Upload
emory-mcdowell
View
216
Download
0
Embed Size (px)
Citation preview
Th
yssen
Kru
pp
Permanent Bridges
Elevated steel constructions andStadium roofs
System Bridges(auxiliary bridges)
Architectural buildings,Turn-key constructions,Shopping-Centers,Central-Stations
Our Production range
Hydraulic steel structures and conveyor systems
Th
yssen
Kru
pp
Linking continents - by train across the Suez Canal The El-Ferdan Bridge, the largest swing bridge in the world
Longest swing bridge in the world
Breaking span 340 m
Swinging weight 13,200 tons
Opening November 2001
Th
yssen
Kru
pp
River railway bridges
Technical Data bridge over the river Rhine
Length: 274 mSpan length: 3 x 91.30 mHeigth: 20.00 mSteel construction: 2,650 tonsConstruction time: 23 months
Technical Data bridge over the river Elbe
Length: 240 mSpan length:66.9/105.8/66.9 m Heigth: 17.75 mSteel construction: 2,700 tonsConstruction time: 8 months
Th
yssen
Kru
pp
River road bridgesOver the Askerø-Fjord, Sweden and the river Saale by Beesedau
Technical Data Askerø-Fjord, Sweden
Length steel bridge: 386 mPylon height:: 100 mSteel construction: 2,191 tonsRopes: 313 tonsConstruction time: 8 months
Technical Data bridge across the river Saale
Length steel bridge: 311 mWidth of arch: 180 mHeight of arch: 38 mSteel construction: 4,400 tonsConstruction time: 31 months
Th
yssen
Kru
pp
The Transrapid – Project in Shanghai We manufactured and supplied points and actuators for the line between Pudong Airport and the Centre of Shanghai.
Th
yssen
Kru
pp
The Transrapid – Project in Shanghai
Th
yssen
Kru
pp
The Transrapid – Project in Shanghai We manufactured and supplied eight switches for the line between Pudong airport and the Shanghai city centre
Th
yssen
Kru
pp
Messe Hannover Conference CenterAn internationally significant steel construction „made in Hannover“
Technical Data
Steel construction: 4,500 tonsTotal length steel construction: 170 mConstruction time: 13 monthsEuropean Steel Construction Award 1991
Th
yssen
Kru
pp
Messe Hannover Exhibition hall 8/9A new dimension in exhibition hall construction
Exhibition Hall 8/9, Hannover
Length: 238 mWidth: 135 mCovered area: 32,000 m²Steel construction: 2,400 tonsConstruction time: 12 months
Exhibition Hall 6, Düsseldorf
Dimensions: 165 m x 165 mPrimary framework: 1,500 tonsSpace frame + cable subsupport: 790 tonsConstruction time: 14 months
Th
yssen
Kru
pp
The „AufSchalke“ Arena (Veltins-Arena)The most modern event centre in Europe
Technical data roof construction
Free span area: 226 m x 186 mWeight fixed roof construction: 3,500 tonsWeight moving roof panel: 560 tonsConstruction time: 10 months
Th
yssen
Kru
pp
The new Soccer Worldcup Stadium for Hannover
Modernization of existing Arena for 2006 World Cup
Capacity: 50,000 spectatorsNew roof with trapezoidal steel and membrane constructionOrder: September 2002Completion: September 2004
Th
yssen
Kru
pp
Volkswagen AutoStadt - Vehicle towersMultistorey parking platforms
Technical Data
Heigth: 50 mDiameter: 28 mCars to be stored: 400 each towerGlass area: 8,800 m²Walled-in space: 99,300 m³Construction time: 18 months
Th
yssen
Kru
pp
Materials handling and systems -1 For more than 30 years we have been a relaible and competent partner in the field of internal stock goods handling.
Th
yssen
Kru
pp
Materials handling and systems -2 Power + Free conveyors – sort, collect, store and distribute with one system.