost: US$3.3 million)

Provision of technical assistance for: (a) carrying out of a water resource study covering,

among others, for water reuse, sub-basin water environment improvements and industrial

wastewater discharge licenses in Xifeng District that supports the ongoing investments of

Page 15: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

5

wastewater management; (b) the improvement of the operation and maintenance capabilities

of QWSSC and Xifeng District’s Public Utility and Transportation Bureaus in the provision

of urban infrastructure services in the key sectors of drainage and wastewater, urban road

transport; (c) capacity building and training for Qingyang Municipality’s and Xifeng

District’s agencies involved in project implementation; and (d) strengthening of QWSSC’s

GIS-based system for the management of its drainage and wastewater pipes networks; and

(e) strengthening the Qingyang Municipality’s capacity for project management and

construction supervision of the Project.

B. Project Financing

Lending Instrument

15. The Project would be financed by an IBRD Specific Investment Loan (SIL) in the

amount of US$100 million. The Bank Loan will be a US Dollar denominated, variable spread

loan (VSL), based on six-month LIBOR, plus an additional variable spread, with a maturity of 25

years, including a five year grace period, and a front end fee of 0.25%.

Project Cost and Financing

16. Table below indicates the Project cost and the Bank’s financing by component.

Project Components Project cost

(US$ million)

IBRD Financing

(US$ million)

% IBRD

Financing

1. Urban Infrastructure Improvement

1.1 Urban Bypass Road Construction 82.26 41.27 50.17

1.2 Integrated Road Corridor Improvement 11.53 7.83 67.91

1.3 Drainage and Sewage Pipes 37.28 26.21 70.31

1.4 Wastewater Treatment Plant (WWTP) 32.31 21.14 65.43

2. Institutional Strengthening and Capacity

Building 3.30 3.30 100.0

Total Base Costs 166.68 99.75 59.85

Physical contingencies 12.09

Price contingencies 10.03

Total Project Costs 188.80 99.75 52.83

Interest During Implementation 3.30

Front-End Fees 0.25 0.25 100

Total Financing Required 192.35 100.00 51.99

Page 16: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

6

C. Lessons Learned and Reflected in the Project Design

17. Project design incorporates lessons from the Bank’s urban infrastructure portfolio in

China, in particular: (a) capacity building for local stakeholders during project preparation to

address the challenge of preparing and implementing a Bank loan project of good quality in the

city, where local capacity is relatively weak and which has no experience with Bank projects and

procedures; (b) support for infrastructure investments of high impact that are selected and

prioritized based on the City’s Development Strategy and Master Plan; (c) focus on a balanced

package of investments in a people-oriented approach; (d) adding value through a practical yet

comprehensive approach; and (e) strengthening the city’s skills and practices for Operation,

Maintenance and Management (OMM) of urban roads and drainage/sewage.

IV. IMPLEMENTATION

A. Institutional and Implementation Arrangements

18. The Project will be implemented by Qingyang Municipal Government (QMG). A Project

Leading Group (PLG) was established by QMG in March 2010, to provide overall leadership,

policy guidance, and institutional coordination for project preparation and implementation. The

PLG is headed by the Executive Vice Mayor, and is composed of senior officials from the

Municipal Development and Reform Commission, Municipal Finance Bureau, Municipal

Construction Bureau, Municipal Land Bureau, Municipal Environment Protection Bureau,

Municipal Urban Planning Bureau, and the Director and Executive Vice Director of Xifeng

District Government. See Annex 3 for further details.

B. Results Monitoring and Evaluation

19. Annex 1 lists the main outcome indicators for the project, as well as the principal results

indicators for each component. Additional indicators are listed in the various documents in the

project files (for example, the Environmental Management Plan). While individual monitoring

data will be collected by project implementing agencies designated for each component (Xifeng

District Housing and Construction Bureau, Qingyang Municipal Water Supply and Sewage

Company, Xifeng District Transportation Bureau), the PMO has the overall responsibility for

coordinating collection of the data required for monitoring and evaluation, and the responsibility

for consolidated reporting to the Bank.

C. Sustainability

20. QMG and Xifeng District Government have provided assurances that the necessary

human and financial resources will be available for project implementation, and to operate and

maintain the assets created. However, long-term institutional, operational and financial

sustainability are critical challenges for this project. To address these issues, special attention

was paid during project preparation to ensure that the investments are in line with the city’s

Master Plan, urban transport and wastewater management sector plans, and the 12th

Five Year

Plan; appropriate technical designs (i.e., avoiding over design, selecting least cost solutions);

Page 17: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

7

sustainable institutional arrangements (i.e., designated PIUs); and financing strategies (i.e.,

higher level government financial support both at the municipal and district level).

21. Component 2, Institutional Strengthening and Capacity Building, includes additional

support to the development of capacity in the PIUs for asset management, project management,

construction supervision, and plans to improve public parking, traffic safety and water resource

efficiency.

V. KEY RISKS AND MITIGATION MEASURES

A. Risk Ratings Summary Table

Risk Rating

Stakeholder Risk Moderate

Implementing Agency Risk

- Capacity Substantial

- Governance Substantial

Project Risk

- Design Substantial

- Social and Environmental Moderate

- Program and Donor Low

- Delivery Monitoring and Sustainability Moderate

Overall Implementation Risk Substantial

B. Overall Risk Rating Explanation

22. The overall risk of the Project is rated substantial. The most critical risks relate to: (a)

implementing agencies, which have no experience in implementing Bank financed projects,

especially on fiduciary aspects; (b) coordination among various municipal and district agencies

for the Integrated Road Corridor Improvement; and (c) engineering designs.

23. To mitigate these risks, the concept and design of each component has been adapted for

the Xifeng urban area. The city has also established a high level PLG chaired by the Executive

Vice Mayor to oversee the preparation and implementation of the Project. The Bank has also

initiated cross-dialogue and horizontal coordination among agencies and stakeholders, together

with technical training and capacity building throughout project preparation; this will continue

during project implementation. Construction management and supervision consultants will

provide quality control for final engineering designs and bidding documents.

Page 18: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

8

VI. APPRAISAL SUMMARY

A. Economic and Financial Analyses

24. Economic Analysis. The main economic benefits of the project are related to transport

and environmental improvement. They include: savings in travel time and costs; productivity

increases; avoided loss of life and property from traffic accidents; better access to public

services; energy savings and associated pollution reduction due to improved road condition in

project areas; and increases in amenity and land value increase due to transportation and

environmental improvement. The economic costs of the project are capital investment costs and

O&M costs, including associated resettlement and environmental mitigation costs.

25. Cost-benefit analysis was used to evaluate the economic viability of each transport

related activity. The results of the cost-benefit analyses show that the EIRR of the three road sub-

components are 11.4%, 11.1%, and 24.7%, respectively. Sensitivity analyses (under the

assumption of a 10% decrease in economic benefit and a 10% increase in total costs or both)

show that the road investments are economically robust. The results of the economic analysis

are summarized in the table below.

Components

NPV

(RMB

million)

EIRR BCR

Sensitivity Analysis (10% cost increase and 10% benefit

reduction)

NPV (RMB

million ) EIRR BCR

Existing road upgrading 109.8 11.4% 1.43 47.3 9.5% 1.17

Urban bypass road

construction 164.6 11.1% 1.34 52.4 9.0% 1.10

Integrated traffic management 233.9 24.7% 3.15 188.8 21.5% 2.58

BCR: Benefit Cost Ratio

26. The wastewater treatment plant component aims to achieve the wastewater treatment

targets set in the local government’s development plan. These targets are based on the

importance of water pollution to public health and economic development. Due to the difficulty

in quantifying and monetizing the health benefits of the wastewater treatment, the cost-

effectiveness approach was used to select least-cost design options to achieve the wastewater

treatment targets. Table below presents a comparison between three alternatives and shows that

the unit cost of Alternative A is less than that of Alternatives B and C.

Page 19: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

9

Alternative A Alternative B Alternative C

Eastern area

A new WWTP (oxidation

ditch process, capacity

20,000 t/d near term,

60,000 t/d long term)

A new WWTP (oxidation

ditch process, capacity

10,000t/d near term,

30,000t/d long term)

A new WWTP (modified

SBR process, capacity

20,000t/d near term,

60,000 t/d long term)

Associated trunk

wastewater collectors 12.63

km

Associated trunk

wastewater collectors 11.4

km

Associated trunk

wastewater collectors

12.63 km

Northern area

A new sewage pumping

station (capacity 8,000 t/d)

A new WWTP (capacity

10,000 t/d near term,

29,000 t/d long term)

A new sewage pumping

station (capacity 8,000 t/d)

Associated trunk

wastewater collectors 5.58

km

Associated trunk

wastewater collectors 5.58

km

Associated trunk

wastewater collectors 5.58

km

Associated wastewater pipe

14.6 km

Associated wastewater

pipe 14.6 km

Capital Investment

(RMB million) 286.5 287.5 297.1

O&M cost per cubic

meter (RMB) 3.86 3.97 4.15

Total O&M cost per

year (RMB million) 19.74 20.32 21.23

27. Financial Analysis at Municipal Level. In addition to the Bank loan, the project will be

financed by equity from Qingyang Municipal Government (QMG) and Xifeng District

Government (XDG); each will provide 50% of counterpart funds. To assess the fiscal impact on

QMG and XDG during the implementation of the project, revenues of QMG and XDG were

projected and compared with their financial contribution to the project. QMG’s highest

contribution to the project will be 1.6% of its revenue in 2014, while XDG’s highest contribution

to the project will be 2.2% of revenue in 2014.

28. Financial Analysis at Entity Level. Qingyang Municipal Water Supply and Sewage

Company (QWSSC), a legally autonomous agency wholly owned by the Xifeng District

Government, is the implementation agency of the wastewater treatment sub-component.

QWSSC’s financial statements show that it ran a deficit over the last 5 years. In order to ensure

the financial sustainability of QWSSC and the wastewater investments under the project, the

following financial covenants have been included in the Project Agreement: QWSSC shall not

later than December 31, 2013, submit a financial performance improvement plan of QWSSC

satisfactory to Gansu, Qingyang Municipality, Xifeng District and the Bank; and QWSSC should

except as the Bank shall otherwise agree, ensure that, commencing with the calendar year

starting January 1, 2015, the sum of QWSSC's operating revenues and non-operating revenues

will be no less than equal to the sum of its operating costs, including depreciation and taxes; debt

Page 20: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

10

service requirements; and funds required for other necessary operating investments, calculated in

a manner satisfactory to Gansu, Qingyang Muncipality, Xifeng District and the Bank.

29. Financial Analysis at Project Level. At full cost recovery, the FIRR of the wastewater

sub-component is estimated to be 7.41%, which is higher than the weighted average cost of

capital (WACC) of 2.40%.

B. Technical

30. The project design builds on the experience of similar Bank projects in China, as well as

on international good practice. Chinese design institutes have prepared detailed feasibility study

reports (FSR) for the investment components, which are technically sound.

31. Urban Bypass Road Construction Sub-Component. Technical standards adopted for

this sub-component follow national design and construction standards. Materials and techniques

applied in the project roads are widely used in the local context, including in the sections of the

two bypass roads that have already been constructed

32. Integrated Road Corridor Improvement Sub-Component. This sub-component

introduces an innovative concept to the city: addressing traffic issues from a car-centered

approach dominated by road engineering, to an integrated approach with an emphasis on moving

people, meeting the needs of different road users, road safety, and traffic management measures.

It is based on a comprehensive urban transport study, the participation of public transport

operators, the traffic police, and other related stakeholders, and provides an appropriate set of

integrated technical proposals. It will also rehabilitate selected backstreets and small lanes in the

densely populated city core, and will thus improve the traffic environment and safety for

pedestrians and cyclists. This will improve connectivity and accessibility to public transit and to

the integrated corridors for pedestrians and cyclists, and divert slow traffic away from the city’s

major road corridors.

33. Wastewater Treatment Plant (WWTP) Sub-Component. This sub-component

introduces a comprehensive approach to wastewater management, focusing on the planning,

budgeting and construction of a wastewater network and facilities. Based on an intensive review

of the city’s plan, a plant with sizable treatment capacity, supported by pumping stations in each

urban pocket, was chosen taking into account capital investment, O&M costs, service quality and

long-term environmental benefits for the city. The new WWTP will be able to treat wastewater

not only from the existing urban area, but also sewage from a planned new large-scale rural

settlement in Xifeng’s rural area. This sub-component also includes additional collection pipes

and facilities to enable full operation of the city’s existing underutilized WWTP. Technical

designs for rehabilitation of the existing drainage/wastewater pipe network, in particular for

connecting the fragmented drainage/wastewater mains into an integrated and efficient network,

are acceptable to the Bank.

34. Effluent from the proposed new WWTP will be discharged to dry gullies. As the project

cycle is too short to develop user markets for water reuse, the project includes technical

Assistance (TA) to explore the potential for water reuse.

Page 21: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

11

C. Financial Management

35. The Bank loan proceeds, including the Designated Account (DA), will be managed by

Gansu Provincial Finance Bureau (GSFB). A financial management capacity assessment

conducted by the Bank identified the principal risk to be the lack of any experience with Bank-

financed projects on the part of the PMO and its financial staff. To address this risk, a detailed

project Financial Management Manual (FMM) will be prepared and issued, and

FM/Disbursement training will be provided to financial staff.

36. The FM assessment concluded that with the implementation of these actions, the

financial management arrangements will satisfy the Bank’s minimum requirements under OP/BP

10.02. Annex 3 provides additional information on financial management.

D. Procurement

37. Qingyang PMO, which will have overall responsibility for project implementation

including procurement, is a newly established PMO, with staff hired from the respective

government agencies responsible for the project components; more staff will be hired from the

local market. Various government agencies have been designated as the Project Implementing

Unit (PIU) for each project component. Institutionally and individually, Bank procurement

policies and requirements are new to them.

38. A Procurement Capacity Assessment (PCA) was carried out during appraisal. The

principal procurement risks are the lack of experience in Bank-financed project and procurement

requirements. The PMO and the PIUs have already attended and will continue to attend more

Bank procurement related training. In addition, a Procurement Management Manual (PMM)

governing project procurement cycle management has been developed and a procurement agent

with Bank project experience has been selected.

39. The PMO and the PIUs will implement the agreed measures to mitigate the identified

procurement risks (see Annex 3 and Annex 4 for details). A procurement plan covering the

initial 18 months of project implementation has been prepared in accordance with Bank

procurement policy; a summary of the plan is provided in Annex 3.

E. Social (including Safeguards)

40. The project will improve the quality of life of the local residents. Social impact analysis

conducted during project preparation identified the potential negative impacts caused by the

project, in particular the need for land acquisition and resettlement.

41. Resettlement and Land Acquisition. The project will need permanent land acquisition

of 740 mu (49 hectares) in eight villages, with 862 people affected (201 families). Structure

demolitions will affect 529 people (143 families). Some temporary land use will be required

during project implementation by contractors, and related mitigation measures will be taken by

them. The municipal resettlement office will supervise land acquisition and resettlement

activities.

Page 22: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

12

42. Information Dissemination. The Resettlement Action Plan (RAP) was advertised in the

main local newspapers and posted on the Qingyang government website. Relevant project

information has been provided to the affected villages through newspaper reports, posters and

public meetings. A resettlement information booklet, with detailed descriptions of the key issues

(e.g., compensation rates, social security policies and other entitlement policies, and grievance

procedures) will be distributed to the affected people prior to their resettlement.

43. Participation Strategy. Focus group discussions and key informant interviews were held

to consult with the affected persons and to obtain their views and preferences on resettlement

impacts and mitigation measures, land compensation, and social security programs. These views

and preferences have been taken into the account during RAP preparation. The majority of the

affected persons agreed that the resettlement and rehabilitation measures proposed in the RAP

are adequate to address and mitigate adverse impacts.

44. Linked Projects. Construction of a section of the West Ring Road and a middle section

on the East Ring Road, financed by the local government, and two earth borrow pits have been

identified as linked projects. Resettlement for these linked projects was implemented in 2009.

Local resettlement policies implemented for these linked projects are consistent with Bank

requirements and the compensation paid to the displaced families is acceptable to the Bank.

F. Environment (including Safeguards)

45. This is a Category B project. It brings positive environmental benefits and contributes to

the improvement of urban roads and urban environmental services in Xifeng District. The

principal negative impacts include construction-related impacts as well as impacts during

operation (e.g., soil erosion, sludge disposal, and noise from the WWTP and improved roads).

Applicable environmental safeguard policies include: Environmental Assessment (OP4.01) and

Physical Cultural Resources (OP4.11).

46. Environmental Assessment (OP4.01). An Environmental Assessment was carried out

in accordance with Bank Operational Policy OP4.01. The assessment includes an analysis of the

potential positive and negative project impacts, alternative analysis, mitigation measures, and an

environmental monitoring plan. It documents the public consultation carried out during the

preparation of the project. The assessment concluded that the project is overall positive. The

identified negative impacts are not significant and are site-specific, and for which mitigation

measures can be designed readily. An EMP has been developed specifying mitigation measures,

monitoring plans, institutional arrangements, capacity building, and the estimated budget for

EMP implementation. Environmental Codes of Practice (ECOPs) have been developed to

address general construction-related impacts (refer to Annex 3).

47. Physical Cultural Resources (OP4.11). Road construction will cause the relocation of

35 household graves and the demolition of a farmer house (400m2) which is used as a church.

New sites have been selected for the graves, and auspicious dates for their relocation will be

agreed in advance. In addition, the church will be rebuilt in a site approximately two kilometers

away from the existing one. An auxiliary building will be installed first as a temporary place to

maintain the religious activities during the construction of the new church. Public consultation

Page 23: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

13

has been conducted with the affected people and concerned parties, and concerns about the

proposed measures have been incorporated in the EMP.

48. Public Consultation and Disclosure. In accordance with Bank Safeguard policies and

Chinese regulations, public consultations were conducted from June to October 2011, including

public consultation meetings and questionnaire survey, with project affected persons and other

stakeholders. Their opinions and concerns have been taken into account in the EA process and

project design. The EA and the EMPs were disclosed locally in November 2011 through

announcements on the local website. The EA documents were sent to the Bank InfoShop for

disclosure on December 7, 2011.

Page 24: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

14

Annex 1: Results Framework and Monitoring

CHINA

Gansu Qingyang Urban Infrastructure Improvement Project

RESULTS FRAMEWORK

Project Development Objective (PDO): is to assist Qingyang Municipality to improve selected urban infrastructure services including urban roads and urban

environmental services.

PDO Level Results Indicators*

Co

re

Unit of Measurement Baseline

Cumulative Target Values**

Frequency

Data

Source/

Method

ology

Responsible. for Data

Collection YR 1 YR 2 YR3 YR 4 YR5

Indicator 1: Journey time saved

for through traffic (freight) ■

minutes

(% change) 28.4

26.2 (-8%)

24.3 (-14%)

21.7 (-24%)

18.2 (-36%)

18.2 (-36%)

Reported

Annually Surveys

XF District Housing and

Construction Bureau

Indicator 2: Share of through

traffic (freight) on two corridors

increased

■ number of trucks 24

hrs, (%)

East:9.1

West: 66.2

9.1 (0%)

66.2 (0%)

9.1 (0%)

66.2 (0%)

15 (65%)

68 (3%)

20 (120%)

70 (6%)

22 (142%)

72 (9%)

Reported

Annually Surveys

XF District Housing and

Construction Bureau

Indicator 3: Service speed of

buses during rush hour on Nan Bei

Street corridor) ■ km/h (% change) 10.3

10.1 (-2%)

9.7 (-6%)

9.5 (-8%)

15.5 (50%)

15.5 (50%)

Reported

Annually Surveys PMO and Bus Company

Indicator 4: % of built-up area

serviced by storm water/wastewater

networks increased ■

% (km2 of serviced

area) 50.6 50.6 55.6 61 73.5 92

Reported

Annually Surveys

Municipal Water Supply and

Sewage Company

Indicator 5: Wastewater pollution

reduction (BOD, COD, SS) ■ ton/year

BOD: 0

COD: 0

SS: 0

0

0

0

0

0

0

0

0

0

365

802

693

1168

2569

2219

Reported Annually

Surveys Municipal Water Supply and Sewage Company

INTERMEDIATE RESULTS

Intermediate Results Component One, Sub-component 1: Urban Bypass Road Construction

% of Road Construction

Completed, by km □ % 0 0 0 100 100 100

Reported

every quarter

Field

Visits Xifeng District Trans. Bureau

Page 25: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

15

Average annual number of

fatalities and severely injured in

project corridors over a three-year

period (relative to base year-

period)

number of fatalities

and severely injured

(persons)

14 14 14 14 9 9 Reported

Annually

Police

Reports Traffic Police

Intermediate Results Component One, Sub-component 2: Integrated Road Corridor Improvement

Passenger ridership of buses during

rush hour on Nan Bei Street

corridor increased □

number of

passengers for

12hrs, (% change)

5,845

(0) 6,100 (4%)

6,400 (9%)

6,700 (15%)

11,000 (88%)

12,000 (105%)

Reported

Annually Surveys PMO and Bus Company

Bus stops reconstructed/upgraded □ Number of bus stops 0 0 11 11 33 33 Reported

every quarter

Field

Visits

XF District Housing and

Construction Bureau

Number of unsignalized zebras

converted to signalized mid-block

crossings on the three corridors

□ Number of crossings 15 15 60 60 103 103 Reported

every quarter

Field

Visits

XF District Housing and

Construction Bureau

Number of intersections with

traffic channelized □

Number of

intersections 12 12 21 21 27 27

Reported

every quarter

Field

Visits

XF District Housing and

Construction Bureau

User satisfaction surveys (feedback

of public transport users, including

disabled and vulnerable groups,

through bus user surveys on Nan

Bei Street corridor)

% expressing

positive opinion on

the services

27 27 27 27 60 65 Reported

Annually Surveys PMO and Bus Company

Intermediate Results Component One, Sub-component 3: Drainage and Sewage Pipes

% of New Drainage/Sewage Pipe

Construction Completed, by km □ Cumulative % 0 5 20 35 65 100

Reported

every quarter

Field

Visits

XF District Housing and

Construction Bureau

% of Drainage/Sewage Pipe

Reconstruction Completed, by km □ Cumulative % 0 10 30 50 75 100

Reported every quarter

Field Visits

XF District Housing and Construction Bureau

Intermediate Results Component One, Sub-component 4: Wastewater Treatment Plant

% of Wastewater Treatment Plant

Investment Completed, by US$ □ Cumulative % 0 15 40 60 80 100

Reported every quarter

Field Visits Municipal Water Supply and Sewage Company

% of associated pipes construction

completed, by km □ Cumulative % 0 5 20 35 65 100

Reported

every quarter Field Visits

Municipal Water Supply

and Sewage Company

Intermediate Results Component Two: Institutional Strengthening and Capacity Building

Study Completed □ Cumulative Number

of studies 0 0 1 2 3 5

Reported

every quarter Surveys PMO

Staff Trained □ Cumulative Number

of staff 0 15 35 75 95 110

Reported every quarter

Surveys PMO

Page 26: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

16

Annex 2: Detailed Project Description

A. Project Context

1. Measured by per capita GDP, Gansu Province ranked almost at the bottom among the 31

provinces in mainland China. Constrained by a long narrow corridor shaped territory, Gansu

relies heavily on a few regional central cities along the corridor, including Qingyang, to drive its

economic development. Recently, Gansu Provincial Government further upgraded the

development profile of Qingyang in its provincial territory development strategy, and defined the

city as a provincial industrial base for energy supply and petrochemicals.

2. Qingyang Municipality is located in the eastern most part of Gansu Province on the Loess

Plateau and has a population of 2.64 million. The per capita GDP in 2009 was RMB11,973

compared with the national average of RMB26,180. Qingyang is considered under-developed in

China, even in Gansu Province where the provincial average is RMB12,852. Qingyang’s

development has been held back by: (a) its relative isolated location and limited access to

strategic markets in the region; (b) the monopoly of two key industries, petroleum exploitation

and coal mining, by the state-owned enterprises; (c) the low level of urbanization (compared to

the national average of 45.7% in 2008, Gansu Province was 32.1% and Qingyang was 24.5%);

and (d) severe shortage of water resources (Qingyang’s per capita water resources are only

13.7% of the national average, and 26.3% of Gansu’s provincial average). With its abundant

deposits of oil and coal resources, Qingyang is positioned by the central government as an

emerging energy base of national significance, and is targeted by the central government’s

initiatives of supporting and revitalizing the economies in the country’s western lagging areas.

3. Qingyang Municipality consists of one urban district and seven rural counties. The

proposed Qingyang project would be focused on the municipality’s capital of Xifeng District.

Xifeng District was upgraded from a small town to an urban district to be the political and

economic center for Qingyang Municipality in 1985. It had a population of 200,000 in 2011 and

a small stock of urban infrastructure.

4. QMG’s efforts to improve the city’s livability and profile in order to attract and retain

external investments have been constrained by the shortage of essential urban infrastructure

services in Xifeng District. Public capital investments in Xifeng over the last few years have

been concentrated mainly on constructing roads and widening the major streets in the existing

urban area. Pressing needs for improving environmental infrastructure in the existing urban area

have not been addressed. For example, the lack of adequate drainage meant that parts of Xifeng

have been flooded repeatedly over the last decade.

5. The following infrastructure improvement and investment needs have been identified as

priorities in Xifeng District’s existing urban area, based on its urban master plan and needs

assessments:

(a) Improvement of the road network and transport management.

(b) Environmental infrastructure improvement, particularly storm drainage, sewage

collection and treatment.

Page 27: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

17

(c) Capacity building and institutional strengthening to sustainably manage existing

urban infrastructure assets, as well as those to be created under the project.

B. Project Components

Component 1: Urban Infrastructure Improvement

Sub-component 1: Urban Bypass Road Construction (Total Base Cost: US$82.26 million)

6. This sub-component will support construction of some key segments of two bypass roads

in Xifeng District, including: (a) construction of bypass roads of the southern section of Xifeng’s

West Ring Road and the northern section of Xifeng’s East Ring Road (4.504 km) with

installation of associated pipes; and (b) construction of three connection roads to the two bypass

corridors of West Ring Road and East Ring Road (2.242 km) with installation of associated pipes.

7. The two bypass corridors for freight traffic (West Ring Road and East Ring Road) have

been planned to divert through traffic (especially oil tankers), improve the city’s mobility,

address the worsening traffic congestion in the central area, and improve road access to the two

industrial areas located in the southern and northern parts of Xifeng. Sections of these two

bypass roads have already been constructed or are under construction, except for the missing

sections to be constructed under the proposed project. Construction of three associated

connection roads will improve connectivity between the two bypass corridors and the city’s

existing road network.

Component 1: Urban Infrastructure Improvement

Sub-component 2: Integrated Road Corridor Improvement (Total Base Cost: US$11.53

million)

8. This sub-component will help improve traffic management, public transport services,

pedestrian and cyclist facilities, and road safety on three corridors in Xifeng’s existing urban area,

including: (a) improvement of three selected main road corridors (Nan Bei Street, Anding Dong

Xi Road, West Ring Road), including road pavement, traffic channelization, and lighting and

greening, along with drainage and sewage system improvements; (b) rehabilitation of three

selected backstreets and small lanes for slow traffic; and (c) carrying out the Parking Action Plan,

the Public Transport Action Plan, and the Traffic Safety, Education and Enforcement Action

Plan.

9. Rehabilitation of selected backstreets and small lanes in Xifeng’s densely populated city

core has the key objectives of : (a) improving the traffic environment and safety for pedestrians

and cyclists; (b) improving the connectivity and accessibility to public transit and integrated

corridors for pedestrians and cyclists, diverting slow traffic modes on city’s major road corridors,

and improving the traffic capacity and traffic efficiency of the road network in the city’s central

area; (c) scaling up the number of local residents (in particular the poor) who will benefit from

the proposed urban infrastructure improvements, with the focus not just on motor vehicles; and

(d) helping to build the missing last-kilometer pipe connections between households and the

storm water/wastewater network along major roads.

Page 28: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

18

10. Transport Action Plans will be prepared and furnished to Bank for review within 12

months from the Loan Effectiveness Date, and thereafter carried out, taking into account any

comments made by the Bank.

Sub-component 3: Drainage and Sewage Pipes (Total Base Cost: US$37.28 million)

11. This sub-component focuses on expanding the service catchment of the existing drainage

and sewage networks by constructing trunk lines, connecting isolated networks, and filling in the

gaps in the collection pipe network. It will finance: (a) construction of drainage and sewer mains

for a section each of the West Ring Road, the Anding East Road and the Anding West Road

(4.702 km of pipes); (b) rehabilitation of 22.91 km of sewage collection pipes in the built-up area

and associated improvements of road pavement, street lighting and greening along these roads.

Component 1: Urban Infrastructure Improvement

Sub-component 4: Wastewater Treatment Plant (Total Base Cost: US$32.31 million)

12. This -subcomponent will finance the construction of a new wastewater treatment plant

and associated pumping stations and sewer mains in Xifeng District, including: (a) a new

wastewater and treatment plant in eastern Xifeng (capacity of 20,000m3/day); (b) a wastewater

pumping station in northern Xifeng; and (c) wastewater trunk mains and collectors associated

with (a) and (b).

Component 2: Institutional Strengthening and Capacity Building (Total Cost: US$3.30

million)

13. This component includes provision of technical assistance for: (a) carrying out a water

resource study covering, among others, water reuse, sub-basin water environment improvements

and industrial wastewater discharge licenses in Xifeng District that support the on-going

wastewater investments; (b) improvement of the operation and maintenance capabilities of

QWSSC, and the Public Utility and Transportation Bureaus; (c) capacity building and training

for QMG and Xifeng District agencies; and (d) strengthening of QWSSC’s GIS-based system for

the management of its drainage and wastewater pipe network, and (e) strengthening the

Qingyang Municipality’s capacity for project management and construction supervision of the

Project.

Page 29: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

19

Annex 3: Implementation Arrangements

A. Summary of Institutional Responsibilities

Entity Project Responsibilities

PMO (established within Xifeng District

Government)

Oversee the progress of each component

Implement Capacity Building Component

Conduct overall monitoring & evaluation.

Xifeng District Housing and Construction Bureau Lead the implementation of two sub-components:

Drainage and Sewage Pipes; and Integrated Road

Corridor Improvement.

Qingyang Municipal Water Supply and Sewage

Company

Implement Wastewater Treatment Plant sub-

component.

Maintain and operate drainage/sewage facilities

(including pipes and WWTP) constructed under this

project.

Xifeng District Transportation Bureau

Implement Urban Bypass Road Construction sub-

component.

Maintain and operate the road assets and facilities

established under this project.

B. Project administration mechanisms

1. Qingyang Municipal Government (QMG) will implement the Project. A Project Leading

Group (PLG) was established by QMG in March 2010 to provide overall leadership, policy

guidance, and institutional coordination for project preparation and implementation. The PLG is

headed by the Executive Vice Mayor of QMG and is comprised of senior officials from relevant

agencies of Qingyang Municipality and Xinfeng District.

2. QMG established a Project Management Office (PMO) for the proposed project in

Qingyang in March 2010. Stationed in the Xifeng District Government, the PMO is responsible

for daily management, supervision and coordination of project preparation and implementation.

The PMO will be the primary coordinating body responsible for communicating with the World

Bank, ensuring that implementation is consistent with all relevant World Bank policies and

procedures, and ensuring continuity and good coordination between the different implementing

entities.

3. Project Implementation Unit each in QWSSC and Xifeng District Housing and

Construction Bureau and Xifeng District Transportation Bureau shall be responsible for

implementing their respective components, including leading the engineering design,

procurement, signing and managing the contracts and authorizing disbursement for each

subcomponents accordingly.

(a) The Xifeng District Housing and Construction Bureau, a project development

agency and sectoral administrator for urban construction under the Xifeng District

Government, has been designated as the PIU for the sub-components of Drainage

and Sewage Pipes and Integrated Road Corridor Improvement.

Page 30: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

20

(b ) The Qingyang Municipal Water Supply and Sewage Company (QWSSC), wholly

owned by the city, is the designated implementing agency and operating agency for

the wastewater sub-component.

(iii) The Xifeng District Transportation Bureau, a construction and operation agency of

urban roads and highways under Xifeng District Government, has been designated

as the implementing agency and operation agency for the Urban Bypass Road

Construction sub-component.

(iv) The Project Management Office (PMO) will be the implementing agency for the

Institutional Strengthening and Capacity Building sub-component.

C. Financial Management, Disbursements and Procurement

Financial Management

4. The FM assessment rated the residual financial management risk after mitigation as

Moderate.

5. Financial staff in the PMO does not have any experience with Bank-financed projects. To

address this, a detailed project Financial Management Manual (FMM) will be prepared and

issued and FM/Disbursement training will be provided to financial staff.

6. Funding sources for the project include the Bank loan and counterpart funds. The Bank

loan will be signed between the Bank and the People’s Republic of China (PRC) through MOF.

On-lending arrangements for the Bank loan will be signed between PRC, through MOF, and

Gansu Provincial Government (through GSFB); and between GSFB and Qingyang Municipal

Government, through Qingyang Municipal Finance Bureau (QYFB); and finally between QYFB

and Xifeng District Government, through Xifeng District Finance Bureau (XFFB). Loan

repayment will be borne by QYFB and XFFB. Counterpart funds will be from the municipal and

the district government budgets. Bank loan proceeds will flow from the Bank into a project

designated account (DA) to be set up at and managed by GSFB, and disbursed to PMO via

QYFB and XFFB based on withdrawal applications.

7. Budgeting. The annual project implementation plan, including the funding budget and

resources, will be prepared by the PMO. Budget for counterpart funds committed by the local

government will be reviewed and approved by the local People’s Congress and will be included

in their sectoral budget. Based on the approved budget and implementation progress, the related

finance bureau will provide government appropriations to the project. Budget variance analysis

will be conducted on a semi-annual basis by the PMO and necessary actions will be taken to

implement the project as planned. The Bank will work with the PMO in supervising the project

budgeting system to enhance the PMO’s budget preparation and execution for the project.

8. Funds Flow. The Bank loan proceeds will flow from the Bank into the project DA.

GSFB will be directly responsible for the management, maintenance and reconciliation of the

DA activities. Supporting documents required for Bank disbursements will be prepared and

Page 31: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

21

submitted by the PMO through QYFB and XFFB for review and verification before sending to

GSFB for further disbursement processing.

9. Accounting and Reporting. The administration, accounting and reporting of the project

will be set up in accordance with Circular #13: “Accounting Regulations for World Bank-

financed Projects” issued in January 2000 by MOF. The standard set of project financial

statements has been agreed between the Bank and MOF, and includes the following: balance

sheet of the project; statement of sources and uses of fund by project components; statement of

implementation of loan agreement; statement of designated account; and Notes to the financial

statements (required only for annual financial statements).

10. The PMO and each PIU will manage, monitor and maintain project accounting records

for the activities they execute. Original supporting documents will be retained by the PMO and

each PIU. The PMO will work together with GSFB to prepare the project consolidated financial

statements. The unaudited semi-annual project interim financial reports (IFRs) will be prepared

and furnished to the Bank by the PMO no later than 75 days following each semester (the due

dates will be March 15 and September 15).

11. Internal Control. The related accounting policy, procedures and regulations were issued

by MOF to uniformly align the financial management and disbursement requirements for all

Bank financed projects. The project FMM will align project financial management policies and

procedures among PIUs.

12. Auditing. Gansu Provincial Audit Office (GSAO) has been identified as the auditor for

the project. The annual audit report will be issued by GSAO. The annual audit report of project

financial statements will be due to the Bank within six months after the end of each calendar

year.

Disbursements

13. Four disbursement methods are available for the project: advance, reimbursement, direct

payment and special commitment. Supporting documents required for Bank disbursement under

different disbursement methods are documented in the Disbursement Letter.

14. One DA in US dollar will be opened at a commercial bank acceptable to the Bank and

will be managed by GSFB. The ceiling of the DA is documented in the Disbursement Letter.

15. The Bank loan would be disbursed against eligible expenditures (taxes inclusive) as in

the following table:

Page 32: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

22

Category

IBRD Loan

Allocated

Amount

Percentage of

Expenditures

to be financed

1) Works and non-consultant services for

Parts I.1, I.2.(a) and(b) and I.3.(a)

and(b) of the Project

75,130,000 80%

2) Works and non-consultant services for

Part I.4 of the Project 21,120,000 80%

3) Goods, Consultants’ Services, non-

consultant’s Services and Training for

Parts 1.2(c), and II of the project

3,500,000 100%

Front-end Fee 250,000

Total 100,000,000

16. Retroactive financing, up to a ceiling of $20 million, may be utilized for project

expenditures incurred on or after May 1, 2012.

17. For Part I. 4 of the Project (Wastewater Treatment Plant), the following disbursement

conditions are applied;

The QWSSC Agreement has been executed and delivered on behalf of Xifeng District

and QWSSC and is legally binding upon the parties thereto in accordance with its terms.

A legal opinion satisfactory to the Bank from counsel acceptable to the Bank has been

received by the Bank confirming that the QWSSC Agreement has been duly authorized

or ratified by Xifeng District and QWSSC, and is legally binding on such parties in

accordance with its terms.

D. Procurement

18. Following the procurement capacity assessment, the overall procurement risk for the

project is assessed as substantial. The principal risks are: (a) low capacity of PMO and PIU

procurement staff; (b) lack of a Procurement Management Manual to guide procurement cycle

management; and (c) differences in procurement policy and procedures between Bank

requirements and local government requirements.

19. The following measures will be taken to mitigate these risks:

Capacity strengthening of the PMO and PIUs’ Procurement Staff. A procurement

agent with qualifications and experience satisfactory to the Bank will be hired to

assist the PMO with project procurement. The PMO will ensure that qualified and

experienced key staff is assigned by the selected Procurement Agent. Depending on

need, the Procurement Agent will also update knowledge on Bank procurement

policies and procedures, and consult the Bank in advance.

Page 33: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

23

PMO staff will attend annual procurement training organized by the Bank. In

addition, the Bank procurement specialist will provide project tailored procurement

training based on progress and issues identified.

Staff from the respective PIUs will strengthen their contract management capacity by

participating in relevant training provided by the Bank and other training agencies.

A Procurement Management Manual (PMM), acceptable to the Bank, will guide

procurement cycle management during the project.

Differences between Bank procurement requirements and the requirements of local

regulations have been addressed in the legal agreement and in the PMM.

20. Procurement under the project will be carried out in accordance with: the World Bank

“Guidelines: Procurement of Goods, Works and Non-Consulting Services under IBRD Loans

and IDA Credits & Grants by World Bank Borrowers” dated January 2011; “Guidelines:

Selection and Employment of Consultants by World Bank Borrowers” dated January 2011; and

the provisions stipulated in the Legal Agreement. NCB shall be carried out in accordance with

the Law on Tendering and Bidding of the People’s Republic of China promulgated by the order

of the President of the People’s Republic of China on August 30, 1999 subject to the

modifications stipulated in the Legal Agreement in order to ensure broad consistency with Bank

Procurement Guidelines.

21. Prior Review Thresholds and Procurement Methods. Prior review and procurement

method thresholds for the project are indicated in Table 2.

Table 2: Thresholds for Procurement Methods and Prior Review

Expenditure Category

Contract Value

Threshold

(US$ thousands)

Procurement Method Prior Review Threshold

(US$ thousands) 1/

1. Goods and Non-

Consulting Services

≥1,000

<1,000

<100

None

ICB

NCB

Shopping

Direct Contracting

All

≥300

1st Contract, irrespective of

value

All

2. Works and Supply and

Installation of Plant and

Equipment

≥20,000

<20,000

<200

None

ICB

NCB

Shopping

Direct Contracting

ALL

≥5,000

1st Contract, irrespective of

value

All

3. Consultants Services ≥300

<300

Para.3.6 of Consultant

Guidelines

Section V of Consultant

Guidelines

Para.3.8 of Consultant

Guidelines

QCBS/QBS

CQS

LCS

Individual Consultant

Single Source Selection

(firm)

All

≥100

All

≥50 and 1st contract,

irrespective of value

All

Page 34: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

24

Section V of Consultant

Guidelines

Sole-Source Selection

(individual)

All

1/ All contracts to be financed through retroactive financing, irrespective of value, will be subject to prior review. A

contract whose cost estimate was below the Bank’s prior review threshold is subject to prior review if the price of

the lowest evaluated responsive bid (or, in the case of consulting services, the financial offer of the selected firm)

exceeds such threshold at the bid evaluation stage;

22. In addition to prior review, Bank missions will carry out procurement post reviews on an

annual basis, with a sampling rate of one in ten contracts.

23. Procurement Plan. The PMO has developed a procurement plan for the initial 18-month

period of project implementation, which has been agreed with the Bank; it includes contracts to

be procured under retro-active financing. The various items under different expenditure

categories are summarized in Table 3. The procurement plan will be updated annually or as

required to reflect project implementation needs. The procurement plan and its updates will be

published on the Bank’s external website in accordance with the Guidelines.

Table 3-Summary of Procurement Plan 1 2 3 4 5 6 7

Ref.

No.

Description Estimated

Cost

US$ (million)

No of

Packages

Domestic

Preference

(yes/no)

Review*

by Bank

(Prior / Post)

Comments

(Prior Review

Contracts)

1 Summary of NCB (Works)

packages 125.50 12 N/A Prior /Post ≥US$5m

2 Summary of Shopping

(Goods) contracts 0.15 2 N/A Prior/Post

Fist contract

through

Shopping

3

Summary of number of

contract ≥US$0.2m , to be let

under QCBS/QBS

3.50 5 N/A Prior All

E. Environmental and Social (including safeguards)

Environmental Safeguards

24. This Category B project will bring positive environmental benefits and will contribute to

the improvement of urban roads and urban environmental services in Xifeng District. Applicable

environmental safeguard policies for the project include: Environmental Assessment (OP4.01)

and Physical Cultural Resources (OP4.11).

25. Environmental Assessment (OP4.01). Environmental Assessments (EAs) were

conducted by Lanzhou University in accordance with China’s legal and EA policy frameworks

as well as applicable Bank safeguard policies. The assessment concluded that the project will

have an overall positive environmental impact. The EIA identified some negative impacts,

which along with the corresponding mitigation measures are summarized below.

26. Soil Erosion. The EA includes an analysis of water and soil conservation in the project

area. The EMP specifies soil conservation measures for the construction activities. To minimize

the impacts of Chengdong WWTP effluent discharged to a nearby gully, mitigation measures

Page 35: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

25

include: (a) proper selection of discharge points; and (b) control of effluent flow velocity along

the gully to avoid or minimize soil erosion.

27. Sludge Disposal. 19.5 tons/day of dewatered sludge (60% moisture content) will be

generated from the new Chengdong WWTP. Sludge cake will be sent for disposal to a nearby

sanitary landfill, which is equipped with lining and leachate collection and treatment facility.

The EA confirms that the sludge cakes can be disposed at the landfill in an environmentally

sound manner. Traffic impacts associated with the transport of dried sludge for off-site landfill

disposal will be minimized by restrictions on the times of day allowed for sludge transport.

28. Other Operational Impacts. Noise and odor from the operation of the wastewater

treatment plant and pumping stations will be minimized by proper siting and by the provision of

buffer zones and landscaping. The odor impact will be minimized by a bio-filter system which is

an integral part of the WWTP.

29. Traffic on the improved roads will increase the noise level to some extent. The sensitive

receptors have been identified. The noise impact will be reduced to the acceptable level by the

provision of acoustic barriers and noise insulation facilities.

30. Construction-related Impacts. General construction-related impacts will be site-

specific and reversible in nature, for which mitigation measures can be designed readily.

Environmental Codes of Practices (ECOPs) have been prepared to address these general impacts

(e.g., dust, spoil disposal, noise, wastewater, disturbance to local communities) and will be

included in bidding documents and civil works contracts.

31. Environmental Risks. Risk assessment, as part of the EA, has been conducted on the

potential for accidents during transportation of chemicals on project roads, and chlorine leakages

at the Chengdong WWTP. Preventive measures and emergency measures have been included in

the EMP to prevent/minimize these risks.

32. Physical Cultural Resources (OP4.11). Road construction will cause the relocation of

35 household graves and the demolition of a farmer house (400m2) which is used as a church.

New sites for these household graves have been selected and auspicious dates for the relocation

will be agreed in advance with the project affected people. The church will be rebuilt on a 7 mu

site (equivalent to 4,669m2) approximately two kilometers away from the current site. The new

site offers better access to the city road networks. An auxiliary building will be installed first as a

temporary place to maintain religious activities during the construction of the new church.

Public consultation with affected people (e.g., priest, farmers) and concerned parties (e.g., local

Religious Affair Bureau) has been conducted, and concerns about the proposed measures have

been incorporated into the EMP.

33. Alternative Analysis. Technical alternatives were considered for the investment

components during the feasibility study and the EA to minimize environmental impacts. The EA

and the feasibility study analyzed alternatives for WWTP configuration (two small WWTPs vs.

one large WWTP), WWTP sites, wastewater treatment technology, sludge treatment technology,

and road construction. The EA also includes the “without project” situation.

Page 36: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

26

34. Environment Management Plan (EMP). An EMP has been developed for the project as

a stand-alone document. The EMP includes mitigation measures, monitoring plans, institutional

arrangements, capacity building, and estimated budget of the mitigation measures and

monitoring programs for both the construction and operation phases. The EMP specifies site-

specific mitigation measures, both for construction and engineering design; and remedial

measures in case of non-compliance by the contractors. Mitigation measures for the construction

phase will be entered into bidding documents and supervised by relevant institutions.

35. Public Consultations and Information Disclosure. In accordance with Bank Safeguard

policies and Chinese regulations, public consultations were conducted from June to October

2011, including public consultation meetings and questionnaire survey with project affected

persons and other stakeholders. Their opinions and concerns have been taken into account in the

EA process and project design. The EA and the EMPs were locally disclosed in November 2011

through announcements on the local website and the PMO. The EA safeguard documents were

sent to the Bank InfoShop for disclosure on December 7, 2011.

Social Safeguards

36. The project has significant social benefits as it supports the development of storm water

and waste water collection, construction of WWTP and related pipe facilities, road construction

and traffic management improvement. Social impact analysis during project preparation enabled

the project to identify and address the potential negative impacts caused by land acquisition and

structure demolition. Measures to mitigate these identified negative impacts have been taken in

the project. In some cases displaced people consider the housing demolition as an opportunity to

significantly improve their living conditions.

37. Resettlement and Land Acquisition. Eight villages in five townships in Xifeng’s peri-

urban area will be affected by the project. The project needs permanent land acquisition of 740

mu (49 hectares), whose land use is as follows: cultivated land (363 mu, or 24 hectares); forest

land (133 mu or 8.9 hectares); orchard land (110 mu or 7.3 hectares); housing lots (89 mu or 6

hectares); and unused land (45 mu, or 3 hectares). The dominant current landuse is for growing

corn and wheat (50 percent of the land area). Some temporary land use will be required during

project implementation by contractors, and related mitigation measures will be taken. The

municipal resettlement office will supervise the activities. The project will affect 201 families

(862 people) by land acquisition and 143 families (528 people) by structure demolition in peri-

urban areas.

38. The RAPs prepared by the project entities provide detailed descriptions of the key aspects

of the resettlement polices and regulations, compensation rates and budget, measures to restore

incomes, as well as necessary institutional and monitoring arrangements.

39. Indigenous People. A socio-economic impact survey found no indigenous people

community in the project area. OP 4.10 on Indigenous Peoples is therefore not triggered.

40. Information Dissemination. The survey identified all households and villages that will

be affected by the project. The RAP was advertised in the main local newspapers and posted on

the Qingyang government website. The RAP is available at the Qingyang Municipal Library free

Page 37: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

27

of charge. Relevant project information has been provided to the affected villages through

newspaper reports, posters and public meetings. A resettlement information booklet with detailed

descriptions of the key issues (e.g., compensation rates, social security policies, other entitlement

policies and grievance procedures) will be distributed to the displaced people prior to their

resettlement.

41. Participation Strategy. Focus group discussions and key informant interviews were held

to consult with project affected persons to obtain their views and preferences on resettlement

impacts and mitigation measures, land compensation, and social security programs. These views

and preferences have been taken into the account during RAP preparation. The majority of

project affected persons agree that the resettlement and rehabilitation measures proposed in the

RAP are adequate to address and mitigate the adverse impacts. The affected villages played a

key role in determining and implementing the livelihood restoration programs. For example,

after land compensation amounts are calculated, each village will determine how the land

compensation funds can be best used to improve, or at least restore, income-earning potential in

the villages.

42. The project entity will set up procedures to supervise the use of land compensation funds,

and local banks will participate in resettlement monitoring. Both internal and independent

monitoring of the resettlement program would be conducted regularly during project

implementation.

43. Consultation with NGOs and Civil Society. Villages and farmer groups were consulted

and participated in the process of resettlement planning and project preparation, and their

feedback has been incorporated into the RAP. These consultations concluded that the

resettlement and rehabilitation measures proposed in the RAP are adequate to address and

mitigate the impacts of land acquisition and house demolition.

44. Institutional Arrangements. An experienced resettlement monitoring institute will be

contracted to serve as the independent monitoring agency of the resettlement program. The

project will be monitored and the living standards of the project-affected people will be

evaluated during project implementation; the results will be reported twice a year and, if needed,

remedial actions will be devised.

45. Linked Projects. Construction of a section of the West Ring Road and a middle section

on the East Ring Road (both financed by the local government) and two earth borrow pits have

been identified as linked projects to the proposed project. Resettlement work on these linked

projects was completed in 2009. Bank due diligence reviews of the compensation paid to the

affected persons indicated that these are acceptable to the Bank.

46. Resettlement Costs. The estimated cost of resettlement is about $25.51 million,

accounting for 13.3% of project costs. Qingyang municipality and Xifeing District will finance

resettlement costs and will compensate the affected entities and individuals.

Page 38: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

28

F. Monitoring & Evaluation

47. Monitoring indictors to assess the achievement of the PDO were agreed at appraisal

between the Bank, QMG, and the Government at Project Appraisal. The agreed set of PDO

Level Result Indicators and Intermediate Outcome Indicators, details of indicator measurement,

frequency, and responsible agencies of data collection and reporting for these Indicators are

shown in Annex 1: Results Framework and Monitoring. Project agencies collected the baseline

data and defined the annual targets for each of these indicators for the five year construction

period.

48. Responsibility for progress monitoring rests with the PMO. The PMO will engage a

construction supervision agency or agent to carry out supervision. While individual monitoring

data will be collected by the implementing agency of each component/sub-component (Xifeng

District Housing and Construction Bureau, Qingyang Municipal Water Supply and Sewage

Company, Xifeng District Transportation Bureau), the PMO has the overall responsibility for

coordinating collection of the data required for monitoring and evaluation, as well as the

responsibility for ensuring timely progress reporting to the Bank, and for the accuracy of the

reports.

Page 39: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

29

Annex 4: Operational Risk Assessment Framework (ORAF)

Project Stakeholder Risks Rating Moderate

Description :

The city government may sacrifice quality and the innovative concepts in order to speed up construction.

Risk Management :

Provision of information to the local government on good practices of comprehensive urban transport management and study tours to learn from other Chinese cities that have addressed the traffic issues in a cost-effective and sustainable way.

Resp: Qingyang

PMO/Bank

Stage: Preparation &

Implementation Due Date :On-going Status:

Resp: Stage: Due Date : Status:

Implementing Agency Risks (including fiduciary)

Capacity Rating: Substantial

Description :

The City and the PMO have no experience in preparing and implementing a Bank-financed project, especially on procurement and financial management requirements.

The technical capacity of the city is weak. PIU and Local consultants do not have adequate experience preparing and implementing the Bank financed comprehensive urban transport projects.

Financial capacity to provide the required counterpart funds may be lacking.

Risk Management :

A project financial management manual will be circulated to all project financial staff to guide their daily work; financial management and procurement training will be provided to furnish them required knowledge in managing project funds and procurement activities.

GSFB and QYFB, which have experience with Bank-financed operations and management of DA, will closely monitor the work of the PMO and the PIUs and provide guidance. A lower prior review threshold has been set and the Bank will prior review more contracts.

Bank will provide training/study tours to help city officials and PMO / PIUs to develop the necessary technical knowledge/skills. This will include organizing activities for Qingyang to learn from the experience of other more advanced Chinese cities.

Counterpart funds will be confirmed in the local government’s annual budget before and during project implementation.

Resp: WB and QMG Stage: Preparation &

Implementation Due Date :On-going Status:

Governance Rating: Substantial

Description

The city may lack the same degree of ownership and commitment to the project exhibited to date when its leadership changes overtime, in particular at the decision-making level of Municipal and District Government. The city government may implement its own financed

Risk Management :

Continuous and strengthened communication with Qingyang municipal and Xifeng district government particularly when the leaderships change.

Regular and on-demand supervision with particular focus on ownership, commitment, accountability and decision making.

The Bank team will also keep regular contact with GMG on its own financed infrastructure projects

Page 40: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

30

infrastructure projects which may have certain impacts on the investments under the project without proper consultation with the Bank.

The profile of the Xifeng District Government PMO may be not high enough for coordinating with related government agencies of Qingyang Municipal level.

which are closely linked with the investment under the project.

A municipal-level leading group will oversee overall project implementation, provide policy guidance and institutional coordination.

Resp: WB and

QMG

Stage: Preparation &

Implementation Due Date: On-going Status:

Project Risks

Design Rating: Substantial

Description :

The city’s master plan and sectoral plans of road network, drainage and sewage infrastructure may be over-designed.

The integrated road improvement and traffic management component is new to the city.

Risk Management :

Continuous discussion with the city government and related sector agencies led to agreement on reasonable projections of service demand, construction phasing, and scales of related infrastructures for various timeframes. Reputable Chinese Design Institutes and an international consulting firm with extensive experiences on Bank projects in China prepared the technical documents and will provide support for preparing preliminary technical designs.

The Bank will provide support during implementation through the inclusion of appropriate technical experts in missions. Outreach has been made to the Traffic Police, a key agency for the operation of traffic management measures.

Resp: QMG and PMO Stage: Implementation Due Date: On-going Status:

Social & Environmental Rating: Moderate

Description :

Even though detailed arrangements for the implementation of the EMP and the RAP are part of these documents , the agreed EMPs and RMPs, may not be implemented properly.

Risk Management :

Project design includes internal and external monitoring of the implementation of safeguard instruments. Bank missions will review the monitoring reports and initiate remedial actions, where necessary.

Resp: PMO and Bank Stage: Implementation Due Date: On-going Status:

Program & Donor Rating: Low

Description :

This is a free standing project and no other donors are involved.

Risk Management :

Resp: Stage: Due Date: Status:

Delivery Monitoring & Sustainability Rating: Moderate

Description :

Limited skills and experience in project management, in particular, in procurement and contract management.

Undeveloped ability to reliably measure outcomes.

O&M of urban infrastructure are not adequately served in the city,

Risk Management :

Continuous training on procurement and financial management will be carried out. PMO and PIUs will recruit experienced procurement agents to assist procurement during the initial implementation phase.

The Bank team will monitor the implementation of agreed mechanisms for measuring delivery quality.

Carrying out specific TAs for knowledge transfer and skill strengthening to operating agencies of key

Page 41: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

31

particularly with the urban roads. Low capacity and efficiency of O&M services may affect the performance of infrastructure assets delivered by the project.

urban infrastructure facilities in the city.

Resp: PMO and

Bank Stage: Implementation Due Date: On-going. Status:

Overall Risk Rating: Substantial

Comments: The key risks for the achievement of the PDO relate to design, governance, capacity of the PIUs. Risk management measures have been built into the project design and the Bank will monitor their implementation carefully during implementation support missions.

Page 42: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

32

Annex 5: Implementation Support Plan

Strategy and approach

1. The strategy for implementation support is based on the ORAF, where the risks to

achieve the project development objective and the agreed mitigation measures have been

identified. The implementation plan will be reviewed and updated based on the periodic

assessments of risks and the appropriateness of the mitigation measures implemented.

2. Capacity. Weak implementation capacity of the PMO and related PIUs has been

identified as the key risk to project implementation. Bank implementation support will focus on

assisting the client in strengthening implementation capacity, particularly in financial

management and procurement, immediately following project start-up. Frequent supervision

early on during the first half of the implementation period is expected to assist with compliance

with Bank FM and procurement policies and procedures.

3. Procurement. Implementation support will focus on ensuring that: (a) the procurement

agent is performing effectively; (b) PMO and PIU staff are fully familiar with, and adheres to the

Procurement Management Manual (PMM); and (c) planned procurement training is provided to

all procurement staff in a timely manner. In addition, the Bank procurement specialist will carry

out prior and post reviews of procurement transactions and monitor the implementation and

updates of the procurement plan.

4. FM. The Bank will supervise the implementation of the identified and agreed actions for

strengthening PIUs’ financial management and pay specific attention to the timely provision of

the required counterpart funds. The FM specialist will ensure that counterpart funds committed

by the Qingyang Municipal Government as well as Xifeng District Government will be included

in their annual budgets. Standard provisions on interim financial reporting and external audit and

their compliance will be monitored.

5. Design. Specific technical expertise on road engineering and traffic management, civil

engineering and wastewater management, OMM, and financial aspects will be mobilized during

regular semi-annual supervision missions. The challenges associated with the detailed design

and implementation of traffic management measures under the integrated road corridor

improvement component will be monitored by the Bank’s technical specialists during routine

supervision.

6. Governance. Implementation support will focus on: (a) continuous and strengthened

communication with the city and district government to maintain a high degree of client

ownership and commitment to the project, particularly when the leadership changes; (b) regular

and on-demand supervision with particular emphasis on ownership, commitment, accountability

and decision making; (c) keeping regular contact with GMG on its own financed infrastructure

projects which are closely linked with the investments under the project.

7. Other risks. The team’s environmental specialist will monitor compliance with

environmental safeguards and adherence to the Environmental Monitoring Program, while the

Page 43: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

33

social specialist will pay particular attention to the implementation of the RAP. They will make

field visits on a semi-annual basis. The task team leader and most of the team members are

based in Beijing and will provide timely and on-demand implementation support to the client

when needed.

8. An overview of the focus and timing of Bank support is presented in Table 1 and the

required skill mix in Table 2.

Table 1: Supervision Inputs

Time Focus Skills Needed

First 12 months Task and team leadership TTL

Technical support/Detailed designs Technical skills

FM and Procurement Bank policies

Safeguards Bank policies

M&E framework and baseline data Technical skills

12-60 months Task and team leadership TTL

Technical support/Project quality/sustainability Technical skills

FM and Procurement Bank policies

Safeguards Bank policies

M & E Technical skills

Table 2: Skill Mix

Skills Needed

Number of

Staff

Weeks

Number of

Trips Remarks

TTL/civil engineering 10 8 Bank staff

Urban Transport Planning & Traffic engineering 10 8 Bank staff / consultants

Urban Road Engineering 10 8 Bank staff / consultants

Wastewater Management 10 6 Bank staff / consultants

Storm Water Engineering 8 4 Bank staff / consultants

Bank Safeguard Policy 8 4 Country-office based

Bank FM Policy 4 2 Country-office based

Bank Procurement Policy 8 4 Country-office based

Page 44: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

34

ANNEX 6: PROJECT LOCATON MAP

IBRD 39185

Page 45: The World Bank FOR OFFICIAL USE ONLYdocuments.worldbank.org/curated/en/... · FSR Feasibility Study Report PP Procurement Plan ... strategic importance as an energy production base,

Jinchang

Wuwei

Dingxi

Wudu

Pingliang

Xifeng

Dongxiang

Xiahe Zhuen

Dunhuang JiuquanJiayuguan

Zhangye

LANZHOU

Tianshui

Baiyin

Aksay KazakzuZizhixian Subei Mongolza

Zizhixian

AnxiYumenzhen Jinta

Gaotai

Yongchang

Gulang

Yongden

Tianzhu ZangzaZizhixian

Minqin

Sunan YugurzuZizhixian

Linze

Shandan

Jingtai

Linxia

YongjinYuzhong

Hezheng

Luqu

Lintan Wushan

Li XianMin XianJone

ZhangXian

GanguQin´an

Zuanglang

TongweiLongxi

Lintao

HuiningJingning

WeiyuanKangle

Gaolan

TewoTanchang

Zhou Qu

KangXian

Hui XianLiangdang

Cheng Xian

Qingshui

ZhangjiachuanHuating

Zhenyuan

ChongxinJingchuan

Ning Xian

Heshui

HuachiHua XianJingyuan

Wen Xian

Maqu

Minle

Xihe

Qingyang

Zengning

LingtaiGuanghe

Dpmgxoamgzi Zizhixian

Hezuozhen

M O N G O L I A

Wei He

Yello

w R

. (H

uang

He)

Yellow R. (Huang He)

Shule He

Hei H e

Huan Jiang NI N

GX

I A

S ICHUAN

SHAANXI

QINGHAI

N E I M O N G O L

XINJIANG

To Xi'an

To Hanzhong

To Guangyuan

To Chengdu

To Ürümqi

To Xining

To Gonghe

To EjinQi

To Wuhai

To Wuhai

To TianjunTo Gölmud

40

38

110

36

34

10810610410210098

98

108106

110108106

104102100989694

9694

38

40

42

36

34

34

This map was produced by the Map Design Unit of The World Bank. The boundaries, colors, denominations and any other informationshown on this map do not imply, on the part of The World BankGroup, any judgment on the legal status of any territory, or anyendorsement or acceptance of such boundaries.

CHINAGANSU QINGYANG

URBAN INFRASTRUCTUREIMPROVEMENT PROJECT

0 50 100 150

KILOMETERS

PROJECT MUNICIPALITY

HIGHWAYS

MAIN ROADS

RAILROADS

COUNTY (XIAN) CAPITALS

PREFECTURE CAPITALS

PROVINCE CAPITAL

COUNTY (XIAN) BOUNDARIES

PREFECTURE BOUNDARIES

PROVINCE BOUNDARIES

INTERNATIONAL BOUNDARY

IBRD 39185

MA

RCH

2012

B a y o fB e n g a l

P h i l i p p i n e

S e a

E a s t

C h i n a

S e a

Yel lowSea

Sea

of

Japan

BEIJING

MACAO

RUSSIANFEDERATION

MONGOLIA

KAZAKHSTAN

JAPAN

PHILIPPINES

VIETNAM

NEPAL

MYA

NM

AR

THAI-LAND

REP. OFKOREA

D.P.R. OFKOREA

LAOP.D.R.

KYRGYZREP.

National Capital

Province Boundaries

International Boundaries

HEILONGJIANG

JILIN

LIAONING

HEBEI

BEIJING

TIANJIN

SHANXI

GANSU

QINGHAI

XINJIANG

XIZANG

NIN

GXI

A SHANDONG

HENAN

ANHUI

JIANGSU

ZHEJIANG

SHANGHAI

SICHUAN

CHO

NGQIN

G HUBEI

GUIZHOU

JIANGXIHUNAN

GUANGDONG

FUJIAN

GUANGXI

TAIWAN

HAINAN

YUNNAN

NEI MONGOL

SHAANXI

HONG KONG

CHINA