Upload
vanle
View
219
Download
4
Embed Size (px)
DESCRIPTION
ok
Citation preview
mui 3 dien giaiPh duyt / Approved: ____________________Ph chun / Ratified: ___________________Schedule of Works - Package 1b (Section 3)Project: Ha Noi Urban Transport Development Project, Road Component Xuan La- Buoi Section-Section: From Km 2+200 to Km 3+780D n Pht trin Giao thng th H Ni, Hp phn ng, on Xun La- Bi-Phn on t Km 2+200 n Km 3+780Lin danh nh thu CRD - HACC1 - NGOC MINH UDIC/ Joint venture of CRD - HACC1 - NGOC MINH UDICKm3+160-:-Km3+6401,000,000NoNi dung cng vic /Work ItemVT (Unit)n gi/Unit priceKhi lng/ QuantityThnh tin/ Amount (vnd)K hoch thc hin/PlanThnh tin/ Amount (vnd)201220132014Theo hp ng phn chia UDICImplemented Volumes Khi lng thc hin bao gm c pht sinhRemaining VolumesKhi lng hp ng cn li do cc yu t khch quanRemaining Volumes( uncompensated area )Khi lng hp ng cn li do cha c mt bngTheo hp ng phn chia UDICImplemented Volumes Khi lng thc hin bao gm c pht sinhRemaining VolumesKhi lng hp ng cn li do cc yu t khch quanRemaining Volumes( uncompensated area )Khi lng hp ng cn li do cha c mt bngCn liT l hon thnh /Percentage (%)Thnh tin/ Amount (vnd)6-OctDecJanFebMarApirl15-MayJuneJulyAugMarchThng 3AprilThng 4MayThng 5JuneThng 6JulyThng 7AugustThng 8SeptemberThng 9172172Mc 01010 - Cc yu cu chung (General Requirements)01010-1Ti liu trnhContractor Submissionstrn gi20,000,0000.300.190.050.066,000,000.003,800,000.001,000,000.001,200,000.000.000.00%190,000.000380,000.000380,000.000380,000.00087,209.302180,232.558174,418.605180,232.558180,232.558162,790.69834,883.7210.000153130313128601010-2Ri cc v vch tuyn ngoi thc aSetting Out and Stakingtrn gi30,000,0000.300.200.040.069,000,000.006,000,000.001,157,812.501,842,187.500.000.00%243,750.00487,500.00487,500.00487,500.00100,972.020208,675.509201,944.041208,675.509208,675.509188,481.10540,388.8080.00001010-3Huy ngGii th cng trngMobilizationtrn gi50,000,0000.300.200.040.0615,000,000.0010,000,000.001,929,687.503,070,312.500.000.00%500,000.001,000,000.001,000,000.001,000,000.00168,286.701347,792.515336,573.401347,792.515347,792.515314,135.17467,314.6800.00001010-4Thi cng v x l dng ncWorking and Dealing with Water Flowstrn gi390,000,0000.300.270.00.03117,000,000.00106,792,968.750.010,207,031.250.000.00%5,339,648.4410,679,296.8810,679,296.8810,679,296.880.00001010-5Chp nh thi cngConstruction Photographstrn gi30,000,0000.300.200.030.079,000,000.006,000,000.001,045,312.501,954,687.500.000.00%300,000.00600,000.00600,000.00600,000.0091,160.974188,399.346182,321.948188,399.346188,399.346170,167.15136,464.3900.00001010-6Bin thng tin v d n kch thc 1,5x3mProject Information Signs 1,5x3mci14,853,1970.00.000.00.00.00.000.00%0.00001010-7Bo tr h thng thot nc hin tiMaintenance of Existing Drainagetrn gi410,000,0000.300.200.030.07123,000,000.0082,000,000.0014,285,937.5026,714,062.500.000.00%4,100,000.008,200,000.008,200,000.008,200,000.001,245,866.6422,574,791.0612,491,733.2852,574,791.0612,574,791.0612,325,617.733498,346.6570.000Mc 01200 - Kho st, bn v v cc ti liu trnh khc (Survey, Drawings and Other Submittals)0.000.00.00.00.00001200-1Kho st, lp thit k BVTC v ti liu trnhSurvey, Shop Drawings and Other Submittalstrn gi500,000,0000.300.240.000.06150,000,000.00118,164,062.502,421,875.0029,414,062.500.000.00%118,164,062.50211,210.029436,500.727422,420.058436,500.727436,500.727394,258.72184,484.0120.000Section 01300 - Lp k hoch cng vic (Schedule of Works)0.000.00.00.00.00001300-1Lp k hoch cng vicSchedule of Workstrn gi20,000,0000.300.240.00.066,000,000.004,704,687.500.01,295,312.500.000.00%235,234.375470,468.750470,468.750470,468.7500.0000.0000.0000.0000.0000.0000.0000.000Section 01400 - Lp bo co tin cng vic tng thng (Monthly Progress Reports)0.000.00.00.00.00001400-1Lp bo co tin cng vic thngMonthly Progress Reportstrn gi20,000,0000.300.200.030.076,000,000.004,000,000.00696,875.001,303,125.000.000.00%200,000.000400,000.000400,000.000400,000.00060,773.983125,599.564121,547.965125,599.564125,599.564113,444.76724,309.5930.000Section 01500 - An ton cho d n (Project Safety)0.000.00.00.00.00001500-1m bo an tonProject Safetytrn gi40,000,0000.300.200.030.0712,000,000.008,000,000.001,393,750.002,606,250.000.000.00%400,000.000800,000.000800,000.000800,000.000121,547.965251,199.128243,095.930251,199.128251,199.128226,889.53548,619.1860.000Section 01600 - Duy tr v m bo giao thng (Maintenance of Traffic)0.000.00.00.00.00001600-1Duy tr v m bo giao thngMaintenance of Traffictrn gi157,993,9540.300.200.030.0747,398,186.2031,598,790.805,505,101.8310,294,293.570.000.00%1,579,939.5403,159,879.0803,159,879.0803,159,879.080480,096.090992,198.586960,192.180992,198.586992,198.586896,179.368192,038.4360.000Section 01700 - Kim sot mi trng (Environmental Control)0.000.00.00.00.00001700-1Kim sot mi trngEnvironmental Controltrn gi95,000,0000.300.200.030.0728,500,000.0019,000,000.003,310,156.256,189,843.750.000.00%950,000.0001,900,000.0001,900,000.0001,900,000.000288,676.417596,597.929577,352.834596,597.929596,597.929538,862.645115,470.5670.000Section 01800 - Qun l cht lng nh thu (Quality Control)0.000.00.00.00.00001800-1Qun l cht lng nh thuQuality Controltrn gi105,000,0000.300.210.020.0631,500,000.0022,451,953.132,608,593.756,439,453.130.000.00%1,122,597.6562,245,195.3132,245,195.3132,245,195.313227,493.641470,153.525454,987.282470,153.525470,153.525424,654.79790,997.4560.000CNG BILL No.1560,398,186.20422,512,462.6835,355,101.83102,530,621.69IISITE WORKS (CNG TC HIN TRNG)0.0001 - Site clearing (Dn dp cng trng)0.00002100-1Dn dp v o b gc cy, bc lp t hu c TB 30cm (bao gm vn chuyn)Site Clearing and Grubbingm42,87024,184.5113,586.240.010,598.271,036,789,943.70582,442,108.800.0454,347,834.900.000.00%194,147,369.60388,294,739.200.00002100-2Di di cy ng knh ln hn 20cmRemoval of trees (min.dia.20cm)cy568,45911.0011.000.00.06,253,049.006,253,049.000.00.00.000.00%0.0002 - Demolition and Removal of Existing Structures and Obstructions (Ph d, di di cng trnh v chng ngi vt)0.000Ph d v di di kt cu gch, xy, b tng v BTCT0.00.00.00.00.00002200-1aPh d b tng c ct thpRemoval of reinforced concretem1,299,0780.00.00.00.00.000.00%0.00002200-1bPh d b tng khng ct thpRemoval of concrete whithout reinforcementm1,110,31066.300.00.066.3073,613,553.000.00.073,613,553.000.000.00%0.00002200-1cPh d tng gchRemoval of brick wallm1,021,5170.00.00.00.00.000.00%0.00002200-1dPh d tng Removal of stone wallm1,021,5170.00.00.00.00.000.00%0.000CNG BILL No.21,116,656,545.70588,695,157.800.0527,961,387.900.000IIIEARTH WORKS (CNG TC T)0.000A - Embankment construction (Thi cng nn p)0.00003400-1Nn p K98Subgrade K98m131,1335,684.643,118.500.02,566.14745,443,897.12408,938,260.500.0336,505,636.620.000.00%79,106,638.0079,106,638.0079,106,638.000.000.000.00003400-2p thng thng K95 (bng ct)Embankment K95 by sandm141,16321,515.0011,278.570.010,236.433,037,121,945.001,592,116,776.910.01,445,005,168.090.000.00%289,475,777.62289,475,777.62289,475,777.62289,475,777.620.000.00003400-3ap t dnh bo v mi dcCohesive slopem100,738600.51298.40103.79198.3260,494,176.3830,060,219.2010,455,790.9419,978,166.240.000.00%2,063,642.954,264,862.094,127,285.900.00003400-3bp t dnh bo v mi dc (vt liu tn dng)Cohesive slope material (salvageable materials)m77,317600.51298.40103.79198.3246,429,631.6723,071,392.808,024,880.2715,333,358.600.000.00%1,583,857.953,273,306.423,167,715.890.00003400-4Vi a k thut Geo-textilem29,57520,688.8211,691.000.08,997.82611,871,851.50345,761,325.000.0266,110,526.500.000.00%66,283,490.0066,283,490.0066,283,490.000.000.000.00003400-5ap bao ti tSoil up sacksm205,32141.220.034.336.898,463,331.620.07,047,720.321,415,611.300.000.00%1,390,997.432,874,728.032,781,994.860.00003400-6p t K90 (vt liu tn dng)Soil Embankment K90 (salvageable materials)m14,8242,311.550.01,252.091,059.4634,266,417.200.018,560,975.9815,705,441.220.000.00%3,663,350.527,570,924.417,326,701.050.000B - o vt liu khng thch hp (Removal of unsuitable material)0.00003500-1o vt liu khng thch hp (bao gm vn chuyn)Removal of unsuitable material (including transportation)m179,8983,973.526,376.160.02,310.00714,828,300.961,147,058,431.680.0415,564,380.000.000.00%104,278,039.24208,556,078.49208,556,078.49208,556,078.490.00003500-2o vt liu khng thch hp (tn dng p)Removal of unsuitable material (salvageable up)m14,8692,352.77637.210.01,715.5634,983,337.139,474,653.810.025,508,683.320.000.00%861,332.161,722,664.331,722,664.331,722,664.330.00003500-3o bn (bao gm vn chuyn)Mud excavation (include transportation)m372,6122,373.091,000.000.01,373.09884,241,811.08372,612,000.000.0511,629,811.080.000.00%33,873,818.1867,747,636.3667,747,636.3667,747,636.360.000C - Aggregate Base and Subbase (Cp phi mng trn v mng di)0.00003960-1Cp phi mng diAggregate Sub.basem420,6339,240.004,834.830.04,405.173,886,648,920.002,033,689,047.390.01,852,959,872.610.000.00%290,527,006.77301,173,228.00301,173,228.000.000.000.000.00003960-2Cp phi mng trnAggregate Basem430,1777,016.85924.003,080.003,012.853,018,487,482.45397,483,548.001,324,945,160.001,296,058,774.450.000.00%540,438,157.37523,004,668.42261,502,334.210.000CNG BILL No.313,083,281,102.116,360,265,655.291,369,034,527.516,201,775,430.03IVDRAINAGE (CNG TC THOT NC)0.0001 - Culverts and Concrete Drains (Cng v rnh thot nc b tng)0.0001.1 - Storm water drains (Cng thot nc ma)0.00004300-2aCng trn b tng ct thp D40cmReinforced Concrete Pipe Culvert - 40cmm2,062,60940.0012.0012.0016.0082,504,360.0024,751,308.0024,751,308.0033,001,744.000.000.00%6,187,827.006,187,827.006,187,827.008,250,436.001650087200%0.00004300-3Cng trn b tng ct thp D75cmReinforced Concrete Pipe Culvert - 75cmm3,669,945212.26212.26778,982,525.700.00.0778,982,525.700.000.00%0.000.000.000.00004300-4aCng trn b tng ct thp D100cmReinforced Concrete Pipe Culvert - 100cmm5,228,127262.55262.551,372,644,743.850.00.01,372,644,743.8560.000.00%0.000.000.000.00004300-5Cng trn b tng ct thp D125cmReinforced Concrete Pipe Culvert - 125cmm6,661,6100.00.00.00.00.00.00.000.00%0.00004300-6Cng trn b tng ct thp D150cmReinforced Concrete Pipe Culvert - 150cmm8,569,175671.76542.000.0129.765,756,428,998.004,644,492,850.000.01,111,936,148.000.000.00%236,128,377.78472,256,755.56472,256,755.56472,256,755.560.00004300-7Cng trn b tng ct thp D175cmReinforced Concrete Pipe Culvert - 175cmm10,255,9900.00.00.00.00004300-9Ca cng D100cm Outlet of Culvert D100cmci23,919,0720.00.00.00.000.00%0.00004300-10Ca cng D125cmOutlet of Culvert D125cmci31,052,1120.00.00.00.000.00%0.00003110-1ao kt cu loi 1 (bao gm vn chuyn)Structure excavation class 1 (including transportation)m153,8744,894.032,834.60165.961,893.47753,063,972.22436,171,240.4025,536,929.04291,355,802.780.000.00%48,463,471.1696,926,942.3196,926,942.3196,926,942.318,512,309.681702461936%0.00004300-12ap tr kt cu thot nc K95 (bng ct)Backfill drainage structures K95 by sandm131,1052,062.051,249.97399.73412.35270,345,065.25163,877,685.7052,406,601.6554,060,777.900.000.00%4,337,608.908,675,217.808,675,217.808,675,217.8017,468,867.223493773443%0.0001.2 - Waste water drains (Cng thot nc thi)0.00004300-1Cng trn b tng ct thp D30cmReinforced Concrete Pipe Culvert - 30cmm1,832,4240.00.00.00.00004300-2aCng trn b tng ct thp D40cmReinforced Concrete Pipe Culvert - 40cmm2,062,609471.7675.00215.00181.76973,056,421.84154,695,675.00443,460,935.00374,899,811.840.000.00%25,782,612.5025,782,612.5025,782,612.5073,097,956.32151,069,109.73146,195,912.6473,097,956.320.00004300-2bCng trn b tng ct thp D50cmReinforced Concrete Pipe Culvert - 50cmm2,378,3670.00.00.00.000.00%0.00004300-11Rnh xy gchBrick ditchm1,826,023393.820.0105.00288.82719,124,377.860.0191,732,415.00527,391,962.860.000.00%0.000.000.0031,604,244.2365,315,438.0863,208,488.4631,604,244.230.00003110-1ao kt cu loi 1 (bao gm vn chuyn)Structure excavation class 1 (including transportation)m153,874926.3789.24458.65378.48142,544,257.3813,731,715.7670,574,310.1058,238,231.520.000.00%2,288,619.292,288,619.292,288,619.2911,633,128.0424,041,797.9523,266,256.0811,633,128.040.00003110-2ao kt cu loi 2 (bao gm vn chuyn)Structure excavation class 2 (including transportation)m153,874502.0521.28249.22231.5577,252,441.703,274,438.7238,348,478.2835,629,524.700.000.00%545,739.79545,739.79545,739.796,321,177.7413,063,767.3312,642,355.486,321,177.740.00003110-2bo kt cu loi 2 (tn dng p)Structure excavation class 2 (salvageable up)m14,8692,504.341,931.97572.3737,237,031.460.028,726,499.858,510,531.610.000.00%0.000.000.004,735,137.349,785,950.509,470,274.674,735,137.340.00004300-12ap tr kt cu thot nc K95 (bng ct)Backfill drainage structures K95 by sandm131,1051,087.14566.73520.41142,529,489.700.074,301,136.6568,228,353.050.000.00%0.000.000.0012,247,440.1125,311,376.2224,494,880.2112,247,440.110.00004300-12bp tr kt cu thot nc K95 (t tn dng)Backfill drainage structures K95 (soil salvageable)m15,9212,504.341,931.97572.3739,871,597.140.030,758,934.979,112,662.170.000.00%0.000.000.005,070,154.1210,478,318.5110,140,308.235,070,154.120.00003110-5Cc thp hnh (bao gm h khung chng, h v nh cc, khu hao)Steel piles (including anti frames, poles down and spit, depreciation.... )m64,55512,074.442,925.005,471.813,677.63779,465,474.20188,823,375.00353,232,752.90237,409,346.300.000.00%31,470,562.5031,470,562.5031,470,562.5058,225,179.05120,332,036.70116,450,358.1058,225,179.050.0002 - Drainage Structures (Kt cu thot nc)0.00004310-1H thu loi CB1Catch Basin Type CB1ci21,278,97020.0011.006.003.00425,579,400.00234,068,670.00127,673,820.0063,836,910.000.000.00%39,011,445.0039,011,445.0039,011,445.0021,045,135.1643,493,279.3442,090,270.3321,045,135.160.00004310-2H thu loi CB2Catch Basin Type CB2ci33,003,4225.005.00165,017,110.000.00.0165,017,110.000.000.00%0.00004310-4aH ga loi MH1-D100AManholes Type MH1-D100Aci29,119,0993.003.0087,357,297.000.00.087,357,297.000.000.00%0.00004310-4bH ga loi MH1-D100BManholes Type MH1-D100Bci36,564,2002.002.0073,128,400.000.00.073,128,400.000.000.00%0.00004310-5aH ga loi MH1-D125AManholes Type MH1-D125Aci31,657,1280.00.00.00.000.00%0.00004310-5bH ga loi MH1-D125BManholes Type MH1-D125Bci38,230,9680.00.00.00.000.00%0.00004310-6H ga loi MH1-D150Manholes Type MH1-D150ci37,934,58119.0015.000.04.00720,757,039.00569,018,715.000.0151,738,324.000.000.00%63,224,301.67126,448,603.33126,448,603.33126,448,603.330.00004310-9H ga loi MH2 (bao gm c cc h ga RW01, RW02, RW03)Manholes Type MH2 (including manholes RW01, RW02, RW03)ci37,752,12019.009.002.008.00717,290,280.00339,769,080.0075,504,240.00302,016,960.000.000.00%26,136,083.0852,272,166.1552,272,166.1552,272,166.1512,445,753.8525,721,224.6224,891,507.6912,445,753.850.00004310-10H ga rnh xy gchBrick manholeci5,090,06410.000.02.008.0050,900,640.000.010,180,128.0040,720,512.000.000.00%0.000.000.000.001,678,043.083,467,955.693,356,086.151,678,043.080.00003110-1ao kt cu loi 1 (bao gm vn chuyn)Structure excavation class 1 (including transportation)m153,8742,524.45334.46702.511,487.48388,447,219.3051,464,698.04108,098,023.74228,884,497.520.000.00%10,292,939.6110,292,939.6117,818,355.5636,824,601.4935,636,711.1217,818,355.560.00004300-12ap tr kt cu thot nc K95 (bng ct)Backfill drainage structures K95 by sandm131,1051,917.5268.64970.02878.86251,396,459.608,999,047.20127,174,035.08115,223,377.320.000.00%1,799,809.441,799,809.4420,962,753.0443,323,022.9441,925,506.0720,962,753.040.00003110-5Cc thp hnh (bao gm h khung chng, h v nh cc, khu hao)Steel piles (including anti frames, poles down and spit, depreciation....)m64,5551,630.980.0883.45747.53105,287,913.900.057,030,953.3648,256,960.540.000.00%0.000.009,400,706.6019,428,126.9718,801,413.209,400,706.600.0003 - Box culvert 2x(3,0x2,5)m - (Cng hp 2x(3,0x2,5)m), Km2+352,040.00003500-3o bn (bao gm vn chuyn)Mud excavation (include transportation)m372,6120.00.00.00.00.00.00.00.00.00003110-2ao kt cu loi 2 (bao gm vn chuyn)Structure excavation type 2 (include transportation)m153,8740.00.00.00.00.00.00.00.00.00004300-12ap tr kt cu thot nc K95 (bng ct)Structure backfill K95 (by sand)m131,1050.00.00.00.00.00.00.00.00.00003110-4 dm mBlinding stonem581,7690.00.00.00.00.00.00.00.00.00003200-8Cc tre (25 ccm)Bamboo pilesm8,7550.00.00.00.00.00.00.00.00.00006100-4aB tng loi D (gi bao gm thm lp nha bitum chng thm v khe ni cng)Concrete Class D (for culvert include bitumen and joint)m3,965,6400.00.00.00.00.00.00.00.00.00006100-4bB tng loi D tng chn u cng (gi bao gm thm ng thot nc c tng lc)Concrete Class D (for retaining wall including pile and filter)m2,638,1570.00.00.00.00.00.00.00.00.00006100-5aB tng loi E (bn gim ti)Concrete Class E (Approach slap)m2,200,3960.00.00.00.00.00.00.00.00.00006100-7B tng loi GConcrete Class Gm1,399,3580.00.00.00.00.00.00.00.00.00006400-1Ct thp - g (bao gm cht khe ni cng)Reinforcing Steel - Deformedkg27,6990.00.00.00.00.00.00.00.00.00006400-2Ct thp - trnReinforcing Steel - Plain Barskg27,1760.00.00.00.00.00.00.00.00.00007930-1a hc xyStone Masonry (all types)m1,152,0450.00.00.00.00.00.00.00.00.00003110-5Cc thp hnh (bao gm h khung chng, h v nh cc, khu hao)Sheet pile (include installation and removalm64,5550.00.00.00.00.00.00.00.00.0004 - Bin php thi cng b vy bao ti t, mng dn dng, cng tm D100cm phc v thi cng cng hp 2x(3x2,5)m/Construction method of box culvert 2x(3x2,5)0.00.00.00.00.00.00.00003110-1ao kt cu loi 1 (bao gm vn chuyn)Structure excavation type 1 (include transportation)m153,8740.00.00.00.00.00.00.00.00.00003110-1bo kt cu loi 1 (tn dng p)Structure excavation type 1 (Reused the excavation material)m14,8690.00.00.00.00.00.00.00.00.00003400-5bp bao ti t (c tho d)Protection with soil bag (include remove)m205,3210.00.00.00.00.00.00.00.00.00003400-6p t K90 (vt liu tn dng)Soil Embankment K90 (salvageable materials)m14,8240.00.00.00.00.00.00.00.00.00003400-2p thng thng K95 (bng ct)Common Embankment K95 (by sand)m141,1630.00.00.00.00.00.00.00.00.00004300-4bCng trn b tng ct thp D100cm thot nc tm - i thnh D200 (lp t, tho d, khu hao)Temporary Reinforced Concrete Pipe Culvert - 100 cm dia - Changed to D200m1,341,1310.00.00.00.00.00.00.00.00.00003110-5Cc thp hnh (bao gm h khung chng, h v nh cc, khu hao)Sheet pile (include installation and un installationm64,5550.00.00.00.00.00.00.00.00.0005 - Box culvert 1,5x1,5m (Cng hp 1,5x1,5m), Km2+6500.00.00.00.00.00.00.00.00003110-1ao kt cu loi 1 (bao gm vn chuyn)Structure excavation type 1 (include transport to dispose)m153,8740.00.00.00.00.00.00.00.00.00003110-4 dm mBlinding stonem581,7690.00.00.00.00.00.00.00.00.00004300-12ap tr kt cu thot nc K95 (bng ct) Structure backfill K95 (by sand)m131,1050.00.00.00.00.00.00.00.00.00006100-7B tng loi GConcrete class Gm1,399,3580.00.00.00.00.00.00.00.00.00006100-4aB tng loi D (gi bao gm thm lp nha bitum chng thm v khe ni cng)Concrete Class D (for culvert include bitumen and joint)m3,965,6400.00.00.00.00.00.00.00.00.00006400-1Ct thp - g (bao gm cht khe ni cng)Reinforcing Steel - Deformedkg27,6990.00.00.00.00.00.00.00.00.00007930-2Gch xy (cc loi)Brick masonrym1,859,5690.00.00.00.00.00.00.00.00.0006 - Box culvert 1,5x2m (Cng hp 1,5x2m), Km2+9680.00.00.00.00.00.00.00.00003110-1ao kt cu loi 1 (bao gm vn chuyn)Structure excavation class 1 (including transportation)m153,8740.00.00.00.00.00.00.00.00.000.00%0.00003110-4 dm mBlinding stonem581,7690.00.00.00.00.00.00.00.00.000.00%0.00004300-12ap tr kt cu thot nc K95 (bng ct)Backfill drainage structures K95 (sand)m131,1050.00.00.00.00.00.00.00.00.000.00%0.00006100-7B tng loi GConcrete class Gm1,399,3580.00.00.00.00.00.00.00.00.000.00%0.00006100-4aB tng loi D (gi bao gm thm lp nha bitum chng thm v khe ni cng)Concrete Class D (price includes an extra layer bituminous waterproofing and sewer joints)m3,965,6400.00.00.00.00.00.00.00.00.000.00%0.00006400-1Ct thp - g (bao gm cht khe ni cng)Reinforcing Steel - Deformed Barskg27,6990.00.00.00.00.00.00.00.00.000.00%0.00006400-2Ct thp - trnReinforcing Steel - Plain Barskg27,1760.00.00.00.00.00.00.00.00.000.00%0.00007930-1a hc xyStone Masonry (all types)m1,152,0450.00.00.00.00.00.00.00.00.000.00%0.0007 - Box culvert 2x2m (Cng hp 2x2m), Km3+5060.00003110-1ao kt cu loi 1 (bao gm vn chuyn)Structure excavation class 1 (including transportation)m153,874761.340.00.0761.34117,150,431.160.00.0117,150,431.160.00003110-4 dm mBlinding stonem581,76920.690.00.020.6912,036,800.610.00.012,036,800.610.00004300-12ap tr kt cu thot nc K95 (bng ct)Backfill drainage structures K95 (sand)m131,105292.190.00.0292.1938,307,569.950.00.038,307,569.950.00006100-7B tng loi GConcrete class Gm1,399,35850.400.00.050.4070,527,643.200.00.070,527,643.200.00006100-4aB tng loi D (gi bao gm thm lp nha bitum chng thm v khe ni cng)Concrete Class D (price includes an extra layer bituminous waterproofing and sewer joints)m3,965,640107.920.00.0107.92427,971,868.800.00.0427,971,868.800.00006400-1Ct thp - g (bao gm cht khe ni cng)Reinforcing Steel - Deformed Barskg27,69919,128.830.00.019,128.83529,849,462.170.00.0529,849,462.170.00006400-2Ct thp - trnReinforcing Steel - Plain Barskg27,176301.720.00.0301.728,199,542.720.00.08,199,542.720.000.00%0.00007930-1a hc xyStone Masonry (all types)m1,152,04511.650.00.011.6513,421,324.250.00.013,421,324.250.000.00%0.0008 - Restoration canal (Ci mng)0.00.00.00.00.00.00.00003110-1ao kt cu loi 1 (bao gm vn chuyn)Structure excavation class 1 (including transportation)m153,8741,578.601,578.600.00.0242,905,496.40242,905,496.400.00.00.00003110-1bo kt cu loi 1 (tn dng p)Structure excavation type 1 (Reused the excavation material)m14,869153.00153.000.00.02,274,957.002,274,957.000.00.00.00003400-6p t K90 (vt liu tn dng)Soil Embankment K90 (salvageable materials)m14,824153.00153.000.00.02,268,072.002,268,072.000.00.00.00003110-4 dm mBlinding stonem581,7690.00.00.00.00.00.00.00.00.00003200-8Cc tre (25 ccm)m8,7550.00.00.00.00.00.00.00.00003400-3ap t dnh bo v mi dcCohesive slopem100,7380.00.00.00.00.00.00.00.00007930-1a hc xyStone Masonry (all types)m1,152,0450.00.00.00.00.00.00.00.000.00%0.00007930-1b hc xy tng chn (bao gm ng thot nc c tng lc, khe ln)Riprap retaining walls (including floor drains with filter, construction joints)m1,273,1620.00.00.00.00.00.00.00.000.00%0.00003110-5Cc thp hnh pht sinh (bao gm h khung chng, h v nh cc, khu hao)Arisen Sheet pile (include installation and un installation0.00.00.00.00.00.00.00.0009 - Temporary Water drains for construction (Cng thot nc tm phc v thi cng): Km2+795; Km3+65; Km3+1850.00004300-4bCng trn b tng ct thp D100cm thot nc tm (lp t, tho d, khu hao)Temporary Reinforced Concrete Pipe Culvert - 100 cm diam1,341,13122.0022.000.00.029,504,882.0029,504,882.000.00.00.000.00%0.00004300-4bCng trn b tng ct thp D100cm thot nc tm chuyn sang D150 ti Km3+185(lp t, tho d, khu hao)Temporary Reinforced Concrete Pipe Culvert - 100 cm dia changed to D150 at Km3+185m15.000.00.00.00.00.000.00%0.00004300-4bCng trn b tng ct thp D100cm thot nc tm chuyn sang D175 ti Km2+795(lp t, tho d, khu hao)Temporary Reinforced Concrete Pipe Culvert - 100 cm dia changed to D175 at Km2+795m205,3210.00.00.00.00.00.000.00%0.00003400-2p thng thng K95 (bng ct)Common Embankment K95 (by sand)141,163101.87101.870.00.014,380,274.8114,380,274.810.00.00.00003400-5bp bao ti t (c tho d)Protection with soil bag (include remove)205,32134.5234.520.00.07,087,680.927,087,680.920.00.00.000CNG BILL No.416,426,098,5217,131,559,8621,839,491,5027,455,047,158VASPHALT PRODUCTS (CC SN PHM ASPHALT V MT NG B TNG NHA)0.000A - Nha thm bm (Prime Coat)0.00005100-1Lp nha thmPrime Coatm30,11916,984.230.09,334.007,650.23511,548,023.370.0281,130,746.00230,417,277.370.000.00%187,420,497.3393,710,248.670.000B - Nha dnh bm (Tack Coat)0.00.00.00.00.00.00.00.00005200-1Lp nha dnh bmTack Coatm16,48316,984.230.09,334.007,650.23279,951,063.090.0153,852,322.00126,098,741.090.000.00%153,852,322.000.000C - B tng nha (Asphalt Concrete)0.00.00.00.00.00.00.00.00005300-1B tng nha ht mn - 5cmAsphalt Concrete Surface Course 5cmm246,53816,984.230.09,334.007,650.234,187,258,095.740.02,301,185,692.001,886,072,403.740.000.00%2,301,185,692.000.00005300-4B tng nha ht th - 7cmAsphalt Concrete binder Course 7cmm288,00616,984.230.09,334.007,650.234,891,560,145.380.02,688,248,004.002,203,312,141.380.000.00%896,082,668.001,792,165,336.000.000CNG BILL No.59,870,317,32805,424,416,7644,445,900,564VIIAUXILIARY ITEMS (HNG MC PH TR)0.000A - Bin bo (Road Signs)0.00007400-1Bin trnWarning Signsci2,226,4340.00.00.00.00.00.00.00.00.000.00%0.00007400-3Bin ch dn v thng tinInformation and Guidance Signsm2,594,11713.460.07.296.1734,916,814.820.018,913,274.6916,003,540.130.000.00%18,913,274.690.000B - Kt cu thp (Steel structure)0.00.00.00007505-1Lan can b hnhPedestrian Hand Railingm469,3650.00.00.00007505-4Gi long mn loi 1 ( L=22.4m)Gantry sign type 1 ( L=22.4m)ci194,849,5452.000.01.001.00389,699,090.000.0194,849,545.00194,849,545.000.000.00%194,849,545.000.000C - Vch sn (Pavement Markings)0.00.00.00.00.00.00007600-2Vch sn ng dy 3 mmThermoplastic Reflective Pavement Markings (t=3.0mm)m341,204580.000.0314.17265.83197,898,320.000.0107,194,923.3390,703,396.670.000.00%107,194,923.330.000D - inh phn quang (Reflective Pavement Studs)0.00.00.00.00.00.00007650-2inh phn quang loi 2Reflectorized Pavement Studs 2 typesvin228,932560.170.0303.43256.74128,240,838.440.069,463,787.4958,777,050.950.000.00%69,463,787.490.000E - Va h (Sidewalk)0.00.00.00.00.00.00007910-1Va h loi 1 ( lt gch t chn va h v GPC bn)Interlocking concrete block sidewalksm149,5697,278.420.03,942.483,335.941,088,626,000.980.0589,672,417.20498,953,583.780.000.00%203,109,388.15203,109,388.15183,453,640.910.00007910-2Va h loi 2 ( lt gch BTXM ti nt giao)Interlocking concrete block sidewalksm319,8740.00.00.00.00.00.00.000.00%0.00007910-3Va h loi 3 ( cc li h h vo ng, cng c quan)Interlocking concrete block sidewalksm355,702243.000.0131.63111.3886,435,586.000.046,819,275.7539,616,310.250.000.00%16,126,639.4316,126,639.4314,565,996.900.00007910-5G chn mp ngoi hWalkway Edge Wallsm94,074960.000.0520.00440.0090,311,040.000.048,918,480.0041,392,560.000.000.00%16,849,698.6716,849,698.6715,219,082.670.00007910-9Li ln xung cho ngi khuyt tt (loi 3)Handicap ramp type 3ci2,047,7240.00.00.00.00.00.00.000.00%0.000F - B va v an rnh b tng (Concrete Curb and Gutter)0.00.00.00.00.00.00007920-1B va bng b tng loi AConcrete Curb, Type Am375,300938.11296.00508.14133.97352,072,683.00111,088,800.00190,706,036.6350,277,846.380.000.00%31,435,060.9864,965,792.7062,870,121.9631,435,060.980.00007920-2B va bng b tng loi BConcrete Curb, Type Bm315,55324.990.013.5411.457,885,669.470.04,271,404.303,614,265.170.000.00%704,077.631,455,093.771,408,155.26704,077.630.00007920-3B va bng b tng loi CConcrete Curb, Type Cm502,0022,966.75393.001,606.99966.761,489,314,433.50197,286,786.00806,711,984.81485,315,662.690.000.00%132,974,502.99274,813,972.85265,949,005.98132,974,502.990.00007920-5an rnh b tng (loi F)Concrete Gutter (type F)m170,612962.65430.00521.4411.21164,239,641.8073,363,160.0088,963,139.311,913,342.490.000.00%14,664,253.7330,306,124.3829,328,507.4614,664,253.730.00007920-6Sn b vaCurb Markingsm55,3020.00.00.00.00.00.00.000.00%0.000G -Tng chn (Retaining wall)0.00.00.00.00003110-1ao kt cu loi 1 (bao gm vn chuyn)Structure excavation type 1 (including transportation)m153,874617.580.0334.52283.0695,029,504.920.051,474,315.1743,555,189.760.000.00%8,484,777.2317,535,206.2716,969,554.458,484,777.230.00003110-1bo kt cu loi 1 (tn dng p)Structure excavation type 1 (Reused the excavation material)m14,869620.540.0336.13284.419,226,809.260.04,997,855.024,228,954.240.000.00%823,822.261,702,565.991,647,644.51823,822.260.00003110-4 dm mBlinding stonem581,76958.060.031.4526.6133,777,508.140.018,296,150.2415,481,357.900.000.00%3,015,848.946,232,754.486,031,697.883,015,848.940.00003400-7bp tr kt cu K95 (t tn dng)Structural backfill K95 (land take)m15,921550.290.0298.07252.228,761,167.090.04,745,632.174,015,534.920.000.00%782,247.061,616,643.931,564,494.12782,247.060.00007930-1b hc xy tng chn (bao gm ng thot nc c tng lc, khe ln)Riprap retaining walls (including floor drains with filter, construction joints)m1,273,162885.860.0479.84406.021,127,843,289.320.0610,915,115.05516,928,174.270.000.00%100,700,293.69208,113,940.29201,400,587.38100,700,293.690.00003400-6p t K90 (vt liu tn dng)Soil Embankment K90 (salvageable materials)m14,82470.240.038.0532.191,041,237.760.0564,003.79477,233.970.000.00%92,967.66192,133.16185,935.3192,967.660.00003110-5Cc thp hnh (bao gm h khung chng, h v nh cc, khu hao)Steel piles (including anti frames, poles down and spit, depreciation.... )m64,5550.00.00.00.00.00.000.00%0.000CNG BILL No.75,305,319,635381,738,7462,857,477,3402,066,103,549VIIILINGHTING AND TUYNEL (CNG TRNH IN V CHIU SNG (HO K THUT V TUYNEL NGANG)0.000A - Ho k thut (Utilities Ditch)0.00003110-1ao kt cu loi 1 (bao gm vn chuyn)Structure excavation type 1 (including transportation)m153,8741,897.88415.401,027.84454.64292,034,387.1263,919,259.60158,157,852.1669,957,275.360.000.00%21,306,419.8721,306,419.8731,215,365.5664,511,755.4962,430,731.120.00003400-7ap tr kt cu K95 (bng ct)Backfill structures K95 (sand)m131,105885.54338.00256.76290.78116,098,721.7044,313,490.0033,662,519.8038,122,711.900.000.00%1333731160%1333731160%5,548,767.0011,467,451.8011,097,534.005,548,767.000.00007505-7Gi cp bng thp hnh m kmtn50,778,27315.864.704.506.66805,343,409.78238,657,883.10228,502,228.50338,183,298.180.000.00%161,068,682.00161,068,682.0037,665,202.5077,841,418.5075,330,405.0037,665,202.500.00008500-2Ho t b cp DBSpecial duct bankm3,266,21365.5237.5055.57194.15214,002,275.76122,482,987.50181,503,456.41634,135,253.950.000.00%63,011,781.2063,011,781.2029,918,152.1661,830,847.7959,836,304.3129,918,152.160.00008500-3Ho k thut loi 1Utilities ditch type 1m6,733,852569.30247.50230.6091.203,833,581,943.601,666,628,370.001,552,826,271.20614,127,302.400.000.00%486,318,791.40486,318,791.40255,960,374.37528,984,773.71511,920,748.75255,960,374.370.00008500-4Ho k thut loi 2Utilities ditch type 2m17,310,712269.247.500.0261.744,660,736,098.88129,830,340.000.04,530,905,758.880.000.00%186,955,689.60186,955,689.600.000.000.000.000.00008500-5Ho k thut loi 3Utilities ditch type 3m6,987,57751.0015.0018.0018.00356,366,427.00104,813,655.00125,776,386.00125,776,386.000.000.00%37,732,915.8037,732,915.8020,732,371.3242,846,900.7341,464,742.6420,732,371.320.000B - Cng hp k thut - Tuynen (Tunnel) Km2+4200.00.00.00.00.00.00.00.00003110-2ao kt cu loi 2 (bao gm vn chuyn)Structure excavation class 2 (including transportation)m153,8740.00.00.00.00.00.00.00.00.00003110-2bo kt cu loi 2 (tn dng p)Structure excavation class 2 (salvageable up)m14,8690.00.00.00.00.00.00.00.00.00003400-7ap tr kt cu K95 (bng ct)Structural backfill K95 (sand)m131,1050.00.00.00.00.00.00.00.00.00003400-7bp tr kt cu K95 (t tn dng)Structural backfill K95 (land take)m15,9210.00.00.00.00.00.00.00.00.00003110-5Cc thp hnh (bao gm h khung chng, h v nh cc, khu hao)Steel piles (including anti frames, poles down and spit, depreciation....)m64,5550.00.00.00.00.00.00.00.00.00006100-5bB tng loi E (gi bao gm thm lp nha bitum chng thm v lm khe ln)Concrete type E (price includes an extra layer bituminous waterproofing and construction joints)m4,177,1680.00.00.00.00.00.00.00.00.00006100-8B tng loi H (lp m)Concrete type H (padding)m1,176,3650.00.00.00.00.00.00.00.00.00006400-1Ct thp - g Reinforcing Steel - Deformed Barskg27,6990.00.00.00.00.00.00.00.00.00006400-2Ct thp - trnReinforcing Steel - Plain Barskg27,1760.00.00.00.00.00.00.00.00.00007505-7Thp hnh m kmForm steelkg50,7780.00.00.00.00.00.00.00.00.00007930-2Gch xy (cc loi)Brick masonrym1,859,5690.00.00.00.00.00.00.00.00.00008500-8H thng chiu sng tuynenLighting system in tuynenT.b42,022,6820.00.00.00.00.00.00.00.00.00008500-9H thng thot nc tuynenDrainage system in tuynenT.b48,672,1030.00.00.00.00.00.00.00.00.00008500-10H thng thng gi tuynenVentilation system in tuynenT.b11,025,9380.00.00.00.00.00.00.00.00.000C - Tunnel (Cng hp k thut - Tuynen) Km3+031,890.00.00.00.00.00.00.00.00003110-2ao kt cu loi 2 (bao gm vn chuyn)Structure excavation class 2 (including transportation)m153,8740.00.00.00.00.00.00.00.00.000.00%0.00003110-2bo kt cu loi 2 (tn dng p)Structure excavation class 2 (salvageable up)m14,8690.00.00.00.00.00.00.00.00.000.00%0.00003400-7ap tr kt cu K95 (bng ct)Structural backfill K95 (sand)m131,1050.00.00.00.00.00.00.00.00.000.00%0.00003400-7bp tr kt cu K95 (t tn dng)Structural backfill K95 (land take)m15,9210.00.00.00.00.00.00.00.00.000.00%0.00003110-5Cc thp hnh (bao gm h khung chng, h v nh cc, khu hao)Steel piles (including anti frames, poles down and spit, depreciation....)m64,5550.00.00.00.00.00.00.00.00.000.00%0.00006100-5bB tng loi E (gi bao gm thm lp nha bitum chng thm v lm khe ln)Concrete type E (price includes an extra layer bituminous waterproofing and construction joints)m4,177,1680.00.00.00.00.00.00.00.00.000.00%0.00006100-8B tng loi H (lp m)Concrete type H (padding)m1,176,3650.00.00.00.00.00.00.00.00.000.00%0.00006400-1Ct thp - g Reinforcing Steel - Deformed Barskg27,6990.00.00.00.00.00.00.00.00.000.00%0.00006400-2Ct thp - trnReinforcing Steel - Plain Barskg27,1760.00.00.00.00.00.00.00.00.000.00%0.00007505-7Thp hnh m kmForm steelkg50,7780.00.00.00.00.00.00.00.00.000.00%0.00007930-2Gch xy (cc loi)Brick masonrym1,859,5690.00.00.00.00.00.00.00.00.000.00%0.00008500-8H thng chiu sng tuynenLighting system in tuynent.b42,022,6820.00.00.00.00.00.00.00.00.000.00%0.00008500-9H thng thot nc tuynenDrainage system in tuynent.b48,672,1030.00.00.00.00.00.00.00.00.000.00%0.00008500-10H thng thng gi tuynenVentilation system in tuynent.b11,025,9380.00.00.00.00.00.00.00.00.000.00%0.000D - Tunnel (Cng hp k thut - Tuynen) Km3+542,120.00.00.00.00.00.00.00.00003110-2ao kt cu loi 2 (bao gm vn chuyn)Structure excavation class 2 (including transportation)m153,874705.290.00.0705.29108,525,793.460.00.0108,525,793.460.00003110-2bo kt cu loi 2 (tn dng p)Structure excavation class 2 (salvageable up)m14,869361.200.00.0361.205,370,682.800.00.05,370,682.800.00003400-7ap tr kt cu K95 (bng ct)Structural backfill K95 (sand)m131,105322.900.00.0322.9042,333,804.500.00.042,333,804.500.00003400-7bp tr kt cu K95 (t tn dng)Structural backfill K95 (land take)m15,921361.200.00.0361.205,750,665.200.00.05,750,665.200.00003110-5Cc thp hnh (bao gm h khung chng, h v nh cc, khu hao)Steel piles (including anti frames, poles down and spit, depreciation....)m64,5554,426.000.00.04,426.00285,720,430.000.00.0285,720,430.000.00006100-5bB tng loi E (gi bao gm thm lp nha bitum chng thm v lm khe ln)Concrete type E (price includes an extra layer bituminous waterproofing and construction joints)m4,177,168131.570.00.0131.57549,589,993.760.00.0549,589,993.760.00006100-8B tng loi H (lp m)Concrete type H (padding)m1,176,36516.830.00.016.8319,798,222.950.00.019,798,222.950.00006400-1Ct thp - g Reinforcing Steel - Deformed Barskg27,69925,783.360.00.025,783.36714,173,288.640.00.0714,173,288.640.00006400-2Ct thp - trnReinforcing Steel - Plain Barskg27,17684.520.00.084.522,296,915.520.00.02,296,915.520.00007505-7Thp hnh m kmForm steelkg50,7781,406.000.00.01,406.0071,393,868.000.00.071,393,868.000.00007930-2Gch xy (cc loi)Brick masonrym1,859,5691.040.00.01.041,933,951.760.00.01,933,951.760.00008500-8H thng chiu sng tuynenLighting system in tuynenT.b42,022,6821.000.00.01.0042,022,682.000.00.042,022,682.000.00008500-9H thng thot nc tuynenDrainage system in tuynenT.b48,672,1031.000.00.01.0048,672,103.000.00.048,672,103.000.00008500-10H thng thng gi tuynenVentilation system in tuynenT.b11,025,9381.000.00.01.0011,025,938.000.00.011,025,938.000.000CNG BILL No.812,186,771,6032,370,645,9852,280,428,7148,259,816,326IXCNH QUAN (LANDSCAPING)0.00.000A - Trng c (Grassing)0.00.00009105-1C l treOplismenus compositusm59,722434.950.0235.60199.3525,976,083.900.014,070,378.7811,905,705.120.000.00%14,070,378.780.000B - t mu (Top Soiling)0.00.00.00.00.00.00.00.00009200-1Cung cp v di t muFurnishing and placing Topsoilm102,907340.650.0184.52156.1335,055,269.550.018,988,271.0116,066,998.540.000.00%18,988,271.010.000C - Cnh quan (Landscaping)0.00.00.00.00.00.00.00.00009250-1Ngu ct xn trn cao 0.8mAglaia odorata 0.8m highcy295,39023.000.012.4610.546,793,970.000.03,680,067.083,113,902.923,680,067.080.00009250-3Ta t cnh cao 0.3m; 25 khm/mColeus blunei 0.3m high; 25 khm/mm167,5470.00.00.00.00.00.00.00.00.00009250-4Cm t mai cao 0.2m; 25 khm/mCuphea hyssopfolia 0.2m high; 25 khm/mm152,189300.240.0162.63137.6145,693,225.360.024,750,497.0720,942,728.2924,750,497.070.00009250-5Bng n cao 0.2m; 100 khm/mSerissa foetida 0.2m high; 100 khm/mm244,3379.030.04.894.142,206,363.110.01,195,113.351,011,249.761,195,113.350.00009250-7Bng lng cao 4m; K thn 10cmLagerstroemia Flosreginal Rets 4m; K thn 10cmcy897,733123.000.066.6356.38110,421,159.000.059,811,461.1350,609,697.8859,811,461.130.00009250-9C cnh - cao 0.8m; K tn 1,0 - 1,5mPalm Tree - 0.8 high; K tn 1,0 - 1,5mcy168,6870.00.00.00.00.00.00.00.00.000.00%0.00009250-11Cc thm, cc ng sc - cao 0.3m; K tn 0,3m; 25 khm/mChrysanthemum Colour - 0.3m high; K tn 0,3m; 25 khm/mm244,337400.000.0216.67183.3397,734,800.000.052,939,683.3344,795,116.670.000.00%52,939,683.330.00009250-12Thin thanh - cao 0.3m; 25 khm/mBlue Sky Tree - 0.3m high; 25 khm/mm340,3240.00.00.00.00.00.00.00.00.000.00%0.00009250-17Bch thin hng - cao 0.7m; 3 cy/khmGardenia angustifolia - 0.7m high; 3 cy/khmm148,350122.980.066.6156.3718,244,083.000.09,882,211.638,361,871.380.000.00%9,882,211.630.000`09250-18Khung b gc cy v xy bn trng cyTerrorism and build tree planting tubsh609,060123.000.066.6356.3874,914,380.000.040,578,622.5034,335,757.500.000.00%40,578,622.500.000CNG BILL No.9417,039,333.920.0225,896,305.87191,143,028.05XCOMPLETION AND HAND OVER (HON THIN V BN GIAO)Tng cng (Total)Bili VN/T VND58.9717.2614.0329.2500.000.000.000.000.0014.521.132.282.892.891.012.623.555.770.240.840.00Cng dn (accumulated)Bili VN/T VND0.000.000.000.000.000.0015.1717.4520.3423.2318.2620.8824.4330.2130.4531.2931.29NoDescription6-OctDecJanFebMarApirlMayJuneJulyAugSeptOctNovDecJanFeb6-Mar1Excavator/ My o1111214579633333332Grader/ My san000003111111111113Truck/ t vn chuyn22222311212121212121212121084Roller/ my lu1111117777734453325Bulldozer/ my i111225222222222226batch mixer/ My trn b tng0112211333333333337Spreader/ My ri000003111111111118Crane/ Cn cu4111111111119Water truct/ Xe ti nc33333333333310Sub Total566899135373936303031292724Chart of Machine/ Biu my thi cngNoDescription6-OctDecJanFebMarApirlMayJuneJulyAugSeptOctNovDecJanFeb6-Mar1Project Manager / Gim c iu hnh111111111100000002Deputy project manager/Ph gim c iu hnh111111111111111113Quality manager/Gim c qun l cht lng235663333311111114Site Engineer/ K s ng7565756778765Structure engineer/ K s kt cu3333311111116Surveyor/K thut trc c2222222222227Desiger engineer/ K s thit k bn v thi cng2222211111118Laboratory/Cn b th nghim444443333333333339Saferty staff/ Nhn vin an ton1222222222222222210Control enviroment/ Qun l mi trng22222222222211Manpower/ Nhn lc911131414262425242618192020212019Chart of main Manpower/ Biu nhn lc ch chtGhi ch: Biu tin ny lp trn c s khi lng h s thit k k thut cha tnh n khi lng pht sinh, vn bn s 1618/BQL-DA1 ngy 7/11/2012 v trn c s 100% mt bng schRemark: This Schedule in base of quantity of bill contrac, document No 1618/BQL-DA1 deted 7/11/2012 and not obstacle areaBan qun l d n/ Prooject management unitT vn gim st/ Supervision consultantBan iu hnh / Joint venture management2230394040269124252426232526262726262425.002400.00%262325262627262624252426232526262726263537393635353536343327
8/58/28/58/28/58/28/58/28/58/28/51/315/1030/931/85/68/28/25/11/41/415/31/21/48/28/28/21/41/41/430/330/315/230/31/530/41//420/111/41/41/41//230/61/121/31//21/21/620/420/1017/41/105/617/420/417/417/417/428/228/21/1228/230/630/1130/615/215/215/21/21/21/217/417/417/417/417/417/410/1128/230/631/831/831/85/615/1220/1215/125/1228/228/228/228/210/121/625/111/61/61/61/61/61/61/61/61/630/630/630/630/630/630/630/630/630/630/101/61/61/6
mui 3 dien giai
30/1130/1130/1130/1130/1130/1120/115/1220/125/121/121/1215/1215/1230/1030/1030/1015/1215/1215/1215/1215/1215/1215/1215/1215/1215/1215/1215/1215/1215/1215/1215/1215/1215/1215/1215/1215/1215/1215/1215/1215/1215/1215/1210/1115/1215/1215/1215/121/121/121/121/121/21/21/21/21/21/21/21/21/2