Upload
vashish-ramrecha
View
212
Download
0
Embed Size (px)
DESCRIPTION
M
Citation preview
Report yourself to the company on the
commencement date
Write weekly or bi-weekly report
During training, the coordinator may contact
you to arrange for an industrial visit by
lecturer(s) from the department
During the industrial training visit, show the log book to the visiting lecturer
Before leaving the company, remind:
The supervisor to complete the evaluation
form (will be given to visiting lecturer)
The supervisor sign every page of the
Engineer log book
The company to prepare a letter that
confirms your industrial training (duration
must be stated in the letter)
Prepare a report of the industrial training
Send the Engineer Log Book, sealed envelope
that contains the evaluation form, a copy of
the company confirmation letter, and
industrial training report to the Industrial training coordinator
Weekly/bi-weekly progress
report prepared and Engineer log Book updated
Confirm the date with
supervisor and inform the Industrial training coordinator
Engineer Log Book prepared and updated
Supervisor has completed the
evaluation form and sealed
the form in an envelope.
Company has issued confirmation letter
Prepared industrial training Presentation (about 10 min.)
Engineer Log Book, sealed
envelop, company
confirmation letter, and
industrial training report
sent to department (to the industrial training coordinator)
Contact Department of
Mechanical Engineering, Industrial training coordinator
Obtain Engineer Log Book from Faculty Office
(for MEng students) or download the scanned copy from the U drive (BEng students)
Engineer Log Book obtained
(Contact the Industrial training
coordinator, Department of Mechanical Engineering)
Things to do during the industrial training
Action Checklist
Industrial training coordinator for Mechanical Engineering is Dr. Yousif Abdalla Abakr Room: BB39 Tel: 03 89248143 Email: [email protected]
Inform the Industrial training coordinator about
the starting date of your training, the company
address and supervisor contact information
Check and understand the safety regulations of the company
Prepare a Presentation of the industrial training (power point presentation)
Prepared industrial training report (minimum 10 pages)