The World Works Here….
Jeff Bishop
Executive Director Port of Moses Lake
Composites, Chemicals, Aerospace and High Tech Manufacturing
Line-of-Sight (LOS) Rehabilitation
• Runway 14L/32R• Remove Hump
from Runway • AIP/FAA Grant
Funded• Project Area 1,000 ft
x 4,500 ft• Replacement of
Lighting Full length • Set to Begin Fall
2019 and Conclude 2020
• Addition of Sec 19 (640 Acres)• Fresh Water Expansion
• Master Development Plan• New Rate Model 2019• JMUSA
• BOD Treatment• Pretreatment Program • LOS Spoils to Create
Additional Storage Capacity
Industrial Wastewater
Planning for the Future
Road G Project (Westside Employment Center)
• 2,100 Acres of Undeveloped Land• 1,388 Acres Public (66%)
• 1,257 Acres Port Owned (60%)• 698 Acres Private (34%)
• Formation of an LID to Facilitate Infrastructure Development• 53% of Private Ownership Approve• Formation of LID Approved by Port
Commission March 11th 2019
• Project Includes • Entrance to Highway 17• 3 ½ Miles of Road Bed• Water, Sewer and IWW• Resolve Power Needs
Northern Columbia Basin Rail (NCBR) Project
• Construction of 8 Miles New Track
• Rehabilitation of 3 Miles Existing Track
• 20 mil in State Funding
• 10 mil in Federal Funding• Federal
Obligation Fall 2019
• Construction to Begin Spring 2021 and Conclude In 2022