Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
THE PROJECT LIFE-CONVIVE: AN INTEGRATED APPROACH FOLLOWING THE
SACS MANAGEMENT PLANS
Juanes, JA, Recio, M, Echavarri, B, Galván, C, Núñez, P, Jiménez, M, Ondiviela, B, Puente, A, García, A
3rd Natura 2000 Biogeographic Seminar for the Atlantic regionAntwerp, Belgium
10 a
ño
s d
e I+D+ip
ara
un
de
sarr
ollo
so
ste
nib
le
Outline
0. Background
1. Exchange knowledge
a. Global context: Justification
b. The Question: Multiple benefits
c. The Solution: Implementation of conservation actions
2. Bottlenecks: causes, solutions, strategies
3. Transboundary cooperation: networking
4. Future steps
10 a
ño
s d
e I+D+ip
ara
un
de
sarr
ollo
so
ste
nib
le
0. Background
2007-19_ Scientific and technical guidelines regarding Natura 2000 Management Plans.Since 2007 → Integrated management of Water systems (FWD-HD-SbD).Management plans for 21 SACs, including river, litoral and terrestial systems.
http://rednatura2000cantabria.ihcantabria.com/
10 a
ño
s d
e I+D+ip
ara
un
de
sarr
ollo
so
ste
nib
le
Hydr/Coast
Engineering/
Water quality
modeling
Met-oceanic variables/
Climate Change /
Renew. Energies
Hydrobiology & Env.
Management.
Background
10 a
ño
s d
e I+D+ip
ara
un
de
sarr
ollo
so
ste
nib
le
/Global Context
Protection of the natural values of the European territory
Natura 2000 Network
Protected areas in which the natural habitats and species must been managed in a sustainable way,
looking for preserving or restoring their “favorable conservation status”
• Assessment: Diagnostic
• Alternatives: Proposals of measures
• Actions: Selection and prioritation
• Monitoring: Verification
1. Exchange Knowledge
10 a
ño
s d
e I+D+ip
ara
un
de
sarr
ollo
so
ste
nib
le
Global ContextEcological Integrity Assessment
Ondiviela, B., Juanes, J.A., Recio, M., 2015. A management approach for the ecological integrity of NE Atlantic estuaries. Ecological Indicators, 52: 105-115
WFD - HD
10 a
ño
s d
e I+D+ip
ara
un
de
sarr
ollo
so
ste
nib
le
• Region of Cantabria, N Spain: 9 estuaries → 6 SACs
• “Management Plan for the littoral SACs”
http://rednatura2000cantabria.ihcantabria.com/
• Specific management measures
• Negative perception of SACs (e.g. EIA regulations)
• Interferences and conflicts among different uses and activities
• Main objective: Sustainable development within SACs
Global ContextNatura 2000 Network
10 a
ño
s d
e I+D+ip
ara
un
de
sarr
ollo
so
ste
nib
le
How can we integrate conservation with educational, recreational or economic activities within SACs?
ENVIRONMENT
SOCIETYECONOMY
SUSTAINABILITY
Socio-economy
Env-economySocio-ecology
The Question
10 a
ño
s d
e I+D+ip
ara
un
de
sarr
ollo
so
ste
nib
le CONVIVE-LIFE project (LIFE14NAT/ES/001213)2016-19
To improve the conservation status of habitats and species of community interest, in different SACs where interferences with other educational, recreational and economic
activities take place
The Solution
10 a
ño
s d
e I+D+ip
ara
un
de
sarr
ollo
so
ste
nib
le
A. Preparatory actions
• B/Ph/Ch Assessment
• Hydrodynamic modeling
• Design of scenarios
C. Conservation actions
• Removal of invasive sps
• HyMo enhancements
D. Monitoring actions
E. Public awareness & Dissemination actions
• CoEDUCA
• CoOPERA
• CoNVIVE
Option 2
The Analysis
10 a
ño
s d
e I+D+ip
ara
un
de
sarr
ollo
so
ste
nib
le
Nutrición: Biomasa
Material: Biomasa
Material: Agua
Fuentes de energía basadas en biomasa
Energía mecánica
Procesado residuos: biota
Procesado residuos: ecosistemas
Flujos sólidos
Flujos líquidosFlujos gaseosos
Protección de hábitats/genes
Control de plagas/enfermedades
Formación/composición del suelo
Condiciones del agua
Regulación de la composición atmosférica y clima
Interacciones físicas/experienciales
Interacciones intelectuales/representativas
Espiritual y/o emblemático
Otras interacciones culturales
1
2
3
4
5 Nutrición: Agua
0
OYAMBREPROVISIONINGCULTURAL
REGULATING/SUPPORTING
ECOSYSTEM SERVICESThe Analysis
10 a
ño
s d
e I+D+ip
ara
un
de
sarr
ollo
so
ste
nib
le
Conservation actions: common issuesREMOVAL OF Baccharis halimifolia
JOYEL
TINA MENOR
VICTORIA
OYAMBREMechanical Chemical (glyphosate)
Habitat restoration through the elimination of nonnative species (Baccharis halimifolia).
Hydrodynamic restoration
Presence of B. halimifolia
Standard protocols?Specialized companies
Menor
10 a
ño
s d
e I+D+ip
ara
un
de
sarr
ollo
so
ste
nib
le
Case study: Tina Menor Estuary
AQUACULTURE FACILITY (70’s)
Clams
Local context
• Administrative permit
• Regulation of tidal fluxes
• Control of eutrophication
• New Company (2017)
• Sustainable aquaculture
• Ecotourism
• Management guidelines
Fishes
10 a
ño
s d
e I+D+ip
ara
un
de
sarr
ollo
so
ste
nib
le
Case study: Tina Menor Estuary
Proposals: Main activity
• Increase of tidal fluxes
• Opening of one lagoon
• Green filter: nutrients
Proposals: secondary activities
• Bird watching
• Environmental education
• Recreation activities
• Others……
10 a
ño
s d
e I+D+ip
ara
un
de
sarr
ollo
so
ste
nib
le
Case study: Tina Menor Estuary
• Pilot case
• Native species: Juncus sp
• New “bussines model”: saltmarsh seddlings
10 a
ño
s d
e I+D+ip
ara
un
de
sarr
ollo
so
ste
nib
le
Capitán
Case study: Oyambre EstuaryDIKE REMOVAL
Local context
• Old reclaimed área
• S Branch opened in 2010
• N Dike used as a bridge
• Old infraestructure
• Sustainable use?
10 a
ño
s d
e I+D+ip
ara
un
de
sarr
ollo
so
ste
nib
le
Case study: Oyambre Estuary
Abertura única de 16 m
• Compromise between: security, budget, public use, conservation issues
• Administrative protocols (who will be in charge?)
• Public concern (Alternatives?)
10 a
ño
s d
e I+D+ip
ara
un
de
sarr
ollo
so
ste
nib
le
• Low tide pass
• Managed by the Municipality
• Alternative pass around the estuary (1 km trial)
Case study: Oyambre Estuary
10 a
ño
s d
e I+D+ip
ara
un
de
sarr
ollo
so
ste
nib
le
Case study: Joyel EstuaryWATER FLUX IMPROVEMENT
How to manage in an optimum way the working time of the old tidal
mill and the renovation time inside the lagoon to avoid eutrophication?
10 a
ño
s d
e I+D+ip
ara
un
de
sarr
ollo
so
ste
nib
le
Case study: Joyel Estuary
• Administrative problems→ cultural heritage, structural concern
• Alternative 3: Is this the final solution?
10 a
ño
s d
e I+D+ip
ara
un
de
sarr
ollo
so
ste
nib
le
✓ Legal constraints: EIA / Fragmented competences / Public domain permits
/ Enforcement of BAT in private areas
✓ Administrative issues: public procurement procedures
✓ Conflicting interests:
▪ Socioecological: Conservation contradictions & priorities
▪ Socieconomic: “Ecosystem services” demonstrations
▪ Environment economy: “Natural capital” accountability
➢ LACK OF A REALBIOGEOGRAPHICAPPROACH
2. Bottlenecks
10 a
ño
s d
e I+D+ip
ara
un
de
sarr
ollo
so
ste
nib
le
3. Transboundary coop.
Final meeting + Scientific Workshop: Santander, May 2020
10 a
ño
s d
e I+D+ip
ara
un
de
sarr
ollo
so
ste
nib
le
4. Future steps
¿Biogeographic approach?
10 a
ño
s d
e I+D+ip
ara
un
de
sarr
ollo
so
ste
nib
le
Acknowledgements