3
Time Schedule 1 Strategic Plan and feasibility study for the conversion into an ICE

Time Schedule 1 Strategic Plan conversion into an ICE - UPM seguimiento/engli… · Time Schedule 1 Strategic Plan and feasibility study for the conversion into an ICE

  • Upload
    dotruc

  • View
    216

  • Download
    1

Embed Size (px)

Citation preview

 

Time Schedule    1 Strategic Plan and feasibility study for the conversion into an ICE   

 

Time Schedule    2 Strategic Plan and feasibility study for the conversion into an ICE   

A. TIME SCHEDULE OF ACTIONS

Tables 1 & 2 schematically summarizes the major milestones and phases in the development of the activities mentioned above, one linked to the economic budget another to the main objectives of the call

ICE ProgrammeTeaching Improvements

International Postgraduate School GSM‐GSTDoctorate Students and Researchers Hall of Residency

Educational Innovation Centre (CIIET)Science Improvements

Construction of IMDEA SWConstruction of CTB

Information Technology Security Centre Marine Technologies Centre 

Bio‐Climatic Architecture Research CentreNew R&D&I Centres

Social Integration ModelImproved Transport System

Improved Energy usage/sourcingEnvironmental Improvements

The Campus and its surrounding areasÁgora Conference Centre

Welcome CentreImprove Sports Facilities

Improved SecurityImproved Communications

Improved Community ServicesTechnology and Knowledge Transfer

Extension of the Business Centre Human Development Technology Center

Construction of Solar HousesHiring Programmes: Transfer and commercialization, Urbanism

ICE Programme  The Campus, as a Social Integration ModelTeaching Improvements Technology and Knowledge TransferScientific Improvements

2015SCHEDULE OF THE ACTIVITIES RELATED TO THE BUDGET 

2009 2010 2011 2012 2013 2014

Table 1: Time Schedule (I)

To Conclude  

This proposal aims to convert the Campus of Montegancedo into an International Campus of Excellence oriented towards technological innovation with a strong focus upon ICTs. This is a long-term strategic objective that surely will affect the whole of the UPM During this proposal we have presented a global overview of the various actions and improvement required to make this vision reality.

 

Time Schedule    3 Strategic Plan and feasibility study for the conversion into an ICE   

Tabla 2. Time Schedule (II) 

Involve the en

tire university commun

ity 

a. Im

plem

ent the

 UPM

 Edu

cation

 Mod

el, cen

tred

 aroun

d inno

vation

 b. Create a Ce

ntre fo

r the

 Research and Inno

vation

 of Teaching Metho

ds 

c. Create an

 International Postgradu

ate Scho

ol (G

MS & GMT)

Strengthen

 the R&

D&I structures and team

s a. Create ne

w re

search cen

tres

b.Create te

chno

logy dem

onstration

 platforms 

Improve hu

man

 resources (HR) ded

icated

 to re

search and

 inno

vation

 a. Establish the ISAAC Pe

ral Program

me*

b. Create diverse research te

ams 

c. Hire do

ctors with expe

rien

ce (I3)+ 

d. Hire youn

g prom

ising do

ctors*

e. Scholarships/ PIF con

tracts

Enhance International dim

ension

 of the

 R&D&I activities 

a. Participate in

 international R&D&I projects and/ or in joint cen

tres located  ou

tside of Spain

b. Establish international R&D&I agree

men

ts 

c. Create a Techno

logical H

uman

 Develop

men

t Cen

tre

Develop

 an en

trep

rene

urial spirit o

n Campu

s a. Com

mercialize  intelle

ctual and

 indu

strial prope

rty 

b. Create platform

s that sup

port business inno

vation

  c. Boo

st th

e creation

 of techn

ology based companies 

d. Incorporate inno

vation

 managem

ent and

 entrepren

eurship into th

e curriculum

 Uniqu

e Campu

s po

sition

ing: A global internation

al brand

 and

 reference 

a. P

lace

tech

nolo

gica

l inno

vatio

n as

the

core

Cam

pus

actio

n b.

Cre

ate

a C

ampu

s or

ient

ed to

war

ds IC

Ts a

nd th

eir v

ertic

al a

nd h

oriz

onta

l app

licat

ion

c. Stren

gthe

n the R&

D&I and

 kno

wledge transfer HR programmes 

d. Boo

st te

aching

 through a stronger fo

cus up

on postgradu

ate stud

ies

e. Stren

gthe

n research by hiring

 foreign researchers

f. Establish a campu

s governmen

t infrastructure 

Simplicity, a fu

nction

al and

 integrated

 Cam

pus 

a. Perform

 urban

 and

 building im

provem

ents

b. Establish a Welcome Ce

ntre

c. Encou

rage

 new

  ways of working

Campu

s of ope

n inno

vation

 and

 sustainability. U

niversity collabo

ration

 a. Inno

vation

 as the core action in th

e Campu

s.b. Roll out agree

men

ts with the Co

uncil of P

ozue

lo de Alarcón

c. Integrate the Campu

s into th

e District Surroun

dings

d. Une

arth th

e river stream

e. Execute environ

men

tal improvem

ents in

 the Campu

sf. Com

plete en

ergy efficiency im

provem

ents

*yearly

 calls

TIME SCHED

ULE OF ACTIONS RE

LATED TO THE OBJECTIVE

S2009

2010

2011

2012

2013

2014

2015