14
ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions, Shopping-Centers, Central-Stations Our Production range Hydraulic steel structures and conveyor systems

ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,

Embed Size (px)

Citation preview

Page 1: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,

Th

yssen

Kru

pp

Permanent Bridges

Elevated steel constructions andStadium roofs

System Bridges(auxiliary bridges)

Architectural buildings,Turn-key constructions,Shopping-Centers,Central-Stations

Our Production range

Hydraulic steel structures and conveyor systems

Page 2: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,

Th

yssen

Kru

pp

Linking continents - by train across the Suez Canal The El-Ferdan Bridge, the largest swing bridge in the world

Longest swing bridge in the world

Breaking span 340 m

Swinging weight 13,200 tons

Opening November 2001

Page 3: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,

Th

yssen

Kru

pp

River railway bridges

Technical Data bridge over the river Rhine

Length: 274 mSpan length: 3 x 91.30 mHeigth: 20.00 mSteel construction: 2,650 tonsConstruction time: 23 months

Technical Data bridge over the river Elbe

Length: 240 mSpan length:66.9/105.8/66.9 m Heigth: 17.75 mSteel construction: 2,700 tonsConstruction time: 8 months

Page 4: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,

Th

yssen

Kru

pp

River road bridgesOver the Askerø-Fjord, Sweden and the river Saale by Beesedau

Technical Data Askerø-Fjord, Sweden

Length steel bridge: 386 mPylon height:: 100 mSteel construction: 2,191 tonsRopes: 313 tonsConstruction time: 8 months

Technical Data bridge across the river Saale

Length steel bridge: 311 mWidth of arch: 180 mHeight of arch: 38 mSteel construction: 4,400 tonsConstruction time: 31 months

Page 5: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,

Th

yssen

Kru

pp

The Transrapid – Project in Shanghai We manufactured and supplied points and actuators for the line between Pudong Airport and the Centre of Shanghai.

Page 6: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,

Th

yssen

Kru

pp

The Transrapid – Project in Shanghai

Page 7: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,

Th

yssen

Kru

pp

The Transrapid – Project in Shanghai We manufactured and supplied eight switches for the line between Pudong airport and the Shanghai city centre

Page 8: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,

Th

yssen

Kru

pp

Messe Hannover Conference CenterAn internationally significant steel construction „made in Hannover“

Technical Data

Steel construction: 4,500 tonsTotal length steel construction: 170 mConstruction time: 13 monthsEuropean Steel Construction Award 1991

Page 9: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,

Th

yssen

Kru

pp

Messe Hannover Exhibition hall 8/9A new dimension in exhibition hall construction

Exhibition Hall 8/9, Hannover

Length: 238 mWidth: 135 mCovered area: 32,000 m²Steel construction: 2,400 tonsConstruction time: 12 months

Exhibition Hall 6, Düsseldorf

Dimensions: 165 m x 165 mPrimary framework: 1,500 tonsSpace frame + cable subsupport: 790 tonsConstruction time: 14 months

Page 10: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,

Th

yssen

Kru

pp

The „AufSchalke“ Arena (Veltins-Arena)The most modern event centre in Europe

Technical data roof construction

Free span area: 226 m x 186 mWeight fixed roof construction: 3,500 tonsWeight moving roof panel: 560 tonsConstruction time: 10 months

Page 11: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,

Th

yssen

Kru

pp

The new Soccer Worldcup Stadium for Hannover

Modernization of existing Arena for 2006 World Cup

Capacity: 50,000 spectatorsNew roof with trapezoidal steel and membrane constructionOrder: September 2002Completion: September 2004

Page 12: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,

Th

yssen

Kru

pp

Volkswagen AutoStadt - Vehicle towersMultistorey parking platforms

Technical Data

Heigth: 50 mDiameter: 28 mCars to be stored: 400 each towerGlass area: 8,800 m²Walled-in space: 99,300 m³Construction time: 18 months

Page 13: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,

Th

yssen

Kru

pp

Materials handling and systems -1 For more than 30 years we have been a relaible and competent partner in the field of internal stock goods handling.

Page 14: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,

Th

yssen

Kru

pp

Materials handling and systems -2 Power + Free conveyors – sort, collect, store and distribute with one system.