This presentation is for a project on US 12 in the St. Croix County towns of Hudson and Warren. Rather than holding an in-person meeting, public involvement efforts have moved online as a precaution against COVID-19 based on the most current health information from state, federal and local health departments. All meeting materials, including the handout with a comment form, are posted on the design website for this project. https://wisconsindot.gov/Pages/projects/by-region/nw/us12scc/default.aspx If you have any questions, please contact WisDOT Project Supervisor, James Koenig at (715) 838-8391.

This presentation is for a project on US 12 in the St ......The presentation will follow the outline shown here - first discussing the project location, second the project’s purpose

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: This presentation is for a project on US 12 in the St ......The presentation will follow the outline shown here - first discussing the project location, second the project’s purpose

This presentation is for a project on US 12 in the St. Croix County towns of Hudson and Warren.Rather than holding an in-person meeting, public involvement efforts have moved online as a precaution against COVID-19 based on the most current health information from state, federal and local health departments.All meeting materials, including the handout with a comment form, are posted on the design website for this project.https://wisconsindot.gov/Pages/projects/by-region/nw/us12scc/default.aspx

If you have any questions, please contact WisDOT Project Supervisor, James Koenig at (715) 838-8391.

Presenter
Presentation Notes
Page 2: This presentation is for a project on US 12 in the St ......The presentation will follow the outline shown here - first discussing the project location, second the project’s purpose

US 12Towns of Hudson and Warren

County U to West Junction WIS 65St. Croix County

Public Involvement Meeting

Presenter
Presentation Notes
Welcome to the virtual public involvement meeting for the US 12 project in the towns of Hudson and Warren, St Croix County.
Page 3: This presentation is for a project on US 12 in the St ......The presentation will follow the outline shown here - first discussing the project location, second the project’s purpose

Project Team• James Koenig

• WisDOT Project Supervisor• Brett Hollister

• WisDOT Consultant Project Manager• Ashley Seibel

• WisDOT Consultant Real Estate Specialist

Presenter
Presentation Notes
Listed here are the team members who are working on this project. Their contact information will be on listed on the last slide of this presentation, which will include their emails and phone numbers. The mailing address of the Wisconsin Department of Transportation Northwest Region Office in Eau Claire also will be listed towards the end of this presentation. Feel free to contact them with any comments, questions or concerns regarding the project.
Page 4: This presentation is for a project on US 12 in the St ......The presentation will follow the outline shown here - first discussing the project location, second the project’s purpose

Presentation Agenda• Project Location• Project Purpose and Need• Proposed Improvements• Construction Staging• Real Estate• Project Schedule• Contact Information

Presenter
Presentation Notes
The presentation will follow the outline shown here - first discussing the project location, second the project’s purpose and need, third the proposed improvements, fourth the construction staging, fifth the real estate process, sixth the next activities in the schedule and finally ending with the project team contact information.
Page 5: This presentation is for a project on US 12 in the St ......The presentation will follow the outline shown here - first discussing the project location, second the project’s purpose

Project Location

Presenter
Presentation Notes
The proposed US 12 project begins just east of County U at the intersection with Ross Road and extends east to west of the roundabout at the WIS 65 intersection. The project is identified by the blue line on the map.
Page 6: This presentation is for a project on US 12 in the St ......The presentation will follow the outline shown here - first discussing the project location, second the project’s purpose

Purpose and Need• PurposeRehabilitate the US 12 driving surface and drainage structures

• NeedDeteriorated pavementDeteriorated drainage structuresDeteriorated beam guardNarrow paved shoulder

Presenter
Presentation Notes
The primary purpose for this project is to improve the condition of the pavement and drainage structures along US 12, in the towns of Hudson and Warren, to provide motorists with a highway that both meets safety standards and provides a high level of service. The project aims to extend the roadway’s service life. In its current state, existing pavement on US 12 exhibits signs of deterioration in the form of alligator, longitudinal and transverse cracking, along with rutting in the wheel paths. In addition, the existing drainage structures are in decay, the existing beam guard is in poor condition, and the existing paved shoulders are narrow with adjacent drop-offs creating undesirable conditions.
Page 7: This presentation is for a project on US 12 in the St ......The presentation will follow the outline shown here - first discussing the project location, second the project’s purpose

Proposed Improvements• Resurface US 12 with asphalt pavement• Remove or replace beam guard• Widen the paved shoulder• Replace and clean out culverts• Install centerline and shoulder rumble strips• Replace concrete approaches and add flumes at the bridge

structure over the railroad tracks• Replace pavement marking

Presenter
Presentation Notes
The primary improvements of the proposed project include resurfacing US 12 with asphalt pavement to provide a safer driving surface and addressing all drainage structures by replacing or cleaning them to ensure water is able to drain appropriately. In addition, other improvements include addressing all beam guard by either removing entirely or replacing with new beam guard meeting current design standards, widening the paved shoulders from 3 feet to 5 feet and installing centerline and shoulder rumble strips to prevent crashes, replacing the concrete approaches and adding flumes at the bridge over the railroad tracks and replacing the pavement marking throughout the project limits.
Page 8: This presentation is for a project on US 12 in the St ......The presentation will follow the outline shown here - first discussing the project location, second the project’s purpose

Proposed Construction Staging

• 2021 construction season (June-October)• US 12 closed to through traffic

• Detour route: US 12 to I-94 to WIS 65• US 12 will be open to residences and businesses located within

the project limits• Temporary driveway closure will be coordinated with property

owners

Presenter
Presentation Notes
Construction of US 12 is anticipated to take place in 2021 and be completed from June through October. During construction, the roadway will be closed to through traffic, and a detour will be signed. The detour will follow US 12, I-94 and WIS 65; a map of the detour will be presented on the next slide. The roadway will remain open for access to residences and businesses located within project limits. In order to construct this project, temporary closures of driveways will be required, and the Department will coordinate these closures with the affected property owners in advance.
Page 9: This presentation is for a project on US 12 in the St ......The presentation will follow the outline shown here - first discussing the project location, second the project’s purpose

Detour Route

Presenter
Presentation Notes
Shown here is the detour route south of the project limits. The detour will follow US 12, I-94 and WIS 65. The detour will be operational for the full duration of the construction project.
Page 10: This presentation is for a project on US 12 in the St ......The presentation will follow the outline shown here - first discussing the project location, second the project’s purpose

Real Estate

• Real estate acquisition for US 12 improvements• Strip takings, both permanent and temporary

• Real estate acquisition process• Contact: Ashley Seibel, (715) 830-0544, ext. 205, or

[email protected]

Presenter
Presentation Notes
The proposed project will require real estate acquisition, both permanent and temporary, along US 12 throughout the project limits. The permanent and temporary easement strip takings are required due to project impacts to adjacent properties attributed to roadway fill, ditching, beam guard installation and culvert work. Not every property along the project will require real estate acquisition. Information discussing the real estate acquisition process will be sent to all affected property owners.
Page 11: This presentation is for a project on US 12 in the St ......The presentation will follow the outline shown here - first discussing the project location, second the project’s purpose

Real Estate

Presenter
Presentation Notes
Shown here is an example right of way plat sheet which real estate acquisition is based on. The right of way plat for the entire project is available to view on the project website. These plat sheets identify properties real estate acquisition will take place and are listed in the Schedule of Land & Interest Required table on each page, circled here in red. If a property is not listed in one of these tables, acquisition is not required for the project improvements. If a property is listed in the table, the type of acquisition and amount will be noted. For instance, the interest required may state FEE, TLE, or both. Fee interest is a permanent acquisition where as TLE, which stands for Temporary Limited Easement, is a temporary acquisition and is only necessary for the duration of the project. If you have any comments or questions regarding real estate, feel free to reach out to any team member.
Page 12: This presentation is for a project on US 12 in the St ......The presentation will follow the outline shown here - first discussing the project location, second the project’s purpose

Project Schedule

• Environmental Document July 2019• Preliminary Plans September 2019• Real Estate Plat June 2020• Public Involvement Virtual Presentation August 2020• Final Plans November 2020• Construction Summer 2021

Presenter
Presentation Notes
The project schedule is listed here and, currently, the project team is working on the design of the project. The environmental document was signed in July 2019. The preliminary plans were completed in September 2019. The right-of-way plat was ready in June 2020. The final plans should be completed by November 2020, and construction is anticipated to begin in 2021.
Page 13: This presentation is for a project on US 12 in the St ......The presentation will follow the outline shown here - first discussing the project location, second the project’s purpose

What we need from youShare your concerns or commentshttps://wisconsindot.gov/Pages/projects/by-region/nw/us12scc/default.aspxResponses returned by Aug. 21, 2020

• By email: [email protected]• By mail:o James Koenig

Wisconsin Department of Transportation718 W. Clairemont Ave.Eau Claire, WI 54701

Thank you for your time

Presenter
Presentation Notes
As part of the design process the Department of Transportation would like to gather information and share its design with the public. WisDOT is requesting you share any concerns or comments you may have about the project by mailing us a comment form or contacting a team member via email or phone. You can find the comment form on the project website shown here and return it to any of the team members shown on the last slide of this presentation by Aug. 21, 2020. If you have any general comments, questions or concerns about this project, please send us an email, give us a call or send a letter to the Wisconsin Department of Transportation Northwest Region Office in Eau Claire. The list of people who are working on this project and their contact information will be displayed on the next slide. Thank you for your time enjoy the rest of your day!
Page 14: This presentation is for a project on US 12 in the St ......The presentation will follow the outline shown here - first discussing the project location, second the project’s purpose

Project Team• James Koenig

• WisDOT Project Supervisor• (715) 838-8391• [email protected]

• Brett Hollister• WisDOT Consultant Project Manager• (715) 831-7545• [email protected]

• Ashley Siebel• WisDOT Consultant Real Estate Specialist• (715) 830-0544 ext. 205• [email protected]