Upload
dasha
View
65
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Time of Flight L/R detector. 2*891 scintillators & PMT (3.4 x 2.3 x 6,7,8)cm 3 HV System Trigger System Start Counter Signal Read Out Discriminators, TDCs, QDCs Control while data taking Calibration and TOF client. Principles of operation. Start signal from S1. - PowerPoint PPT Presentation
Citation preview
Faculty of Physics, University of Belgrade
Collaboration meeting, Zagreb, 10th of October, 2011.
Remote control and monitoringof ToF-L/R detector
Jovan Puzović,Faculty of Physics, Belgrade
Faculty of Physics, University of Belgrade
Collaboration meeting, Zagreb, 10.10.2011.Page 2 out of 24Jovan Puzović, Belgrade SHINE team
Time of Flight L/R detector
Faculty of Physics, University of Belgrade
Collaboration meeting, Zagreb, 10.10.2011.Page 3 out of 24Jovan Puzović, Belgrade SHINE team
2*891 scintillators & PMT (3.4 x 2.3 x 6,7,8)cm3
HV System
Trigger System
Start Counter Signal
Read Out Discriminators, TDCs, QDCs
Control while data taking
Calibration and TOF client
Faculty of Physics, University of Belgrade
Collaboration meeting, Zagreb, 10.10.2011.Page 4 out of 24Jovan Puzović, Belgrade SHINE team
Principles of operationStart signal from S1
Stop signal from scintillator
Faculty of Physics, University of Belgrade
Collaboration meeting, Zagreb, 10.10.2011.Page 5 out of 24Jovan Puzović, Belgrade SHINE team
Current system topologyCaen 5Caen 1Caen 5Caen 1
Crate 5HV Generator
Crate 5HV Generator
Crate 1HV Distributor
Crate 2HV Distributor
Crate 3HV Distributor
Crate 4HV Distributor
Crate 1HV Distributor
Crate 2HV Distributor
Crate 3HV Distributor
Crate 4HV Distributor
Caen
Net
Caen
Net
VT 100Terminal
RS232 RS232
TOF-L TOF-R
Faculty of Physics, University of Belgrade
Collaboration meeting, Zagreb, 10.10.2011.Page 6 out of 24Jovan Puzović, Belgrade SHINE team
SY527 Main menu
C.A.E.N. SY527 V3.17 Crate 01 M A I N M E N U Display Display/Modify channels Protections Set/Reset password Crate Connect a new crate Map Crate map Kill Kill all channels Alarms Reset alarms Status Select type of alarm Format Reformat EEPROM Quit Abandon program Select item
Faculty of Physics, University of Belgrade
Collaboration meeting, Zagreb, 10.10.2011.Page 7 out of 24Jovan Puzović, Belgrade SHINE team
SY527 Data display
C.A.E.N. SY527 V3.04 A753 GROUP00 Ch_En is: On V0-SEL I0-SEL Crate 05 Page 1 * Channel HVmax Vmon Imon V0set I0set Pw Status Ch# CHANNEL07 2713 2104.00 0004.90 mA 2100.00 0013.00 mA On 3.07 CHANNEL08 2713 2153.20 0005.22 mA 2150.00 0013.00 mA On 3.08 CHANNEL00 2680 2490.20 0005.08 mA 2500.00 0013.00 mA On 5.00 CHANNEL01 2680 2540.00 0005.27 mA 2550.00 0013.00 mA On 5.01 CHANNEL02 2680 2490.00 0005.17 mA 2500.00 0013.00 mA On 5.02 CHANNEL03 2680 2190.00 0004.83 mA 2200.00 0013.00 mA On 5.03 CHANNEL04 2680 1990.80 0005.02 mA 2000.00 0013.00 mA On 5.04 CHANNEL05 2680 2240.00 0004.51 mA 2250.00 0013.00 mA On 5.05 CHANNEL06 2680 2540.20 0004.87 mA 2550.00 0013.00 mA On 5.06 CHANNEL07 2680 2490.00 0005.05 mA 2500.00 0013.00 mA On 5.07 CHANNEL08 2680 2540.00 0004.16 mA 2550.00 0013.00 mA On 5.08 CHANNEL00 2668 2502.20 0004.84 mA 2500.00 0013.00 mA On 7.00 CHANNEL01 2668 2203.00 0005.13 mA 2200.00 0013.00 mA On 7.01 CHANNEL02 2668 2102.60 0004.92 mA 2100.00 0013.00 mA On 7.02 CHANNEL03 2668 2302.40 0005.54 mA 2300.00 0013.00 mA On 7.03 CHANNEL04 2668 2152.60 0005.44 mA 2150.00 0013.00 mA On 7.04 Quit Change Update Next Prev More Switch V/Isel
Faculty of Physics, University of Belgrade
Collaboration meeting, Zagreb, 10.10.2011.Page 8 out of 24Jovan Puzović, Belgrade SHINE team
TOF-L/R in 2010 run
Faculty of Physics, University of Belgrade
Collaboration meeting, Zagreb, 10.10.2011.Page 9 out of 24Jovan Puzović, Belgrade SHINE team
2010 Run summary
Faculty of Physics, University of Belgrade
Collaboration meeting, Zagreb, 10.10.2011.Page 10 out of 24Jovan Puzović, Belgrade SHINE team
Current system topologyCaen 5Caen 1Caen 5Caen 1
Crate 5HV Generator
Crate 5HV Generator
Crate 1HV Distributor
Crate 2HV Distributor
Crate 3HV Distributor
Crate 4HV Distributor
Crate 1HV Distributor
Crate 2HV Distributor
Crate 3HV Distributor
Crate 4HV Distributor
Caen
Net
Caen
Net
VT 100Terminal
RS232 RS232
TOF-L TOF-R
Faculty of Physics, University of Belgrade
Collaboration meeting, Zagreb, 10.10.2011.Page 11 out of 24Jovan Puzović, Belgrade SHINE team
Planned system topology
Crate 5HV Generator
Crate 5HV Generator
Crate 1HV Distributor
Crate 2HV Distributor
Crate 3HV Distributor
Crate 4HV Distributor
Crate 1HV Distributor
Crate 2HV Distributor
Crate 3HV Distributor
Crate 4HV Distributor
Caen
Net
Caen
Net
PCRS232 RS232
TOF-L TOF-R
Faculty of Physics, University of Belgrade
Collaboration meeting, Zagreb, 10.10.2011.Page 12 out of 24Jovan Puzović, Belgrade SHINE team
Objectives
1) Improve connection reliability with crates in the pit
2) Enable remote monitoring of HV parameters
3) Enable remote control of HV parameters
4) Enable possibility for HV status logging
5) Allow possibility to send warnings to expert in case of malfunction
Faculty of Physics, University of Belgrade
Collaboration meeting, Zagreb, 10.10.2011.Page 13 out of 24Jovan Puzović, Belgrade SHINE team
RS232 mux candidates
Price ~400USDHave to be order from US
Remote Access Terminal ServerPrice: 840EUR !!!
Distrelec
Price: 420 CHF at DistrelecDeliver time: ?
Techmania – stack empty
Tech Mania 35CHFTopd 65CHF
Faculty of Physics, University of Belgrade
Collaboration meeting, Zagreb, 10.10.2011.Page 14 out of 24Jovan Puzović, Belgrade SHINE team
DELOCK
OHC computers, Topd ~ 90CHF
Not as elegant as Terminal Servers, but cheap!
Faculty of Physics, University of Belgrade
Collaboration meeting, Zagreb, 10.10.2011.Page 15 out of 24Jovan Puzović, Belgrade SHINE team
Hardware
Faculty of Physics, University of Belgrade
Collaboration meeting, Zagreb, 10.10.2011.Page 16 out of 24Jovan Puzović, Belgrade SHINE team
Aging problem
• Communication problem persist with TOF-R crate 4!
• Problems are typical aging problem (bad contact between connectors, chips and sockets etc…)
• Decide to open Crate 4 in very bad working conditions
• Communication restored, but we lose 2 HV distributors!
Faculty of Physics, University of Belgrade
Collaboration meeting, Zagreb, 10.10.2011.Page 17 out of 24Jovan Puzović, Belgrade SHINE team
QDC distribution - before
Faculty of Physics, University of Belgrade
Collaboration meeting, Zagreb, 10.10.2011.Page 18 out of 24Jovan Puzović, Belgrade SHINE team
QDC distribution - after
Faculty of Physics, University of Belgrade
Collaboration meeting, Zagreb, 10.10.2011.Page 19 out of 24Jovan Puzović, Belgrade SHINE team
TDC – single bad pixel
Faculty of Physics, University of Belgrade
Collaboration meeting, Zagreb, 10.10.2011.Page 20 out of 24Jovan Puzović, Belgrade SHINE team
TDC – multi bad pixel
Faculty of Physics, University of Belgrade
Collaboration meeting, Zagreb, 10.10.2011.Page 21 out of 24Jovan Puzović, Belgrade SHINE team
ToF-R bad pixels
PixelBefore
After
Gen
Crate
Dist
Chan
1 5-2 3 0 1245 5-3 3 1 046 5-3 3 1 175 5-5 3 3 8
148 7-2 3 9 16194 3-5 2 5 11243 5-1 2 9 0244 5-1 2 9 1245 5-1 2 9 2265 3-5 2 4 12337 7-3 4 0 18338 7-3 4 0 19339 7-3 4 0 20342 7-4 4 1 12347 7-4 4 1 17357 7-5 4 1 16
364-374 7-6 4 3 12÷22
397-407 9-0 4 6 12÷22496-506 1-5 1 5 12÷22
517 1-6 1 6 22525 1-7 1 7 19529 1-8 1 7 22607 5-7 3 5 13
661-671 7-6 4 3 0÷10694-701 9-0 4 6 0÷7702-704 9-0 4 6 8÷10705-706 9-1 4 7 0÷1
722 9-2 4 8 6754 1-1 1 1 5763 1-2 1 2 3
793-803 1-5 1 5 0÷10804 1-6 1 6 0818 1-7 1 7 3835 1-8 1 8 9844 3-0 1 9 7849 3-1 2 0 1891 5-0 2 8 22
Before: 34 bad pixel (random)After: 30 (random)Before: 34 bad pixel (random)After: 30 (random)Before: 34 bad pixel (random)After: 30 (random)
Before: 34 single bad pixel (random)After: 30 single bad pixel (random)
Faculty of Physics, University of Belgrade
Collaboration meeting, Zagreb, 10.10.2011.Page 22 out of 24Jovan Puzović, Belgrade SHINE team
ToF-R bad pixelsPixel
Before
After
Gen Crate
DistChan
364-374 7-6 4 3 12÷22
397-407 9-0 4 6 12÷22
496-506 1-5 1 5 12÷22
661-671 7-6 4 3 0÷10
694-701 9-0 4 6 0÷7
793-803 1-5 1 5 0÷10
Additional 59 bad pixel (4 already in random!)
Crate 4, distributors 3 and 6 – 37 new bad pixel
Crate 1, distributor 5 – 22 new bad pixel (HV Off!)
Faculty of Physics, University of Belgrade
Collaboration meeting, Zagreb, 10.10.2011.Page 23 out of 24Jovan Puzović, Belgrade SHINE team
Summary
At the end of 2011 proton runToF-L : 87 (bad pixel) (9.7%)
+ 17 (suspicious) (1.9%)- -------------------
104 (11.6%)Before intervention:
ToF-R: 34 (random bad pixel)After intervention:
ToF-R: 30 (random bad pixel)+ 37 (due to the intervention, Crate 4)+ 22 (unknown reason, Crate 1)
- -------------------
89 (10.0%)
Faculty of Physics, University of Belgrade
Collaboration meeting, Zagreb, 10.10.2011.Page 24 out of 24Jovan Puzović, Belgrade SHINE team
Conclusion
• Control and monitoring hardware upgrade successful!
• For ION run, remote control, monitoring and data logging of HV status will be possible
• Problems: urgently needs for spare parts for CAEN HV system, TDC and QDC
• Without spare parts, the future will not be bright for ToF-LR!
Faculty of Physics, University of Belgrade
Collaboration meeting, Zagreb, 10.10.2011.Page 25 out of 24Jovan Puzović, Belgrade SHINE team
THE END
Faculty of Physics, University of Belgrade
Collaboration meeting, Zagreb, 10.10.2011.Page 26 out of 24Jovan Puzović, Belgrade SHINE team
TOF-L TDC sample
Faculty of Physics, University of Belgrade
Collaboration meeting, Zagreb, 10.10.2011.Page 27 out of 24Jovan Puzović, Belgrade SHINE team
TOF-L bad pixels
- 87 bad pixels (count 0 in TDC)1, 3, 14, 42, 54, 61, 63, 64, 102, 129, 133, 137, 138, 142, 154, 156, 157, 160, 163, 179, 194, 199, 216, 221, 226, 243, 250, 253, 287, 318, 320, 329, 353, 358, 379, 380, 390, 410, 411, 413, 453, 460, 469, 480, 501, 506, 529, 530, 545, 564, 570, 588, 595, 599, 627, 635, 639, 653, 660, 662, 663, 670, 681, 683, 711, 743, 748, 757, 766, 767, 771, 773, 774, 783, 787, 790, 793, 800, 805, 819, 824, 840, 861, 868, 878, 879, 883
- 17 suspicious pixels (count 1 in TDC)85, 140, 169, 376, 395, 424, 451, 549, 633, 634, 660, 720, 736, 779, 784, 819, 889