Page 1: THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California

THEMIS Mission CDR JacksonUCB, June 14-18, 2004

Critical Design Review

THEMIS

Mission Assurance Critical Design Review

Ron Jackson

University of California - Berkeley

June 14-18, 2004

Page 2: THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California

THEMIS Mission CDR JacksonUCB, June 14-18, 2004

Critical Design Review

THEMIS Mission Assurance Team

• Ron Jackson Mission Assurance Manager

• Jorg FisherQuality Assurance Engineer

• Chris Scholz Quality Control Engineer

• Tom Clemons Quality Control Technician

Page 3: THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California

THEMIS Mission CDR JacksonUCB, June 14-18, 2004

Critical Design Review

Quality Assurance Flowdown

• UCB-PAIP – released – Pending approval by GSFC

• Swales PAIP – released – Approved by UCB• FGM/TUB PAIP – released – Approved by UCB• SCM/CETP PAIP – released – Approved by UCB• All other vendors - Purchase order Flowdown

Instrument Mission Assurance Requirements Document (MAR) was released on June 25, 2002.

UCB responded with a Performance Assurance Implementation Plan (PAIP):

Page 4: THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California

THEMIS Mission CDR JacksonUCB, June 14-18, 2004

Critical Design Review

Responsibilities of Quality Assurance

1.) Review and report on: a) Evaluate/Audit contractors facilities for the ability to

consistently produce quality flight hardware dailyb) Equipment calibration, temperature and humidity monitorsc) Clean room controlsd) Compliance to ESD requirementse) Workmanship procedures/processesf) Material handling and shelf life material storageg) Data packages and logbooksh) Nonconformance reporting / Problem reportsi) Assembly instruction / BOMj) Personnel training and certification to NASA standardsk) Part/Materials Alert Status

Page 5: THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California

THEMIS Mission CDR JacksonUCB, June 14-18, 2004

Critical Design Review

Responsibilities of Quality Assurance

2.) Support integration and test activities: a) Verify test set ups at board/instrument and

spacecraft levelsb) Monitor thermal testing at Box/instrument and

spacecraft levelsc) Witness vibration testing at instrument and

spacecraft levelsd) Verify magnetics testing at instrument levelse) All European suppliers – UCB shall review

Acceptance Package Data / Travelers and inspect component/Box upon delivery to U.S.

Page 6: THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California

THEMIS Mission CDR JacksonUCB, June 14-18, 2004

Critical Design Review

Responsibilities of Quality Assurance 3.) Provide electrical and mechanical inspections but not limited to:

a) Incoming materialsb) Solder workmanship, through hole and

SMT methods (verify coupon acceptance)c) Conformal coating and staking applicationsd) Witness board or Box closuree) Wire harness build, continuity test, Hi-pot

testing and routingf) Configuration verification, as designed vs.

as built

Page 7: THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California

THEMIS Mission CDR JacksonUCB, June 14-18, 2004

Critical Design Review

Contamination Control

• UCB Contamination Control– Class 100k clean room– Air particle count will be monitored– All flight hardware will be placed in clean bags

Page 8: THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California

THEMIS Mission CDR JacksonUCB, June 14-18, 2004

Critical Design Review

Software Assurance

• IV &V (IDPU & BAU)– To review software code– Develop metrics (Software risk assessment)– All software problems will be tracked on problem

reports– All software changes will be under configuration

review

• Probe Bus– Under UCB configuration management review– Software problems reports provided to UCB

Page 9: THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California

THEMIS Mission CDR JacksonUCB, June 14-18, 2004

Critical Design Review

Responsibilities of Quality Assurance

4.) Communications: a) Provide both written and verbal reports to

THEMIS project management – monthly

b) Participate in program telecons - as required

c) Problem/failure reporting may be informal up to the time of integration with flight hardware

Page 10: THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California

THEMIS Mission CDR JacksonUCB, June 14-18, 2004

Critical Design Review

THEMIS Parts Requirements

• 311- INST-001, Level 3– Parts in compliance with 311-INST-001, Level 3 requirements

and Standard Parts.– Use PPL 21 preferred parts, design permitting.

• PIND, per Mil-STD-750 and Mil-STD-883, required for cavity devices.– Impose on manufacture, if possible.– When needed, have DESC approved test facility perform

testing.• CSI and/or DPA for complex or known problem devices.

Page 11: THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California

THEMIS Mission CDR JacksonUCB, June 14-18, 2004

Critical Design Review

THEMIS Parts Requirements (continued)• Non-standard EEE parts will require at a minimum: PEM

– DPA, Preconditioning, HAST, CSAM• Radiation Testing

– Total Ionizing Dose Requirement 66 Krads (si)• Review existing test data from GSFC, JPL & Manufacturer• Review NASA “where used” historical data

– Parts o.k. to use if data and/or orbit requirements equals or exceeds THEMIS

• When needed, will perform Cobalt 60 TID testing– Single Event Effects: use existing data or historical use similarity

• Whenever possible, designers will use latchup immune devices• Latchup requirements 37mev• Exceptions are handled on case by case basis with THEMIS Project Office

Page 12: THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California

THEMIS Mission CDR JacksonUCB, June 14-18, 2004

Critical Design Review

THEMIS EEE Parts List• UCB QA will maintain EEE Parts Identification List (PIL)

• PIL will contain

– Manufacturer’s generic part number

– Military part number or SCD number

– Manufacturer(s)

– Where used (unique assembly) / Quantity used

– Quantity ordered

– Lot/Date Code

– Radiation status (TID / SEL)

– Project Approval Status

– Alert status

– Comments

Page 13: THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California

THEMIS Mission CDR JacksonUCB, June 14-18, 2004

Critical Design Review

THEMIS EEE Parts List (continued)• Parts will be procured to an approved Parts List

– Schedule permitting, Berkeley will do common buy.– Procurement of devices will be based upon design Engineers

Confidence-of-use factor of 70%.• Unique, high dollar items will be at 90% - 100% Confidence

Level– Minimum Attrition / Spares factor of 20% - 30% will be applied

to flight procurement quantities. Standard devices will have higher spares’ factor.

– Schedule and Cost permitting, Engineering test units will use flight qualified part. Especially where minimum buy quantities are imposed.

• ETU and Flight units– Procurements will run concurrently

• Flowdown PAIP requirements on subcontractors.

Page 14: THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California

THEMIS Mission CDR JacksonUCB, June 14-18, 2004

Critical Design Review

THEMIS EEE Parts List (continued)Parts Control Board (PCB)

• PCB members: THEMIS QA, Parts Engineer (GSFC), design Engineer and THEMIS – Berkeley Project Manger, or representative.

• PCB shall review EEE part for:– Testing, Screening and Qualification requirements– Alerts– Review non-standard parts requirements

• PCB will disposition EEE parts failures and nonconformance issues.

• UCB QA will coordinate PCB parts issues with GSFC Flight Assurance Manager, or his representative.

Page 15: THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California

THEMIS Mission CDR JacksonUCB, June 14-18, 2004

Critical Design Review

GIDEP Alert Review

• Microcircuits- 41 ea. Checked ok- 1 ea. Checked bad

• Semiconductor Devices– 49 ea. Checked ok– 1 ea. Checked bad

• Resistors/Capacitors– 31 ea. Checked ok

• Connectors– 6 ea. Checked ok

• Wire/Harness– 4 ea. Checked ok

• Misc. Materials– 0 ea. Checked

• Mechanical Parts– 0 ea. Checked

Page 16: THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California

THEMIS Mission CDR JacksonUCB, June 14-18, 2004

Critical Design Review

Parts Issues

EEE parts Alerts

Actel – FPGAIn-rush current problem

JANTXV1N5711-1ESD /Lead handling problem

Parts at up- screening

CA3080A @ GSFC

OP462HRU @ GSFC

LTC1604 @ GSFC

2N6519 @ GSFC

PT100 @ GSFC

AD5544 @ WYLE

Page 17: THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California

THEMIS Mission CDR JacksonUCB, June 14-18, 2004

Critical Design Review

THEMIS Parts Lists Status

Assembly List Developer Status Comments

EFI,SCM,FGE,PCB,LVPS,

DFB,BEB,DCB,ETC,ESA,SST

UCB Parts Status

University of California

In-Review at GSFC

Parts Control Board in-process

Probe,

Probe CarrierSwales Parts Status

Swales In-Review at UCB

Parts list to be submitted to GSFC for review

Page 18: THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California

THEMIS Mission CDR JacksonUCB, June 14-18, 2004

Critical Design Review

THEMIS Materials Lists Status

Assembly List Developer Status Comments

EFI,SCM,FGE,PCB,LVPS,

DFB,BEB,DCB,ETC,ESA,SST

UCB Material Status

University of California

In-Review at GSFC

None

Probe,

Probe CarrierSwales Material Status

Swales In-Review at UCB

Material list to be submitted to GSFC for review