Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
TITLE 18. ENVIRONMENTAL QUALITY
CHAPTER 2. DEPARTMENT OF ENVIRONMENTAL QUALITY AIR POLLUTION
CONTROL
ARTICLE 1. GENERAL
R18-2-101. Definitions R18-2-102. Incorporated Materials
ARTICLE 2. AMBIENT AIR QUALITY STANDARDS; AREA DESIGNATIONS; CLASSIFICATIONS
R18-2-201. Particulate Matter: PM10 and PM2.5 R18-2-202. Sulfur Oxides (Sulfur Dioxide) R18-2-203. Ozone: One-hour Standard and Eight-hour Average Standard R18-2-204. Carbon monoxide R18-2-205. Nitrogen Oxides (Nitrogen Dioxide) R18-2-206. Lead R18-2-210. Attainment, Nonattainment, and Unclassifiable Area Designations R18-2-215. Ambient air quality monitoring methods and procedures R18-2-216. Interpretation of Ambient Air Quality Standards and Evaluation of Air
Quality Data R18-2-217. Designation and Classification of Attainment Areas R18-2-218. Limitation of Pollutants in Classified Attainment Areas R18-2-219. Repealed R18-2-220. Air pollution emergency episodes
ARTICLE 3. PERMITS AND PERMIT REVISIONS
R18-2-301. Definitions R18-2-302. Applicability; Registration; Classes of Permits R18-2-302.01. Source Registration Requirements R18-2-303. Transition from Installation and Operating Permit Program to Unitary
Permit Program; Registration Transition; Minor NSR Transition R18-2-304. Permit Application Processing Procedures R18-2-306.01. Permits Containing Voluntarily Accepted Emission Limitations and
Standards R18-2-306.02. Establishment of an Emissions Cap R18-2-319. Minor Permit Revisions R18-2-320. Significant Permit Revisions R18-2-326. Fees Related to Individual Permits R18-2-327. Annual Emissions Inventory Questionnaire R18-2-330. Public Participation R18-2-332. Stack Height Limitation R18-2-334. Minor New Source Review
ARTICLE 4. PERMIT REQUIREMENTS FOR NEW MAJOR SOURCES AND MAJOR MODIFICATIONS TO EXISTING MAJOR SOURCES
R18-2-401. Definitions
Page 1 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
R18-2-402. General R18-2-403. Permits for Sources Located in Nonattainment Areas R18-2-404. Offset Standards R18-2-405. Special Rule for Major Sources of VOC or Nitrogen Oxides in Ozone
Nonattainment Areas Classified as Serious or Severe R18-2-406. Permit Requirements for Sources Located in Attainment and
Unclassifiable Areas R18-2-407. Air Quality Impact Analysis and Monitoring Requirements R18-2-408. Innovative Control Technology R18-2-409. Air Quality Models R18-2-410. Visibility Protection R18-2-411. Permit Requirements for Sources that Locate in Attainment or
Unclassifiable Areas and Cause or Contribute to a Violation of Any National Ambient Air Quality Standard.
R18-2-412. PALs
ARTICLE 1. GENERAL
R18-2-101. Definitions
The following definitions apply to this Chapter. Where the same term is defined in this Section
and in the definitions Section for an Article of this Chapter, the Article-specific definition shall
apply.
1. “Act” means the Clean Air Act of 1963 (P.L. 88-206; 42 U.S.C. 7401 through
7671q) as amended through December 31, 2011 (and no future editions).
2. “Actual emissions” means the actual rate of emissions of a regulated NSR
pollutant from an emissions unit, as determined in subsections (2)(a) through (e).
a. In general, actual emissions as of a particular date shall equal the average
rate, in tons per year, at which the unit actually emitted the pollutant
during a consecutive 24-month period that precedes the particular date
and that is representative of normal source operation. The Director may
allow the use of a different time period upon a determination that it is
more representative of normal source operation. Actual emissions shall
be calculated using the unit’s actual operating hours, production rates,
and types of materials processed, stored or combusted during the selected
time period.
b. The Director may presume that source-specific allowable emissions for
the unit are equivalent to the actual emissions of the unit.
c. For any emissions unit that is located at a source with a Class I permit
source that and has not begun normal operations on the particular date,
Page 2 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
actual emissions shall equal the unit’s potential to emit on that date.
d. For any emissions unit that is located at a source with a Class II permit
source that and has not begun normal operations on the particular date,
actual emissions shall be based on applicable control equipment
requirements and projected conditions of operation.
e. This definition shall not apply for calculating whether a significant
emissions increase has occurred, or for establishing a PAL. Instead, the
definitions of projected actual emissions and baseline actual emissions in
R18-2-401 shall apply for those purposes.
3. “Administrator” means the Administrator of the United States Environmental
Protection Agency.
4. “Affected facility” means, with reference to a stationary source, any apparatus to
which a standard is applicable.
5. “Affected source” means a source that includes one or more units which are
subject to emission reduction requirements or limitations under Title IV of the
Act.
6. “Affected state” means any state whose air quality may be affected by a source
applying for a permit, permit revision, or permit renewal and that is contiguous to
Arizona or that is within 50 miles of the permitted source.
7. “Afterburner” means an incinerator installed in the secondary combustion
chamber or stack for the purpose of incinerating smoke, fumes, gases, unburned
carbon, and other combustible material not consumed during primary
combustion.
8. “Air contaminants” means smoke, vapors, charred paper, dust, soot, grime,
carbon, fumes, gases, sulfuric acid mist aerosols, aerosol droplets, odors,
particulate matter, wind-borne matter, radioactive materials, or noxious
chemicals, or any other material in the outdoor atmosphere.
9. “Air curtain destructor” means an incineration device designed and used to
secure, by means of a fan-generated air curtain, controlled combustion of only
wood waste and slash materials in an earthen trench or refractory-lined pit or bin.
10. “Air pollution” means the presence in the outdoor atmosphere of one or more
air contaminants or combinations thereof in sufficient quantities, which either
alone or in connection with other substances by reason of their concentration
and duration are or tend to be injurious to human, plant or animal life, or cause
Page 3 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
damage to property, or unreasonably interfere with the comfortable enjoyment of
life or property of a substantial part of a community, or obscure visibility, or
which in any way degrade the quality of the ambient air below the standards
established by the director. A.R.S. § 49-421(2).
11. “Air pollution control equipment” means equipment used to eliminate, reduce or
control the emission of air pollutants into the ambient air.
12. “Air quality control region” (AQCR) means an area so designated by the
Administrator pursuant to Section 107 of the Act and includes the following
regions in Arizona:
a. Maricopa Intrastate Air Quality Control Region which is comprised of
the County of Maricopa.
b. Pima Intrastate Air Quality Control Region which is comprised of the
County of Pima.
c. Northern Arizona Intrastate Air Quality Control Region which
encompasses the counties of Apache, Coconino, Navajo, and Yavapai.
d. Mohave-Yuma Intrastate Air Quality Control Region which
encompasses the counties of La Paz, Mohave, and Yuma.
e. Central Arizona Intrastate Air Quality Control Region which
encompasses the counties of Gila and Pinal.
f. Southeast Arizona Intrastate Air Quality Control Region which
encompasses the counties of Cochise, Graham, Greenlee, and Santa
Cruz.
13. “Allowable emissions” means the emission rate of a stationary source calculated
using both the maximum rated capacity of the source, unless the source is subject
to federally enforceable limits which restrict the operating rate or hours of
operation, and the most stringent of the following:
a. The applicable standards as set forth in 40 CFR 60, 61 and or 63;
b. The applicable existing source performance standard, as approved
for the SIP and contained in Article 7 of this Chapter emissions
limitations approved into the state implementation plan, including
those with a future compliance date; or,
c. The emissions rate specified in any federally promulgated rule or as a
federally enforceable permit conditions applicable to the stationary
source condition, including those with a future compliance date.
Page 4 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
14. “Ambient air” means that portion of the atmosphere, external to buildings, to
which the general public has access.
15. “Applicable implementation plan” means those provisions of the state
implementation plan approved by the Administrator or a federal implementation
plan promulgated for Arizona or any portion of Arizona in accordance with Title
I of the Act.
16. “Applicable requirement” means any of the following:
a. Any federal applicable requirement.
b. Any other requirement established pursuant to this Chapter or A.R.S.
Title 49, Chapter 3.
17. “Arizona Testing Manual” means sections 1 and 7 of the Arizona Testing Manual
for Air Pollutant Emissions amended as of March 1992 (and no future editions).
18. “ASTM” means the American Society for Testing and Materials.
19. “Attainment area” means any area in the state that has been identified in
regulations promulgated by the Administrator as being in compliance with
national ambient air quality standards.
20. “Begin actual construction” means, initiation of physical on-site construction
activities on an emissions unit which are of a permanent nature. With respect to
a change in method of operation this term refers to those onsite activities, other
than preparatory activities, which mark the initiation of the change.
a. For purposes of title I, parts C and D and section 112 of the clean air
act, and for purposes of applicants that require permits containing limits
designed to avoid the application of title I, parts C and D and section
112 of the clean air act, these activities include installation of building
supports and foundations, laying of underground pipework, and
construction of permanent storage structures but do not include any of
the following, subject to subsection (20)(c):
i. Clearing and grading, including demolition and removal of
existing structures and equipment, stripping and stockpiling of
topsoil.
ii. Installation of access roads, driveways and parking lots.
iii. Installation of ancillary structures, including fences, office
buildings and temporary storage structures, that are not a
necessary component of an emissions unit or associated air
Page 5 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
pollution control equipment for which the permit is required.
iv. Ordering and onsite storage of materials and equipment.
b. For purposes other than those identified in subsection (20)(a), these
activities do not include any of the following, subject to subsection
(20)(c):
i. Clearing and grading, including demolition and removal of
existing structures and equipment, stripping and stockpiling of
topsoil and earthwork cut and fill for foundations.
ii. Installation of access roads, parking lots, driveways and storage
areas.
iii. Installation of ancillary structures, including fences,
warehouses, storerooms and office buildings, provided none of
these structures impacts the design of any emissions unit or
associated air pollution control equipment.
iv. Ordering and onsite storage of materials and equipment.
v. Installation of underground pipework, including water, sewer,
electric and telecommunications utilities.
vi. Installation of building and equipment supports, including
concrete forms, footers, pilings, foundations, pads and platforms,
provided none of these supports impacts the design of any
emissions unit or associated air pollution control equipment.
c. An applicant’s performance of any activities that are excluded from the
definition of “begin actual construction” under subsection (20)(a) or (b)
shall be at the applicant’s risk and shall not reduce the applicant’s
obligations under this Chapter. The director shall evaluate an
application for a permit or permit revision and make a decision on the
same basis as if the activities allowed under subsection (20)(a) or (b)
had not occurred. A.R.S. § 49-401.01(7).
21. “Best available control technology” (BACT) means an emission limitation,
including a visible emissions standard, based on the maximum degree of
reduction for each air regulated NSR pollutant which would be emitted from any
proposed major source or major modification, taking into account energy,
environmental, and economic impact and other costs, determined by the Director
in accordance with R18-2-406(A)(4) to be achievable for such source or
Page 6 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
modification.
22. “Btu” means British thermal unit, which is the quantity of heat required to raise
the temperature of one pound of water 1°F.
23. “Categorical sources” means the following classes of sources:
a. Coal cleaning plants with thermal dryers;
b. Kraft pulp mills;
c. Portland cement plants;
d. Primary zinc smelters;
e. Iron and steel mills;
f. Primary aluminum ore reduction plants;
g. Primary copper smelters;
h. Municipal incinerators capable of charging more than 250 tons of refuse
per day;
i. Hydrofluoric, sulfuric, or nitric acid plants;
j. Petroleum refineries;
k. Lime plants;
l. Phosphate rock processing plants;
m. Coke oven batteries;
n. Sulfur recovery plants;
o. Carbon black plants using the furnace process;
p. Primary lead smelters;
q. Fuel conversion plants;
r. Sintering plants;
s. Secondary metal production plants;
t. Chemical process plants, which shall not include ethanol production
facilities that produce ethanol by natural fermentation included in North
American Industry Classification System codes 325193 or 312140;
u. Fossil-fuel boilers, combinations thereof, totaling more than 250 million
Btus per hour heat input;
v. Petroleum storage and transfer units with a total storage capacity more
than 300,000 barrels;
w. Taconite ore preprocessing plants;
x. Glass fiber processing plants;
y. Charcoal production plants;
Page 7 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
z. Fossil-fuel-fired steam electric plants and combined cycle gas turbines of
more than 250 million Btus per hour heat input.
24. “Categorically exempt activities” means any of the following:
a. Any combination of diesel-, natural gas- or gasoline-fired engines with
cumulative power equal to or less than 145 horsepower.
b. Natural gas-fired engines with cumulative power equal to or less than
155 horsepower.
c. Gasoline-fired engines with cumulative power equal to or less than 200
horsepower.
d. Any of the following emergency or stand-by engines used for less than
500 hours in each calendar year, provided the permittee keeps records
documenting the hours of operation of the engines:
i. Any combination of diesel-, natural gas- or gasoline-fired
emergency engines with cumulative power equal to or less than
2,500 horsepower.
ii. Natural gas-fired emergency engines with cumulative power
equal to or less than 2,700 horsepower.
iii. Gasoline-fired emergency engines with cumulative power equal
to or less than 3,700 horsepower.
e. Any combination of boilers with a cumulative maximum design heat
input capacity of less than 10 million Btu/hr.
25. “CFR” means the Code of Federal Regulations, amended as of July 1, 2011, (and
no future editions), with standard references in this Chapter by Title and Part, so
that “40 CFR 51” means Title 40 of the Code of Federal Regulations, Part 51.
26. “Charge” means the addition of metal bearing materials, scrap, or fluxes to a
furnace, converter or refining vessel.
27. “Clean coal technology” means any technology, including technologies applied
at the precombustion, combustion, or post-combustion stage, at a new or existing
facility that will achieve significant reductions in air emissions of sulfur dioxide
or oxides of nitrogen associated with the utilization of coal in the generation of
electricity, or process steam, that was not in widespread use as of November 15,
1990.
28. “Clean coal technology demonstration project” means a project using funds
appropriated under the heading “Department of Energy - Clean Coal
Page 8 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
Technology,” up to a total amount of $2,500,000,000 for commercial
demonstration of clean coal technology or similar projects funded through
appropriations for the Environmental Protection Agency. The federal
contribution for a qualifying project shall be at least 20% of the total cost of the
demonstration project.
29. “Coal” means all solid fossil fuels classified as anthracite, bituminous,
subbituminous, or lignite by ASTM D-388-91, (Classification of Coals by Rank).
30. “Combustion” means the burning of matter.
31. “Commence” means, as applied to construction of a source, or a major
modification as defined in Article 4 of this Chapter, that the owner or operator
has all necessary preconstruction approvals or permits and either has:
a. Begun, or caused to begin, a continuous program of actual onsite
construction of the source, to be completed within a reasonable time; or
b. Entered into binding agreements or contractual obligations, which cannot
be cancelled or modified without substantial loss to the owner or
operator, to undertake a program of actual construction of the source to
be completed within a reasonable time.
32. “Construction” means any physical change or change in the method of operation,
including fabrication, erection, installation, demolition, or modification of an
emissions unit, which would result in a change in actual emissions.
33. “Continuous monitoring system” means a CEMS, CERMS, or CPMS.
34. “Continuous emissions monitoring system” or “CEMS” means the total
equipment, required under the emission monitoring provisions in this Chapter,
used to sample, condition (if applicable), analyze, and to provide, on a
continuous basis, a permanent record of emissions.
35. “Continuous emissions rate monitoring system” or “CERMS” means the total
equipment required for the determination and recording of the pollutant mass
emissions rate (in terms of mass per unit of time).
36. “Continuous parameter monitoring system” or “CPMS” means the total
equipment, required under the emission monitoring provisions in this Chapter, to
monitor process or control device operational parameters (for example, control
device secondary voltages and electric currents) or other information (for
example, gas flow rate, O2 or CO2 concentrations) and to provide, on a
continuous basis, a permanent record of monitored values.
Page 9 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
37. “Controlled atmosphere incinerator” means one or more refractory-lined
chambers in which complete combustion is promoted by recirculation of gases by
mechanical means.
38. “Conventional air pollutant” means any pollutant for which the Administrator
has promulgated a primary or secondary national ambient air quality standard.
A.R.S. § 49-401.01(12).
39. “Department” means the Department of Environmental Quality. A.R.S. § 49-
101(2)
40. “Director” means the director of environmental quality who is also the director
of the department. A.R.S. § 49-101(3)
41. “Discharge” means the release or escape of an effluent from a source into the
atmosphere.
42. “Dust” means finely divided solid particulate matter occurring naturally or
created by mechanical processing, handling or storage of materials in the solid
state.
43. “Dust suppressant” means a chemical compound or mixture of chemical
compounds added with or without water to a dust source for purposes of
preventing air entrainment.
44. “Effluent” means any air contaminant which is emitted and subsequently escapes
into the atmosphere.
45. “Electric utility steam generating unit” means any steam electric generating unit
that is constructed for the purpose of supplying more than one-third of its
potential electric output capacity and more than 25 MW electrical output to any
utility power distribution system for sale. Any steam supplied to a steam
distribution system for the purpose of providing steam to a steam-electric
generator that would produce electrical energy for sale is also considered in
determining the electrical energy output capacity of the affected facility.
46. “Emission” means an air contaminant or gas stream, or the act of discharging an
air contaminant or a gas stream, visible or invisible.
47. “Emission standard” or “emission limitation” means a requirement established by
the state, a local government, or the Administrator which limits the quantity, rate,
or concentration of emissions of air pollutants on a continuous basis, including
any requirements which limit the level of opacity, prescribe equipment, set fuel
specifications, or prescribe operation or maintenance procedures for a source to
Page 10 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
assure continuous emission reduction.
48. “Emissions unit” means any part of a stationary source which emits or would
have the potential to emit any regulated air pollutant and includes an electric
steam generating unit.
49. “Equivalent method” means any method of sampling and analyzing for an air
pollutant which has been demonstrated under R18-2-311(D) to have a consistent
and quantitatively known relationship to the reference method, under specified
conditions.
50. “Excess emissions” means emissions of an air pollutant in excess of an emission
standard as measured by the compliance test method applicable to such emission
standard.
51. “Federal applicable requirement” means any of the following (including
requirements that have been promulgated or approved by EPA through
rulemaking at the time of issuance but have future effective compliance dates):
a. Any standard or other requirement provided for in the applicable
implementation plan approved or promulgated by EPA through
rulemaking under Title I of the Act that implements the relevant
requirements of the Act, including any revisions to that plan promulgated
in 40 CFR 52.
b. Any term or condition of any preconstruction permits issued pursuant to
regulations approved or promulgated through rulemaking under Title I,
including parts C or D, of the Act.
c. Any standard or other requirement under section 111 of the Act,
including 111(d).
d. Any standard or other requirement under section 112 of the Act,
including any requirement concerning accident prevention under section
112(r)(7) of the Act.
e. Any standard or other requirement of the acid rain program under Title
IV of the Act or the regulations promulgated thereunder and incorporated
pursuant to R18-2-333.
f. Any requirements established pursuant to section 504(b) or section
114(a)(3) of the Act.
g. Any standard or other requirement governing solid waste incineration,
under section 129 of the Act.
Page 11 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
h. Any standard or other requirement for consumer and commercial
products, under section 183(e) of the Act.
i. Any standard or other requirement for tank vessels under section 183(f)
of the Act.
j. Any standard or other requirement of the program to control air pollution
from outer continental shelf sources, under section 328 of the Act.
k. Any standard or other requirement of the regulations promulgated to
protect stratospheric ozone under Title VI of the Act, unless the
Administrator has determined that such requirements need not be
contained in a Title V permit.
l. Any national ambient air quality standard or increment maximum
increase allowed under R18-2-218 or visibility requirement under Part
C of Title I of the Act, but only as it would apply to temporary sources
permitted pursuant to section 504(e) of the Act.
52. “Federal Land Manager” means, with respect to any lands in the United States,
the secretary of the department with authority over such lands.
53. “Federally enforceable” means all limitations and conditions which are
enforceable by the Administrator under the Act, including all of the following:
a. The requirements of the New Source Performance Standards and
National Emission Standards for Hazardous Air Pollutants
contained in Articles 9 and 11 of this Chapter new source
performance standards and national emission standards for
hazardous air pollutants.
b. The requirements of such other state or county rules or regulations
approved by the Administrator, including the requirements of state and
county operating and new source review permit and registration
programs that have been approved by the Administrator.
Notwithstanding this subsection, the condition of any permit or
registration designated as being enforceable only by the state is not
federally enforceable.
c. The requirements of any applicable implementation plan.
d. Emissions limitations, controls, and other requirements, and any
associated monitoring, recordkeeping, and reporting requirements, other
than those designated as enforceable only by the state, that are
Page 12 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
included in a permit pursuant to R18-2-306.01 or R18-2-306.02.
54. “Federally listed hazardous air pollutant” means a pollutant listed pursuant to
R18-2-1701(9).
55. “Final permit” means the version of a permit issued by the Department after
completion of all review required by this Chapter.
56. “Fixed capital cost” means the capital needed to provide all the depreciable
components.
57. “Fuel” means any material which is burned for the purpose of producing energy.
58. “Fuel burning equipment” means any machine, equipment, incinerator, device or
other article, except stationary rotating machinery, in which combustion takes
place.
59. “Fugitive emissions” means those emissions which could not reasonably pass
through a stack, chimney, vent, or other functionally equivalent opening.
60. “Fume” means solid particulate matter resulting from the condensation and
subsequent solidification of vapors of melted solid materials.
61. “Fume incinerator” means a device similar to an afterburner installed for the
purpose of incinerating fumes, gases and other finely divided combustible
particulate matter not previously burned.
62. “Good engineering practice (GEP) stack height” means a stack height meeting
the requirements described in R18-2-332.
63. “Hazardous air pollutant” means any federally listed hazardous air pollutant.
64. “Heat input” means the quantity of heat in terms of Btus generated by fuels fed
into the fuel burning equipment under conditions of complete combustion.
65. “Incinerator” means any equipment, machine, device, contrivance or other
article, and all appurtenances thereof, used for the combustion of refuse, salvage
materials or any other combustible material except fossil fuels, for the purpose of
reducing the volume of material.
66. “Indian governing body” means the governing body of any tribe, band, or group
of Indians subject to the jurisdiction of the United States and recognized by the
United States as possessing power of self-government.
67. “Indian reservation” means any federally recognized reservation established by
Treaty, Agreement, Executive Order, or Act of Congress.
68. “Insignificant activity” means any of the following activities:
a. Liquid Storage and Piping
Page 13 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
i. Petroleum product storage tanks containing the following
substances, provided the applicant lists and identifies the
contents of each tank with a volume of 350 gallons or more and
provides threshold values for throughput or capacity or both for
each such tank: diesel fuels and fuel oil in storage tanks with
capacity of 40,000 gallons or less, lubricating oil, transformer
oil, and used oil.
ii. Gasoline storage tanks with capacity of 10,000 gallons or less.
iii. Storage and piping of natural gas, butane, propane, or liquified
petroleum gas, provided the applicant lists and identifies the
contents of each stationary storage vessel with a volume of 350
gallons or more and provides threshold values for throughput or
capacity or both for each such vessel.
iv. Piping of fuel oils, used oil and transformer oil, provided the
applicant includes a system description.
v. Storage and handling of drums or other transportable containers
where the containers are sealed during storage, and covered
during loading and unloading, including containers of waste and
used oil regulated under the federal Resource Conservation and
Recovery Act, 42 U.S.C. 6901-6992k. Permit applicants must
provide a description of material in the containers and the
approximate amount stored.
vi. Storage tanks of any size containing exclusively soaps,
detergents, waxes, greases, aqueous salt solutions, aqueous
solutions of acids that are not regulated air pollutants, or aqueous
caustic solutions, provided the permit applicant specifies the
contents of each storage tank with a volume of 350 gallons or
more.
vii. Electrical transformer oil pumping, cleaning, filtering, drying
and the re-installation of oil back into transformers.
b. Internal combustion engine-driven compressors, internal combustion
engine-driven electrical generator sets, and internal combustion engine-
driven water pumps used for less than 500 hours per calendar year for
emergency replacement or standby service, provided the permittee keeps
Page 14 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
records documenting the hours of operation of this equipment.
c. Low Emitting Processes
i. Batch mixers with rated capacity of 5 cubic feet or less.
ii. Wet sand and gravel production facilities that obtain material
from subterranean and subaqueous beds, whose production rate
is 200 tons/hour or less, and whose permanent in-plant roads are
paved and cleaned to control dust. This does not include
activities in emissions units which are used to crush or grind any
non-metallic minerals.
iii. Powder coating operations.
iv. Equipment using water, water and soap or detergent, or a
suspension of abrasives in water for purposes of cleaning or
finishing.
v. Blast-cleaning equipment using a suspension of abrasive in water
and any exhaust system or collector serving them exclusively.
vi. Plastic pipe welding.
d. Site Maintenance
i. Housekeeping activities and associated products used for
cleaning purposes, including collecting spilled and accumulated
materials at the source, including operation of fixed vacuum
cleaning systems specifically for such purposes.
ii. Sanding of streets and roads to abate traffic hazards caused by
ice and snow.
iii. Street and parking lot striping.
iv. Architectural painting and associated surface preparation for
maintenance purposes at industrial or commercial facilities.
e. Sampling and Testing
i. Noncommercial (in-house) experimental, analytical laboratory
equipment which is bench scale in nature, including quality
control/quality assurance laboratories supporting a stationary
source and research and development laboratories.
ii. Individual sampling points, analyzers, and process
instrumentation, whose operation may result in emissions but
that are not regulated as emission units.
Page 15 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
f. Ancillary Non-Industrial Activities
i. General office activities, such as paper shredding, copying,
photographic activities, and blueprinting, but not to include
incineration.
ii. Use of consumer products, including hazardous substances as
that term is defined in the Federal Hazardous Substances Act (15
U.S.C. 1261 et seq.) where the product is used at a source in the
same manner as normal consumer use.
iii. Activities directly used in the diagnosis and treatment of disease,
injury or other medical condition.
g. Miscellaneous Activities
i. Installation and operation of potable, process and waste water
observation wells, including drilling, pumping, filtering
apparatus.
ii. Transformer vents.
69. “Kraft pulp mill” means any stationary source which produces pulp from wood
by cooking or digesting wood chips in a water solution of sodium hydroxide and
sodium sulfide at high temperature and pressure. Regeneration of the cooking
chemicals through a recovery process is also considered part of the kraft pulp
mill.
70. “Lead” means elemental lead or alloys in which the predominant component is
lead.
71. “Lime hydrator” means a unit used to produce hydrated lime product.
72. “Lime plant” includes any plant which produces a lime product from limestone
by calcination. Hydration of the lime product is also considered to be part of the
source.
73. “Lime product” means any product produced by the calcination of limestone.
74. “Major modification” is defined as follows:
a. A major modification is any physical change in or change in the method
of operation of a major source that would result in both a significant
emissions increase of any regulated NSR pollutant and a significant net
emissions increase of that pollutant from the stationary source.
b. Any emissions increase or net emissions increase that is significant for
nitrogen oxides or volatile organic compounds is significant for ozone.
Page 16 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
c. For the purposes of this definition, none of the following is a physical
change or change in the method of operation:
i. Routine maintenance, repair, and replacement;
ii. Use of an alternative fuel or raw material by reason of an order
under sections 2(a) and (b) of the Energy Supply and
Environmental Coordination Act of 1974, 15 U.S.C. 792, or by
reason of a natural gas curtailment plan under the Federal Power
Act, 16 U.S.C. 792 - 825r;
iii. Use of an alternative fuel by reason of an order or rule under
section 125 of the Act;
iv. Use of an alternative fuel at a steam generating unit to the extent
that the fuel is generated from municipal solid waste;
v. Use of an alternative fuel or raw material by a stationary
source that either:
(1) The source was capable of accommodating before
December 12, 1976, unless the change would be
prohibited under any federally enforceable permit
condition established after December 12, 1976, under
40 CFR 52.21, or under Articles 3 or 4 of this
Chapter; or
(2) The source is approved to use under any permit
issued under 40 CFR 52.21, or under Articles 3 or 4
of this Chapter.
vi. An increase in the hours of operation or in the production
rate, unless the change would be prohibited under any
federally enforceable permit condition established after
December 12, 1976, under 40 CFR 52.21, or under Articles 3
or 4 of this Chapter.
v. For purposes of determining the applicability of R18-2-403
through R18-2-405 or R18-2-411, any of the following:
(1) Use of an alternative fuel or raw material by a
stationary source that the source was capable of
accommodating before December 21, 1976, unless the
change would be prohibited under any federally
Commented [SB1]: Separated existing (v) and (vi) into (v)(1)-(3) and (vi)(1)-(3) to distinguish between NA-NSR and PSD definitions. The differences between the NA-NSR and PSD definitions are highlighted.
Page 17 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
enforceable permit condition established after
December 12, 1976 under 40 CFR 52.21 or under
Articles 3 or 4 of this Chapter; or
(2) Use of an alternative fuel or raw material by a
stationary source that the source is approved to use
under any permit issued under R18-2-403;
(3) An increase in the hours of operation or in the
production rate, unless the change would be
prohibited under any federally enforceable permit
condition established after December 21, 1976, under
40 CFR 52.21, or under Articles 3 or 4 of this
Chapter.
vi. For purposes of determining the applicability of R18-2-406
through R18-2-408 or R18-2-410, any of the following:
(1) Use of an alternative fuel or raw material by a
stationary source that the source was capable of
accommodating before January 6, 1975, unless the
change would be prohibited under any federally
enforceable permit condition established after
January 6, 1975 under 40 CFR 52.21 or under
Articles 3 or 4 of this Chapter;
(2) Use of an alternative fuel or raw material by a
stationary source that the source is approved to use
under any permit issued under 40 CFR 52.21, or
under R18-2-406; or
(3) An increase in the hours of operation or in the
production rate, unless the change would be
prohibited under any federally enforceable permit
condition established after January 6, 1975, under 40
CFR 52.21, or under Articles 3 or 4 of this Chapter.
vii. Any change in ownership at a stationary source;
viii. [Reserved.]
ix. The installation, operation, cessation, or removal of a temporary
clean coal technology demonstration project, if the project
Page 18 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
complies with:
(1) The SIP, and
(2) Other requirements necessary to attain and maintain the
national ambient air quality standards during the project
and after it is terminated;
x. For electric utility steam generating units located in attainment
and unclassifiable areas only, the installation or operation of a
permanent clean coal technology demonstration project that
constitutes repowering, if the project does not result in an
increase in the potential to emit any regulated pollutant emitted
by the unit. This exemption applies on a pollutant-by-pollutant
basis; and
xi. For electric utility steam generating units located in attainment
and unclassifiable areas only, the reactivation of a very clean
coal-fired electric utility steam generating unit.
d. This definition shall not apply with respect to a particular regulated NSR
pollutant when the major source is complying with the requirements of
R18-2-412 for a PAL for that regulated NSR pollutant. Instead, the
definition of PAL major modification in R18-2-401(17) R18-2-401(20)
shall apply.
75. “Major source” means:
a. A major source as defined in R18-2-401.
b. A major source under section 112 of the Act:
i. For pollutants other than radionuclides, any stationary source
that emits or has the potential to emit, in the aggregate, including
fugitive emission 10 tons per year (tpy) or more of any
hazardous air pollutant which has been listed pursuant to section
112(b) of the Act, 25 tpy or more of any combination of such
hazardous air pollutants, or such lesser quantity as described in
Article 11 of this Chapter. Notwithstanding the preceding
sentence, emissions from any oil or gas exploration or
production well (with its associated equipment) and emissions
from any pipeline compressor or pump station shall not be
aggregated with emissions from other similar units, whether or
Page 19 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
not such units are in a contiguous area or under common control,
to determine whether such units or stations are major sources; or
ii. For radionuclides, “major source” shall have the meaning
specified by the Administrator by rule.
c. A major stationary source, as defined in section 302 of the Act, that
directly emits or has the potential to emit, 100 tpy or more of any air
pollutant including any major source of fugitive emissions of any such
pollutant. The fugitive emissions of a stationary source shall not be
considered in determining whether it is a major stationary source for the
purposes of section 302(j) of the Act, unless the source belongs to a
section 302(j) category.
76. “Malfunction” means any sudden and unavoidable failure of air pollution control
equipment, process equipment or a process to operate in a normal and usual
manner, but does not include failures that are caused by poor maintenance,
careless operation or any other upset condition or equipment breakdown which
could have been prevented by the exercise of reasonable care.
77. “Minor source” means a source of air pollution which is not a major source for
the purposes of Article 4 of this Chapter and over which the Director, acting
pursuant to A.R.S. § 49-402(B), has asserted jurisdiction.
78. “Minor source baseline area” means the air quality control region in which the
source is located.
79. “Mobile source” means any combustion engine, device, machine or equipment
that operates during transport and that emits or generates air contaminants
whether in motion or at rest. A.R.S. § 49-401.01(23).
80. “Modification” or “modify” means a physical change in or change in the
method of operation of a source that increases the emissions of any regulated air
pollutant emitted by such source by more than any relevant de minimis amount
or that results in the emission of any regulated air pollutant not previously
emitted by more than such de minimis amount. An increase in emissions at a
minor source shall be determined by comparing the source’s potential to emit
before and after the modification. The following exemptions apply:
a. A physical or operational change does not include routine maintenance,
repair or replacement.
b. An increase in the hours of operation or if the production rate is not
Page 20 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
considered an operational change unless such increase is prohibited
under any permit condition that is legally and practically enforceable by
the department.
c. A change in ownership at a source is not considered a modification.
A.R.S. § 49-401.01(24).
81. “Monitoring device” means the total equipment, required under the applicable
provisions of this Chapter, used to measure and record, if applicable, process
parameters.
82. “Motor vehicle” means any self-propelled vehicle designed for transporting
persons or property on public highways.
83. “Multiple chamber incinerator” means three or more refractory-lined combustion
chambers in series, physically separated by refractory walls and interconnected
by gas passage ports or ducts.
84. “Natural conditions” includes naturally occurring phenomena that reduce
visibility as measured in terms of light extinction, visual range, contrast, or
coloration.
85. “National ambient air quality standard” means the ambient air pollutant
concentration limits established by the Administrator pursuant to section 109 of
the Act. A.R.S. § 49-401.01(25).
86. “National emission standards for hazardous air pollutants” or “NESHAP”
means standards adopted by the Administrator under section 112 of the Act.
8687. “Necessary preconstruction approvals or permits” means those permits or
approvals required under the Act and those air quality control laws and rules
which are part of the SIP.
8788. “Net emissions increase” means:
a. The amount by which the sum of subsections (87)(a)(i) (88)(a)(i) and (ii)
exceeds zero:
i. The increase in emissions of a regulated NSR pollutant from a
particular physical change or change in the method of operation
at a stationary source as calculated pursuant to R18-2-402(D);
and
ii. Any other increases and decreases in actual emissions of the
regulated NSR pollutant at the source that are contemporaneous
with the particular change and are otherwise creditable.
Page 21 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
iii. For purposes of calculating increases and decreases in actual
emissions under subsection (87)(a)(ii) (88)(a)(ii), baseline actual
emissions shall be determined as provided in the definition of
baseline actual emissions in R18-2-401(2), except that
subsections R18-2-401(a)(iii) R18-2-401(2)(a)(iii) and (b)(iv)
shall not apply.
b. An increase or decrease in actual emissions is contemporaneous with the
increase from the particular change only if it occurs between:
i. The date five years before construction on the particular change
commences, and
ii. The date that the increase from the particular change occurs.
c. For purposes of determining the applicability of R18-2-403 through
R18-2-405 or R18-2-411, an An increase or decrease in actual
emissions is creditable only if the Director has not relied on it in issuing
a permit or permit revision under R18-2-403, which is in effect when
the increase in actual emissions from the particular change occurs. For
purposes of determining the applicability of R18-2-406 through R18-
2-408 or R18-2-410, an increase or decrease in actual emissions is
creditable only if the Director has not relied on it in issuing a permit
under R18-2-406, which is in effect when the increase in actual
emissions from the particular change occurs.
d. An increase or decrease in actual emissions of sulfur dioxide, nitrogen
oxides, or PM10, or PM2.5 which occurs before the applicable minor
source baseline date, as described defined in R18-2-218, is creditable
only if it is required to be considered in calculating the amount of
maximum allowable increases remaining available.
e. An increase in actual emissions is creditable only to the extent that the
new level of actual emissions exceeds the old level.
f. A decrease in actual emissions is creditable only to the extent that it
satisfies all of the following conditions:
i. The old level of actual emissions or the old level of allowable
emissions, whichever is lower, exceeds the new level of actual
emissions.
ii. It is enforceable as a practical matter at and after the time that
Commented [SB2]: Edited to distinguish between NA-NSR and PSD requirements.
Page 22 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
actual construction on the particular change begins.
iii. It has approximately the same qualitative significance for public
health and welfare as that attributed to the increase from the
particular change.
iv. The emissions unit was actually operated and emitted the
specific pollutant.
v. For a source located in an area designated as nonattainment for
the regulated NSR pollutant, the Director has not relied on it in
issuing any permit under Article 4, R18-2-302.01, or R18-2-334,
and the state has not relied on it in demonstrating attainment or
reasonable further progress.
g. An increase that results from a physical change at a source occurs when
the emissions unit on which construction occurred becomes operational
and begins to emit a particular pollutant. Any emissions replacement
unit, as defined in R18-2-401(24), that replaces an existing emissions
unit and that requires shakedown becomes operational only after a
reasonable shakedown period, not to exceed 180 days.
h. Subsection (2)(a) shall not apply for determining creditable increases
and decreases.
8889. “New source” means any stationary source of air pollution which is subject to an
applicable a new source performance standard under Article 9 of this Chapter.
90. “New source performance standards” means standards adopted by the
Administrator under section 111(b) of the Act.
8991. “Nitric acid plant” means any facility producing nitric acid 30% to 70% in
strength by either the pressure or atmospheric pressure process.
9092. “Nitrogen oxides” means all oxides of nitrogen except nitrous oxide, as measured
by test methods set forth in the Appendices to 40 CFR 60.
9193. “Nonattainment area” means an area so designated by the Administrator acting
pursuant to section 107 of the Act as exceeding national primary or secondary
ambient air standards for a particular pollutant or pollutants.
9294. “Nonpoint source” means a source of air contaminants which lacks an
identifiable plume or emission point.
9395. “Opacity” means the degree to which emissions reduce the transmission of light
and obscure the view of an object in the background.
Page 23 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
9496. “Operation” means any physical or chemical action resulting in the change in
location, form, physical properties, or chemical character of a material.
9597. “Owner or operator” means any person who owns, leases, operates, controls, or
supervises an affected facility or a stationary source.
9698. “Particulate matter” means any airborne finely divided solid or liquid material
with an aerodynamic diameter smaller than 100 micrometers.
9799. “Particulate matter emissions” means all finely divided solid or liquid materials
other than uncombined water, emitted to the ambient air as measured by
applicable test methods and procedures described in R18-2-311.
98100. “Permitting authority” means the department or a county department, agency or
air pollution control district that is charged with enforcing a permit program
adopted pursuant to A.R.S. § 49-480(A). A.R.S. § 49-401.01(28).
99101. “Permitting exemption thresholds” for a regulated minor NSR pollutant means
the following:
Regulated Air Pollutant
Emission Rate in tons per year (TPY)
PM2.5 (primary emissions only; levels for
precursors are set below)
5
PM10 7.5
SO2 20
NOx 20
VOC 20
CO 50
Pb 0.3
100102. “Person” means any public or private corporation, company, partnership, firm,
association or society of persons, the federal government and any of its
departments or agencies, the state and any of its agencies, departments or
political subdivisions, as well as a natural person.
101103. “Planning agency” means an organization designated by the governor pursuant
to 42 U.S.C. 7504. A.R.S. § 49-401.01(29).
102. “Predictive Emissions Monitoring System” or “PEMS” means the total
equipment, required under the emission monitoring provisions in this
Chapter, to monitor process and control device operational parameters and
Page 24 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
other information, and calculate and record the mass emissions rate on a
continuous basis.
103104. “PM2.5” means particulate matter with an aerodynamic diameter less than or
equal to a nominal 2.5 micrometers as measured by a reference method based on
40 CFR 50 Appendix L, or by an equivalent method designated according to 40
CFR 53.
104105. “PM10” means particulate matter with an aerodynamic diameter less than or equal
to a nominal 10 micrometers as measured by a reference method contained
within 40 CFR 50 Appendix J or by an equivalent method designated in
accordance with 40 CFR 53.
105106. “PM10 emissions” means finely divided solid or liquid material, with an
aerodynamic diameter less than or equal to a nominal 10 micrometers emitted to
the ambient air as measured by applicable test methods and procedures described
in R18-2-311.
106107. “Plume” means visible effluent.
107108. “Pollutant” means an air contaminant the emission or ambient concentration of
which is regulated pursuant to this Chapter.
108109. “Portable source” means any building, structure, facility, or installation subject to
regulation pursuant to A.R.S. § 49-426 which emits or may emit any air pollutant
and is capable of being operated at more than one location.
109110. “Potential to emit” or “potential emission rate” means the maximum capacity of a
stationary source to emit a pollutant, excluding secondary emissions, under its
physical and operational design. Any physical or operational limitation on the
capacity of the source to emit a pollutant, including air pollution control
equipment and restrictions on hours of operation or on the type or amount of
material combusted, stored, or processed, shall be treated as part of its design if
the limitation or the effect it would have on emissions is legally and practically
enforceable by the Department or a county under A.R.S. Title 49, Chapter 3; any
rule, ordinance, order or permit adopted or issued under A.R.S. Title 49, Chapter
3 or the state implementation plan.
111. “Predictive Emissions Monitoring System” or “PEMS” means the total
equipment, required under the emission monitoring provisions in this
Chapter, to monitor process and control device operational parameters (for
example, control device secondary voltages and electric currents) and other
Page 25 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
information (for example, gas flow rate, O2 or CO2 concentrations), and
calculate and record the mass emissions rate (for example, lb/hr) on a
continuous basis.
110112. “Primary ambient air quality standards” means the ambient air quality standards
which define levels of air quality necessary, with an adequate margin of safety, to
protect the public health, as specified in Article 2 of this Chapter.
111113. “Process” means one or more operations, including equipment and technology,
used in the production of goods or services or the control of by-products or
waste.
112114. “Project” means a physical change in, or change in the method of operation of, an
existing major source.
115. “Proposed final permit” means the version of a Class I permit or Class I
permit revision that the Department proposes to issue and forwards to the
Administrator for review in compliance with R18-2-307(A). A proposed final
permit constitutes a final and enforceable authorization to begin actual
construction of, but not to operate, a new Class I source or a modification to
a Class I source.
113116. “Proposed permit” means the version of a permit for which the Director offers
public participation under R18-2-330 or affected state review under R18-2-
307(D).
114. “Proposed final permit” means the version of a Class I permit or Class I
permit revision that the Department proposes to issue and forwards to the
Administrator for review in compliance with R18-2-307(A).
115117. “Reactivation of a very clean coal-fired electric utility steam generating unit”
means any physical change or change in the method of operation associated with
commencing commercial operations by a coal-fired utility unit after a period of
discontinued operation if the unit:
a. Has not been in operation for the two-year period before enactment of
the Clean Air Act Amendments of 1990, and the emissions from the unit
continue to be carried in the Director’s emissions inventory at the time of
enactment;
b. Was equipped before shutdown with a continuous system of emissions
control that achieves a removal efficiency for sulfur dioxide of no less
than 85% and a removal efficiency for particulates of no less than 98%;
Page 26 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
c. Is equipped with low-NOx burners before commencement of operations
following reactivation; and
d. Is otherwise in compliance with the Act.
116118. “Reasonable further progress” means the schedule of emission reductions defined
within a nonattainment area plan as being necessary to come into compliance
with a national ambient air quality standard by the primary standard attainment
date.
117119. “Reasonably available control technology” (RACT) means devices, systems,
process modifications, work practices or other apparatus or techniques that are
determined by the Director to be reasonably available taking into account:
a. The necessity of imposing the controls in order to attain and maintain a
national ambient air quality standard;
b. The social, environmental, energy and economic impact of the controls;
c. Control technology in use by similar sources; and
d. The capital and operating costs and technical feasibility of the controls.
118120. “Reclaiming machinery” means any machine, equipment device or other article
used for picking up stored granular material and either depositing this material on
a conveyor or reintroducing this material into the process.
119121. “Reference method” means the methods of sampling and analyzing for an air
pollutant as described in the Arizona Testing Manual; 40 CFR 50, Appendices A
through K; 40 CFR 51, Appendix M; 40 CFR 52, Appendices D and E; 40 CFR
60, Appendices A through F; and 40 CFR 61, Appendices B and C, as
incorporated by reference in 18 A.A.C. 2, Appendix 2.
120122. “Regulated air pollutant” means any of the following:
a. Any conventional air pollutant.
b. Nitrogen oxides and volatile organic compounds.
c. Any air contaminant that is subject to a standard contained in Article 9 of
this Chapter.
d. Any hazardous air pollutant as defined in Article 17 of this Chapter.
e. Any Class I or II substance listed in section 602 of the Act.
121123. “Regulated minor NSR pollutant” means any pollutant for which a national
ambient air quality standard has been promulgated and the following precursors
for such pollutants:
a. VOC and nitrogen oxides as precursors to ozone.
Page 27 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
b. Nitrogen oxides and sulfur dioxide as precursors to PM2.5.
122124. “Regulated NSR pollutant” means any of the following is defined as follows:
a. Any For purposes of determining the applicability of R18-2-403
through R18-2-405 and R18-2-411, regulated NSR pollutant means
any pollutant for which a national ambient air quality standard has been
promulgated and any pollutant identified under this subsection as a
constituent of or precursor to such pollutant, provided that such
constituent or precursor pollutant may only be regulated under NSR
as part of the regulation of the general pollutant. Precursors for
purposes of NSR are the following:
i. Volatile organic compounds and nitrogen oxides are precursors
to ozone in all areas.
ii. Sulfur dioxide is a precursor to PM2.5 in all areas.
iii. Nitrogen oxides are precursors to PM2.5 in all areas.
iv. VOC and ammonia are precursors to PM2.5 in PM2.5
nonattainment areas. 1
b. For all other purposes, regulated NSR pollutant means the
pollutants identified in subsection (a) and the following:
i. Any pollutant that is subject to any standard promulgated
under Article 9 of this Chapter new source performance
standard.
cii. Any Class I or II substance subject to a standard promulgated
under or established by Title VI of the Act as of July 1, 2011.
diii. [Reserved.] Any pollutant that is otherwise subject to
regulation under the Act, except greenhouse gases as defined
in 40 CFR 86.1818-12(a).
ec. Notwithstanding subsections (122)(a) (124)(a) through (d) and (b), the
term regulated NSR pollutant shall not include any or all hazardous air
1 NOTE TO REVIEWERS: Changes relating to the treatment of PM2.5 in the NNSR program are based on EPA’s proposed implementation rule for PM2.5 NAA at 80 Fed. Reg. 15340 (March 23, 2015). The implementation rule’s NNSR provisions appear necessary to comply with the D.C. Circuit’s decision that Part D, Subpart 4 applies to PM2.5 nonattainment areas, see NRDC v. EPA, 706 F.3d 428 (D.C. Cir. 2013), and are therefore likely to be included in the final rule. In particular, the court noted that under § 189(e), control requirements must apply to major sources of all precursors of PM2.5 unless EPA has determined that the sources do not contribute to levels exceeding the NAAQS in a particular nonattainment area. Since we have received no such determination from EPA, we should list all 4 known PM2.5 precursors as regulated NSR pollutants.
Commented [SB3]: Edited to reflect differences between NA-NSR and PSD in federal regulations. Eliminates potential NA-NSR for major mod at existing source that is major only for non-criteria pollutant.
Commented [SB4]: See footnote.
Page 28 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
pollutants either listed under R18-2-1101 in section 112 of the Act, or
added to the list pursuant to section 112(b)(2) of the Act, unless the
listed hazardous air pollutant is also regulated as a constituent or
precursor of a general pollutant listed under section 108 of the Act as of
July 1, 2010.
fd. Particulate matter emissions, PM2.5 emissions, and PM10 emissions
shall include gaseous emissions from a source or activity which condense
to form particulate matter at ambient temperatures. On and after January
1, 2011, condensable particulate matter shall be accounted for in
applicability determinations and in establishing emissions limitations for
particulate matter, PM2.5 and PM10 in permits issued under Article 4.
123125. “Repowering” means:
a. Replacing an existing coal-fired boiler with one of the following clean
coal technologies:
i. Atmospheric or pressurized fluidized bed combustion;
ii. Integrated gasification combined cycle;
iii. Magnetohydrodynamics;
iv. Direct and indirect coal-fired turbines;
v. Integrated gasification fuel cells; or
vi. As determined by the Administrator, in consultation with the
United States Secretary of Energy, a derivative of one or more of
the above technologies; and
vii. Any other technology capable of controlling multiple
combustion emissions simultaneously with improved boiler or
generation efficiency and with significantly greater waste
reduction relative to the performance of technology in
widespread commercial use as of November 15, 1990.
b. Repowering also includes any oil, gas, or oil and gas-fired unit that has
been awarded clean coal technology demonstration funding as of January
1, 1991, by the United States Department of Energy.
c. The Director shall give expedited consideration to permit applications for
any source that satisfies the requirements of this subsection and is
granted an extension under section 409 of the Act.
124126. “Run” means the net period of time during which an emission sample is
Page 29 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
collected, which may be, unless otherwise specified, either intermittent or
continuous within the limits of good engineering practice.
125. “SCREEN model” means the AERSCREEN air dispersion model published
by the Administrator in April 2011 and available on the Support Center for
Regulatory Atmospheric Modeling web site: http://www.epa.gov/ttn/scram.
126127. “Secondary ambient air quality standards” means the ambient air quality
standards which define levels of air quality necessary to protect the public
welfare from any known or anticipated adverse effects of a pollutant, as specified
in Article 2 of this Chapter.
127128. “Secondary emissions” means emissions which are specific, well defined,
quantifiable, occur as a result of the construction or operation of a major source
or major modification, but do not come from the major source or major
modification itself, and impact the same general area as the stationary source or
modification which causes the secondary emissions. Secondary emissions
include emissions from any offsite support facility which would not otherwise be
constructed or increase its emissions except as a result of the construction or
operation of the major source or major modification. Secondary emissions do not
include any emissions which come directly from a mobile source, such as
emissions from the tailpipe of a motor vehicle, from a train, or from a vessel.
128129. “Section 302(j) category” means:
a. Any of the classes of sources listed in the definition of categorical source
in subsection (23); or
b. Any category of affected facility which, as of August 7, 1980, is being
regulated under section 111 or 112 of the Act.
129130. “Shutdown” means the cessation of operation of any air pollution control
equipment or process equipment for any purpose, except routine phasing out of
process equipment.
130131. “Significant” means, in reference to a significant emissions increase, a net
emissions increase, or a stationary source’s potential to emit or a stationary
source’s maximum capacity to emit with elective limits under R18-2-
302(B)(2):
a. A rate of emissions of conventional pollutants that would equal or
exceed any of the following rates:
Commented [SB5]: Federal NA-NSR rules establish significant rates solely for criteria pollutants and precursors. Amending to provide that significant rates for non-criteria pollutants apply solely for determining PSD and Class II permit applicability.
Page 30 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
Pollutant Emissions Rate
Carbon monoxide 100 tons per year (tpy)
Nitrogen oxides 40 tpy
Sulfur dioxide 40 tpy
Particulate matter 25 tpy
PM10 15 tpy
PM2.5 10 tpy of direct PM2.5 emissions;
40 tpy of sulfur dioxide emissions;
40 tpy of nitrogen oxide emissions.
VOC Ozone 40 tpy of VOC or nitrogen oxides
Lead 0.6 tpy
b. For purposes of determining the applicability of R18-2-302(B)(2) or
R18-2-406, a rate of emissions of non-conventional pollutants that
would equal or exceed any of the following:
Pollutant Emissions Rate
Particulate matter 25 tpy
Fluorides 3 tpy
Sulfuric acid mist 7 tpy
Hydrogen sulfide (H2S) 10 tpy
Total reduced sulfur
(including H2S)
10 tpy
Reduced sulfur compounds
(including H2S)
10 tpy
Municipal waste combustor
organics (measured as total tetra-
through octa-chlorinated dibenzo-
p-dioxins and dibenzofurans)
3.5 x 10-6 tpy
Page 31 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
Municipal waste combustor
metals (measured as particulate
matter)
15 tpy
Municipal waste combustor acid
gases (measured as sulfur
dioxide and hydrogen chloride)
40 tpy
Municipal solid waste landfill
emissions (measured as
nonmethane organic compounds)
50 tpy
Any regulated NSR pollutant
not specifically listed in this
subsection or subsection
(131)(a).
Any emission rate
bc. In ozone nonattainment areas classified as serious or severe, significant
emissions of the emission rate for nitrogen oxides and or VOC shall
be determined under R18-2-405.
cd. In a carbon monoxide nonattainment area classified as serious, a rate of
emissions that would equal or exceed 50 tons per year, if the
Administrator has determined that stationary sources contribute
significantly to carbon monoxide levels in that area.
e. In PM2.5 nonattainment areas, 40 tons per year of VOC as a
precursor of PM2.5.
d. For a regulated NSR pollutant that is not listed in subsection
(130)(a), any emission rate.
ef. Notwithstanding the emission rates listed in subsection (130)(a), (131)(a)
or (b), for purposes of determining the applicability of R18-2-406,
any emissions rate or any net emissions increase associated with a major
source or major modification, which would be constructed within 10
kilometers of a Class I area and have an impact on the ambient air quality
of such area equal to or greater than 1 mg/m3 µg/m3 (24-hour average).
131132. “Significant emissions increase” means, for a regulated NSR pollutant, an
increase in emissions that is significant as defined in this Section for that
Commented [SB6]: Under NRDC decision, and EPA proposal, ammonia must be treated as a precursor for PM2.5. However, EPA has not established significant rate for ammonia, even in proposal. If we used the PSD definition of significant for NA-NSR, the significant rate for ammonia would be 0 under this provision.
Commented [SB7]: Reflects NRDC decision that Part 4 applies to PM2.5 NAA and EPA proposed rule.
Page 32 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
pollutant.
132133. “Smoke” means particulate matter resulting from incomplete combustion.
133134. “Source” means any building, structure, facility or installation that may cause or
contribute to air pollution or the use of which may eliminate, reduce or control
the emission of air pollution. A.R.S. § 49-401.01(23).
134135. “Stack” means any point in a source designed to emit solids, liquids, or gases into
the air, including a pipe or duct but not including flares.
135136. “Stack in existence” means that the owner or operator had either:
a. Begun, or caused to begin, a continuous program of physical onsite
construction of the stack;
b. Entered into binding agreements or contractual obligations, which could
not be cancelled or modified without substantial loss to the owner or
operator, to undertake a program of construction of the stack to be
completed in a reasonable time.
136137. “Start-up” means the setting into operation of any air pollution control equipment
or process equipment for any purpose except routine phasing in of process
equipment.
137138. “State implementation plan” or “SIP” means the accumulated record of
enforceable air pollution control measures, programs and plans adopted by the
Director and submitted to and approved by the Administrator pursuant to 42
U.S.C. 7410.
138139. “Stationary rotating machinery” means any gas engine, diesel engine, gas
turbine, or oil fired turbine operated from a stationary mounting and used for the
production of electric power or for the direct drive of other equipment.
139140. “Stationary source” means any building, structure, facility or installation subject
to regulation pursuant to A.R.S. § 49-426(A) which emits or may emit any
regulated NSR air pollutant. “Building,” “structure,” “facility,” or “installation”
means all of the pollutant-emitting activities which belong to the same industrial
grouping, are located on one or more contiguous or adjacent properties, and are
under the control of the same person or persons under common control.
Pollutant-emitting activities shall be considered as part of the same industrial
grouping if they belong to the same “Major Group” as described in the “Standard
Industrial Classification Manual, 1987.”
141. “Subject to regulation” means, for any air pollutant, that the pollutant is
Page 33 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
subject to either a provision in the Act, or a nationally-applicable regulation
codified by the administrator in 40 CFR chapter I, subchapter C, that
requires actual control of the quantity of emissions of that pollutant, and
that such a control requirement has taken effect and is operative to control,
limit or restrict the quantity of emissions of that pollutant released from the
regulated activity.
140142. “Sulfuric acid plant” means any facility producing sulfuric acid by the contact
process by burning elemental sulfur, alkylation acid, hydrogen sulfide, or acid
sludge, but does not include facilities where conversion to sulfuric acid is utilized
as a means of preventing emissions of sulfur dioxide or other sulfur compounds
to the atmosphere.
141143. “Temporary clean coal technology demonstration project” means a clean coal
technology demonstration project operated for five years or less, and that
complies with the applicable implementation plan and other requirements
necessary to attain and maintain the national ambient air quality standards during
the project and after the project is terminated.
142144. “Temporary source” means a source which is portable, as defined in A.R.S. § 49-
401.01(23) and which is not an affected source.
143145. “Total reduced sulfur” (TRS) means the sum of the sulfur compounds, primarily
hydrogen sulfide, methyl mercaptan, dimethyl sulfide, and dimethyl disulfide,
that are released during kraft pulping and other operations and measured by
Method 16 in 40 CFR 60, Appendix A.
144146. “Trivial activities” means activities and emissions units, such as the following,
that may be omitted from a permit or registration application. Certain of the
following listed activities include qualifying statements intended to exclude
similar activities:
a. Low-Emitting Combustion
i. Combustion emissions from propulsion of mobile sources;
ii. Emergency or backup electrical generators at residential
locations;
iii. Portable electrical generators that can be moved by hand from
one location to another. “Moved by hand” means capable of
being moved without the assistance of any motorized or non-
motorized vehicle, conveyance, or device;
Page 34 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
b. Low- Or Non-Emitting Industrial Activities
i. Blacksmith forges;
ii. Hand-held or manually operated equipment used for buffing,
polishing, carving, cutting, drilling, sawing, grinding, turning,
routing or machining of ceramic art work, precision parts,
leather, metals, plastics, fiberboard, masonry, carbon, glass, or
wood;
iii. Brazing, soldering, and welding equipment, and cutting torches
related to manufacturing and construction activities that do not
result in emission of HAP metals. Brazing, soldering, and
welding equipment, and cutting torches related to manufacturing
and construction activities that emit HAP metals are insignificant
activities based on size or production level thresholds. Brazing,
soldering, and welding equipment, and cutting torches directly
related to plant maintenance and upkeep and repair or
maintenance shop activities that emit HAP metals are treated as
trivial and listed separately in this definition;
iv. Drop hammers or hydraulic presses for forging or metalworking;
v. Air compressors and pneumatically operated equipment,
including hand tools;
vi. Batteries and battery charging stations, except at battery
manufacturing plants;
vii. Drop hammers or hydraulic presses for forging or metalworking;
viii. Equipment used exclusively to slaughter animals, not including
other equipment at slaughterhouses, such as rendering cookers,
boilers, heating plants, incinerators, and electrical power
generating equipment;
ix. Hand-held applicator equipment for hot melt adhesives with no
VOC in the adhesive formulation;
x. Equipment used for surface coating, painting, dipping, or
spraying operations, except those that will emit VOC or HAP;
xi. CO2 lasers used only on metals and other materials that do not
emit HAP in the process;
xii. Electric or steam-heated drying ovens and autoclaves, but not the
Page 35 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
emissions from the articles or substances being processed in the
ovens or autoclaves or the boilers delivering the steam;
xiii. Salt baths using nonvolatile salts that do not result in emissions
of any regulated air pollutants;
xiv. Laser trimmers using dust collection to prevent fugitive
emissions;
xv. Process water filtration systems and demineralizers;
xvi. Demineralized water tanks and demineralizer vents;
xvii. Oxygen scavenging or de-aeration of water;
xviii. Ozone generators;
xix. Steam vents and safety relief valves;
xx. Steam leaks; and
xxi. Steam cleaning operations and steam sterilizers;
xxii. Use of vacuum trucks and high pressure washer/cleaning
equipment within the stationary source boundaries for cleanup
and in-source transfer of liquids and slurried solids to waste
water treatment units or conveyances;
xxiii. Equipment using water, water and soap or detergent, or a
suspension of abrasives in water for purposes of cleaning or
finishing.
xxiv. Electric motors.
c. Building and Site Maintenance Activities
i. Plant and building maintenance and upkeep activities, including
grounds-keeping, general repairs, cleaning, painting, welding,
plumbing, re-tarring roofs, installing insulation, and paving
parking lots, if these activities are not conducted as part of a
manufacturing process, are not related to the source’s primary
business activity, and do not otherwise trigger a permit revision.
Cleaning and painting activities qualify as trivial activities if
they are not subject to VOC or hazardous air pollutant control
requirements;
ii. Repair or maintenance shop activities not related to the source’s
primary business activity, not including emissions from surface
coating, de-greasing, or solvent metal cleaning activities, and not
Page 36 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
otherwise triggering a permit revision;
iii. Janitorial services and consumer use of janitorial products;
iv. Landscaping activities;
v. Routine calibration and maintenance of laboratory equipment or
other analytical instruments;
vi. Sanding of streets and roads to abate traffic hazards caused by
ice and snow;
vii. Street and parking lot striping;
viii. Caulking operations which are not part of a production process.
d. Incidental, Non-Industrial Activities
i. Air-conditioning units used for human comfort that do not have
applicable requirements under Title VI of the Act;
ii. Ventilating units used for human comfort that do not exhaust air
pollutants into the ambient air from any manufacturing,
industrial or commercial process;
iii. Tobacco smoking rooms and areas;
iv. Non-commercial food preparation;
v. General office activities, such as paper shredding, copying,
photographic activities, pencil sharpening and blueprinting, but
not including incineration;
vi. Laundry activities, except for dry-cleaning and steam boilers;
vii. Bathroom and toilet vent emissions;
viii. Fugitive emissions related to movement of passenger vehicles, if
the emissions are not counted for applicability purposes under
subsection (144)(c) (146)(c) of the definition of major source in
this Section and any required fugitive dust control plan or its
equivalent is submitted with the application;
ix. Use of consumer products, including hazardous substances as
that term is defined in the Federal Hazardous Substances Act (15
U.S.C. 1261 et seq.) where the product is used at a source in the
same manner as normal consumer use;
x. Activities directly used in the diagnosis and treatment of disease,
injury or other medical condition;
xi. Circuit breakers;
Page 37 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
xii. Adhesive use which is not related to production.
e. Storage, Piping and Packaging
i. Storage tanks, vessels, and containers holding or storing liquid
substances that will not emit any VOC or HAP;
ii. Storage tanks, reservoirs, and pumping and handling equipment
of any size containing soaps, vegetable oil, grease, animal fat,
and nonvolatile aqueous salt solutions, if appropriate lids and
covers are used;
iii. Chemical storage associated with water and wastewater
treatment where the water is treated for consumption and/or use
within the permitted facility;
iv. Chemical storage associated with water and wastewater
treatment where the water is treated for consumption and/or use
within the permitted facility;
v. Storage cabinets for flammable products;
vi. Natural gas pressure regulator vents, excluding venting at oil and
gas production facilities;
vii. Equipment used to mix and package soaps, vegetable oil, grease,
animal fat, and nonvolatile aqueous salt solutions, if appropriate
lids and covers are used;
f. Sampling and Testing
i. Vents from continuous emissions monitors and other analyzers;
ii. Bench-scale laboratory equipment used for physical or chemical
analysis, but not laboratory fume hoods or vents;
iii. Equipment used for quality control, quality assurance, or
inspection purposes, including sampling equipment used to
withdraw materials for analysis;
iv. Hydraulic and hydrostatic testing equipment;
v. Environmental chambers not using HAP gases;
vi. Soil gas sampling;
vii. Individual sampling points, analyzers, and process
instrumentation, whose operation may result in emissions but
that are not regulated as emission units;
g. Safety Activities
Page 38 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
i. Fire suppression systems;
ii. Emergency road flares;
h. Miscellaneous Activities
i. Shock chambers;
ii. Humidity chambers;
iii. Solar simulators;
iv. Cathodic protection systems;
v. High voltage induced corona; and
vi. Filter draining.
145147. “Unclassified area” means an area which the Administrator, because of a lack of
adequate data, is unable to classify as an attainment or nonattainment area for a
specific pollutant, and which, for purposes of this Chapter, is treated as an
attainment area.
146148. “Uncombined water” means condensed water containing analytical trace amounts
of other chemical elements or compounds.
147149. “Urban or suburban open area” means an unsubdivided tract of land surrounding
a substantial urban development of a residential, industrial, or commercial nature
and which, though near or within the limits of a city or town, may be
uncultivated, used for agriculture, or lie fallow.
148150. “Vacant lot” means a subdivided residential or commercial lot which contains no
buildings or structures of a temporary or permanent nature.
149151. “Vapor” means the gaseous form of a substance normally occurring in a liquid or
solid state.
150152. “Visibility impairment” means any humanly perceptible change in visibility
(light extinction, visual range, contrast, coloration) from that which would have
existed under natural conditions.
151153. “Visible emissions” means any emissions which are visually detectable without
the aid of instruments and which contain particulate matter.
152154. “Volatile organic compounds” or “VOC” means any compound of carbon,
excluding carbon monoxide, carbon dioxide, carbonic acid, metallic carbides or
carbonates, and ammonium carbonate, that participates in atmospheric
photochemical reactions. This includes any such organic compound other than
the following:
a. Methane;
Page 39 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
b. Ethane;
c. Methylene chloride (dichloromethane);
d. 1,1,1-trichloroethane (methyl chloroform);
e. 1,1,2-trichloro-1,2,2-trifluoroethane (CFC-113);
f. Trichlorofluoromethane (CFC-11);
g. Dichlorodifluoromethane (CFC-12);
h. Chlorodifluoromethane (HCFC-22);
i. Trifluoromethane (HFC-23);
j. 1,2-dichloro 1,1,2,2-tetrafluoroethane (CFC-114);
k. Chloropentafluoroethane (CFC-115);
l. 1,1,1-trifluoro 2,2-dichloroethane (HCFC-123);
m. 1,1,1,2-tetrafluoroethane (HFC-134a);
n. 1,1-dichloro 1-fluoroethane (HCFC-141b);
o. 1-chloro 1,1-difluoroethane (HCFC-142b);
p. 2-chloro-1,1,1,2-tetrafluoroethane (HCFC-124);
q. Pentafluoroethane (HFC-125);
r. 1,1,2,2-tetrafluoroethane (HFC-134);
s. 1,1,1-trifluoroethane (HFC-143a);
t. 1,1-difluoroethane (HFC-152a);
u. Parachlorobenzotrifluoride (PCBTF);
v. Cyclic, branched, or linear completely methylated siloxanes;
w. Acetone;
x. Perchloroethylene (tetrachloroethylene);
y. 3,3-dichloro-1,1,1,2,2-pentafluoropropane (HCFC-225ca);
z. 1,3-dichloro-1,1,2,2,3-pentafluoropropane (HCFC-225cb);
aa. 1,1,1,2,3,4,4,5,5,5-decafluoropentane (HFC 43-10mee);
bb. Difluoromethane (HFC-32);
cc. Ethylfluoride (HFC-161);
dd. 1,1,1,3,3,3-hexafluoropropane (HFC-236fa);
ee. 1,1,2,2,3-pentafluoropropane (HFC-245ca);
ff. 1,1,2,3,3-pentafluoropropane (HFC-245ea);
gg. 1,1,1,2,3-pentafluoropropane (HFC-245eb);
hh. 1,1,1,3,3-pentafluoropropane (HFC-245fa);
ii. 1,1,1,2,3,3-hexafluoropropane (HFC-236ea);
Page 40 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
jj. 1,1,1,3,3-pentafluorobutane (HFC-365mfc);
kk. Chlorofluoromethane (HCFC-31);
ll. 1 chloro-1-fluoroethane (HCFC-151a);
mm. 1,2-dichloro-1,1,2-trifluoroethane (HCFC-123a);
nn. 1,1,1,2,2,3,3,4,4-nonafluoro-4-methoxy-butane (C4F9OCH3);
oo. 2-(difluoromethoxymethyl)-1,1,1,2,3,3,3-heptafluoropropane
((CF3)2CFCF2OCH3);
pp. 1-ethoxy-1,1,2,2,3,3,4,4,4-nonafluorobutane (C4F9OC2H5);
qq. 2-(ethoxydifluoromethyl)-1,1,1,2,3,3,3-heptafluoropropane
((CF3)2CFCF2OC2H5;
rr. Methyl acetate; and
ss. 1,1,1,2,2,3,3-heptafluoro-3-methoxypropane (n-C3F7OCH3, HFE—
7000);
tt. 3-ethoxy-1,1,1,2,3,4,4,5,5,6,6,6-dodecafluoro-2-(trifluoromethyl) hexane
(HFE – 7500);
uu. 1,1,1,2,3,3,3-hentafluoropropane (HFC 227ea);
vv. Methyl formate (HCOOCH3): and
ww. (1) 1,1,1,2,2,3,4,5,5,5-decafluoro-3-methoxy-4-trifluoromethyl-pentane
(HFE–7300);
xx. Propylene carbonate;
yy. Dimethyl carbonate; and
zz. Trans -1,3,3,3-tetrafluoropropene;
aaa. HCF2OCF2H (HFE-134);
bbb. HCF2OCF2OCF2H (HFE-236cal2);
ccc. HCF2OCF2CF2OCF2H (HFE-338pcc13);
ddd. HCF2OCF2OCF2CF2OCF2H (H-Galden 1040x or H-Galden ZT 130
(or 150 or 180));
eee. Trans 1-chloro-3,3,3- trifluoroprop-1-ene;
fff. 2,3,3,3-tetrafluoropropene;
ggg. 2-amino-2-methyl-1-propanol; and
hhh. Perfluorocarbon compounds that fall into these classes:
i. Cyclic, branched, or linear, completely fluorinated alkanes.
ii. Cyclic, branched, or linear, completely fluorinated ethers with no
unsaturations.
Page 41 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
iii. Cycle, branched, or linear, completely fluorinated tertiary amines
with no unsaturations; or
iv. Sulfur containing perfluorocarbons with no unsaturations and
with sulfur bonds only to carbon and fluorine.
aaaiii. The following compound is VOC for purposes of all recordkeeping,
emissions reporting, photochemical dispersion modeling and inventory
requirements which apply to VOC and shall be uniquely identified in
emission reports, but are is not VOC for purposes of VOC emissions
limitations or VOC content requirements: t-butyl acetate.
153155. “Wood waste burner” means an incinerator designed and used exclusively for the
burning of wood wastes consisting of wood slabs, scraps, shavings, barks,
sawdust or other wood material, including those that generate steam as a by-
product.
R18-2-102. Incorporated Materials
A. The following documents are incorporated by reference and are on file with the Office of
the Secretary of State (1700 W. Washington St., Suite 103, Phoenix, AZ 85007) and the
Department (1110 W. Washington St., Phoenix, AZ 85007):
1. Sections 1 and 7 of the Department’s “Arizona Testing Manual for Air Pollutant
Emissions,” amended as of March 1992 (and no future editions).
2. All ASTM test methods referenced in this Chapter as of the year specified in the
reference (and no future amendments). They are available from the American
Society for Testing and Materials, 1916 Race St., Philadelphia, PA 19103-1187.
3. The U.S. Government Printing Office’s “Standard Industrial Classification
Manual, 1987” (and no future editions).
B. The Code of Federal Regulations is published by the United States Government
Printing Office, 732 North Capital Street, NW, Washington, DC 20401-0001, is on
file with the Department of Environmental Quality, 1110 West Washington Street,
Phoenix, Arizona 85007, and is available at the Arizona State Library, Archives &
Public Records, 1700 West Washington Street, Phoenix, Arizona 85007 and at other
Federal depositary libraries in the state (see
http://catalog.gpo.gov/fdlpdir/FDLPdir.jsp?st_12=AZ&flag=searchp). It is also
available online at
http://www.gpo.gov/fdsys/browse/collectionCfr.action?collectionCode=CFR.
Page 42 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
ARTICLE 2. AMBIENT AIR QUALITY STANDARDS; AREA DESIGNATIONS; CLASSIFICATIONS
R18-2-201. Particulate Matter: PM10 and PM2.5
A. PM10 Standards
1. The level of the primary and secondary ambient air quality standards for PM10 is
150 micrograms per cubic meter of PM10 – 24-hour average concentration.
2. To determine attainment of the primary and secondary standards, a person shall
measure PM10 in the ambient air by:
a. A reference method based on 40 CFR 50, Appendix J, and designated
according to 40 CFR 53; or
b. An equivalent method designated according to 40 CFR 53.
3. The primary and secondary 24-hour ambient air quality standards for PM10 are
attained when the expected number of days per calendar year with a 24-hour
average concentration above 150 micrograms per cubic meter, determined
according to 40 CFR 50, Appendix K, is less than or equal to one.
B. PM2.5 Standards
1. The primary ambient air quality standards for PM2.5 are:
a. 15 12 micrograms per cubic meter of PM2.5 – annual arithmetic mean
concentration.
b. 35 micrograms per cubic meter of PM2.5 – 24-hour average
concentration.
2. The secondary ambient air quality standards for PM2.5 are:
a. 15 micrograms per cubic meter of PM2.5 – annual arithmetic mean
concentration.
b. 35 micrograms per cubic meter of PM2.5 – 24-hour average
concentration.
3. To determine attainment of the primary and secondary standards, a person shall
measure PM2.5 in the ambient air by:
a. A reference method based on 40 CFR 50, Appendix L, and designated
according to 40 CFR 53; or
b. An equivalent method designated according to 40 CFR 53.
4. The primary and secondary annual ambient air quality standardsstandard for
PM2.5 areis met when the annual arithmetic mean concentration, determined
according to 40 CFR 50, Appendix N, is less than or equal to 15 12 micrograms
Page 43 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
per cubic meter.
5. The secondary annual ambient air quality standard for PM2.5 is met when
the annual arithmetic mean concentration, determined according to 40 CFR
50, Appendix N, is less than or equal to 15 micrograms per cubic meter.
56. The primary and secondary 24-hour ambient air quality standards for PM2.5 are
met when the 98th percentile 24-hour concentration, determined according to 40
CFR 50, Appendix N, is less than or equal to 35 micrograms per cubic meter.
R18-2-217. Designation and Classification of Attainment Areas
A. All attainment and unclassified areas or parts thereof shall be classified as either Class
I, Class II or Class III.
B. All of the following areas which were in existence on August 7, 1977, including any
boundary changes to those areas which occurred subsequent to the date of
enactment of the Clean Air Act Amendments of 1977 and before March 12, 1993,
shall be Class I areas irrespective of attainment status and shall not be redesignated:
1. International parks;
2. National wilderness areas which exceed 5,000 acres in size;
3. National memorial parks which exceed 5,000 acres in size; and
4. National parks which exceed 6,000 acres in size.
C. Areas which were redesignated as Class I under regulations promulgated before
August 7, 1977, shall remain Class I, but may be redesignated as provided in this
section.
D. Any other area , unless otherwise specified in the legislation creating such an area, is
initially designated Class II, but may be redesignated as provided in this Section.
CE. The following areas shall be designated only as Class I or II:
1. An area which as of August 7, 1977, exceeds 10,000 acres in size and is one of
the following:
a. A national monument,
b. A national primitive area,
c. A national preserve,
d. A national recreational area,
e. A national wild and scenic river,
f. A national wildlife refuge,
g. A national lakeshore or seashore.
2. A national park or national wilderness area established after August 7, 1977,
Page 44 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
which exceeds 10,000 acres in size.
D. All other areas shall be Class II areas unless redesignated under subsections (E) or
(F).
EF. Except as otherwise provided in subsections (B) to (E), the The Governor or the
Governor’s designee may redesignate areas of the state as Class I or Class II, provided
that the following requirements are fulfilled:
1. At least one public hearing is held in or near the area affected in accordance
with 40 CFR 51.102;
2. Other states, Indian governing bodies and Federal Land Managers, whose land
may be affected by the proposed redesignation are notified at least 30 days prior
to the public hearing.
3. A discussion document of the reasons for the proposed redesignation including a
description and analysis of health, environmental, economic, social and energy
effects of the proposed redesignation is prepared by the Governor or the
Governor’s designee. The discussion document shall be made available for
public inspection at least 30 days prior to the hearing and the notice announcing
the hearing shall contain appropriate notification of the availability of such
discussion document.
4. Prior to the issuance of notice respecting the redesignation of an area which
includes any federal lands, the Governor or the Governor’s designee has provided
written notice to the appropriate Federal Land Manager and afforded the Federal
Land Manager adequate opportunity, not in excess of 60 days, to confer with the
state respecting the redesignation and to submit written comments and
recommendations. The Governor or the Governor’s designee shall publish a list
of any inconsistency between such redesignation and such recommendations,
together with the reasons for making such redesignation against the
recommendation of the Federal Land Manager, if any Federal Land Manager has
submitted written comments and recommendations.
5. The redesignation is proposed after consultation with the elected leadership of
local governments in the area covered by the proposed redesignation.
6. The redesignation is submitted to the Administrator as a revision to the SIP.
FG. Except as otherwise provided in subsections (B) to (E), theThe Governor or the
Governor’s designee may redesignate areas of the state as Class III if all of the
following criteria are met:
Page 45 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
1. Such redesignation meets the requirements of subsection (E)(F);
2. Such redesignation has been approved after consultation with the appropriate
committee of the legislature if it is in session or with the leadership of the
legislature if it is not in session.
3. The general purpose units of local government representing a majority of the
residents of the area to be redesignated concur in the redesignation;
4. Such redesignation shall not cause, or contribute to, a concentration of any air
pollutant which exceeds any national ambient air quality standard or any
maximum allowable increase or maximum allowable concentration permitted
under the classification of any area allowed under R18-2-218;
5. For any new major source as defined in R18-2-401 or a major modification of
such source which may be permitted to be constructed and operated only if the
area in question is redesignated as Class III, any permit application or related
and materials submitted as part of the application shall be made available for
public inspection prior to a any public hearing on the redesignation of the area
as Class III.
6. The redesignation is submitted to the Administrator as a revision to the SIP.
GH. A redesignation shall not be effective until approved by the Administrator as part of an
applicable implementation plan. If the Administrator disapproves the redesignation,
the classification of the area shall be that which was in effect before the disapproved
redesignation.
HI. Lands within the exterior boundaries of Indian reservations may be redesignated only by
the appropriate Indian governing body.
R18-2-218. Limitation of Pollutants in Classified Attainment Areas
A. Areas designated as Class I, II, or III shall be limited to the following increases in air
pollutant concentrations occurring over the baseline concentration; provided that for any
period other than an annual period, the applicable maximum allowable increase may be
exceeded once per year at any one location:
CLASS I
Maximum Allowable
Increase (Micrograms
per cubic meter)
Particulate matter: PM2.5
Page 46 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
Annual arithmetic mean 1
24-hr maximum 2
Particulate matter: PM10
Annual arithmetic mean 4
24-hour maximum 8
Sulfur dioxide:
Annual arithmetic mean 2
24-hour maximum 5
3-hour maximum 25
Nitrogen dioxide:
Annual arithmetic mean 2.5
CLASS II
Particulate matter: PM2.5
Annual arithmetic mean 4
24-hr maximum 9
Particulate matter: PM10
Annual arithmetic mean 17
24-hour maximum 30
Sulfur dioxide:
Annual arithmetic mean 20
24-hour maximum 91
3-hour maximum 512
Nitrogen dioxide:
Annual arithmetic mean 25
CLASS III
Particulate matter: PM2.5
Annual arithmetic mean 8
24-hr maximum 18
Page 47 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
Particulate matter: PM10
Annual arithmetic mean 34
24-hour maximum 60
Sulfur dioxide:
Annual arithmetic mean 40
24-hour maximum 182
3-hour maximum 700
Nitrogen dioxide:
Annual arithmetic mean 50
B. The baseline concentration shall be is that ambient concentration level which exists in
the baseline area at the time of the applicable minor source baseline data.
1. The major source baseline date is:
a. January 6, 1975, for sulfur dioxide and PM10.
b. February 8, 1988, for nitrogen dioxide.
c. October 20, 2010, for PM2.5.
2. The minor source baseline date shall be the earliest date after the trigger date on
which a major source as defined in R18-2-401 or major modification subject to
40 CFR 52.21 or R18-2-406 submits a complete application under the relevant
regulations.
a. The trigger date is:
ai. August 7, 1977, for PM10 and sulfur dioxide.
bii. February 8, 1988, for nitrogen dioxide.
ciii. October 20, 2011, for PM2.5.
b. Any minor source baseline date established originally for total
suspended particulates shall remain in effect and shall apply for
purposes of determining the amount of available PM-10 increments,
except that the Department may rescind any such minor source
baseline date where it can be shown, to the satisfaction of the
Department, that the emissions increase from the major source, or
the net emissions increase from the major modification, responsible
for triggering that date did not result in a significant amount of PM-
10 emissions.
Page 48 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
3. A baseline concentration shall be determined for each pollutant for which there is
a minor source baseline date and shall include both:
a. The actual emissions representative of sources in existence on the minor
source baseline date, except as provided in subsection (B)(4); and
b. The allowable emissions of major sources as defined in R18-2-401 which
commenced construction before the major source baseline date but were
not in operation by the applicable minor source baseline date.
4. The following shall not be included in the baseline concentration and shall affect
the applicable maximum allowable increase:
a. Actual emissions from any major source as defined in R18-2-401 on
which construction commenced after the major source baseline date; and
b. Actual emissions increases and decreases at any stationary source
occurring after the minor source baseline date.
C. The baseline date shall be established for each pollutant for which maximum allowable
increases or other equivalent measures have been established if both:
1. The area in which the proposed source or modification would construct is
designated as attainment or unclassifiable under section 107(d)(1)(A)(ii) or (iii)
of the Act for the pollutant on the date of its complete application under 40 CFR
52.21 or R18-2-406; and
2. In the case of a major source as defined in R18-2-401, the pollutant would be
emitted in significant amounts, or in the case of a major modification, there
would be a significant net emissions increase of the pollutant.
D. The baseline area shall be the AQCR that contains the area, designated as attainment or
unclassifiable under section 107(d)(1)(A)(ii) or (iii) of the Act, in which the major source
as defined in R18-2-401 or major modification establishing the minor source baseline
date would construct or would have an air quality impact for the pollutant for which the
minor source baseline date is established, as follows: greater than or equal to 1
microgram per cubic meter (annual average) for sulfur dioxide, nitrogen dioxide or PM10;
or greater than or equal to 0.3 microgram per cubic meter (annual average) for PM2.5.
1. Area redesignations under R18-2-217 section 107(d)(1)(A)(ii) or (iii) of the Act
that would redesignate a baseline area may not intersect or be smaller than the
area of impact of any new major source as defined in R18-2-401 or a major
modification which either:
1a. Establishes a minor source baseline date, or
Page 49 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
2b. Is subject to either 40 CFR 52.21 or R18-2-406 and would be constructed
in Arizona.
2. Any baseline area established originally for total suspended particulates
shall remain in effect and shall apply for purposes of determining the
amount of available PM–10 increments, except that such baseline area shall
not remain in effect if the Department rescinds the corresponding minor
source baseline date in accordance with subsection (B)(2)(b).
E. The maximum allowable concentration of any air pollutant in any area to which
subsection (A) applies shall not exceed a concentration for each pollutant equal to the
concentration permitted under the national ambient air quality standards contained in
this Article.
F. For purposes of determining compliance with the maximum allowable increases in
ambient concentrations of an air pollutant, the following concentrations of such pollutant
shall not be taken into account:
1. Concentration of such pollutant attributable to the increase in emissions from
major and stationary sources which have converted from the use of petroleum
products, or natural gas, or both, by reason of a natural gas curtailment order
which is in effect under the provisions of sections 2(a) and (b) of the Energy
Supply and Environmental Coordination Act of 1974, 15 U.S.C. 792, over the
emissions from such sources before the effective date of such order;
2. The concentration of such pollutant attributable to the increase in emissions from
major and stationary sources which have converted from using gas by reason of a
natural gas curtailment plan in effect pursuant to the Federal Power Act, 16
U.S.C. 792 - 825r, over the emissions from such sources before the effective date
of the natural gas curtailment plan;
3. Concentrations of PM10 or PM2.5 attributable to the increase in emissions from
construction or other temporary emission related activities of a new or modified
source;
4. The increase in concentrations attributable to new sources outside the United
States over the concentrations attributable to existing sources which are included
in the baseline concentration; and
5. Concentrations attributable to the temporary increase in emissions of sulfur
dioxide, nitrogen oxides, PM2.5, or PM10 from major sources as defined in R18-2-
401 when the following conditions are met:
Page 50 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
a. The operating permit permits issued to such sources specifies specify
the time period during which the temporary emissions increase of sulfur
dioxide, nitrogen oxides, PM2.5 or PM10 would occur. Such time period
shall not be renewable and shall not exceed two years unless a longer
period is specifically approved by the Director.
b. No emissions increase shall be approved which would either The
temporary emissions increase will not:
i. Impact any portion of any Class I area or any portion of any
other area where an applicable incremental ambient standard
a maximum increase allowed by subsection (A) is known to be
violated in that portion; or
ii. Cause or contribute to the violation of a state national ambient
air quality standard.
c. The operating permit issued to such sources specifies that, at the end of
the time period described in subsection (F)(5)(a), the emissions levels
from the sources would not exceed the levels occurring before the
temporary emissions increase was approved.
6. The exception granted by subsections (F)(1) and (2) with respect to increment
consumption under subsections (F)(1) and (2) maximum increases allowed
under subsection (A) shall not apply more than five years after the effective date
of the order or natural gas curtailment plan on which the exception is based.
G. If the Director or the Administrator determines that the SIP is substantially inadequate to
prevent significant deterioration or that an applicable maximum allowable increase as
specified in subsection (A) is being violated, the SIP shall be revised to correct the
inadequacy or the violation. The SIP shall be revised within 60 days of such a finding by
the Director or within 60 days following notification by the Administrator, or by such
later date as prescribed by the Administrator after consultation with the Director.
H. The Director shall review the adequacy of the SIP on a periodic basis and within 60 days
of such time as information becomes available that an applicable maximum allowable
increase is being violated.
ARTICLE 3. PERMITS AND PERMIT REVISIONS
R18-2-301. Definitions
The following definitions apply to this Article:
Page 51 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
1. “Alternative method” means any method of sampling and analyzing for an air
pollutant which is not a reference or equivalent method but which has been
demonstrated to produce results adequate for the Director’s determination of
compliance in accordance with R18-2-311(D).
2. “Billable permit action” means the issuance or denial of a new permit, significant
permit revision, or minor permit revision, or the renewal of an existing permit.
3. “Capacity factor” means the ratio of the average load on a machine or equipment
for the period of time considered to the capacity rating of the machine or
equipment.
4. “CEM” means a continuous emission monitoring system as defined in R18-2-
101.
5. “Complete” means, in reference to an application for a permit, permit revision or
registration, that the application contains all the information necessary for
processing the application. Designating an application complete for purposes of a
permit, permit revisions or registration processing does not preclude the Director
from requesting or accepting any additional information.
6. “Dispersion technique” means any technique which attempts to affect the
concentration of a pollutant in the ambient air by any of the following:
a. Using that portion of a stack which exceeds good engineering practice
stack height;
b. Varying the rate of emission of a pollutant according to atmospheric
conditions or ambient concentrations of that pollutant; or
c. Increasing final exhaust gas plume rise by manipulating source process
parameters, exhaust gas parameters, stack parameters, or combining
exhaust gases from several existing stacks into one stack; or other
selective handling of exhaust gas streams so as to increase the exhaust
gas plume rise. This shall not include any of the following:
i. The reheating of a gas stream, following use of a pollution
control system, for the purpose of returning the gas to the
temperature at which it was originally discharged from the
facility generating the gas stream.
ii. The merging of exhaust gas streams under any of the following
conditions:
(1) The source owner or operator demonstrates that the
Page 52 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
facility was originally designed and constructed with
such merged gas streams;
(2) After July 8 18, 1985, such merging is part of a change
in operation at the facility that includes the installation
of pollution controls and is accompanied by a net
reduction in the allowable emissions of a pollutant,
applying only to the emission limitation for that
pollutant; or
(3) Before July 8, 1985, such merging was part of a change
in operation at the facility that included the installation
of emissions control equipment or was carried out for
sound economic or engineering reasons. Where there
was an increase in the emission limitation or, in the
event that no emission limitation was in existence prior
to the merging, an increase in the quantity of pollutants
actually emitted prior to the merging, the reviewing
agency shall presume that merging was significantly
motivated by an intent to gain emissions credit for
greater dispersion. Absent a demonstration by the source
owner or operator that merging was not significantly
motivated by such intent, the reviewing agency shall
deny credit for the effects of such merging in calculating
the allowable emissions for the source.
iii. Smoke management in agricultural or silvicultural prescribed
burning programs.
iv. Episodic restrictions on residential woodburning and open
burning.
v. Techniques which increase final exhaust gas plume rise where
the resulting allowable emissions of sulfur dioxide from the
facility do not exceed 5,000 tons per year.
7. “Emissions allowable under the permit” means a permit term or condition
determined at issuance to be required by an applicable requirement that
establishes an emissions limit (including a work practice standard) or an
emissions cap that the source has assumed to avoid an applicable requirement to
Page 53 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
which the source would otherwise be subject.
8. “Fossil fuel-fired steam generator” means a furnace or boiler used in the process
of burning fossil fuel for the primary purpose of producing steam by heat
transfer.
9. “Fuel oil” means Number 2 through Number 6 fuel oils as specified in ASTM D-
396-90a (Specification for Fuel Oils), gas turbine fuel oils Numbers 2-GT
through 4-GT as specified in ASTM D-2880-90a (Specification for Gas Turbine
Fuel Oils), or diesel fuel oils Numbers 2-D and 4-D as specified in ASTM D-
975-90a (Specification for Diesel Fuel Oils).
10. “Itemized bill” means a breakdown of the permit processing time into the
categories of pre-application activities, completeness review, substantive review,
and public involvement activities, and within each category, a further breakdown
by employee name.
11. “Major source threshold” means the lowest applicable emissions rate for a
pollutant that would cause the source to be a major source at the particular time
and location, under the definition of major source in R18-2-101.
12. “Maximum capacity to emit” means the maximum amount a source is
capable of emitting under its physical and operational design without taking
any limitations on operations or air pollution controls into account.
13. “Maximum capacity to emit with elective limits” means the maximum
amount a source is capable of emitting under its physical and operational
design taking into account the effect on emissions of any elective limits
included in the source’s registration under R18-2-302.01(F).
1214. “Minor NSR Modification” means any of the following changes that do not
qualify as a major source or major modification:
a. Any physical change in or change in the method of operation of an
emission unit or a stationary source that either:
i. Increases the potential to emit of a regulated minor NSR
pollutant by an amount greater than the permitting exemption
thresholds, or
ii. Results in emissions of a regulated minor NSR pollutant not
previously emitted by such emission unit or stationary source in
an amount greater than the permitting exemption thresholds.
b. Construction of one or more new emissions units that have the potential
Page 54 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
to emit regulated minor NSR pollutants at an amount greater than the
permitting exemption threshold.
c. A change covered by subsection (12)(a) or (b) of this Section constitutes
a minor NSR modification regardless of whether there will be a net
decrease in total source emissions or a net increase in total source
emissions that is less than the permitting exemption threshold as a result
of decreases in the potential to emit of other emission units at the same
stationary source.
d. For the purposes of this subsection the following do not constitute a
physical change or change in the method of operation:
i. A change consisting solely of the construction of, or changes to,
a combination of emissions units qualifying as a categorically
exempt activity.
ii. For a stationary source that is required to obtain a Class II permit
under R18-2-302 and that is subject to source-wide emissions
caps under R18-2-306.01 or R18-2-306.02, a change that will not
result in the violation of the existing emissions cap for that
regulated minor NSR pollutant.
iii. Replacement of an emission unit by a unit with a potential to
emit regulated minor NSR pollutants that is less than or equal to
the potential to emit of the existing unit, provided the
replacement does not cause an increase in emissions at other
emission units at the stationary source. A unit installed under this
provision is subject to any limits applicable to the unit it
replaced.
iv. Routine maintenance, repair, and replacement.
v. Use of an alternative fuel or raw material by reason of an order
under Sections 2(a) and (b) of the Energy Supply and
Environmental Coordination Act of 1974, 15 U.S.C. 792, or by
reason of a natural gas curtailment plan under the Federal Power
Act, 16 U.S.C. 792 to 825r.
vi. Use of an alternative fuel by reason of an order or rule under
Section 125 of the Act.
vii. Use of an alternative fuel at a steam generating unit to the extent
Page 55 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
that the fuel is generated from municipal solid waste.
viii. Use of an alternative fuel or raw material by a stationary source
that either:
(1) The source was capable of accommodating before
December 12, 1976, unless the change would be
prohibited under any federally enforceable permit
condition established after December 12, 1976, under 40
CFR 52.21, or under Articles 3 or 4 of this Chapter; or
(2) The source is approved to use under any permit issued
under 40 CFR 52.21, or under Articles 3 or 4 of this
Chapter.
ix. An increase in the hours of operation or in the production rate,
unless the change would be prohibited under any federally
enforceable permit condition established after December 12,
1976, under 40 CFR 52.21, or under Articles 3 or 4 of this
Chapter.
x. Any change in ownership at a stationary source
xi. The installation, operation, cessation, or removal of a temporary
clean coal technology demonstration project, if the project
complies with:
(1) The SIP, and
(2) Other requirements necessary to attain and maintain the
national ambient air quality standards during the project
and after it is terminated.
xii. For electric utility steam generating units located in attainment
and unclassifiable areas only, the installation or operation of a
permanent clean coal technology demonstration project that
constitutes repowering, if the project does not result in an
increase in the potential to emit any regulated pollutant emitted
by the unit. This exemption applies on a pollutant-by-pollutant
basis.
xiii. For electric utility steam generating units located in attainment
and unclassifiable areas only, the reactivation of a very clean
coal-fired electric utility steam generating unit.
Page 56 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
e. For purposes of this subsection:
i. “Potential to emit” means the lower of a source’s or emission
unit’s potential to emit or its allowable emissions.
ii. In determining potential to emit, the fugitive emissions of a
stationary source shall not be considered unless the source
belongs to a section 302(j) category.
iii. All of the roadways located at a stationary source constitute a
single emissions unit.
1315. “NAICS” means the five- or six-digit North American Industry Classification
System-United States, 1997, number for industries used by the U.S. Department
of Commerce.
1416. “Permit processing time” means all time spent by Air Quality Division staff or
consultants on tasks specifically related to the processing of an application for the
issuance or renewal of a particular permit or permit revision, including time spent
processing an application that is denied.
1517. “Quantifiable” means, with respect to emissions, including the emissions
involved in equivalent emission limits and emission trades, capable of being
measured or otherwise determined in terms of quantity and assessed in terms of
character. Quantification may be based on emission factors, stack tests,
monitored values, operating rates and averaging times, materials used in a
process or production, modeling, or other reasonable measurement practices.
1618. “Registration” means a registration under R18-2-302.01.
1719. “Replicable” means, with respect to methods or procedures, sufficiently
unambiguous that the same or equivalent results would be obtained by the
application of the method or procedure by different users.
1820. “Responsible official” means one of the following:
a. For a corporation: a president, secretary, treasurer, or vice-president of
the corporation in charge of a principal business function, or any other
person who performs similar policy or decision-making functions for the
corporation, or a duly authorized representative of such person if the
representative is responsible for the overall operation of one or more
manufacturing, production, or operating facilities applying for or subject
to a permit and either:
i. The facilities employ more than 250 persons or have gross
Page 57 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
annual sales or expenditures exceeding $25 million (in second
quarter 1980 dollars); or
ii. The delegation of authority to such representatives is approved
in advance by the permitting authority;
b. For a partnership or sole proprietorship: a general partner or the
proprietor, respectively;
c. For a municipality, state, federal, or other public agency: Either a
principal executive officer or ranking elected official. For the purposes of
this Article, a principal executive officer of a federal agency includes the
chief executive officer having responsibility for the overall operations of
a principal geographic unit of the agency (e.g., a Regional Administrator
of EPA); or
d. For affected sources:
i. The designated representative in so far as actions, standards,
requirements, or prohibitions under Title IV of the Act or the
regulations promulgated thereunder are concerned; and
ii. The designated representative for any other purposes under 40
CFR 70.
21. “Screening model” means air dispersion modeling performed with screening
techniques in accordance with 40 CFR 51 Appendix W.
1922. “Small source” means a source with a potential to emit, without controls, less
than the rate defined as permitting exemption thresholds in R18-2-101, but
required to obtain a permit solely because it is subject to a standard under 40
CFR 63.
2023. “Startup” means the setting in operation of a source for any purpose.
2124. “Synthetic minor” means a source with a permit that contains voluntarily
accepted emissions limitations, controls, or other requirements (for example, a
cap on production rates or hours of operation, or limits on the type of fuel) under
R18-2-306.01 to reduce the potential to emit to a level below the major source
threshold.
22. “Uncontrolled potential to emit” means the maximum capacity of a
stationary source to emit a pollutant, excluding secondary emissions, under
its physical and operational design. Any physical or operational limitation
on the capacity of the source to emit a pollutant, including air pollution
Page 58 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
control equipment and restrictions on hours of operation or on the type or
amount of material combusted, stored, or processed, shall be treated as part
of its design only if the limitation or the effect it would have on emissions is
subject to an elective limit under R18-2-302.01(F).
R18-2-302. Applicability; Registration; Classes of Permits
A. Except as otherwise provided in this Article, no person shall begin actual construction of,
operate, or make a modification to any stationary source subject to regulation under this
Article, without obtaining a registration, permit or permit revision from the Director.
B. Class I and II permits and registrations shall be required as follows:
1. A Class I permit shall be required for a person to begin actual construction of or
operate any of the following:
a. Any major source,
b. Any solid waste incineration unit required to obtain a permit pursuant to
Section 129(e) of the Act,
c. Any affected source, or
d. Any stationary source in a source category designated by the
Administrator pursuant to 40 CFR 70.3 and adopted by the Director by
rule.
2. Unless a Class I permit is required, a Class II permit shall be required for:
a. A person to begin actual construction of or operate any stationary source
that emits, or has the uncontrolled potential to emit maximum
capacity to emit with elective limits, significant quantities of regulated
NSR pollutants;
b. A person to make a physical or operational change to a stationary source
that would cause the source to emit, or have the uncontrolled potential
to emit maximum capacity to emit with elective limits significant
quantities of regulated NSR pollutants.
c. A person to begin actual construction of a source subject to Article
17 of this Chapter.
d. A person to make a modification subject to Article 17 of this Chapter
to a source for which a permit has not been issued under this Article.
ec. A person to begin actual construction of or modify a stationary source
that otherwise would be subject to registration but that the Director has
determined requires a permit under R18-2-302.01(B)(3)(b) R18-2-
Commented [SB8]: Eliminating references to unenforceable state HAPs program.
Page 59 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
302.01(C)(4) or (D).
3. Until the effective date of the Administrator’s approval of the registration
program in R18-2-302.01 into the state implementation plan, unless a Class I
permit is required, a Class II permit shall be required for any of the
activities that would require a registration under subsections (B)(4)(b) and
(c).
43. After the effective date of the Administrator’s approval of R18-2-302.01 into
the state implementation plan, unless Unless a Class I or II permit is required,
registration shall be required for:
a. A person to begin actual construction of or operate any stationary source
that emits or has the maximum capacity to emit under its physical and
operational design, without taking any limitations on operations or
air pollution controls into account, any regulated minor NSR pollutant
in an amount greater than or equal to a permitting exemption threshold.
b. A person to begin actual construction of or operate any stationary source
subject to a standard under section 111 of the Act, except that a
stationary source is not required to register solely because it is subject to
any of the following standards:
i. 40 CFR 60, Subpart AAA (Residential Wood Heaters).
ii. 40 CFR 60, Subpart IIII (Stationary Compression Ignition
Internal Combustion Engines).
iii. 40 CFR 60, Subpart JJJJ (Stationary Spark Ignition Internal
Combustion Engines).
c. A person to begin actual construction of or operate any stationary source,
including an area source, subject to a standard under section 112 of the
Act, except that a stationary source is not required to register solely
because it is subject to any of the following standards:
i. 40 CFR 61.145.
ii. 40 CFR 63, Subpart ZZZZ (Reciprocating Internal Combustion
Engines).
iii. 40 CFR 63, Subpart WWWWW (Ethylene Oxide Sterilizers).
iv. 40 CFR 63, Subpart CCCCCC (Gasoline Distribution).
v. 40 CFR 63, Subpart HHHHHH (Paint Stripping and
Miscellaneous Surface Coating Operations).
Page 60 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
vi. 40 CFR 63, Subpart JJJJJJ (Industrial, Commercial, and
Institutional Boilers Area Sources), published at 76 FR 15554
(March 21, 2011).
vii. A regulation or requirement under section 112(r) of the Act.
d. A physical or operational change to a source that would cause the source
to emit or have the maximum capacity to emit under its physical and
operational design, without taking any limitations on operations or
air pollution control into account, any regulated minor NSR pollutant
in excess of a in an amount greater than or equal to the permitting
exemption threshold.
C. Notwithstanding subsections (A) and (B), the following stationary sources do not require
a permit or registration unless the source is a major source, or unless operation without a
permit would result in a violation of the Act:
1. A stationary source that consists solely of a single categorically exempt activity
plus any combination of trivial activities.
2. Agricultural equipment used in normal farm operations. “Agricultural equipment
used in normal farm operations” does not include equipment classified as a
source that requires a permit under Title V of the Act, or that is subject to a
standard under 40 CFR 60, 61 or 63.
D. No person may construct or reconstruct any major source of hazardous air pollutants,
unless the Director determines that maximum achievable control technology emission
limitation (MACT) for new sources under Section 112 of the Act will be met. If MACT
has not been established by the Administrator, such determination shall be made on a
case-by-case basis pursuant to 40 CFR 63.40 through 63.44, as incorporated by reference
in R18-2-1101(B). For purposes of this subsection, constructing and reconstructing a
major source shall have the meaning prescribed in 40 CFR 63.41.
E. Elective limits or controls adopted under R18-2-302.01(F) shall not be considered in
determining whether a source requires registration or a Class I permit but shall be
considered in determining any of the following:
1. Whether the registration is subject to the public participation requirements of
R18-2-330, as provided in R18-2-302.01(B)(3)(a) R18-2-302.01(B)(3).
2. Whether review for possible interference with attainment or maintenance of
ambient standards is required under R18-2-302.01(C).
3. Whether the source requires a Class II permit, as provided in subsection (B)(2)(a)
Page 61 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
or (b).
F. The fugitive emissions of a stationary source shall not be considered in determining
whether the source requires a Class II permit under subsection (B)(2)(a) or (b) or a
registration under subsection (B)(4)(a) or (e) (B)(3)(a) or (d), unless the source belongs
to a section 302(j) category. If a permit is required for a stationary source, the fugitive
emissions of the source shall be subject to all of the requirements of this Article.
G. Notwithstanding subsections (A) and (B) of this Section, a person may begin actual
construction, but not operation, of a source requiring a Class I permit or Class I permit
revision upon the Director’s issuance of the proposed final permit or proposed final
permit revision.
R18-2-302.01. Source Registration Requirements
A. Application. An application for registration shall be submitted on the form specified by
the Director and shall include the following information:
1. The name of the applicant.
2. The physical location of the source, including the street address, city, county, zip
code and latitude and longitude coordinates.
3. The source’s uncontrolled potential to emit maximum capacity to emit with
elective limits each regulated minor NSR pollutant calculated in accordance
with R18-2-327(C).
4. Identification of any elective limits or controls adopted under subsection (F).
5. In the case of a modification, each increase in the source’s potential to emit that
exceeds the applicable threshold in subsection (G)(1)(a).
6. Identification of the method used to determine the potential to emit or change in
potential to emit specified under R18-2-302(B)(4)(a) R18-2-302(B)(3)(a) or (d)
or subsection (G)(1)(a) of this Section.
7. Process information for the source, including a list of emission units, design
capacity, operations schedule, and identification of emissions control devices.
B. Registration Processing Procedures.
1. The Department shall complete a review of a registration application for
administrative completeness within 30 calendar days, calculated in accordance
with A.A.C. R18-1-503, after its receipt.
2. The Department shall complete a substantive review and take final action on a
registration application within 60 calendar days if no hearing is requested, and 90
calendar days if a hearing is requested, calculated in accordance with A.A.C.
Page 62 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
R18-1-504, after the application is administratively complete.
3. Public Participation.
a. Except as provided in subsection (B)(3)(b) (B)(5), a registration for
construction of a source shall be subject to the public notice and
participation requirements of R18-2-330. The materials relevant to the
registration decision made available to the public under R18-2-
330(D)(11) R18-2-330(D) shall include any determination made or
modeling conducted by the Director under subsection (C).
4. A copy of the notice required by subsection (B)(3) shall also be sent to the
Administrator through the appropriate regional office, and to all other state
and local air pollution control agencies having jurisdiction in the region in
which the source subject to the permit or permit revision will be located.
The notice also shall be sent to any other agency in the region having
responsibility for implementing the procedures required under 40 CFR 51,
I.
b5. A registration for construction of a source shall not be subject to the public
notice and participation requirements of R18-2-330 subsection (B)(3) or (4),
if the source’s uncontrolled potential to emit maximum capacity to emit with
elective limits each regulated minor NSR pollutant is less than the applicable
permitting exemption threshold.
C. Review for NAAQS National Ambient Air Quality Standards Compliance;
Requirement to Obtain a Permit.
1. The Director shall review each application for registration of a source with the
uncontrolled potential to emit maximum capacity to emit with elective limits
any regulated minor NSR pollutant in an amount equal to or greater than the
permitting exemption threshold. The purpose of the review shall be to determine
whether the new or modified source may interfere with attainment or
maintenance of a standard imposed in Article 2 of this Chapter national
ambient air quality standard in Arizona or any affected state. In making the
determination required by this subsection, the Director shall take into account the
following factors:
a. The source’s emission rates, including fugitive emission rates, taking
into account any elective limits or controls adopted under subsection (F).
b. The location of emission units within the facility and their proximity to
Commented [SB9]: Notice provisions required for minor NSR.
Page 63 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
the ambient air.
c. The terrain in which the source is or will be located.
d. The source type.
e. The location and emissions of nearby sources.
f. Background concentrations of regulated minor NSR pollutants.
2. The Director may undertake the review specified in subsection (C)(1) for a
source with the uncontrolled potential to emit maximum capacity to emit
with elective limits regulated minor NSR pollutants in an amount less than the
permitting exemption threshold.
3. If the Director determines under subsection (C)(1) or (C)(2) that a source’s
emissions may interfere with attainment or maintenance of a standard imposed
in Article 2 of this Chapter national ambient air quality standard, the
Director shall perform a SCREEN screening model run for each regulated minor
NSR pollutant for which that determination has been made.
4. If the Director determines, based on performance of the SCREEN screening
model pursuant to subsection (C)(3), that a source’s emissions, taking into
account any elective limits or controls adopted under subsection (F), will
interfere with attainment or maintenance of a standard imposed in Article 2 of
this Chapter national ambient air quality standard, the Director shall deny
the application for registration. Notwithstanding R18-2-302(B)(4) R18-2-
302(B)(3), the owner or operator of the source shall be required to obtain a
permit under R18-2-302 and shall comply with R18-2-334 before beginning
actual construction of the source or modification.
D. Requirement to Obtain a Permit. Notwithstanding R18-2-302(B)(4)(b) R18-2-
302(B)(3)(b) and (c), the Director shall deny an application for registration for a source
subject to a standard under section 111 or 112 of the Act and require the owner or
operator to obtain a permit under R18-2-302, if the Director determines based on the
following factors that the requirement to obtain a permit is warranted:
1. The size and complexity of the source.
2. The complexity of the section 111 or 112 standard applicable to the source.
3. The public health or environmental risks posed by the pollutants subject to
regulation under the section 111 or 112 standard.
E. Registration Contents. A registration shall contain the following elements:
1. Identification of each emission unit subject to an applicable requirement and
Page 64 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
all applicable requirements that apply to the unit, including Enforceable
emission limitations and standards, including operational requirements and
limitations that ensure compliance with all SIP requirements at the time of
issuance and any testing, monitoring, recordkeeping and reporting obligations
imposed by the applicable requirement or by R18-2-312.
2. Any elective limits or controls and associated operating, maintenance,
monitoring and recordkeeping requirements adopted pursuant to subsection (F).
3. A requirement to retain any records required by the registration at the source for
at least three years in a form that is suitable for expeditious inspection and
review.
4. For any source that has adopted elective limits or controls under subsection (F), a
requirement to submit an annual compliance report on the form provided by the
Director in the registration.
F. Elective Limits or Controls. The owner or operator of a source requiring registration may
elect to include any of the following emission limitations in the registration, provided the
Department approves the limitation and the registration also includes the operating,
maintenance, monitoring, and recordkeeping requirements specified below for the
limitation.
1. A limitation on the hours of operation of any process or combination of
processes.
a. The registration shall express the limitation in terms of hours per
calendar month and shall specify the process or combination of
processes subject to the limitation.
b. The owner or operator shall maintain a log or readily available business
records showing actual operating hours through the preceding operating
day for the process or processes subject to the limitation and shall
update the log or business records at least once per operating day at
the end of the day.
2. A limitation on the production rate for any process or combination of processes.
a. The registration shall express the limitation in terms of an
appropriate unit of mass or production per calendar month and
shall specify the process or combination of processes subject to the
limitation.
b. The owner or operator shall maintain a log or readily available business
Commented [SB10]: Added to address EPA comment that existing language was not adequate to insure that construction of source will not result in violation of applicable portions of control strategy.
Commented [SB11]: TSD 28-29 indicates that elective limits do not satisfy requirements for practical enforceability. We have amended the elective limit provisions to insure they are enforceable.
Page 65 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
records showing the actual production rate through the preceding
operating day for the process or processes subject to the limitation. The
owner or operator shall update the log or business records at least
once per operating day at the end of the day.
3. A requirement to operate a fabric filter for the control of particulate matter
emissions.
a. The owner or operator shall operate the fabric filter at all times that the
emission unit controlled by the fabric filter is operated.
b. The owner or operator shall inspect the fabric filter at least once per
month for tears and leaks and shall promptly repair any tears or leaks
identified.
c. The owner or operator shall operate and maintain the fabric filter in
substantial compliance with the manufacturer’s operation and
maintenance recommendations.
d. The owner or operator shall keep a log or readily available business
records of the inspections required by subsection (F)(3)(b) and the
maintenance activities required by subsection (F)(3)(c). The owner or
operator shall update the log or business records at the end of each
day that an inspection or maintenance activity is performed.
e. The registration shall identify the fabric filters and processes subject
to this requirement.
4. Limitations on the concentration total amount of VOC or hazardous air
pollutants in solvents, coatings or other process materials used at the
registered source.
a. The registration shall identify the pollutants and processes covered
by the limitations and shall express the limitations in terms of
pounds per month.
b. The owner or operator shall maintain a log or readily available business
records showing the concentration of each covered VOC or hazardous
air pollutant concentration in each material used at the source subject
to such a limitation and the amounts of each material used during
the current calendar year. The owner or operator shall update the
records whenever the concentration in any material changes or a
new material is used. The presence at the source of a current MSDS
Page 66 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
for a material used without dilution or other alteration satisfies this
requirement.
c. The owner or operator shall maintain a spreadsheet or database to
record the amount of each material containing a covered VOC or
hazardous air pollutant used. The spreadsheet or database shall
calculate the total pounds of the VOC or hazardous air pollutant
used by multiplying the concentration of VOC or hazardous air
pollutant in a material by the amount of material used and shall
employ appropriate units of measurement and conversion factors.
The owner or operator shall update the spreadsheet or database at
least once per operating day.
G. Revised Registrations.
1. Unless a Class II permit is required under R18-2-302(B)(2)(b), the owner or
operator of a registered source shall file a revised registration on the occurrence
of any of the following:
a. A modification to the source that would result in an increase in the
source’s uncontrolled potential to emit maximum capacity to emit
with elective limts exceeding any of the following amounts:
i. 2.5 tons per year for NOx, SO2, PM10, PM2.5, VOC or CO.
ii. 0.3 tons per year for lead.
b. Relocation of a portable source.
c. The transfer of the source to a new owner.
2. The requirements of subsection (B) shall not apply to a revised registration. The
owner or operator may begin actual construction and operation of the modified,
relocated or transferred source on filing the revised registration.
H. Registration Term.
1. A source’s registration shall expire five years after the date of issuance of the last
registration for the source or any modification to the source.
2. A source shall submit an application for renewal of a registration not later than
six months before expiration of the registration’s term.
3. If a source submits a timely and complete application for renewal of a
registration, the source’s authorization to operate under its existing registration
shall continue until the Director takes final action on the application.
4. The Director may terminate a registration under R18-2-321(C). If the Director
Page 67 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
terminates a registration under R18-2-321(C)(3), the owner or operator shall be
required to apply for a permit for the source under R18-2-302.
I. Delayed Effective Date. This Section shall take effect on the effective date of the
Administrator’s action approving it as part of the state implementation plan.
Issuance of a registration shall not relieve the owner or operator of the
responsibility to comply fully with applicable provisions of the SIP and any other
requirements under local, state, or federal law.
R18-2-303. Transition from Installation and Operating Permit Program to Unitary
Permit Program; Registration Transition; Minor NSR Transition
A. An installation or operating permit issued before September 1, 1993, and the authority to
operate, as provided in Laws 1992, Ch. 299, § 65, continues in effect until the installation
or operating permit is terminated, or until the Director issues or denies a Class I or Class
II permit to the source, whichever is earlier.
B. The terms and conditions of installation permits issued before September 1, 1993, or in
permits or permit revisions issued under R18-2-302 and authorizing the construction or
modification of a stationary source, remain federal applicable requirements unless
modified or revoked by the Director.
C. All sources in existence on September 1, 2012, requiring a registration shall provide
notice to the Director by no later than December 1, 2012, on a form provided by the
Director.
D. All sources requiring a registration that are in existence on the date R18-2-302.01
becomes effective under R18-2-302.01(I) may submit applications for registration at any
time after R18-2-302.01 is effective and shall submit an application no later than 180
days after receipt of written notice from the Director that an application is required.
Applications to register the construction or modification of a source must be submitted,
and the registration must be issued, before the applicant begins actual construction of the
source or modification.
E. Sources in existence on the date R18-2-334 becomes effective under R18-2-334(I)
[EFFECTIVE DATE OF EPA APPROVAL] are not subject to R18-2-334, unless the
source undertakes a minor NSR modification. Notwithstanding any other provision of
this Chapter, R18-2-334 shall apply only to applications for permits or permit revisions
filed after the date R18-2-334 takes effect under R18-2-334(I) [EFFECTIVE DATE
OF EPA APPROVAL].
Commented [SB12]: Will be able to specify date of EPA approval, once final LA/LD is published.
Page 68 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
R18-2-304. Permit Application Processing Procedures
A. Unless otherwise noted, this Section applies to each source requiring a Class I or II
permit or permit revision.
B. Standard Application Form and Required Information. To apply for any permit in this
Chapter, applicants shall complete the “Standard Permit Application Form” and supply
all information required by the “Filing Instructions” as shown in Appendix 1. The
Director, either upon the Director’s own initiative or on the request of a permit applicant,
may waive a requirement that specific information or data be submitted in the application
for a Class II permit for a particular source or category of sources if the Director
determines that the information or data would be unnecessary to determine all of the
following:
1. The applicable requirements to which the source may be subject;
2. That the source is so designed, controlled, or equipped with such air pollution
control equipment that it may be expected to operate without emitting or without
causing to be emitted air contaminants in violation of the provisions of A.R.S.
Title 49, Chapter 3, Article 2 and this Chapter;
3. The fees to which the source may be subject;
4. A proposed emission limitation, control, or other requirement that meets the
requirements of R18-2-306.01 or R18-2-306.02.
C. A timely application is:
1. For a source, that becomes subject to the permit program as a result of a change
in regulation and not as a result of construction or a physical or operational
change, one that is submitted within 12 months after the source becomes subject
to the permit program.
2. For purposes of permit renewal, a timely application is one that is submitted at
least six months, but not more than 18 months, prior to the date of permit
expiration.
3. Any source under R18-2-326(A)(3) which becomes subject to a standard
promulgated by the Administrator pursuant to section 112(d) of the Act shall,
within 12 months of the date on which the standard is promulgated, submit an
application for a permit revision demonstrating how the source will comply with
the standard.
D. If an applicable implementation plan allows the determination of an alternative emission
limit, a source may, in its application, propose an emission limit that is equivalent to the
Page 69 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
emission limit otherwise applicable to the source under the applicable implementation
plan. The source shall also demonstrate that the equivalent limit is quantifiable,
accountable, enforceable, and subject to replicable compliance determination procedures.
E. A complete application shall comply with all of the following:
1. To be complete, an application shall provide all information required by
subsection (B) (standard application form section). An application for permit
revision only need supply information related to the proposed change, unless the
source’s proposed permit revision will change the permit from a Class II permit
to a Class I permit. A responsible official shall certify the submitted information
consistent with subsection (H) (Certification of Truth, Accuracy, and
Completeness).
2. An application for a new permit or permit revision shall contain an assessment of
the applicability of the requirements of Article 4 of this Chapter. If the applicant
determines that the proposed new source is a major source as defined in R18-2-
401, or the proposed permit revision constitutes a major modification as defined
in R18-2-101, then the application shall comply with all applicable requirements
of Article 4.
3. An application for a new permit or permit revision shall contain an assessment of
the applicability of Minor New Source Review requirements in R18-2-334. If the
applicant determines that the proposed new source is subject to R18-2-334, or the
proposed permit revision constitutes a Minor NSR Modification, then the
application shall comply with all applicable requirements of R18-2-334.
4. An application for a new permit or a permit revision shall contain an
assessment of the applicability of the requirements established under Article
17 of this Chapter. If the applicant determines that the proposed new source
permit or permit revision is subject to the requirements of Article 17 of this
Chapter, the application shall comply with all applicable requirements of
that Article.
54. Except for proposed new major sources or major modifications subject to the
requirements of Article 4 of this Chapter, an application for a new permit, a
permit revision, or a permit renewal shall be deemed to be complete unless,
within 60 days of receipt of the application, the Director notifies the applicant by
certified mail that the application is not complete.
65. If a source wishes to voluntarily enter into an emissions limitation, control, or
Page 70 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
other requirement pursuant to R18-2-306.01, the source shall describe that
emissions limitation, control, or other requirement in its application, along with
proposed associated monitoring, recordkeeping, and reporting requirements
necessary to demonstrate that the emissions limitation, control, or other
requirement is permanent, quantifiable, and otherwise enforceable as a practical
matter.
76. If, while processing an application that has been determined or deemed to be
complete, the Director determines that additional information is necessary to
evaluate or take final action on that application, the Director may request such
information in writing and set a reasonable deadline for a response. Except for
minor permit revisions as set forth in R18-2-319, a source’s ability to continue
operating without a permit, as set forth in subsection (J), shall be in effect from
the date the application is determined to be complete until the final permit is
issued, provided that the applicant submits any requested additional information
by the deadline specified by the Director.
7. The completeness determination shall not apply to revisions processed through
the minor permit revision process.
98. Activities which are insignificant pursuant to the definition of insignificant
activities in R18-2-101 shall be listed in the application. Except as necessary to
complete the assessment required by subsection (E)(2) or (3), the The
application need not provide emissions data regarding insignificant activities. If
the Director determines that an activity listed as insignificant does not meet the
requirements of the definition of insignificant activities in R18-2-101 or that
emissions data for the activity is required to complete the assessment
required by subsection E(2) or (3), the Director shall notify the applicant in
writing and specify additional information required.
109. If a permit applicant requests terms and conditions allowing for the trading of
emission increases and decreases in the permitted facility solely for the purpose
of complying with a federally enforceable emission cap that is established in the
permit independent of otherwise applicable requirements, the permit applicant
shall include in its application proposed replicable procedures and permit terms
that ensure the emissions trades are quantifiable and enforceable.
1110. The Director is not in disagreement with a notice of confidentiality submitted
with the application pursuant to A.R.S. § 49-432.
Commented [SB13]: Added to address EPA objection to exclusion of insignificant activities that may have emissions from determination of NSR applicability.
Page 71 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
F. A source applying for a Class I permit that has submitted information with an application
under a claim of confidentiality pursuant to A.R.S. § 49-432 and R18-2-305 shall submit
a copy of such information directly to the Administrator.
G. Duty to Supplement or Correct Application. Any applicant who fails to submit any
relevant facts or who has submitted incorrect information in a permit application shall,
upon becoming aware of such failure or incorrect submittal, promptly submit such
supplementary facts or corrected information. In addition, an applicant shall provide
additional information as necessary to address any requirements that become applicable
to the source after the date it filed a complete application but prior to release of a
proposed permit.
H. Certification of Truth, Accuracy, and Completeness. Any application form, report, or
compliance certification submitted pursuant to this Chapter shall contain certification by
a responsible official of truth, accuracy, and completeness. This certification and any
other certification required under this Article shall state that, based on information and
belief formed after reasonable inquiry, the statements and information in the document
are true, accurate, and complete.
I. Action on Application.
1. The Director shall issue or deny each permit according to the provisions of
A.R.S. § 49-427. The Director may issue a permit with a compliance schedule for
a source that is not in compliance with all applicable requirements at the time of
permit issuance.
2. In addition, a permit may be issued, revised, or renewed only if all of the
following conditions have been met:
a. The application received by the Director for a permit, permit revision, or
permit renewal shall be complete according to subsection (E).
b. Except for revisions qualifying as administrative or minor under R18-2-
318 and R18-2-319, all of the requirements for public notice and
participation under R18-2-330 shall have been met.
c. For Class I permits, the Director shall have complied with the
requirements of R18-2-307 for notifying and responding to affected
states, and if applicable, other notification requirements of R18-2-
402(D)(2) and R18-2-410(C)(2).
d. For Class I and II permits, the conditions of the permit shall require
compliance with all applicable requirements.
Page 72 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
e. For permits for which an application is required to be submitted to the
Administrator under R18-2-307(A), and to which the Administrator has
properly objected to its issuance in writing within 45 days of receipt of
the proposed final permit and all necessary supporting information from
the Department, the Director has revised and submitted a proposed final
permit in response to the objection and EPA has not objected to this
proposed final permit within 45 days of receipt.
f. For permits to which the Administrator has objected to issuance pursuant
to a petition filed under 40 CFR 70.8(d), the Administrator’s objection
has been resolved.
g. For a Class II permit that contains voluntary emission limitations,
controls, or other requirements established pursuant to R18-2-306.01, the
Director shall have complied with the requirement of R18-2-306.01(C) to
provide the Administrator with a copy of the proposed permit.
3. If the Director denies a permit under this Section, a notice shall be served on the
applicant by certified mail, return receipt requested. The notice shall include a
statement detailing the grounds for the denial and a statement that the permit
applicant is entitled to a hearing.
4. The Director shall provide a statement that sets forth the legal and factual basis
for the proposed permit conditions including references to the applicable
statutory or regulatory provisions. The Director shall send this statement to any
person who requests it and, for Class I permits, to the Administrator.
5. Priority shall be given by the Director to taking action on applications for
construction or modification submitted pursuant to Title I, Parts C (Prevention of
Significant Deterioration) and D (New Source Review) of the Act.
J. Requirement for a Permit. Except as noted under the provisions in R18-2-317 and R18-2-
319, no source may operate after the time that it is required to submit a timely and
complete application, except in compliance with a permit issued pursuant to this Chapter.
However, if a source under R18-2-326(A)(3) submits a timely and complete application
for continued operation under a permit revision or renewal, the source’s failure to have a
permit is not a violation of this Article until the Director takes final action on the
application. This protection shall cease to apply if, subsequent to the completeness
determination, the applicant fails to submit, by the deadline specified in writing by the
Director, any additional information identified as being needed to process the application.
Page 73 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
This subsection does not affect a source’s obligation to obtain a permit revision before
making a modification to the source.
R18-2-306.01. Permits Containing Voluntarily Accepted Emission Limitations and
Standards
A. A source may voluntarily propose in its application, and accept in its permit, emissions
limitations, controls, or other requirements that are permanent, quantifiable, and
otherwise enforceable as a practical matter in order to avoid classification as a source that
requires a Class I permit or to avoid one or more other applicable requirements. For the
purposes of this Section, “enforceable as a practical matter” means that specific means to
assess compliance with an emissions limitation, control, or other requirement are
provided for in the permit in a manner that allows compliance to be readily determined
by an inspection of records and reports.
B. In order for a source to obtain a permit containing voluntarily accepted emissions
limitations, controls, or other requirements, the source shall demonstrate all of the
following in its permit application:
1. The emissions limitations, controls, or other requirements to be imposed for the
purpose of avoiding an applicable requirement are at least as stringent as the
emissions limitations, controls, or other requirements that would otherwise be
applicable to that source, including those that originate in an applicable
implementation plan; and the permit does not waive, or make less stringent, any
limitations or requirements contained in or issued pursuant to an applicable
implementation plan, or that are otherwise federally enforceable.
2. All voluntarily accepted emissions limitations, controls, or other requirements
will be permanent, quantifiable, and otherwise enforceable as a practical matter.
C. At the same time as notice of proposed issuance is first published pursuant to A.R.S. §
49-426(D), the Director shall send a copy of any Class II permit proposed to be issued
pursuant to this Section to the Administrator for review during the comment period
described in the notice pursuant to R18-2-330(D) R18-2-330(C)(3).
D. The Director shall send a copy of each final permit issued pursuant to this Section to the
Administrator.
R18-2-306.02. Establishment of an Emissions Cap
A. An applicant may, in its application for a new permit, renewal of an existing permit, or as
a significant permit revision, request an emissions cap for a particular pollutant expressed
in tons per year as determined on a 12-month rolling average, or any shorter averaging
Page 74 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
time necessary to enforce any applicable requirement, for any emissions unit,
combination of emissions units, or an entire source to allow operating flexibility
including emissions trading for the purpose of complying with the cap. This Section shall
not apply to sources that hold an authority to operate under a general permit pursuant to
Article 5 of this Chapter.
B. An emissions cap for a Class II source that limits the emissions of a particular pollutant
for the entire source shall not exceed any of the following:
1. The applicable requirement for the pollutant if expressed in tons per year;
2. The source’s actual emissions plus the applicable significance significant level
for the pollutant established in R18-2-101(104);
3. The applicable major source threshold for the pollutant; or
4. A sourcewide emission limitation for the pollutant voluntarily agreed to by the
source under R18-2-306.01.
C. In order to incorporate an emissions cap in a permit the applicant must demonstrate to the
Director that terms and conditions in the permit will:
1. Ensure compliance with all applicable requirements for the pollutant;
2. Contain replicable procedures to ensure that the emissions cap is enforceable as a
practical matter and emissions trading conducted under it is quantifiable and
enforceable as a practical matter. For the purposes of this Section, “enforceable
as a practical matter” shall include the following criteria:
a. The permit conditions are permanent and quantifiable;
b. The permit includes a legally enforceable obligation to comply;
c. The limits impose an objective and quantifiable operational or
production limit or require the use of in-place air pollution control
equipment;
d. The permit limits have short-term averaging times consistent with the
averaging times of the applicable requirement;
e. The permit conditions are enforceable and are independent of any other
applicable limitations; and
f. The permit conditions for monitoring, recordkeeping, and reporting
requirements are sufficient to comply with R18-2-306(A)(3),(4), and (5).
3. For a Class I permit, include all terms required under R18-2-306(A) and R18-2-
309.
D. Class I sources shall log an increase or decrease in actual emissions authorized as a trade
Page 75 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
under an emissions cap unless an applicable requirement requires notice to the Director.
The log shall contain the information required by the permit including, at a minimum,
when the proposed emissions increase or decrease occurred, a description of the physical
change or change in method of operation that produced the increase or decrease, the
change in emissions from the physical change or change in method of operation, and how
the increase or decrease in emissions complies with the permit. Class II sources shall
comply with R18-2-317.02(B)(5).
E. The Director shall not include in an emissions cap or emissions trading allowed under a
cap any emissions unit for which the emissions are not quantifiable or for which there are
no replicable procedures or practical means to enforce emissions trades.
R18-2-319. Minor Permit Revisions
A. Minor permit revision procedures may be used only for those changes at a Class I source
that satisfy all of the following:
1. Do not violate any applicable requirement;
2. Do not involve substantive changes to existing monitoring, reporting, or
recordkeeping requirements in the permit;
3. Do not require or change a case-by-case determination of an emission limitation
or other standard, or a source-specific determination of ambient impacts, or a
visibility or increment an analysis of impacts on visibility or maximum
increases allowed under R18-2-218;
4. Do not seek to establish or change a permit term or condition for which there is
no corresponding underlying applicable requirement and that the source has
assumed in order to avoid an applicable requirement to which the source would
otherwise be subject. The terms and conditions include:
a. A federally enforceable emissions cap that the source would assume to
avoid classification as a modification under any provision of Title I of
the Act; and
b. An alternative emissions limit approved under regulations promulgated
under the section 112(i)(5) of the Act.
5. Are not modifications under any provision of Title I of the Act;
6. Are not changes in fuels not represented in the permit application or provided for
in the permit;
7. Are not minor NSR modifications subject to R18-2-334, except that minor NSR
modifications subject to R18-2-334(G) may be processed as minor permit
Commented [SB14]: EPA disapproved exemption from minor NSR public notice in 334(G) for impacts less than 75 % of NAAQS and RACT based on safe harbor provisions.
Page 76 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
revisions; and
8. Are not required to be processed as a significant permit revision under R18-2-
320.
B. Minor permit revision procedures shall be used for the following changes at a Class II
source:
1. A change that triggers a new applicable requirement if all of the following apply:
a. The change is not a minor NSR modification subject to R18-2-334,
except that minor NSR modifications subject to R18-2-334(G) may
be processed as minor permit revisions;
b. A case-by-case determination of an emission limitation or other standard
is not required; and
c. The change does not require the source to obtain a Class I permit;.
2. A change that increases emissions above the permitted level unless the increase
otherwise creates a condition that requires a significant permit revision;
3. A change in fuel from fuel oil or coal, to natural gas or propane, if not authorized
in the permit;
4. A change that results in emissions subject to monitoring, recordkeeping, or
reporting under R18-2-306(A)(3),(4), or (5) and that cannot be measured or
otherwise adequately quantified by monitoring, recordkeeping, or reporting
requirements already in the permit;
5. A decrease in the emissions permitted under an emissions cap unless the decrease
requires a change in the conditions required to enforce the cap or to ensure that
emissions trades conducted under the cap are quantifiable and enforceable; and
6. Replacement of an item of air pollution control equipment listed in the permit
with one that does not have the same or better efficiency.
C. As approved by the Director, minor permit revision procedures may be used for permit
revisions involving the use of economic incentives, marketable permits, emissions
trading, and other similar approaches, to the extent that the minor permit revision
procedures are explicitly provided for in an applicable implementation plan or in
applicable requirements promulgated by the Administrator.
D. An application for minor permit revision shall be on the standard application form
contained in Appendix 1 and include the following:
1. A description of the change, the emissions resulting from the change, and any
new applicable requirements that will apply if the change occurs;
Page 77 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
2. For Class I sources, and any source that is making the change immediately after
it files the application, the source’s suggested draft permit;
3. Certification by a responsible official, consistent with standard permit application
requirements, that the proposed revision meets the criteria for use of minor
permit revision procedures and a request that the procedures be used;
E. EPA and affected state notification. For Class I permits, within five working days of
receipt of an application for a minor permit revision, the Director shall notify the
Administrator and affected states of the requested permit revision in accordance with
R18-2-307.
F. For Class I permits, the Director shall not issue a final permit revision until after the
Administrator’s 45-day review period or until the Administrator has notified the Director
that the Administrator will not object to issuance of the permit revision, whichever is
first, although the Director may approve the permit revision before that time. Within 90
days of the Director’s receipt of an application under minor permit revision procedures,
or 15 days after the end of the Administrator’s 45-day review period, whichever is later,
the Director shall do one or more of the following:
1. Issue the permit revision as proposed,
2. Deny the permit revision application,
3. Determine that the proposed permit revision does not meet the minor permit
revision criteria and should be reviewed under the significant revision
procedures, or
4. Revise the proposed permit revision and transmit to the Administrator the new
proposed permit revision as required in R18-2-307.
G. The source may make the change proposed in its minor permit revision application
immediately after it files the application. After a Class I source makes a change allowed
by the preceding sentence, and until the Director takes any of the actions specified in
subsection (F), the source shall comply with both the applicable requirements governing
the change and the proposed revised permit terms and conditions. During this time
period, the Class I source need not comply with the existing permit terms and conditions
it seeks to modify. However, if the Class I source fails to comply with its proposed permit
terms and conditions during this time period, the existing permit terms and conditions it
seeks to revise may be enforced against it.
H. The permit shield under R18-2-325 shall not extend to minor permit revisions.
I. Notwithstanding any other part of this Section, the Director may require a permit to be
Page 78 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
revised under R18-2-320 for any change that, when considered together with any other
changes submitted by the same source under this Section or R18-2-317.02 over the life of
the permit, do not satisfy subsection (A) for Class I sources or subsection (B) for Class II
sources.
J. The Director shall make available to the public monthly summaries of all applications for
minor permit revisions.
R18-2-320. Significant Permit Revisions
A. For Class I sources, a significant revision shall be used for an application requesting a
permit revision that does not qualify as a minor permit revision or as an administrative
amendment. A significant revision that is only required because of a change described in
R18-2-319(A)(6) or (7) shall not be considered a significant permit revision under part 70
for the purposes of 40 CFR 64.5(a)(2). Every significant change in existing monitoring
permit terms or conditions and every relaxation of reporting or recordkeeping permit
terms or conditions shall follow significant revision procedures.
B. A source with a Class II permit shall make the following changes only after the permit is
revised following the public participation requirements of R18-2-330:
1. Establishing or revising a voluntarily accepted emission limitation or standard as
described by R18-2-306.01 or R18-2-306.02, except a decrease in the limitation
authorized by R18-2-319(B)(5);
2. Making any change in fuel not authorized by the permit and that is not fuel oil or
coal, to natural gas or propane;
3. A change that is a minor NSR modification subject to R18-2-334, except for a
minor modification subject to R18-2-334(G);
4. A change that relaxes monitoring, recordkeeping, or reporting requirements,
except when the change results from:
a. Removing equipment that results in a permanent decrease in actual
emissions, if the source keeps onsite records of the change in a log that
satisfies Appendix 3 of this Chapter and if the requirements that are
relaxed are present in the permit solely for the equipment that was
removed; or
b. A change in an applicable requirement.
5. A change that will cause the source to violate an existing applicable requirement
including the conditions establishing an emissions cap;
6. A change that will require any of the following:
Page 79 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
a. A case-by-case determination of an emission limitation or other standard;
b. A source-specific determination of ambient impacts, or a visibility or
increment an analysis of impacts on visibility or maximum allowable
increases allowed under R18-2-218; or
c. A case-by-case determination of a monitoring, recordkeeping, and
reporting requirement.
7. A change that requires the source to obtain a Class I permit.
C. Any modification to a major source of federally listed hazardous air pollutants, and any
reconstruction of a source, or a process or production unit, under section 112(g) of the
Act and regulations promulgated thereunder, shall follow significant permit revision
procedures and any rules adopted under A.R.S. § 49-426.03.
D. Significant permit revisions shall meet all requirements of this Article for applications,
public participation, review by affected states, and review by the Administrator that apply
to permit issuance and renewal. Notwithstanding R18-2-330(C), the Director may
provide notice for changes requiring a significant permit revision solely under subsection
(B)(2), (4) or (6)(c) by posting a notice on the Department’s web site, sending e-mails to
persons who have requested electronic notification of the Department’s proposed air
quality permit actions and by mailing a copy of the notice as provided in R18-2-
330(C)(1).
E. When an existing source applies for a significant permit revision to revise its permit from
a Class II permit to a Class I permit, it shall submit a Class I permit application in
accordance with R18-2-304. The Director shall issue the entire permit, and not just the
portion being revised, in accordance with Class I permit content and issuance
requirements, including requirements for public, affected state, and EPA review,
contained in R18-2-307 and R18-2-330.
R18-2-326. Fees Related to Individual Permits
A. Source Categories. The owner or operator of a source required to have an air quality
permit from the Director shall pay the fees described in this Section unless authorized to
operate under a general permit issued under Article 5. The fees are based on a source
being classified in one of the following three categories:
1. Class I Title V sources are those required or that elect to have a permit under
R18-2-302(B)(1).
2. Class II Title V sources are those required to have a permit under R18-2-
302(B)(2) and for which either R18-2-302(B)(2)(a)(i) or (ii) applies that are
Page 80 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
subject to new source performance standards or national emission standards
for hazardous air pollutants.
3. Class II Non-Title V sources are those required to have a permit under R18-2-
302(B)(2) and for which neither R18-2-302(B)(2)(a)(i) nor (ii) applies that are
subject to new source performance standards or national emission standards
for hazardous air pollutants.
B. Fees for Permit Actions.
1. The owner or operator of a Class I Title V source, Class II Title V source, or
Class II Non-Title V source shall pay to the Director the following:
a. $133.50 per hour, adjusted annually under subsection (H), for all permit
processing time required for a billable permit action; and
b. The actual costs of public notice conducted according to R18-2-330.
2. The Director may require periodic payment of permit processing fees based on
the most recent accounting of time spent processing the permit including any fees
for contractors.
3. Upon completion of permit processing activities other than issuance or denial of
the permit or permit revision, the Director shall send notice of the decision to the
applicant along with a final itemized bill. The maximum fee for any billable
permit action for a non-Title V source is $25,000. Except as provided in
subsection (G), the Director shall not issue a permit or permit revision until the
final bill is paid in full.
C. Class I Title V Fees. The owner or operator of a Class I Title V source that has undergone
initial startup by January 1 shall annually pay to the Director an administrative fee plus
an emissions-based fee as follows:
1. The applicable administrative fee from the table below, as adjusted annually
under subsection (H). The fee is due by February 1 or 60 days after the Director
mails the invoice under subsection (F), whichever is later.
Class I Title V Source
Category
Administrative
Fee
Aerospace $20,800
Air Curtain Destructors $750
Cement Plants $63,690
Combustion/Boilers $15,480
Page 81 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
Compressor Stations $12,730
Electronics $20,490
Expandable Foam $14,680
Foundries $19,520
Landfills $15,960
Lime Plants $60,160
Copper & Nickel Mines $15,000
Gold Mines $15,000
Mobile Home Manufacturing $14,830
Paper Mills $20,480
Paper Coaters $15,480
Petroleum Products Terminal
Facilities
$22,730
Polymeric Fabric Coaters $20,480
Reinforced Plastics $15,480
Semiconductor Fabrication $26,930
Copper Smelters $63,690
Utilities - Fossil Fuel Fired
Except Coal
$16,440
Utilities - Coal Fired $32,570
Vitamin/Pharmaceutical
Manufacturing
$15,800
Wood Furniture $15,480
Others $20,490
Others with Continuous
Emissions Monitoring
$20,490
2. An emissions-based fee of $38.25 per ton of actual emissions of all regulated
pollutants emitted during the previous calendar year ending 12 months earlier.
The fee is adjusted annually under subsection (d) and due by February 1 or 60
Page 82 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
days after the Director mails the invoice under subsection (F), whichever is later.
a. For purposes of this Section, “actual emissions” means the quantity of all
regulated pollutants emitted during the calendar year, as determined by
the annual emissions inventory under R18-2-327.
b. For purposes of this Section, regulated pollutants consist of the
following:
i. Nitrogen oxides and any volatile organic compounds;
ii. Conventional air pollutants, except carbon monoxide and ozone;
iii. Any pollutant that is subject to any standard promulgated under
Section 111 of the Act, including fluorides, sulfuric acid mist,
hydrogen sulfide, total reduced sulfur, and reduced sulfur
compounds; and
iv. Any federally listed hazardous air pollutant.
c. For purposes of this Section, the following emissions of regulated
pollutants are excluded from a source’s actual emissions:
i. Emissions of any regulated pollutant from the source in excess of
4,000 tons per year;
ii. Emissions of any regulated pollutant already included in the
actual emissions for the source, such as a federally listed
hazardous air pollutant that is already accounted for as a VOC or
as PM10;
iii. Emissions from insignificant activities listed in the permit
application for the source under R18-2-304(E)(8) R18-2-
304(E)(7);
iv. Fugitive emissions of PM10 from activities other than crushing,
belt transfers, screening, or stacking; and
v. Fugitive emissions of VOC from solution-extraction units.
d. The Director shall adjust the rate for emission-based fees every
November 1, after December 4, 2007, by multiplying $38.25 by the
Consumer Price Index (CPI) for the most recent year, and then dividing
by the CPI for the year 2007. The Consumer Price Index for any year is
the average of the Consumer Price Index for all-urban consumers
published by the United States Department of Labor, as of the close of
the 12-month period ending on August 31 of that year.
Page 83 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
D. Class II Title V Fees. The owner or operator of a Class II Title V source that has
undergone initial startup by January 1 shall pay the applicable administrative fee from the
table below, adjusted under subsection (H), for that calendar year, and annually
thereafter. The fee is due by February 1 or 60 days after the Director mails the invoice
under subsection (F), whichever is later.
Class II Title V Source
Category
Administrative Fee
Synthetic minor sources,
except portable sources
Administrative fee
from Class I Title V
table for category
Stationary $8,070
Portables $8,070
Small Source $750
E. Class II Non-Title V Fees. The owner or operator of a Class II Non-Title V source that
has undergone initial startup by January 1 shall pay the applicable inspection fee from the
table below, adjusted under subsection (H), for that calendar year, and annually
thereafter. The fee is due by February 1 or 60 days after the Director mails the invoice
under subsection (F), whichever is later.
Class II Non-Title V Source
Category
Inspection Fee
Stationary $5,230
Portables $5,230
Gasoline Service Stations $750
F. The Director shall mail the owner or operator of each source an invoice for all fees due
under subsections (C), (D), or (E) by December 1.
G. Any person who receives a final itemized bill from the Director under this Section for a
billable permit action may request an informal review of the hours billed and may pay the
bill under protest as provided below:
1. The request shall be made in writing, and received by the Director within 30 days
of the date of the final bill. Unless the Director and person agree otherwise, the
Page 84 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
informal review shall take place within 30 days after the Director’s receipt of the
request. The Director shall arrange the date and location of the informal review
with the person at least 10 business days before the informal review. The
Director shall review whether the amounts of time billed are correct and
reasonable for the tasks involved. The Director shall mail his or her decision on
the informal review to the person within 10 business days after the informal
review date.
2. The Director’s decision after informal review shall become final unless, within
30 days after person’s receipt of the informal review decision, the person
requests a hearing under R18-1-202.
3. If the final itemized bill is paid under protest, the Director shall take final action
on the permit or permit revision.
H. The Director shall adjust the hourly rate every November 1, to the nearest 10 cents per
hour, after December 4, 2007, by multiplying $133.50 by the Consumer Price Index
(CPI) for the most recent year, and then dividing by the CPI for the year 2007. The
Director shall adjust the administrative or inspection fees listed in subsections (C), (D),
and (E) every November 1, to the nearest $10, beginning December 4, 2007, by
multiplying the administrative or inspection fee by the Consumer Price Index (CPI) for
the most recent year, and then dividing by the CPI for the year 2007. The Consumer Price
Index for any year is the average of the Consumer Price Index for all-urban consumers
published by the United States Department of Labor, as of the close of the 12-month
period ending on August 31 of that year.
I. An applicant for a Class I or Class II permit or permit revision may request that the
Director provide accelerated processing of the application by providing the Director
written notice 60 days before filing the application. The request shall be accompanied by
an initial fee of $15,000. The fee is non-refundable to the extent of the Director’s costs
for accelerating the processing if the Director undertakes the accelerated processing
described below:
1. If an applicant requests accelerated permit processing, the Director may, to the
extent practicable, undertake to process the permit or permit revision according
to the following schedule:
a. For applications for initial Class I and II permits under R18-2-302 or
significant permit revisions under R18-2-320, the Director shall issue or
deny the proposed permit or permit revision within 120 days after the
Page 85 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
Director determines that the application is complete.
b. For minor permit revisions under R18-2-319, the Director shall issue or
deny the permit revision within 60 days after receiving a complete
application.
2. At any time after an applicant requests accelerated permit processing, the
Director may require additional advance payments based on the most recent
estimate of additional costs.
3. Upon completion of permit processing activities but before issuance or denial of
the permit or permit revision, the Director shall send notice of the decision to the
applicant along with a final bill. The maximum fee for any billable permit action
for a non-Title V source is $25,000. The final bill shall include all regular permit
processing and other fees due, and, in addition, the difference between the cost of
accelerating the permit application, including any costs incurred by the Director
in contracting for, hiring, or supervising the work of outside consultants, and all
advance payments submitted for accelerated processing. In the event all
payments made exceed actual accelerated permit costs, the Director shall refund
the excess advance payments. Nothing in this subsection affects the public
participation requirements of R18-2-330, or EPA and affected state review as
required under R18-2-307 or R18-2-319.
J. Inactive Sources. The owner or operator of a permitted source that has undergone initial
startup but was shut down for the entire preceding year shall pay 50 percent of the
administrative or inspection fee required under subsection (C), (D), or (E). The owner or
operator of a source claiming inactive status under this subsection shall submit a letter to
the Director by December 15 of the calendar year for which the source was inactive.
Termination of a permit does not relieve a source of any past fees due.
K. If an applicant uses the Tier 4 method for conducting a risk management analysis (RMA)
according to R18-2-1708(B), the applicant shall pay any costs incurred by the Director in
contracting for, hiring or supervising work of outside consultants.
M. Transition.
1. Subsections (A) through (J) of this Section are effective December 4, 2007. The
first administrative or inspection fees are due on February 1, 2008.
2. Except as provided in subsection (b), all fees incurred after December 4, 2007,
are payable in accordance with the rates contained in this Section.
a. Emission-based fees for calendar year 2006 shall be billed at $38.25 per
Page 86 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
ton and be due February 1, 2008.
b. The hourly rates and maximum fees for a new permit or permit revision
are those in effect when the application for the permit or revision is
determined to be complete.
c. Fees accrued but not yet paid before the effective date of this Section
remain as obligations to be paid to the Department.
R18-2-327. Annual Emissions Inventory Questionnaire
A. Every source subject to permit requirements under this Chapter shall complete and
submit to the Director an annual emissions inventory questionnaire. The questionnaire is
due by March 31 or 90 days after the Director makes the inventory form available,
whichever occurs later, and shall include emission information for the previous calendar
year. These requirements apply whether or not a permit has been issued and whether or
not a permit application has been filed.
B. The questionnaire shall be on a form provided by the Director and shall include the
following information:
1. The source’s name, description, mailing address, contact person and contact
person phone number, and physical address and location, if different than the
mailing address.
2. Process information for the source, including design capacity, operations
schedule, and emissions control devices, their description and efficiencies.
3. The actual quantity of emissions from permitted emission points and fugitive
emissions as provided in the permit, including documentation of the method of
measurement, calculation, or estimation, determined pursuant to subsection (C),
of the following regulated air pollutants:
a. Any single regulated air pollutant in a quantity greater than 1 ton or the
amount listed for the pollutant in the definition of “significant” in R18-2-
101(130)(a) R18-2-101(131)(a) or (b), whichever is less.
b. Any combination of regulated air pollutants in a quantity greater than 2
1/2 tons.
C. Actual quantities of emissions shall be determined using the following emission factors
or data:
1. Whenever available, emissions estimates shall either be calculated from
continuous emissions monitors certified pursuant to 40 CFR 75, Subpart C and
referenced appendices, or data quality assured pursuant to Appendix F of 40 CFR
Page 87 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
60.
2. When sufficient data pursuant to subsection (C)(1) is not available, emissions
estimates shall be calculated from data from source performance tests conducted
pursuant to R18-2-312 in the calendar year being reported or, when not available,
conducted in the most recent calendar year representing the operating conditions
of the year being reported.
3. When sufficient data pursuant to subsection (C)(1) or (2) is not available,
emissions estimates shall be calculated using emissions factors from EPA
Publication No. AP-42 “Compilation of Air Pollutant Emission Factors,” Volume
I: Stationary Point and Area Sources, Fifth Edition, 1995, U.S. Environmental
Protection Agency, Research Triangle Park, NC, including Supplements A
through F and all updates published through July 1, 2011 (and no future
editions). AP-42 is incorporated by reference and is on file with the Department
of Environmental Quality and can be obtained from the Government Printing
Office, 732 North Capitol Street, NW, Washington, D.C. 20401, telephone (202)
512-1800, or by downloading the document from the web site for the EPA
Clearinghouse for Emission Inventories and Emission Factors.
4. When sufficient data pursuant to subsections (C)(1) through (C)(3) is not
available, emissions estimates shall be calculated from material balance using
engineering knowledge of process.
5. When sufficient data pursuant to subsections (C)(1) through (4) is not available,
emissions estimates shall be calculated by equivalent methods approved by the
Director. The Director shall only approve methods that are demonstrated as
accurate and reliable as one of the methods in subsections (C)(1) through (4).
D. Actual quantities of emissions calculated under subsection (C) shall be determined on the
basis of actual operating hours, production rates, in-place process control equipment,
operational process control data, and types of materials processed, stored, or combusted.
E. An amendment to an annual emission inventory questionnaire, containing the
documentation required by subsection (B)(3), shall be submitted to the Director by any
source whenever it discovers or receives notice, within two years of the original
submittal, that incorrect or insufficient information was submitted to the Director by a
previous questionnaire. If the incorrect or insufficient information resulted in an incorrect
annual emissions fee, the Director shall require that additional payment be made or shall
apply an amount as a credit to a future annual emissions fee. The submittal of an
Page 88 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
amendment under this subsection shall not subject the owner or operator to an
enforcement action or a civil or criminal penalty if the original submittal of incorrect or
insufficient information was due to reasonable cause and not willful neglect.
F. The Director may require submittal of supplemental emissions inventory questionnaires
for air contaminants pursuant to A.R.S. §§ 49-422, 49-424, and 49-426.03 through 49-
426.08.
R18-2-330. Public Participation
A. The Director shall provide public notice, an opportunity for public comment, and an
opportunity for a hearing before taking any of the following actions:
1. A permit issuance or renewal of a permit The issuance or denial of a permit
or permit renewal,
2. The issuance or denial of a A significant permit revision,
3. Revocation The revocation and reissuance or reopening of a permit,
4. The grant of any Any conditional orders pursuant to R18-2-328,
5. Granting a variance from a general permit under R18-2-507 and R18-2-
1705. The issuance or denial of a registration for the construction of a
source, except as provided in R18-2-302.01(B)(5).
B. The Director shall provide public notice of receipt of complete applications for permits or
permit revisions subject to Article 4 of this Chapter by publishing a notice in a newspaper
of general circulation in the county where the source is or will be located.
C. The Director shall provide the notice required pursuant to subsection (A) as follows:
1. The Director shall publish the notice once each week for two consecutive weeks
in two newspapers of general circulation in the county where the source is or will
be located.
2. The Director shall mail a copy of the notice to persons on a mailing list
developed by the Director consisting of those persons who have requested in
writing to be placed on such a mailing list.
D3. The notice required by subsection (C) shall include the following:
1a. Identification of the affected facility;
2b. Name and address of the permittee or applicant;
3c. Name and address of the permitting authority processing the permit
action;
4d. The activity or activities involved in the permit action;
5e. The emissions change involved in any permit revisions;
Page 89 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
6f. The air contaminants to be emitted;
7g. If applicable, that a notice of confidentiality has been filed under R18-2-
305;
8h. If applicable, that the source has submitted a risk management analysis
under R18-2-1708;
9i. A statement that any person may submit written comments, or a written
request for a public hearing, or both, on the proposed permit action,
along with the deadline for such requests or comments;
10j. The name, address, and telephone number of a person from the
Department from whom additional information may be obtained;
11k. Locations where copies of the permit or permit revision application,
the proposed permit, and all other materials available to the
Director that are relevant to the permit decision the materials
identified in subsection (D) may be reviewed, including the closest
Department office, and the times at which they shall be available for
public inspection.
12l. The Director shall include a statement in the public notice if the permit
or permit revision would result in the generation of emission reduction
credits under R18-2-1204, or the utilization of emission reduction credits
under R18-2-1206.
D. By no later than the date notice is first published under subsection (A), the
Department shall make copies of the following materials available at a public
location in the same county as the stationary source that is the subject of the
application and at the closest Department office:
1. The application;
2. The proposed permit or permit revision, if applicable;
3. The Department’s analysis in support of the grant or denial of the permit or
permit revision;
4. All other materials available to the Director that are relevant to the permit
decision.
E. The Director shall hold a public hearing to receive comments on petitions for conditional
orders which would vary from requirements of the applicable implementation plan. For
all other actions involving a proposed permit, the Director shall hold a public hearing
only upon written request. If a public hearing is requested, the Director shall schedule the
Page 90 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
hearing and publish notice as described in A.R.S. § 49-444 and subsection (D). The
Director shall give notice of any public hearing at least 30 days in advance of the hearing.
F. At the time the Director publishes the first notice under subsection (C)(1), the applicant
shall post a notice containing the information required in subsection (D) (C)(3) at the site
where the source is or may be located. Consistent with federal, state, and local law, the
posting shall be prominently placed at a location under the applicant’s legal control,
adjacent to the nearest public roadway, and visible to the public using the public
roadway. If a public hearing is to be held, the applicant shall place an additional posting
providing notice of the hearing. Any posting shall be maintained until the public
comment period is closed.
G. The Director shall provide at least 30 days from the date of its first notice for public
comment to receive comments and requests for a hearing. The Director shall keep a
record of the commenters and of the issues raised during the public participation process
and shall prepare written responses to all comments received. At the time a final
proposed permit is submitted to EPA, in the case of a Class I permit, or a final decision is
made, in the case of a Class II permit, the record and copies of the Director’s responses
shall be made available to the applicant and all commenters.
R18-2-332. Stack Height Limitation
A. The degree of emission limitation required of any source for control of any pollutant
shall not be affected by so much of any source’s stack height that exceeds good
engineering practice or by any other dispersion technique, except as provided in
subsection (B).
AB. The limitations set forth herein Subsection (A) shall not apply to stacks or dispersion
techniques used by the owner or operator prior to December 31, 1970, for which the
owner or operator had:
1. Begun, or caused to begin, a continuous program of physical on-site
construction of the stack;
2. Entered into building agreements or contractual obligations, which could
not be cancelled or modified without substantial loss to the owner or
operator, to undertake a program of construction of the stack to be
completed in a reasonable time Stacks in existence, or dispersion techniques
implemented, on or before December 31, 1970, unless the stationary source
or emission unit emitting pollutants through the stack, or employing the
dispersion technique, was constructed, reconstructed or underwent a major
Commented [SB15]: Reorganized in the process of correcting a number of deficiencies identified by EPA. Formerly, the rule started with the exceptions, rather than the requirement.
Page 91 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
modification after December 31, 1970; or
32. Coal-fired steam electric generating units, subject to the provisions of Section
118 of the Act which commenced operation before July 1, 1975 1957, with
stacks constructed under a construction contract awarded before February 8,
1974.
BC. GEP Good engineering practice stack height is calculated as the greater of the
following four numbers in subsections (1) through (4) heights:
1. 213.25 feet (65 meters) measured from the ground-level elevation at the base
of the stack;
2. The result of one of the following equations, where “Hg” = good engineering
practice stack height measured from the ground-level elevation at the base
of the stack; “H” = height of nearby structures measured from the ground-
level elevation at the base of the stack; and “L” = lesser dimension (height
or projected width) of nearby structures:
a. For stacks in existence on January 12, 1979, and for which the owner or
operator had obtained all applicable preconstruction permits or approvals
required under 40 CFR Parts 51 and 52 and R18-2-403, Hg = 2.5H,
provided the owner or operator produces evidence that this equation
was actually relied on in establishing an emission limitation;
3b. For all other stacks, Hg = H + 1.5L, where
Hg = good engineering practice stack height, measured from the
ground-level elevation at the base of the stack;
H = height of nearby structure measured from the ground-level
elevation at the base of the stack;
L = lesser dimension (height or projected width) of nearby structure;
provided that the EPA, the Director, or local control agency may require
the use of a field study or fluid model to verify GEP good engineering
practice stack height for the source; or
43. The height demonstrated by a fluid model or a field study approved by the
reviewing agency, which ensures that the emissions from a stack do not result in
excessive concentrations of any air pollutant as a result of atmospheric
downwash, wakes, or eddy effects created by the source itself, nearby structures,
or nearby terrain obstacles features;
D. As used in this Section:
Page 92 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
51. For a specific structure or terrain feature, “nearby” shall be means:
a. For purposes of applying the formulae in subsections (B)(2) and (3)
subsection (C)(2), that distance up to five times the lesser of the height
or the width dimension of a structure but not greater than 0.8 km (1/2
mile).
b. For conducting demonstrations under subsection (B)(4) (C)(3), means
not greater than 0.8 km (1/2 mile). An exception is that the portion of a
terrain feature may be considered to be nearby which falls within a
distance of up to 10 times the maximum height (H+) (Ht) of the feature,
not to exceed 2 miles if such feature achieved a height (H+) (Ht) 0.8 km
from the stack. The height shall be that is at least 40% of the GEP
good engineering practice stack height determined by the formula
provided in subsection (B)(3) (C)(2)(b), or 85 feet (26 meters),
whichever is greater, as measured from the ground-level elevation at the
base of the stack.
62. “Excessive concentrations” means, for the purpose of determining good
engineering practice stack height under subsection (B)(4):
a. For sources seeking credit for stack height exceeding that established
under subsections (B)(2) and (3) subsection (C)(2), a maximum
ground-level concentration due to emissions from a stack due in whole or
in part to downwash, wakes, and eddy effects produced by nearby
structures or nearby terrain features which individually is at least 40% in
excess of the maximum concentration experienced in the absence of such
downwash, wakes, or eddy effects and which contributes to a total
concentration due to emissions from all sources that is greater than an
ambient air quality standard a national ambient air quality
standard. For sources subject to the requirements for permits or
permit revisions under Article 4 of this Chapter R18-2-406, an
excessive concentration alternatively means a maximum ground-level
concentration due to emissions from a stack due in whole or part to
downwash, wakes or eddy effects produced by nearby structures or
nearby terrain features which individually is at least 40% in excess of the
maximum concentration experienced in the absence of such downwash,
wakes, or eddy effects and greater than the applicable maximum
Page 93 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
allowable increase contained in R18-2-218. The allowable emission rate
to be used in making demonstrations under subsection (B)(4) (C)(3) shall
be prescribed by the new source performance standard which is
applicable to the source category unless the owner or operator
demonstrates that this emission rate is infeasible. Where such
demonstrations are approved by the Director, an alternative emission rate
shall be established in consultation with the source owner or operator;
b. For sources seeking credit after October 11, 1983, for increases in
existing stack heights up to the heights established under subsections
(B)(2) and (3) subsection (C)(2), either:
i. A maximum ground-level concentration due in whole or in part
to downwash, wakes, or eddy effects as provided in subsection
(B)(6)(a) (D)(2)(a), except that emission rate specified by any
applicable SIP (or, in the absence of such a limit, the actual
emission rate) shall be used; or
ii. The actual presence of a local nuisance caused by the existing
stack, as determined by the Director; and
c. For sources seeking credit after January 12, 1979, for a stack height
determined under subsections (B)(2) and (3) subsection (C)(2), where
the Director requires the use of a field study or fluid model to verify
GEP good engineering practice stack height, for sources seeking stack
height credit after November 9, 1984, based on the aerodynamic
influence of cooling towers, and for sources seeking stack height credit
after December 31, 1970, based on the aerodynamic influence of
structures not adequately represented by the equations in subsections
(B)(2) and (3) subsection (C)(2), a maximum ground-level
concentration due in whole or in part to downwash, wakes, or eddy
effects that is at least 40% in excess of the maximum concentration
experienced in the absence of such downwash, wakes, or eddy effects.
C. The degree of emission limitation required of any source after the respective date
given in subsection (A) above for control of any pollutant shall not be affected by so
much of any source’s stack height that exceeds good engineering practice or by any
other dispersion technique.
D. The good engineering practice (GEP) stack height for any source seeking credit
Page 94 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
because of plume impaction which results in concentrations in violation of national
ambient air quality standards or applicable maximum allowable increases under
R18-2-218 can be adjusted by determining the stack height necessary to predict the
same maximum air pollutant concentration on any elevated terrain feature as the
maximum concentration associated with the emission limit which results from
modelling the source using the GEP stack height as determined herein and
assuming the elevated terrain features to be equal in elevation to the GEP stack
height. If this adjusted GEP stack height is greater than stack height the source
proposes to use, the source’s emission limitation and air quality impact shall be
determined using the proposed stack height and the actual terrain heights.
E. Before the Director issues a permit or permit revision under this Article or Article 4 to a
source based on a good engineering practice stack height that exceeds the height allowed
by subsection (B) (B)(1) or (2), the Director shall notify the public of the availability of
the demonstration study and provide opportunity for a public hearing in accordance with
the requirements of R18-1-402 R18-2-330.
R18-2-334. Minor New Source Review
A. Applicability.
1. Except as provided in subsection (A)(4), this Section shall apply to the following
activities:
a. Construction of any new Class I or Class II source, including the
construction of any source requiring a Class II permit under R18-2-
302.01(C)(4); or
b. Any minor NSR modification to a Class I or Class II source.
2. This Section shall apply to a regulated minor NSR pollutant emitted by a new
stationary source, if the source will have the potential to emit that pollutant at an
amount equal to or greater than the permitting exemption threshold.
3. This Section shall apply to an increase in emissions of a regulated minor NSR
pollutant from a minor NSR modification, if the modification would increase the
source’s potential to emit that pollutant by an amount equal to or greater than the
permitting exemption threshold.
4. This Section shall not apply to the emissions of a pollutant from any of the
activities identified in this subsection, if the emissions of that pollutant are
subject to Article 4 of this Chapter.
B. No person shall begin actual construction of a new stationary source, or minor NSR
Page 95 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
modification, subject to this Section without first obtaining a permit, a permit revision, a
proposed final permit, or a proposed final permit revision from the Director in accordance
with R18-2-304.
C. The Director shall not issue a proposed final Class I permit or permit revision or a Class
II permit or permit revision subject to this Section to a person proposing to construct a
new source or make a minor NSR modification unless the source or modification meets
one of the following conditions for each regulated minor NSR pollutant subject to this
section:
1. The owner or operator elects to implement RACT.
a. In the case of a new source, the owner or operator shall implement
RACT for each emissions unit that has the potential to emit a regulated
minor NSR pollutant in an amount equal to or greater than 20% of the
permitting exemption threshold.
b. In the case of a minor NSR modification, the owner or operator shall
implement RACT for each emissions unit that will experience an
increase in the potential to emit a regulated minor NSR pollutant equal to
or greater than 20% of the permitting exemption threshold.
c. When it is technically feasible and otherwise consistent with the
definition of RACT to apply the same devices, systems, process
modifications, work practices or other apparatus or techniques to a group
of emissions units, that group of emissions units shall be treated as a
single emissions unit for purposes of subsections (C)(1)(a) and (b). The
following are examples of situations to which this subsection may apply:
i. Emissions from a group of emissions units can be vented to a
single control device.
ii. A low-VOC coating can be used in several spray-painting
booths.
2. An ambient air quality assessment demonstrates that emissions from the source
or minor NSR modification will not interfere with attainment or maintenance of a
standard imposed in Article 2 of this Chapter national ambient air quality
standard in Arizona or any affected state.
a. An owner or operator may elect to have the Director perform a SCREEN
screening model of its emissions. If the results of the SCREEN
screening model indicate that the source or minor NSR modification will
Page 96 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
interfere with attainment or maintenance of a standard imposed in
Article 2 of this Chapter national ambient air quality standard, the
owner or operator may perform a more refined model to make the
demonstration required by this subsection.
b. The requirements of this subsection shall be satisfied, if the results of the
SCREEN screening or more refined modeling model conducted
pursuant to subsection (B)(2)(a) demonstrate either of the following:
i. Ambient concentrations resulting from emissions from the
source or modification combined with existing concentrations of
regulated minor NSR pollutants will not cause or exacerbate the
violation of a standard imposed in Article 2 of this Chapter
national ambient air quality standards.
ii. Emissions from the source or minor modification will have an
ambient impact below the significance levels as defined in R18-
2-401.
c. The assessment required by this subsection shall take into account any
limitations, controls or emissions decreases that are or will be
enforceable in the permit or permit revision for the source.
D. RACT Determinations.
1. Except as otherwise provided in this subsection, the Director shall determine
RACT on the basis of a case-by-case analysis performed by the permit applicant
of the emission reduction methods available for each emission unit subject to the
RACT requirement under subsection (C)(1).
2. The Director shall accept a requirement proposed by a permit applicant as RACT
under subsection (C)(1) if it complies with the most recently adopted of the
following guidelines or standards in effect at the time of the application:
a. A control technique guideline issued by the Administrator under section
108(f)(1) of the Act.
b. An emissions standard established or revised by the Administrator for the
same type of source under section 111 or 112 of the Act after November
15, 1990.
c. An applicable requirement of this Chapter or of air quality control
regulations adopted by a County under A.R.S. § 49-479 that has been
specifically identified as constituting RACT.
Page 97 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
d. A RACT standard imposed on the same type of source by a general
permit.
e. A RACT standard imposed on the same type of source under this Section
no more than 10 years before submission of the application by the permit
applicant. To facilitate identification of previously imposed RACT
standards, the Director shall establish an online database of RACT
determinations made under this Section.
E. Notwithstanding an election to adopt RACT under subsection (C)(1), a permit applicant
subject to this Section shall conduct an ambient air quality impact assessment under
subsection (C)(2) upon the Director’s request. The Director shall make such a request, if
there is reason to believe that a source or minor NSR modification could interfere with
attainment or maintenance of a standard imposed in Article 2 of this Chapter national
ambient air quality standards. In making that determination, the Director shall take into
consideration:
1. The source’s emission rates.
2. The location of emission units within the facility and their proximity to the
ambient air.
3. The terrain in which the source is or will be located.
4. The source type.
5. The location and emissions of nearby sources.
6. Background concentrations of regulated minor NSR pollutants.
F. The Director shall deny an application for a Class I permit or permit revision or a Class II
permit or permit revision subject to this Section, if an assessment conducted pursuant to
subsection (C)(2) demonstrates that the source or modification will interfere with
attainment or maintenance of a standard imposed in Article 2 of this Chapter national
ambient air quality standards.
G. An application for a permit or permit revision subject to this Section may be
processed as a minor permit revision if one of the following conditions is satisfied for
each pollutant subject to subsection (C):
1. A RACT standard is imposed under subsection (D)(2) on each emissions unit
that requires such a standard under subsection (C)(1).
2. The results of the SCREEN model for a regulated minor NSR pollutant
show expected concentrations, including background concentrations, that
are less than 75% of the applicable standard imposed in Article 2 of this
Commented [SB16]: Disapproved by EPA
Page 98 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
Chapter.
HG. A copy of the notice required by R18-2-330 for permits or significant permit revisions
subject to this Section must also be sent to the Administrator through the appropriate
regional office, and to all other state and local air pollution control agencies having
jurisdiction in the region in which the source subject to the permit or permit revision will
be located. The notice also must be sent to any other agency in the region having
responsibility for implementing the procedures required under this subpart 40 CFR 51,
I.
IH. All modeling required pursuant to this Section shall be conducted in accordance with 40
CFR 51, Appendix W.
JI. The Director shall specify those conditions in the permit that are implemented pursuant to
this Section. The specified conditions shall be included in subsequent permit renewals
unless modified pursuant to this Section or Article 4 of this Chapter.
KJ. The issuance of a permit or permit revision under this Section shall not relieve the owner
or operator of the responsibility to comply fully with applicable provisions of the SIP and
any other requirements under local, state, or federal law.
L. Delayed Effective Date. This Section shall take effect on the effective date of the
Administrator’s action approving it as part of the state implementation plan.
ARTICLE 4. PERMIT REQUIREMENTS FOR NEW MAJOR SOURCES AND MAJOR MODIFICATIONS TO EXISTING MAJOR SOURCES
R18-2-401. Definitions
The following definitions apply to this Article:
1. “Adverse impact on visibility” means visibility impairment that interferes with
the management, protection, preservation, or enjoyment of the visitor’s visual
experience of a federal Class I area, as determined according to R18-2-410. This
determination must be made on a case-by-case basis taking into account the
geographic extent, intensity, duration, frequency and time of visibility
impairments, and how these factors correlate with times of visitor use of the
federal Class I area and the frequency and timing of natural conditions that
reduce visibility. This term does not include effects on integral vistas.
2. “Baseline actual emissions” means the rate of emissions, in tons per year, of a
regulated NSR pollutant, as determined in accordance with subsections (2)(a)
through (c) (d).
Commented [SB17]: Moved from rule language. This is the complete federal definition.
Page 99 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
a. For any existing electric utility steam generating unit, baseline actual
emissions means the average rate, in tons per year, at which the unit
actually emitted the pollutant during any consecutive 24-month period
selected by the owner or operator within the five-year period
immediately preceding when the owner or operator begins actual
construction of the project. The Director shall allow the use of a different
time period upon a determination that it is more representative of normal
source operation.
i. The average rate shall include fugitive emissions to the extent
quantifiable, and emissions associated with startups, shutdowns,
and malfunctions.
ii. The average rate shall be adjusted downward to exclude any
non-compliant emissions that occurred while the source was
operating above any emission limitation that was legally
enforceable during the consecutive 24-month period.
iii. For a regulated NSR pollutant, when a project involves multiple
emissions units, only one consecutive 24-month period must be
used to determine the baseline actual emissions for the emissions
units being changed. A different consecutive 24-month period
can be used for each regulated NSR pollutant.
iv. The average rate shall not be based on any consecutive 24-month
period for which there is inadequate information for determining
annual emissions, in tons per year, and for adjusting this amount
if required by subsection (2)(a)(ii).
b. For any existing emissions unit (other than an electric utility steam
generating unit), baseline actual emissions means the average rate, in
tons per year, at which the unit actually emitted the pollutant during any
consecutive 24-month period selected by the owner or operator within
the 10-year period immediately preceding either the date the owner or
operator begins actual construction of the project, or the date a complete
permit application is received by the Administrator for a permit required
under 40 CFR 52.21 or by the Director for a permit required under the
state implementation plan, whichever is earlier, except that the 10-year
period shall not include any period earlier than November 15, 1990.
Page 100 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
i. The average rate shall include fugitive emissions to the extent
quantifiable, and emissions associated with startups, shutdowns,
and malfunctions.
ii. The average rate shall be adjusted downward to exclude any
non-compliant emissions that occurred while the source was
operating above any emission limitation that was legally
enforceable during the consecutive 24-month period. This
provision applies to excess emissions associated with a
malfunction.
iii. The average rate shall be adjusted downward to exclude any
emissions that would have exceeded an emission limitation with
which the major source must currently comply, had such major
source been required to comply with such limitations during the
consecutive 24-month period. However, if an emission limitation
is part of a maximum achievable control technology standard
that the Administrator proposed or promulgated under 40 CFR
63, the baseline actual emissions need only be adjusted if the
state of Arizona has taken credit for such emissions reductions in
an attainment demonstration or maintenance plan consistent
with the requirements of 40 CFR 51.165(a)(3)(ii)(G)
submitted to the Administrator pursuant to section 110(a)(1)
of the Act.
iv. For a regulated NSR pollutant, when a project involves multiple
emissions units, only one consecutive 24-month period must be
used to determine the baseline actual emissions for all existing
emissions units affected by the project. A different consecutive
24-month period may be used for each regulated NSR pollutant.
v. The average rate shall not be based on any consecutive 24-month
period for which there is inadequate information for determining
annual emissions, in tons per year, and for adjusting this amount
if required by subsection (2)(b)(ii) or (iii).
c. For a new emissions unit, the baseline actual emissions for purposes of
determining the emissions increase that will result from the initial
construction and operation of such unit shall equal zero; and thereafter,
Page 101 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
for all other purposes, shall equal the unit’s potential to emit.
d. For a PAL for a stationary source, the baseline actual emissions shall be
calculated for existing electric utility steam generating units in
accordance with the procedures in subsection (2)(a), for other existing
emissions units in accordance with the procedures contained in
subsection (2)(b), and for new emissions units in accordance with the
procedures contained in subsection (2)(c).
3. “Basic design parameter” means:
a. Except as provided in subsection (3)(c), for a process unit at a steam
electric generating facility, the owner or operator may select as its basic
design parameters either maximum hourly heat input and maximum
hourly fuel consumption rate or maximum hourly electric output rate and
maximum steam flow rate. When establishing fuel consumption
specifications in terms of weight or volume, the minimum fuel quality
based on Btu content shall be used for determining the basic design
parameters for a coal-fired electric utility steam generating unit.
b. Except as provided in subsection (3)(c), the basic design parameters for
any process unit that is not at a steam electric generating facility are
maximum rate of fuel or heat input, maximum rate of material input, or
maximum rate of product output. Combustion process units will typically
use maximum rate of fuel input. For sources having multiple end
products and raw materials, the owner or operator should consider the
primary product or primary raw material when selecting a basic design
parameter.
c. If the owner or operator believes the basic design parameters in
subsections (3)(a) and (b) are not appropriate for a specific industry or
type of process unit, the owner or operator may propose to the Director
an alternative basic design parameters for the source’s process unit. If the
Director approves of the use of an alternative basic design parameters,
the Director shall issue a permit that is legally enforceable that records
such basic design parameters and requires the owner or operator to
comply with such parameters.
d. The owner or operator shall use credible information, such as results of
historic maximum capability tests, design information from the
Commented [SB18]: Retained consistent with EPA’s final LA/LD.
Page 102 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
manufacturer, or engineering calculations, in establishing the magnitude
of the basic design parameters specified in subsections (3)(a) and (b).
e. If design information is not available for a process unit, then the owner
or operator shall determine the process unit’s basic design parameters
using the maximum value achieved by the process unit in the five-year
period immediately preceding the planned activity.
f. Efficiency of a process unit is not a basic design parameter.
g. The replacement activity shall not cause the process unit to exceed any
emission limitation, or operational limitation that has the effect of
constraining emissions, that applies to the process unit and that is legally
enforceable.
4. “Complete” means, in reference to an application for a permit or permit revision,
that the application contains all the information necessary for processing the
application. Designating an application complete for purposes of permit
processing does not preclude the Department from requesting or accepting
any additional information.
5. “Dispersion technique” means any technique that attempts to affect the
concentration of a pollutant in the ambient air by any of the following:
a. Using that portion of a stack that exceeds good engineering practice
stack height;
b. Varying the rate of emission of a pollutant according to atmospheric
conditions or ambient concentrations of that pollutant; or
c. Increasing final exhaust gas plume rise by manipulating source process
parameters, exhaust gas parameters, stack parameters, or combining
exhaust gases from several existing stacks into one stack; or other
selective handling of exhaust gas streams that increases the exhaust gas
plume rise. This shall not include any of the following:
i. The reheating of a gas stream, following use of a pollution
control system, for the purpose of returning the gas to the
temperature at which it was originally discharged from the
facility generating the gas stream.
ii. The merging of exhaust gas streams under any of the following
conditions:
(1) The source owner or operator demonstrates that the
Page 103 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
facility was originally designed and constructed with the
merged gas streams;
(2) After July 18 8, 1985, the merging is part of a change in
operation at the facility that includes the installation of
pollution controls and is accompanied by a net reduction
in the allowable emissions of a pollutant, applying only
to the emission limitation for that pollutant; or
(3) Before July 8, 1985, the merging was part of a change in
operation at the facility that included the installation of
emissions control equipment or was carried out for
sound economic or engineering reasons. Where there
was an increase in the emission limitation or, in the
event that no emission limitation was in existence prior
to the merging, an increase in the quantity of pollutants
actually emitted prior to the merging, the Department
shall presume that merging was significantly motivated
by an intent to gain emissions credit for greater
dispersion. Absent a demonstration by the source owner
or operator that merging was not significantly motivated
by such intent, the Department shall deny credit for the
effects of the merging in calculating the allowable
emissions for the source.
iii. Smoke management in agricultural or silvicultural prescribed
burning programs.
iv. Episodic restrictions on residential woodburning and open
burning.
v. Techniques that increase final exhaust gas plume rise if the
resulting allowable emissions of sulfur dioxide from the facility
do not exceed 5,000 tons per year.
6. “Existing emissions unit” is any emissions unit that is currently in existence and
that is not a new emissions unit. A replacement unit is an existing emissions unit.
7. “Federal Class I area” means an area designated as Class I under R18-2-
217.
78. “High terrain” means any area having an elevation of 900 feet or more above the
Page 104 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
base of the stack of a source.
89. “Innovative control technology” means any system of air pollution control that
has not been adequately demonstrated in practice but would have a substantial
likelihood of achieving greater continuous emissions reduction than any control
system in current practice, or of achieving at least comparable reductions at
lower cost in terms of energy, economics, or nonair quality environmental
impacts.
910. “Low terrain” means any area other than high terrain.
1011. “Lowest achievable emission rate” (LAER) means, for any source, the more
stringent rate of emissions based on one of the following:
a. The most stringent emissions limitation that is contained in any
implementation plan approved or promulgated under sections 110 or 172
of the Act for the class or category of stationary source, unless the owner
or operator of the proposed stationary source demonstrates that the
limitation is not achievable; or
b. The most stringent emissions limitation that is achieved in practice by
the class or category of stationary source. This limitation, when applied
to a modification, means the lowest achievable emissions rate for the
new or modified emissions units within the stationary source. The
application of this term shall not permit a proposed new or modified
stationary source to emit any pollutant in excess of the amount allowable
under the applicable standards of performance in Articles 9 and 11 of
this Chapter new source performance standards.
12. “Major emissions unit” means:
a. Any emissions unit that emits or has the potential to emit 100 tons
per year or more of the PAL pollutant in an attainment area; or
b. Any emissions unit that emits or has the potential to emit the PAL
pollutant in an amount that is equal to or greater than the major
source threshold for the PAL pollutant for nonattainment areas. For
example, in accordance with the definition of major stationary
source in section 182(c) of the Act, an emissions unit would be a
major emissions unit for VOC if the emissions unit is located in a
serious ozone nonattainment area and it emits or has the potential to
emit 50 or more tons of VOC per year.
Page 105 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
1113. “Major source” means is defined as follows:
a. For purposes of determining the applicability of R18-2-403 through
R18-2-405 or R18-2-411, major source means any Any stationary
source located in a nonattainment area that emits, or has the potential
to emit, 100 tons per year or more of any regulated NSR pollutant,
except that the following thresholds shall apply in areas subject to
subpart 2, subpart 3 or subpart 4 of part D, Title I of the Act:
Pollutant
Emitted
Nonattainment
Pollutant and
Classification
Quantity
Threshold
tons/year or
more
Carbon
Monoxide
(CO)
CO, Serious, if
stationary
sources
contribute
significantly to
CO levels in the
area as
determined
under rules
issued by the
Administrator
50
VOC
Ozone, Serious
50
VOC
Ozone, Severe
25
PM10
PM10, Serious
70
PM2.5 PM2.5 Serious 70
Commented [SB19]: The new approach in a and b to identifying when the definition applies is more accurate and consistent with the federal rules.
Page 106 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
PM2.5
precursors
identified in
R18-2-
101(124)(a)
PM2.5 Serious 70
NOx
Ozone, Serious
50
NOx Ozone, Severe 25
b. For purposes of determining the applicability of R18-2-406 through
R18-2-408 or R18-2-410, major source means any Any stationary
source located in an attainment or unclassifiable area that emits, or
has the potential to emit, 100 tons per year or more of any regulated NSR
pollutant if the source is classified as a Categorical Source categorical
source, or 250 tons per year or more of any regulated NSR pollutant if
the source is not classified as a Categorical Source categorical source;
c. Any stationary source that emits, or has the potential to emit, five or
more tons of lead per year;
c. A major source includes a physical change that would occur at a
stationary source, not otherwise qualifying under subsection (13)(a)
or (b) as a major source, if the change would constitute a major
source by itself.
d. A major source that is major for VOC or nitrogen oxides shall be
considered major for ozone; or.
e. The fugitive emissions of a stationary source shall not be included in
determining for any of the purposes of this Section Article whether it is
a major stationary source, unless the source belongs to a section 302(j)
category.
14. “Mandatory federal Class I area” means an area identified in R18-2-217(B).
1215. “New emissions unit” means any emissions unit which is (or will be) newly
constructed and which has existed for less than two years from the date such
emissions unit first operated.
Page 107 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
1316. “Plantwide applicability limitation” or “PAL” means an emission limitation that
is based on the baseline actual emissions of all emissions units at the stationary
source that emit or have the potential to emit the PAL pollutant, expressed in tons
per year, for a pollutant at a major source, that is enforceable as a practical matter
and established source-wide in accordance with this Section.
1417. “PAL allowable emissions” means “allowable emissions” as defined in R18-2-
101, except that the allowable emissions for any emissions unit shall be
calculated considering any emission limitations that are enforceable as a practical
matter on the emissions unit’s potential to emit.
1518. PAL effective date generally means the date of issuance of the PAL permit.
However, the PAL effective date for an increased PAL is the date any emissions
unit that is part of the PAL major modification becomes operational and begins
to emit the PAL pollutant.
1619. “PAL effective period” means the period beginning with the PAL effective date
and ending 10 years later.
1720. “PAL major modification” means any physical change in or change in the
method of operation of the PAL source that causes it to emit the PAL pollutant at
a level equal to or greater than the PAL.
1821. “PAL permit” means the permit issued by the Director that establishes a PAL for
a major source under Article 3 or 4 of this Chapter.
1922. “PAL pollutant” means the pollutant for which a PAL is established at a major
source.
2023. “Projected actual emissions” means:
a. The maximum annual rate, in tons per year, at which an existing
emissions unit is projected to emit a regulated NSR pollutant during any
12-month period in the 60 calendar months following the date the unit
resumes regular operation after the project, or in any 12-month period in
the 120 calendar months following that date if the project involves
increasing the design capacity or potential to emit of any emissions unit
for that regulated NSR pollutant and full utilization of the unit would
result in a significant emissions increase or a significant net emissions
increase at the major source.
b. In determining the projected actual emissions before beginning actual
construction, the owner or operator of the major source:
Page 108 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
i. Shall consider all relevant information, including but not limited
to, historical operational data, the company’s own
representations, the company’s expected business activity and
the company’s highest projections of business activity, the
company’s filings with the county, state or federal regulatory
authorities, and compliance plans under these regulations; and
ii. Shall include fugitive emissions to the extent quantifiable;
iii. Shall include emissions associated with startups, and shutdowns,
and malfunctions except emissions from a shutdown
associated with a malfunction; and
iv. Shall exclude, only for calculating any increase in emissions that
results from the particular project, that portion of the unit’s
emissions following the project that an existing unit could have
accommodated during the consecutive 24-month period used to
establish the baseline actual emissions and that are also unrelated
to the particular project, including any increased utilization due
to product demand growth; or
c. In lieu of using the method set out subsections (20)(b)(i) 23(b)(i) through
(iv), the owner or operator may elect to use the emissions unit’s potential
to emit, in tons per year.
21. “Reconstruction” of sources located in nonattainment areas shall be
presumed to have taken place if the fixed capital cost of the new components
exceeds 50% of the fixed capital cost of a comparable entirely new
stationary source, as determined in accordance with the provisions of 40
CFR 60.15(f)(1) through (3).
2224. “Replacement unit” means an emissions unit for which all the criteria listed in
subsections (22)(a) (24)(a) through (d) are met. No creditable emission
reductions shall be generated from shutting down the existing emissions unit that
is replaced.
a. The emissions unit is a reconstructed unit within the meaning of 40 CFR
60.15(b)(1), or the emissions unit completely takes the place of an
existing emissions unit.
b. The emissions unit is identical to or functionally equivalent to the
replaced emissions unit.
Page 109 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
c. The replacement does not alter the basic design parameters of the process
unit.
d. The replaced emissions unit is permanently removed from the major
source, otherwise permanently disabled, or permanently barred from
operation by a permit that is enforceable as a practical matter. If the
replaced emissions unit is brought back into operation, it shall constitute
a new emissions unit.
2325. “Resource recovery project” means any facility at which solid waste is processed
for the purpose of extracting, converting to energy, or otherwise separating and
preparing solid waste for reuse. Only energy conversion facilities that utilize
solid waste that provides more than 50% of the heat input shall be considered a
resource recovery project under this Article.
2426. “Significant emissions unit” means an emissions unit that emits or has the
potential to emit a PAL pollutant in an amount that is equal to or greater than the
significant level for that PAL pollutant, but less than the amount that would
qualify the unit as a major emissions unit.
2527. “Significance levels” means the following ambient concentrations for the
enumerated pollutants:
Averaging Time
Pollutant Annual 24-Hour 8-Hour 3-Hour 1-Hour
SO2 1 µg/m3 5 µg/m3 25 µg/m3
NO2 1 µg/m3
CO 0.5 mg/m3 2 mg/m3
PM10 1 µg/m3 5 µg/m3 PM2.5
federal
Class I area
0.06 µg/m3 0.07 µg/m3
PM2.5
federal
Class II area
0.3 µg/m3 1.2 µg/m3
PM2.5
federal
Class III area
0.3 µg/m3 1.2 µg/m3
Page 110 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
Except for the annual pollutant concentrations, the Department shall deem that exceedance of significance levels has occurred when the ambient concentration of the above pollutant is exceeded more than once per year at any one location. If the concentration occurs at a specific location and at a time when Arizona ambient air quality standards the national ambient air quality standards for the pollutant are not violated, the significance level does not apply.
2628. “Small emissions unit” means an emissions unit that emits or has the potential to
emit the PAL pollutant in an amount less than the significant level for that PAL
pollutant.
R18-2-402. General
A. The preconstruction review requirements of this Article shall apply to the construction of
any new major source or any project at an existing major source.
B. The requirements of R18-2-403 through R18-2-410 apply to the construction of a major
source or a major modification of any existing stationary source, except as this Article
otherwise provides.
C. No person shall begin actual construction of a new major source or a major modification
subject to the requirements of R18-2-403 through R18-2-410 without first obtaining a
proposed final permit from the Director, pursuant to R18-2-307(A)(2), stating that the
major source or major modification shall meet those requirements.
D. The requirements of this Article apply to projects at major sources in accordance with the
following principles.
1. Except as otherwise provided in subsection (E), a project is a major modification
for a regulated NSR pollutant if it causes both a significant emissions increase
and a significant net emissions increase. The project is not a major modification
if it does not cause a significant emissions increase. If the project causes a
significant emissions increase, then the project is a major modification only if it
also results in a significant net emissions increase.
2. The procedure for calculating before beginning actual construction whether a
significant emissions increase will occur depends upon the types of emissions
units being modified as set forth in subsections (D)(3) through (6). The procedure
for calculating before beginning actual construction whether a significant net
emissions increase will occur at the major source is set forth in the definition of
Page 111 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
net emissions increase in R18-2-101. Regardless of any such preconstruction
projections, a major modification results if the project causes a significant
emissions increase and a significant net emissions increase.
3. Actual-to-projected-actual applicability test for projects that only involve existing
emissions units. A significant emissions increase of a regulated NSR pollutant is
projected to occur if the sum of the difference between the projected actual
emissions and the baseline actual emissions, for each existing emissions unit,
equals or exceeds the significant amount for that pollutant.
4. Actual-to-potential applicability test for projects that only involve new emissions
units. A significant emissions increase of a regulated NSR pollutant is projected
to occur if the sum of the difference between the potential to emit from each new
emissions unit following completion of the project and the baseline actual
emissions of these units before the project equals or exceeds the significant
amount for that pollutant.
5. [Reserved.]
6. Hybrid applicability test for projects that involve both new emissions units and
existing emissions units. A significant emissions increase of a regulated NSR
pollutant is projected to occur if the sum of the emissions increases for each
emissions unit, using the method specified in subsection subsections (D)(3)
through (D)(4), as applicable with respect to each emissions unit, equals or
exceeds the significant amount for that pollutant.
E. Any major source with a PAL for a regulated NSR pollutant shall comply with R18-2-
412.
F. This subsection applies with respect to any regulated NSR pollutant emitted from projects
at existing emissions units at a major stationary source (other than projects at a source
with a PAL) in circumstances where there is a reasonable possibility, within the meaning
of subsection (F)(6) of this Section, that a project that is not a part of a major
modification may result in a significant emissions increase of such pollutant and the
owner or operator elects to use the method specified in R18-2-401(20)(b)(i) R18-2-
401(23)(b)(i) through (iv) of the definition of projected actual emissions for calculating
projected actual emissions.
1. Before beginning actual construction of the project, the owner or operator shall
document and maintain a record of the following information:
a. A description of the project;
Page 112 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
b. Identification of the emissions unit(s) with emissions of a regulated NSR
pollutant that could be affected by the project;
c. A description of the applicability test used to determine that the project is
not a major modification for any regulated NSR pollutant, including the
baseline actual emissions, the projected actual emissions, the amount of
emissions excluded under R18-2-401(20)(b)(iii) R18-2-401(23)(b)(iv) of
the definition of projected actual emissions, and an explanation for why
such amount was excluded; and
d. Any netting calculations, if applicable.
2. If the emissions unit is an existing electric utility steam generating unit, before
beginning actual construction, the owner or operator shall provide a copy of the
information set out in subsection (F)(1) to the Director. Nothing in this
subsection shall be construed to require the owner or operator of such a unit to
obtain any determination from the Director before beginning actual construction.
3. The owner or operator shall monitor the emissions of any regulated NSR
pollutant that could increase as a result of the project and that is emitted by any
emissions unit identified in subsection (F)(1)(b); and calculate and maintain a
record of the annual emissions, in tons per year on a calendar year basis, for a
period of five years following resumption of regular operations after the change,
or for a period of 10 years following resumption of regular operations after the
change if the project increases the design capacity or potential to emit of that
regulated NSR pollutant at such emissions unit. For purposes of this subsection,
fugitive emissions (to the extent quantifiable) shall be monitored if the emissions
unit is part of a section 302(j) category or if the emissions unit is located at a
major stationary source that belongs to a section 302(j) category.
4. The owner or operator shall submit a report to the Director if for a calendar year
the annual emissions, in tons per year, from the project identified in subsection
(F)(1)(a) (F)(1) exceed the sum of the baseline actual emissions, as documented
and maintained under subsection (F)(1)(c), by a significant amount for that
regulated NSR pollutant, and if the emissions differ from the preconstruction
projection as documented and maintained under subsection (F)(1)(c). The owner
or operator shall submit the report to the Director within 60 days after the end of
the calendar year. The report shall contain the following:
a. The name, address and telephone number of the major source;
Page 113 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
b. The annual emissions as calculated pursuant to subsection (F)(3); and
c. Any other information that the owner or operator wishes to include in the
report, such as an explanation as to why the emissions differ from the
preconstruction projection.
5. Notwithstanding subsection (F)(4), if any existing emissions unit identified in
subsection (F)(1)(b) is an electric utility steam generating unit, the owner or
operator shall submit a report to the Director within 60 days after the end of each
calendar year during which the owner or operator must generate records under
subsection (F)(3). The report shall document the unit’s post-project annual
emissions during the calendar year that preceded submission of the report.
6. A “reasonable possibility” under subsection (F) occurs when the owner or
operator calculates the project to result in one of the following:
a. A projected actual emissions increase of at least 50% of the amount that
is a significant emissions increase (without reference to the amount that
is a significant net emissions increase) for the regulated NSR pollutant.
b. A projected actual emissions increase that, added to the amount of
emissions excluded under subsection R18-2-401(20)(b)(iv) R18-2-
401(23)(b)(iv) of the definition of projected actual emissions, sums to at
least 50% of the amount that is a significant emissions increase (without
reference to the amount that is a significant net emissions increase) for
the regulated NSR pollutant. For a project for which a reasonable
possibility occurs only within the meaning of subsection (F)(6)(b), and
not also within the meaning of subsection (F)(6)(a), subsections (F)(2)
through (5) do not apply to the project.
7. The owner or operator of the source shall make the information required to
be documented and maintained under subsection (F) available for review
upon request for inspection by the Department or the general public.
G. An application for a permit or permit revision under this Article, other than a PAL permit
pursuant to R18-2-412, shall not be considered complete unless the application
demonstrates that:
1. The requirements in subsection (H) are met;
2. The more stringent of the applicable new source performance standards in
Article 9 of this Chapter or the existing source performance standards in Article
7 of this Chapter are applied to the proposed new major source or major
Page 114 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
modification of a major source;
3. The visibility requirements contained in R18-2-410 are satisfied;
4. All applicable provisions of Article 3 of this Chapter are met;
5. The new major source or major modification will be in compliance with
whatever emission limitation, design, equipment, work practice or operational
standard, or combination thereof is applicable to the source or modification. The
degree of emission limitation required for control of any pollutant under this
Article shall not be affected in any manner by:
a. Stack height in excess of GEP stack height except as provided in R18-2-
332; or
b. Any other dispersion technique, unless implemented prior to December
31, 1970;
6. The new major source or major modification will not exceed the applicable
standards for hazardous air pollutants contained in this Chapter;
7. The new major source or major modification will not exceed the limitations, if
applicable, on emission from nonpoint sources contained in Article 6 of this
Chapter;
8. A stationary source that will emit five or more tons of lead per year will not
violate the ambient air quality standards for lead contained in R18-2-206;
98. The new major source or major modification will not have an adverse impact on
visibility, as determined according to R18-2-410.
H. Except for assessing air quality impacts within federal Class I areas, the air impact
analysis required to be conducted as part of a permit application shall initially consider
only the geographical area located within a 50 kilometer radius from the point of greatest
emissions for the new major source or major modification. The Director, on his own
initiative or upon receipt of written notice from any person shall have the right at any
time to request an enlargement of the geographical area for which an air quality impact
analysis is to be performed by giving the person applying for the permit or permit
revision written notice thereof, specifying the enlarged radius to be so considered. In
performing an air impact analysis for any geographical area with a radius of more than 50
kilometers, the person applying for the permit or permit revision may use monitoring or
modeling data obtained from major sources having comparable emissions or having
emissions which are capable of being accurately used in such demonstration, and which
are subjected to terrain and atmospheric stability conditions which are comparable or
Page 115 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
which may be extrapolated with reasonable accuracy for use in such demonstration.
I. Unless the requirement has been satisfied pursuant to Article 3 of this Chapter, the
The Director shall comply with following requirements with respect to an application
for a permit or permit revision subject to this Article:
1. Within 60 days after receipt of an the application for a permit or permit
revision subject to this Article, or any addition to such the application, the
Director shall advise the applicant of any deficiency. The date of receipt of the a
complete application shall be, for the purpose of this Section, the date on which
the Director received receives all required information. The permit application
shall not be deemed complete if the Director fails to meet the requirements of this
subsection.
2. Within one year after receipt of a complete application, the Director shall do
all of the following:
a. Make a preliminary determination whether the permit or permit
revision should be granted or denied.
b. Make the application, all materials the applicant submitted, the
preliminary determination, and materials relating to the application
available under R18-2-330(D).
c. Notify the public of the application, the preliminary determination
and the opportunity for a public hearing and to submit written
comments in accordance with R18-2-330(C). In the case of an
application subject to R18-2-406, the notice shall include the degree
of consumption of the maximum allowable increases allowed under
R18-2-218 that is expected to occur as a result of emissions from the
proposed source or modification.
d. Take final action on the application by denying the permit or permit
revision or issuing a proposed final permit or permit revision.
e. Notify the applicant in writing of the approval or denial and make
the notification, comments on the proposed action, and materials
supporting the final action available for public inspection at the
location where materials relating to the proposed action were placed
under R18-2-330(D).
23. A copy of any notice required by R18-2-330 and subsection (I)(2)(c) shall be
sent to the permit applicant, to the Administrator, and to the following officials
Page 116 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
and agencies having cognizance over the location where the proposed major
source or major modification would occur:
a. The air pollution control officer, if one exists, for the county wherein the
proposed or existing source that is the subject of the permit or permit
revision application is located;
b. The county manager for the county wherein the proposed or existing
source that is the subject of the permit or permit revision application is
located;
c. The city or town managers of the city or town which contains, and any
city or town the boundaries of which are within 5 miles of, the location
of the proposed or existing source that is the subject of the permit or
permit revision application;
d. Any regional land use planning agency with authority for land use
planning in the area where the proposed or existing source that is the
subject of the permit or permit revision application is located; and
e. Any state, Federal Land Manager, or Indian governing body whose lands
may be affected by emissions from the proposed source or modification.
3. The Director shall take final action on the application within one year of the
proper filing of the completed application. The Director shall notify the
applicant in writing of his approval or denial.
4J. The authority to construct and operate a new major source or major modification under a
permit or permit revision issued under this Article shall terminate if the owner or operator
does not commence the proposed construction or major modification within 18 months of
issuance or if, during the construction or major modification, the owner or operator
suspends work for more than 18 months. The Director may extend the 18-month period
upon a satisfactory showing that an extension is justified. This provision does not apply
to the time period between construction of the approved phases of a phased construction
project; each phase must commence construction within 18 months of the projected and
approved commencement date.
R18-2-403. Permits for Sources Located in Nonattainment Areas
A. Except as provided in subsections (C) through (G) below, no permit or permit revision
shall be issued under this Article to a person proposing to construct a new major source
or make a major modification that is major for the pollutant for which the area is
designated nonattainment unless:
Page 117 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
1. The person demonstrates that the new major source or the major modification
will meet an emission limitation which is the lowest achievable emission rate
(LAER) for that source for that regulated NSR pollutant.
2. The person demonstrates that all existing major sources owned or operated by
that person (or any entity controlling, controlled by, or under common control
with that person) in the state are in compliance with, or on a schedule of
compliance for, all conditions contained in permits of each of the sources and all
other applicable emission limitations and standards under the Act and this
Chapter.
3. The person demonstrates that emission reductions for the specific pollutant(s)
from source(s) in existence in the allowable offset area of the new major source
or major modification (whether or not under the same ownership) meet the offset
requirements of R18-2-404.
4. The Administrator has not determined that the applicable implementation
plan is not being adequately implemented for the nonattainment area in
which the proposed source is to be constructed or modified in accordance
with the requirements in this Section.
B. No permit or permit revision under this Article shall be issued to a person proposing to
construct a new major source or make a major modification to a major source located in a
nonattainment area unless:
1. The person performs an analysis of alternative sites, sizes, production processes,
and environmental control techniques for such new major source or major
modification; and
2. The Director determines that the analysis demonstrates that the benefits of the
new major source or major modification significantly outweigh the
environmental and social costs imposed as a result of its location, construction, or
modification.
C. At such time that a particular source or modification becomes a major source or major
modification solely by virtue of a relaxation in any enforceable limitation which was
established after August 7, 1980, on the capacity of the source or modification otherwise
to emit a pollutant, such as restriction on hours of operation, then the requirements of this
Section shall apply to the source or modification as though construction had not yet
commenced on the source or modification.
D. Secondary emissions shall not be considered in determining the potential to emit of a new
Page 118 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
source or modification and therefore whether the new source or modification is major.
However, if a new source or modification is subject to this Section on the basis of its
direct emissions, a permit or permit revision under this Article to construct the new
source or modification shall be denied unless the requirements of R18-2-403(A)(3) and
R18-2-404 are met for reasonably quantifiable secondary emissions caused by the new
source or modification.
E. A permit to construct a new major source or major modification shall be denied unless
the conditions specified in subsections (A)(1), (2), and (3) are met for fugitive emissions
caused by the new source or modification. However, these conditions shall not apply to a
new major source or major modification that would be a major source or major
modification only if fugitive emissions, to the extent quantifiable, are considered in
calculating the potential emissions of the source or modification, and the source does not
belong to a section 302(j) category.
F. The requirements of subsection (A)(3) shall not apply to temporary emissions units, such
as pilot plants, portable facilities that will be relocated outside of the nonattainment area
and the construction phase of a new source, if those units will operate for no more than
24 months in the nonattainment area, are otherwise in compliance with the requirement to
obtain a permit under this Chapter and are in compliance with the conditions of that
permit.
G. A decrease in actual emissions shall be considered in determining the potential of a new
source or modification to emit only to the extent that the Director has not relied on it in
issuing any permit or permit revision under this Article or the state has not relied on it in
demonstrating attainment or reasonable further progress.
H. The Director shall transmit to the Administrator a copy of each permit application
relating to a major stationary source or major modification under this Section.
Within 30 days of the issuance of any permit under this Section, the Director shall also
submit control technology information from the permit to the Administrator for the
purposes listed in Section 173(d) of the Act.
I. The issuance of a permit or permit revision under this Article in accordance with this
Section shall not relieve the owner or operator of the responsibility to comply fully with
applicable provisions of the SIP and any other requirements under local, state, or federal
law.
R18-2-404. Offset Standards
A. Increased emissions by a major source or major modification subject to R18-2-403 of
Page 119 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
each pollutant for which the area has been designated as nonattainment and for
which the source or modification is classified as major shall be offset by real
reductions in the actual emissions of each the pollutant for which the area has been
designated as nonattainment and for which the source or modification is classified
as major. Offsets shall be for the same regulated NSR Pollutant, except that
emissions of the ozone precursors NOx and VOC may be offset by reductions in
emissions of either of those pollutants, provided that all other applicable
requirements of this Section and R18-2-405 are satisfied. Except as provided in R18-
2-405, emissions increases shall be offset by decreases at a ratio of and subsection
(J), the ratio of the total actual reductions to the emissions increase shall be at least 1
to 1.
B. Except as provided in subsection (B)(1) or (2), for sources and modifications subject to
this Section, the baseline for determining credit for emissions reductions is the emissions
limit for the source generating the offset credit under the applicable implementation plan
in effect at the time the application for a permit or permit revision is filed.
1. The offset baseline shall be the actual emissions of the source from which offset
credit is obtained where either of the following conditions is satisfied:
a. The demonstration of reasonable further progress and attainment of
ambient air quality standards is based upon the actual emissions of
sources located within a designated nonattainment area for which the
preconstruction review program was adopted.
b. The applicable implementation plan does not contain an emissions
limitation for that source or source category.
2. Where the emissions limit under the applicable implementation plan allows
greater emissions than the potential to emit of the source, emissions offset credit
will be allowed only for control below this potential.
C. For an existing fuel combustion source, emissions offset credit shall be based on the
allowable emissions under the applicable implementation plan for the type of fuel being
burned at the time the application to construct is filed. If the existing source commits to
switch to a cleaner fuel at some future date, emissions offset credit based on the
allowable or actual emissions for the fuels involved is not acceptable, unless the permit
for the existing source is conditioned to require the use of a specified alternative control
measure which would achieve the same degree of emissions reduction should the source
switch back to a fuel generating higher emissions. The owner or operator of the existing
Commented [SB20]: Required by federal rule.
Commented [SB21]: Allowed by 2008 ozone NAAQS implementation rule.
Page 120 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
source must demonstrate that adequate long-term supplies of the new fuel are available
before granting emissions offset credit for fuel switches.
D. Offset Credit for Shutdowns.
1. Emissions reductions achieved by shutting down an existing emission unit or
curtailing production or operating hours may be credited for offsets if they meet
both of the following conditions.
a. The reductions are surplus, permanent, quantifiable, and federally
enforceable.
b. The shutdown or curtailment occurred after the last day of the base year
for the SIP planning process. For purposes of this subsection, the
Director may choose to consider a prior shutdown or curtailment to have
occurred after the last day of the base year if the projected emissions
inventory used to develop the attainment demonstration explicitly
includes the emissions from such previously shutdown or curtailed
emission units. However, in no event may credit be given for shutdowns
that occurred before August 7, 1977.
2. Emissions reductions achieved by shutting down an existing emissions unit or
curtailing production or operating hours and that do not meet the requirements in
subsection (D)(1)(b) may be credited only if one of the following conditions is
satisfied:
a. The shutdown or curtailment occurred on or after the date the
construction permit application is filed.
b. The applicant can establish that the proposed new emissions unit is a
replacement for the shutdown or curtailed emissions unit, and the
emissions reductions achieved by the shutdown or curtailment met the
requirements of subsection (D)(1)(a).
E. No emissions credit may be allowed for replacing one hydrocarbon compound with
another of lesser reactivity, except for those compounds listed in Table 1 of EPA’s
“Recommended Policy on Control of Volatile Organic Compounds,” 42 FR 35314 (July
8, 1977).
F. All emission reductions claimed as offset credits shall be federally enforceable by the
time a proposed final permit is issued to the owner or operator of the major source
subject to this Section and shall be in effect by the time the new or modified source
subject to the permit commences operation.
Page 121 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
G. The owner or operator of a major source or major modification subject to this Section
must obtain offset credits from the same source or from other sources in the same
nonattainment area, except that the Director may allow the owner or operator to obtain
offset credits from another nonattainment area if both of the following conditions are
satisfied:
1. The other area has an equal or higher nonattainment classification than the area
in which the source is located.
2. Emissions from such other area contribute to a violation of the national ambient
air quality standard in the nonattainment area in which the source is located.
H. Credit for an emissions reduction can be claimed to the extent that the Director has not
relied on it in issuing any permit under this Article, R18-2-334, or the state has not relied
on it in a demonstration of attainment or reasonable further progress.
I. The total tonnage of increased emissions, in tons per year, resulting from a major
modification that must be offset under this Section shall be determined by summing the
difference between the allowable emissions after the modification and the actual
emissions before the modification for each emissions unit.
J. In ozone nonattainment areas classified as marginal, total emissions of VOC and oxides
of nitrogen from other sources shall offset those proposed or permitted from the major
source or major modification by a ratio of at least 1.10 to 1. In ozone nonattainment areas
classified as moderate, total emissions of VOC and oxides of nitrogen from other sources
shall offset those proposed or permitted from the major source or major modification by a
ratio of at least 1.15 to 1. New major sources and major modifications in serious and
severe ozone nonattainment areas shall comply with this Section and R18-2-405.
R18-2-405. Special Rule for Major Sources of VOC or Nitrogen Oxides in Ozone
Nonattainment Areas Classified as Serious or Severe
A. Applicability. The provisions of this Section only apply to stationary sources of VOC or
nitrogen oxides in ozone nonattainment areas classified as serious or severe. Unless
otherwise provided in this Section, all requirements of Articles 3 and 4 of this Chapter
apply.
B. “Significant” means, for the purposes of a major modification of any major
stationary source of VOC or nitrogen oxides, or for determining whether an
otherwise minor source is major under the definition of major source in R18-2-401,
any physical change or change in the method of operations that results in net
increases in emissions of either pollutant by more than 25 tons when aggregated
Page 122 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
with all other creditable increases and decreases in emissions from the source over
the previous five consecutive calendar years, including the calendar year in which
the increase is proposed in reference to an emissions increase or a net emissions
increase, any increase in actual emissions of volatile organic compounds or nitrogen
oxides that would result from any physical change in, or change in the method of
operation of, a major source, if the emissions increase of volatile organic compounds
or nitrogen oxides exceeds 25 tons per year.
C. For any major source that emits or has the potential to emit less than 100 tons of VOC or
oxides of nitrogen per year, a physical or operational change that results in a significant
increase in VOC or oxides of nitrogen, respectively, from any discrete operation, unit, or
other pollutant emitting activity at the source shall constitute a major modification,
except that the increase shall not constitute a major modification, if the owner or operator
of the source elects to offset the increase by a greater reduction in emissions of VOC or
oxides of nitrogen, as applicable, from other operations, units or activities at the source at
an internal offset ratio of at least 1.3 to 1. If the owner or operator does not make such an
election, the change shall constitute a major modification but BACT shall be substituted
for LAER when applying R18-2-403(A)(1) to the major modification.
D. For any stationary source that emits or has the potential to emit 100 tons or more of VOC
or oxides of nitrogen per year, a physical or operational change that results in any
significant increase in VOC from any discrete operation, unit or other pollutant emitting
activity at the source or oxides of nitrogen, respectively, shall constitute a major
modification except that if the owner or operator of the source elects to offset the increase
by a greater reduction in emissions of VOC or oxides of nitrogen, as applicable, from
other operations, units or activities within the source at an internal offset ratio of at least
1.3 to 1, R18-2-403(A)(1) shall not apply to the change.
E. For any new major source or major modification that is classified as major because of
emissions or potential to emit VOC or nitrogen oxides in an ozone nonattainment area
classified as serious, the increase in emissions of these pollutants from the source or
modification shall be offset at a ratio of 1.2 to 1. The offset shall be made in accordance
with the provisions of R18-2-404.
F. For any new major source or major modification that is classified as such because of
emissions or potential to emit VOC or nitrogen oxides in an ozone nonattainment area
classified as severe, the increase in emissions of these pollutants from the source or
modification shall be offset at a ratio of 1.3 to 1. These offsets shall be made in
Page 123 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
accordance with the provisions of R18-2-404.
R18-2-406. Permit Requirements for Sources Located in Attainment and Unclassifiable
Areas
A. Except as provided in subsections (B) through (G) (J) below and R18-2-408 (Innovative
control technology), no permit or permit revision under this Article shall be issued to a
person proposing to construct a new major source or make a major modification to a
major source that would be constructed in an area designated as attainment or
unclassifiable for any regulated NSR pollutant unless the source or modification meets
the following conditions:
1. A new major source shall apply best available control technology (BACT) for
each regulated NSR pollutant for which the potential to emit is significant.
2. A major modification shall apply BACT for each regulated NSR pollutant for
which the project would result in a significant net emissions increase at the
source. This requirement applies to each proposed emissions unit at which a net
emissions increase in the pollutant would occur as a result of a physical change
or change in the method of operation in the unit.
3. For phased construction projects, the determination of BACT shall be reviewed
and modified as appropriate at the latest reasonable time which occurs no later
than 18 months prior to commencement of construction of each independent
phase of the project. At such time the owner or operator of the applicable
stationary source may be required to demonstrate the adequacy of any previous
determination of BACT for the source.
4. BACT shall be determined on a case-by-case basis and may constitute
application of production processes or available methods, systems, and
techniques, including fuel cleaning or treatment, clean fuels, or innovative fuel
combustion techniques, for control of such pollutant. In no event shall such
application of BACT result in emissions of any pollutant, which would exceed
the emissions allowed by any applicable new source performance standard or
national emission standard for hazardous air pollutants under Articles 9 and 11
of this Chapter or by the applicable implementation plan. If the Director
determines that technological or economic limitations on the application of
measurement methodology to a particular emissions unit would make the
imposition of an emissions standard infeasible, a design, equipment, work
practice, operational standard, or combination thereof may be prescribed instead
Page 124 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
to satisfy the requirement for the application of BACT. Such standard shall, to
the degree possible, set forth the emissions reduction achievable by
implementation of such design, equipment, work practice, or operation and shall
provide for compliance by means which achieve equivalent results.
5. The person applying for the permit or permit revision under this Article performs
an air impact analysis and monitoring as specified in R18-2-407, and such the
analysis demonstrates that allowable emission increases from the proposed new
major source or major modification, in conjunction with all other applicable
emission increases or reductions, including secondary emissions, for all
pollutants listed in R18-2-218(A), and including minor and mobile source
emissions of nitrogen oxides and PM10:
a. Would would not cause or contribute to concentrations of conventional
air pollutants in violation of:
a. any Any national ambient air quality standard in Article 2 of this
Chapter in any air quality control region; or
b. any Any applicable maximum allowable increase allowed under R18-2-
218 over the baseline concentration for in any attainment or
unclassified area; or.
b. Would not contribute to an increase in ambient concentrations for a
pollutant by an amount in excess of the significance level for such
pollutant in any adjacent area in which Arizona primary or
secondary ambient air quality standards for that pollutant are being
violated. A new major source of volatile organic compounds or
nitrogen oxides, or a major modification to a major source of volatile
organic compounds or nitrogen oxides shall be presumed to
contribute to violations of the Arizona ambient air quality standards
for ozone if it will be located within 50 kilometers of a nonattainment
area for ozone. The presumption may be rebutted for a new major
source or major modification if it can be satisfactorily demonstrated
to the Director that emissions of volatile organic compounds or
nitrogen oxides from the new major source or major modification
will not contribute to violations of the Arizona ambient air quality
standards for ozone in adjacent nonattainment areas for ozone. Such
a demonstration shall include a showing that topographical,
Commented [SB22]: This subsection formerly attempted to implement both the PSD air quality impact analysis requirements and the requirements of 51.165(b) for sources located in attainment areas that affect nonattainment areas. There were a number of problems with this that became apparent after we reviewed EPA’s comments and compared the federal rules to ours. For example, each of the federal rules has a different definition of major source. So we moved the 51.165(b) provisions to a new 411.
Page 125 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
meteorological, or other physical factors in the vicinity of the new
major source or major modification are such that transport of
volatile organic compounds emitted from the source are not expected
to contribute to violations of the ozone standards in the adjacent
nonattainment areas.
6. Air quality models:
a. All estimates of ambient concentrations required under this Section shall
be based on the applicable air quality models, data basis databases, and
other requirements specified in 40 CFR 51, Appendix W, “Guideline On
Air Quality Models,” as of July 1, 2011 July 1, 2015 (and no future
amendments or editions), which shall be referred to hereinafter as
“Guideline” and is adopted by reference and is on file with the
Department.
b. Where an air quality impact model specified in the “Guideline” is not
applicable, the model may be modified or another model substituted.
Such a change shall be subject to notice and opportunity for public
comment under R18-2-330. Written approval of the EPA Administrator
shall be obtained for any modification or substitution.
B. The requirements of this This Section and 18-2-407 shall not apply to a new major
source or major modification to a source with respect to a particular pollutant if the
person applying for the permit or permit revision under this Article demonstrates that, as
to that pollutant, the source or modification is located in an area designated as
nonattainment for the pollutant. This exemption shall not apply to an area designated
nonattainment for a revoked national ambient air quality standard in 40 CFR 81.
C. The requirements of this This Section, R18-2-407, and R18-2-410(B), (F), and (G)
shall not apply to a new major source or a major modification if such the source or
modification would be a major source or major modification only if fugitive emissions, to
the extent quantifiable, are considered in calculating the potential emissions of the source
or modification, and the source 1980 does not belong to a section 302(j) category.
D. The requirements of this This Section, R18-2-407, and R18-2-410(B), (F), and (G)
shall not apply to a new major source or major modification to a source when the owner
or operator of such the source is a nonprofit health or educational institution.
E. The requirements of this This Section, R18-2-407, and R18-2-410(B), (F) and (G)
shall not apply to a portable source which would otherwise be a new major source or
Page 126 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
major modification to an existing source if all of the following conditions are satisfied:
1. such The portable source will operate for no more than 24 months at its next
proposed location, .
2. The source is under subject to a permit or permit revision issued under this
Article, Section or 40 CFR 52.21.
3. The source is in compliance with the conditions of that permit or permit revision
under this Article, .
4. the emissions Emissions from the source will not impact a federal Class I area
nor an area where an applicable increment maximum increase allowed under
R18-2-218 is known to be violated, and.
5. reasonable Reasonable notice is given to the Director prior to the relocation
identifying the proposed new location and the probable duration of operation at
the new location. Such notice shall be given to the Director not less than at
least 10 calendar days in advance of the proposed relocation, unless a different
time duration is previously approved by the Director.
F. Subsection (A)(5), R18-2-407, and R18-2-410(B) shall not apply to a proposed major
source or major modification with respect to a particular pollutant, if the allowable
emissions of that pollutant from the source, or the net emissions increase of that
pollutant from the modification, would be temporary and impact no federal Class I
area and no area where a maximum increase allowed under R18-2-218 is known to
be violated.
G. Subsection (A)(5), R18-2-407, and R18-2-410(B) as they relate to any maximum
allowable increase for a Class II area shall not apply to a modification of a major
stationary source that was in existence on March 1, 1978, if the net increase in
allowable emissions of each regulated NSR pollutant from the modification after the
application of best available control technology would be less than 50 tons per year.
H. Subsection (A)(5)(b) shall not apply to a stationary source or modification with
respect to any maximum increase allowed for nitrogen oxides under R18-2-218 if the
owner or operator of the source or modification submitted an application for a
permit under the applicable permit program approved or promulgated under the
Act before the provisions embodying the maximum allowable increase took effect as
part of the state implementation plan and the Director subsequently determined
that the application as submitted before that date was complete.
I. Subsection (A)(5)(b) shall not apply to a stationary source or modification with
Commented [SB23]: Adding exemptions available under federal rules not previously included in ours.
Page 127 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
respect to any maximum increase allowed for PM10 under R18-2-218 if the owner or
operator of the source or modification submitted an application for a permit under
the applicable permit program approved under the Act before the provisions
embodying the maximum allowable increases for PM10 took effect as part of the
state implementation plan and the Director subsequently determined that the
application as submitted before that date was complete. Instead, subsection
(A)(5)(b) shall apply with respect to the maximum allowable increases for total
suspended particulate as in effect on the date the application was submitted.
J. Subsection (A)(5)(a) shall not apply to a stationary source or modification with
respect to the national ambient air quality standards for PM2.5 in effect on March
18, 2013 if either of the following is true:
1. The Director determined a permit application subject to this Section was
complete on or before December 14, 2012. Instead, subsection (A)(5)(a) shall
apply with respect to the national ambient air quality standards for PM2.5 in
effect at the time the Director determined the permit application to be
complete.
2. The Director first published before March 18, 2013 a public notice of a
proposed permit subject to this Section. Instead, subsection (A)(5)(a) shall
apply with respect to the national ambient air quality standards for PM2.5 in
effect at the time of first publication of the public notice.
K. The owner or operator of a proposed source or modification shall submit all
information necessary to perform any analysis or make a determination required
under this Section. The owner or operator shall also provide information
regarding:
1. The air quality impact of the source or modification, including
meteorological and topographical data necessary to estimate such impact,
and
2. The air quality impacts and the nature and extent of any or all general
commercial, residential, industrial, and other growth which has occurred
since August 7, 1977, in the area the source or modification would affect.
F. Special rules applicable to Federal Land Managers:
1. Notwithstanding any other provision of this Section, a Federal Land
Manager may present to the Director a demonstration that the emissions
attributed to such new major source or major modification to a source
Commented [SB24]: Moved to 410 to consolidate visibility requirements.
Page 128 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
would have an adverse impact on visibility or other specifically defined air
quality related values of any Federal Mandatory Class I area designated in
R18-2-217(B) regardless of the fact that the change in air quality resulting
from emissions attributable to such new major source or major modification
to a source in existence will not cause or contribute to concentrations which
exceed the maximum allowable increases for the area in R18-2-218. If the
Director concurs with such demonstrations, the permit or permit revision
under this Article shall be denied.
2. If the owner or operator of a proposed new major source or a source for
which major modification is proposed demonstrates to the Federal Land
Manager that the emissions attributable to such major source or major
modification will have no significant adverse impact on the visibility or other
specifically defined air quality-related values of such areas and the Federal
Land Manager so certifies to the Director, the Director may issue a permit
or permit revision under this Article, notwithstanding the fact that the
change in air quality resulting from emissions attributable to such new
major source or major modification will cause or contribute to
concentrations which exceed the maximum allowable increases for a Class I
area. Such a permit or permit revision under this Article shall require that
such new major source or major modification comply with such emission
limitations as may be necessary to assure that emissions will not cause
increases in ambient concentrations greater than the following maximum
allowable increases over baseline concentrations for such pollutants:
Pollutant
Maximum
allowable increase
(micrograms per cubic
meter)
PM2.5:
Annual arithmetic
mean
4
24-hr maximum 9
PM10:
Page 129 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
Annual arithmetic
mean
17
24-hr maximum 30
Sulfur dioxide:
Annual arithmetic
mean
20
24-hr maximum 91
3-hr maximum 325
Nitrogen dioxide
Annual arithmetic
mean
25
GL. The issuance of a permit or permit revision under this Article in accordance with this
Section shall not relieve the owner or operator of the responsibility to comply fully with
applicable provisions of the SIP and any other requirements under local, state, or federal
law.
HM. At such time that a particular source or modification becomes a major source or major
modification solely by virtue of a relaxation in any enforceable limitation which was
established after August 7, 1980, on the capacity of the source or modification otherwise
to emit a pollutant, such as a restriction on hours of operation, then the requirements of
this Section shall apply to the source or modification as though construction had not yet
commenced on the source or modification.
R18-2-407. Air Quality Impact Analysis and Monitoring Requirements
A. Any application for a permit or permit revision under this Article R18-2-406 to construct
a new major source or major modification to a major source shall contain an analysis of
ambient air quality in the area that the new major source or major modification would
affect for each of the following pollutants:
1. For the new source, each pollutant that it would have the potential to emit in a
significant amount;
2. For the modification, each pollutant for which it would result in a significant net
emissions increase.
B. With respect to any such pollutant for which no Arizona national ambient air quality
Page 130 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
standard exists, the analysis shall contain all air quality monitoring data as the Director
determines is necessary to assess ambient air quality for that pollutant in any area that the
emissions of the pollutant would affect.
C. With respect to any such pollutant (other than nonmethane hydrocarbons) for which such
a standard does exist, the analysis shall contain continuous air quality monitoring data
gathered for purposes of determining whether emissions of that pollutant would cause or
contribute to a violation of the standard or any maximum allowable increase.
D. In general, the continuous air quality monitoring data that is required shall have been
gathered over a period of at least one year and shall represent at least the year preceding
receipt of the application, except that, if the Director determines that a complete and
adequate analysis can be accomplished with monitoring data gathered over a period
shorter than one year (but not to be less than four months), the data that is required shall
have been gathered over at least that shorter period.
E. The owner or operator of a proposed stationary source or modification to a source of
volatile organic compounds who satisfies all conditions of 40 CFR 51, Appendix S,
Section IV, may provide post-approval monitoring data for ozone in lieu of providing
preconstruction data as required under subsections (B), (C), and (D) above.
F. Post-construction monitoring. The owner or operator of a new major source or major
modification shall, after construction of the source or modification, conduct such ambient
monitoring as the Director determines is necessary to determine the effect emissions from
the new source or modification may have, or are having, on air quality in any area.
G. Operations of monitoring stations. The owner or operator of a new major source or major
modification shall meet the requirements of 40 CFR 58, Appendix B, during the
operation of monitoring stations for purposes of satisfying subsections (B) through (F)
above.
H. The requirements of subsections (B) through (G) above shall not apply to a new major
source or major modification to an existing source with respect to monitoring for a
particular pollutant if:
1. The emissions increase of the pollutant from the new source or the net emissions
increase of the pollutant from the modification would cause, in any area, air
quality impacts less than the following amounts:
a. Carbon Monoxide - 575 µg/m3, eight-hour average;
b. Nitrogen dioxide - 14 µg/m3, annual average;
c. PM2.5 – 04 µg/m3, 24-hour average;
Page 131 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
d. PM10 - 10 µg/m3, 24-hour average;
e. Sulfur dioxide - 13 µg/m3, 24-hour average;
f. Lead - 0.1 µg/m3, 24-hour average 3-month average;
g. Fluorides - 0.25 µg/m3, 24-hour average;
h. Total reduced sulfur - 10 µg/m3, one-hour average;
i. Hydrogen sulfide - 0.04 µg/m3, one-hour average;
j. Reduced sulfur compounds - 10 µg/m3, one-hour average;
k. Ozone - increased emissions net emissions increases of less than 100
tons per year of volatile organic compounds or oxides of nitrogen; or
2. The concentrations of the pollutant in the area that the new source or
modification would affect are less than the concentrations listed in subsection
(H)(1) above.; or
3. The pollutant is not listed in subsection (H)(1).
I. Any application for permit or permit revision under this Article to construct a new
major source or major modification to a source shall contain:
1. An analysis of the impairment to visibility, soils, and vegetation that would
occur as a result of the new source or modification and general commercial,
residential, industrial, and other growth associated with the new source or
modification. The applicant need not provide an analysis of the impact on
vegetation having no significant commercial or recreational value.
2. An analysis of the air quality impact projected for the area as a result of
general commercial, residential, industrial, and other growth associated
with the new source or modification.
R18-2-408. Innovative Control Technology
A. Notwithstanding the provisions of R18-2-406(A)(1) through (3), the owner or operator of
a proposed new major source or major modification may request that the Director
approve a system of innovative control technology rather than the best available control
technology requirements otherwise applicable to the new source or modification.
B. The Director shall approve the installation of a system of innovative control technology if
the following conditions are met:
1. The owner or operator of the proposed source or modification satisfactorily
demonstrates that the proposed control system would not cause or contribute to
an unreasonable risk to public health, welfare, or safety in its operation or
function;
Commented [SB25]: Moved to 410
Page 132 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
2. The owner or operator agrees to achieve a level of continuous emissions
reduction equivalent to that which would have been required under R18-2-
406(A)(2) R18-2-406(A)(1) or (2) by a date specified in the permit or permit
revision under this Article for the source. Such date shall not be later than four
years from the time of start-up or seven years from the issuance of a permit or
permit revision under this Article;
3. The source or modification would meet requirements equivalent to those in R18-
2-406(A) based on the emissions rate that the stationary source employing the
system of innovative control technology would be required to meet on the date
specified in the permit or permit revision under this Article.
4. Before the date specified in the permit or permit revision under this Article, the
source or modification would not:
a. Cause or contribute to any violation of an applicable state national
ambient air quality standard; or
b. Impact any area where an applicable increment maximum increase
allowed under R18-2-208 is known to be violated.
5. All other applicable requirements including those for public participation have
been met.
6. The Director receives the consent of the governors of other affected states.
7. The limits on pollutants contained in R18-2-218 requirements of R18-2-410
for federal Class I areas will be met for all periods during the life of the source
or modification.
C. The Director shall withdraw any approval to employ a system of innovative control
technology made under this Section if:
1. The proposed system fails by the specified date to achieve the required
continuous emissions reduction rate; or
2. The proposed system fails before the specified date so as to contribute to an
unreasonable risk to public health, welfare, or safety; or
3. The Director decides at any time that the proposed system is unlikely to achieve
the required level of control or to protect the public health, welfare, or safety.
D. If the new source or major modification fails to meet the required level of continuous
emissions reduction within the specified time period, or if the approval is withdrawn in
accordance with subsection (C) above, the Director may allow the owner or operator of
the source or modification up to an additional three years to meet the requirement for the
Page 133 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
application of best available control technology through use of a demonstrated system of
control.
R18-2-409. Air Quality Models
A. Where the Director requires a person requesting a permit or permit revision under this
Article to perform air quality impact modeling to obtain such permit or permit revision
under this Article, the modeling shall be performed in a manner consistent with the
Guideline specified in R18-2-406(A)(6)(a).
B. Where the person requesting a permit or permit revision under this Article can
demonstrate that an air quality impact model specified in the Guideline is inappropriate,
the model may be modified or another model substituted. However, before such
modification or substitution can occur, the Director shall make a written finding that:
1. No model in the Guideline is appropriate for a particular permit or permit
revision under this Article under consideration, or
2. The data base required for the appropriate model in the Guideline is not
available, and
3. The model proposed as a substitute or modification is likely to produce results
equal or superior to those obtained by models in the Guideline, and
4. The model proposed as a substitute or modification has been approved by the
Administrator.
C. The substitution or modification of an air quality model under this Section shall be
included in the public notice under R18-2-330(C).
R18-2-410. Visibility and Air Quality Related Value Protection
A. For any new major source or major modification subject to the provisions of this
Chapter, no permit or permit revision under this Article shall be issued to a person
proposing to construct or modify the source unless the applicant has provided:
1. An analysis of the anticipated impacts of the proposed source on visibility in
any Class I areas which may be affected by the emissions from that source;
and
2. Results of monitoring of visibility in any area near the proposed source for
such purposes and by such means as the Director determines is necessary
and appropriate.
B. A determination of an adverse impact on visibility shall be made based on
consideration of all of the following factors:
1. The times of visitor use of the area;
Commented [SB26]: Section has been rewritten to make sure we fully comply with PSD and 51.307 requirements relating to visibility.
Page 134 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
2. The frequency and timing of natural conditions in the area that reduce
visibility;
3. All of the following visibility impairment characteristics:
a. Geographic extent,
b. Intensity,
c. Duration,
d. Frequency,
e. Time of day;
4. The correlation between the characteristics listed in subsection (B)(3) and
the factors described in subsections (B)(1) and (2).
C. The Director shall not issue a permit or permit revision pursuant to this Article or
Article 3 of this Chapter for any new major source or major modification subject to
this Chapter unless the following requirements have been met:
1. The Director shall notify the individuals identified in subsection (C)(2)
within 30 days of receipt of any advance notification of any such permit or
permit revision under this Article.
2. Within 30 days of receipt of an application for a permit or permit revision
under this Article for a source whose emissions may affect a Class I area, the
Director shall provide written notification of the application to the Federal
Land Manager and the federal official charged with direct responsibility for
management of any lands within any such area. The notice shall:
a. Include a copy of all information relevant to the permit or permit
revision under this Article,
b. Include an analysis of the anticipated impacts of the proposed source
on visibility in any area which may be affected by emissions from the
source, and
c. Provide for no less than a 30-day period within which written
comments may be submitted.
3. The Director shall consider any analysis provided by the Federal Land
Manager that is received within the comment period provided in subsection
(C)(2).
a. Where the Director finds that the analysis provided by the Federal
Land Manager does not demonstrate to the satisfaction of the
Director that an adverse impact on visibility will result in the area,
Page 135 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
the Director shall, within the public notice required under R18-2-
330, either explain the decision or specify where the explanation can
be obtained.
b. When the Director finds that the analysis provided by the Federal
Land Manager demonstrates to the satisfaction of the Director that
an adverse impact on visibility will result in the area, the Director
shall not issue a permit or permit revision under this Article for the
proposed major new source or major modification.
4. When the proposed permit decision is made, pursuant to R18-2-304(J), and
available for public review, the Director shall provide the individuals
identified in subsection (C)(2) with a copy of the proposed permit decision
and shall make available to them any materials used in making that
determination.
NOTE: The following is new rule language that uses automatic numbering and cross-references. It will be converted to the Secretary of State-approved format before the NPRM is submitted for publication.
A. Applicability.
1. All of the requirements of this Section apply to a new major source or major
modification that would be constructed in an area that is designated attainment or
unclassifiable.
2. Subsections B to D apply to the following:
a. A new major source or major modification that may have an impact on
any integral vista of a mandatory federal Class I area, if it is identified in
accordance with 40 CFR 51.304 by the Federal Land Manager at least
twelve months before submission of a complete permit application for
the source or modification, except where the Federal Land Manager has
provided notice and opportunity for public comment on the integral vista,
in which case the review must include impacts on any integral vista
identified at least six months before submission of a complete permit
application. This subsection shall not apply if the Director determines
under 40 CFR 51.304(d) that the identification was not in accordance
with the identification criteria.
b. A new major source or major modification that proposes to locate in an
area designated as nonattainment and that may have an impact on
visibility in any mandatory federal Class I area.
Page 136 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
B. Application Requirements. Any application for a permit or permit revision to construct a
major source or major modification shall contain:
1. An analysis of the impairment to visibility, soils, and vegetation that would occur
as a result of the new source or modification and general commercial, residential,
industrial, and other growth associated with the new source or modification. The
applicant need not provide an analysis of the impact on vegetation having no
significant commercial or recreational value.
2. An analysis of the air quality impact projected for the area as a result of general
commercial, residential, industrial, and other growth associated with the new
source or modification.
C. Notification Requirements.
1. The Director shall provide written notice of the application to the Administrator,
the Federal Land Manager and the federal official charged with direct
responsibility for management of any lands within any Class I area that may be
affected by the source or modification. The notice shall be provided within 30
days of receipt of the application and at least 60 days before any public hearing
on the application. The notice shall:
a. Include a copy of the application and all information relevant to the
permit or permit revision under this Article;
b. Include an analysis of the anticipated impacts of the proposed source on
visibility in any federal Class I area; and
c. Provide for no less than a 30-day period within which written comments
may be submitted.
2. The Director shall notify the individuals identified in subsection C.1 within 30
days of receipt of any advance notification of any such permit or permit revision.
3. The Director shall notify the individuals identified in subsection C.1 of the
preliminary determination for the application under R18-2-402(I)(2)(c) and shall
make available any materials used in making that determination.
D. Consideration of Federal Land Manager Analysis.
1. The Federal Land Manager and the federal official charged with direct
responsibility for management of federal Class I areas have an affirmative
responsibility to protect the air quality related values, including visibility, of any
such areas and to consider, in consultation with the Administrator, whether a
proposed source or modification would have an adverse impact on such values.
Page 137 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
2. The Director shall consider any analysis performed by the Federal Land Manager
and provided within 30 days of the notification required by subsection C.1 that
shows that a proposed new major stationary source or major modification may
have an adverse impact on visibility in a federal Class I area or integral vista.
3. In considering the analysis, the Director shall ensure that the source’s emissions
will be consistent with making reasonable progress toward the national visibility
goal referred to in 40 CFR 51.300(a), taking into account the costs of
compliance, the time necessary for compliance, the energy and nonair quality
environmental impacts of compliance, and the useful life of the source.
4. If the Director concurs with the analysis, the Director shall deny the permit or
permit revision.
5. If the Director finds that the analysis does not demonstrate to the satisfaction of
the Director that an adverse impact on visibility will result in the federal Class I
area or integral vista, the Director shall, in the notice required by R18-2-
402(I)(2)(c), either explain that decision or give notice as to where the
explanation can be obtained.
E. Federal Land Manager Analysis Showing Adverse Impact Despite Compliance with
Maximum Allowable Increases for Class I Area.
1. Within 30 days after the notification required by subsection C.3, the Federal
Land Manager may present to the Director a demonstration that the emissions
attributed to a new major source or major modification would have an adverse
impact on visibility or other specifically defined air quality related values of any
mandatory federal Class I area, even though the change in air quality resulting
from emissions attributable to the source or modification will not cause or
contribute to concentrations that exceed the maximum increases allowed for the
area in R18-2-218.
2. If the Director concurs with the demonstration, the Director shall not issue a
permit or permit revision for the major source or major modification.
F. Class I Variance with Federal Land Manager Concurrence.
1. The owner or operator of a proposed source or modification may demonstrate to
the Federal Land Manager that emissions from the source will have no adverse
impact on the air quality related values (including visibility) of federal Class I
areas, even though the change in air quality resulting from emissions from the
source or modification are projected to cause or contribute to concentrations that
Page 138 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
exceed the maximum increases allowed for a Class I area under R18-2-218.
2. If the Federal land manager concurs with the demonstration and so certifies to the
Director, the Director may issue the permit, provided that:
a. Applicable requirements are otherwise met; and
b. The permit contains emission limits necessary to assure that emissions of
sulfur dioxide, PM2.5, PM10, and nitrogen oxides will not cause increases
in ambient concentrations of those pollutants exceeding the following
maximum allowable increases over minor source baseline
concentrations:
Pollutant
Maximum allowable increase (micrograms per cubic meter)
PM2.5: Annual arithmetic
mean 4
24-hr maximum 9 PM10: Annual arithmetic
mean 17
24-hr maximum 30 Sulfur dioxide: Annual arithmetic
mean 20
24-hr maximum 91 3-hr maximum 325 Nitrogen dioxide Annual arithmetic
mean 25
G. Class I Sulfur Dioxide Variance by Governor with Concurrence by Federal Land
Manager or President.
1. The owner or operator of a proposed source or modification that cannot be
approved under subsection F may demonstrate to the Governor that the source
cannot be constructed by reason of any maximum allowable increase for sulfur
dioxide for a period of twenty-four hours or less applicable to any Class I area
and, in the case of mandatory federal Class I areas, that a variance under this
Page 139 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
clause would not adversely affect the air quality related values of the area
(including visibility). The Governor, after consideration of the Federal Land
Manager's recommendation (if any) and subject to his concurrence, may, after
notice and public hearing, grant a variance from the maximum allowable
increase. If the variance is granted, the Director shall issue a permit or permit to
the source or modification pursuant to the requirements of subsection G.3,
provided that the applicable requirements of R18-2-406 are otherwise met.
2. In any case where the Governor recommends a variance in which the Federal
Land Manager does not concur, the recommendations of the Governor and the
Federal Land Manager shall be transmitted to the President. The President may
approve the Governor's recommendation if the President finds that the variance is
in the national interest. If the variance is approved, the Director shall issue a
permit pursuant to subsection G.3, provided that the applicable requirements of
R18-2-406 are otherwise met.
3. In the case of a permit issued pursuant to subsection G.1 or G.2 the source or
modification shall comply with emission limitations necessary to assure that
emissions of sulfur dioxide from the source or modification will not (during any
day on which the otherwise applicable maximum allowable increases are
exceeded) cause or contribute to concentrations that would exceed the following
maximum allowable increases over the baseline concentration and to assure that
the emissions will not cause or contribute to concentrations that exceed the
otherwise applicable maximum allowable increases for periods of exposure of 24
hours or less for more than 18 days, not necessarily consecutive, during any
annual period:
Maximum Allowable Increase [Micrograms per cubic meter]
Period of exposure
Terrain areas
Low High 24-hr
maximum 36 62
3-hr maximum 130 221 H. Visibility Monitoring. The Director may require monitoring of visibility in any federal
Class I area near a proposed major source or major modification for such purposes and by
Page 140 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
such means as the Director deems necessary and appropriate.
R18-2-411. Permit Requirements for Sources that Locate in Attainment or
Unclassifiable Areas and Cause or Contribute to a Violation of Any National
Ambient Air Quality Standard.
A. Except as provided in subsection C or D, the Director shall deny a permit or permit
revision to any major source or major modification that would locate in any attainment or
unclassified area, if the source or modification would cause or contribute to a violation
of any national ambient air quality standard.
B. A major source or major modification will be considered to cause or contribute to a
violation of a national ambient air quality standard when the source or modification
would, at a minimum, cause an increase in the concentrations of a regulated NSR
pollutant that exceeds the significance level at any locality that does not, or as a result of
the increase would not, meet the standard.
C. A proposed major source or major modification subject to subsection A may reduce the
impact of its emissions upon air quality by obtaining sufficient emission reductions to, at
a minimum, compensate for its adverse ambient impact where the major source or major
modification would otherwise cause or contribute to a violation of any national ambient
air quality standard.
D. Subsection A shall not apply to a major stationary source or major modification with
respect to a particular pollutant if the owner or operator demonstrates that, as to that
pollutant, the source or modification is located in an area designated as nonattainment
pursuant to section 107 of the Act.
R18-2-412. PALs
A. Applicability.
1. The Director may approve the use of a PAL for any existing major source if the
PAL meets the requirements of this Section.
2. Any physical change in or change in the method of operation of a major
stationary source that maintains its total source-wide emissions below the PAL
level, meets the requirements of this Section, and complies with the PAL permit:
a. Is not a major modification for the PAL pollutant,
b. Does not have to be approved through the PSD program under R18-2-
403 or R18-2-406, and
c. Is not subject to the provisions in R18-2-403(C) or R18-2-406(H) R18-
2-406(M).
Commented [SB27]: Moved 51.165(b) requirements from 406.
Page 141 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
3. Except as provided under subsection (A)(2)(c), a major stationary source shall
continue to comply with all applicable federal or state requirements, emission
limitations, and work practice requirements that were established prior to the
effective date of the PAL.
B. Permit application requirements. As part of a permit application requesting a PAL, the
owner or operator of a major source shall submit the following information to the
Director for approval:
1. A list of all emissions units at the source designated as small, significant or major
based on their potential to emit. In addition, the owner or operator of the source
shall indicate which, if any, federal or state applicable requirements, emission
limitations, or work practices apply to each unit.
2. Calculations of the baseline actual emissions (with supporting documentation).
Baseline actual emissions shall include emissions associated not only with
operation of the unit, but also emissions associated with the startup,
shutdown and malfunction.
3. The calculation procedures that the major source owner or operator proposes to
use to convert the monitoring system data to monthly emissions and annual
emissions based on a 12-month rolling total for each month as required by
subsection (L)(1).
C. General requirements for establishing PALs.
1. The Director is allowed to establish a PAL at a major source, provided that at a
minimum, the following requirements are met:
a. The PAL shall impose an annual emission limitation in tons per year,
that is enforceable as a practical matter, for the entire major source. For
each month during the PAL effective period after the first 12 months of
establishing a PAL, the major source owner or operator shall show that
the sum of the monthly emissions from each emissions unit under the
PAL for the previous 12 consecutive months is less than the PAL (a 12-
month sum, rolled monthly). For each month during the first 11 months
from the PAL effective date, the major source owner or operator shall
show that the sum of the preceding monthly emissions from the PAL
effective date for each emissions unit under the PAL is less than the
PAL.
b. The PAL shall be established in a PAL permit that meets the
Page 142 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
requirements in subsection (D).
c. The PAL permit shall contain all the requirements of subsection (F).
d. The PAL shall include fugitive emissions, to the extent quantifiable,
from all emissions units that emit or have the potential to emit the PAL
pollutant at the major source.
e. Each PAL shall regulate emissions of only one pollutant.
f. Each PAL shall have a PAL effective period of 10 years.
g. The owner or operator of the major source with a PAL shall comply with
the monitoring, recordkeeping, and reporting requirements provided in
subsections (K) through (M) for each emissions unit under the PAL
through the PAL effective period.
2. At no time (during or after the PAL effective period) are emissions reductions of
a PAL pollutant that occur during the PAL effective period creditable as
decreases for purposes of offsets under R18-2-404 unless the level of the PAL is
reduced by the amount of such emissions reductions and such reductions would
be creditable in the absence of the PAL.
D. Action on PAL permit application. A PAL permit application shall be processed in
accordance with one of the following:
1. As an initial Class I permit pursuant to R18-2-304.
2. As a renewal of a Class I permit pursuant to R18-2-322.
3. As a significant revision to a Class I permit pursuant to R18-2-320.
E. Setting the 10-year actuals PAL level.
1. Except as provided in subsection (E)(2), the PAL level for a major source shall
be established as the sum of the baseline actual emissions of the PAL pollutant
for each emissions unit at the source; plus an amount equal to the applicable
significant level for the PAL pollutant. When establishing the PAL level, only
one consecutive 24-month period must be used to determine the baseline actual
emissions for all existing emissions units. However, a different consecutive 24-
month period may be used for each different PAL pollutant. Emissions associated
with units that were permanently shut down after this 24-month period must be
subtracted from the PAL level. The Director shall specify a reduced PAL level(s)
(in tons/yr) in the PAL permit to become effective on the future compliance
date(s) of any applicable federal or state regulatory requirement(s) that the
Director is aware of prior to issuance of the PAL permit. For instance, if the
Page 143 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
source owner or operator will be required to reduce emissions from industrial
boilers in half from baseline emissions of 60 ppm NOX to a new rule limit of 30
ppm, then the permit shall contain a future effective PAL level that is equal to the
current PAL level reduced by half of the original baseline emissions of such
unit(s).
2. For newly constructed units (which do not include modifications to existing
units) on which actual construction began after the 24-month period, in lieu of
adding the baseline actual emissions as specified in subsection (E)(1), the
emissions must be added to the PAL level in an amount equal to the potential to
emit of the units.
F. Contents of the PAL permit. The PAL permit must contain, at a minimum, the following
information:
1. The PAL pollutant and the applicable source-wide emission limitation in tons per
year.
2. The PAL permit effective date and the expiration date of the PAL (PAL effective
period).
3. Specification in the PAL permit that if a major source owner or operator applies
to renew a PAL in accordance with subsection (I) before the end of the PAL
effective period, then the PAL shall not expire at the end of the PAL effective
period. It shall remain in effect until a revised PAL permit is issued by the
Director.
4. A requirement that emission calculations for compliance purposes must include
emissions from startups, shutdowns, and malfunctions.
5. A requirement that, once the PAL expires, the major source is subject to the
requirements of subsection (H).
6. The calculation procedures that the major source owner or operator shall use to
convert the monitoring system data to monthly emissions and annual emissions
based on a 12-month rolling total as required by subsection (L)(1).
7. A requirement that the major source owner or operator monitor all emissions
units in accordance with the provisions under subsection (K).
8. A requirement to retain the records required under subsection (L) onsite. Such
records may be retained in an electronic format.
9. A requirement to submit the reports required under subsection (M) by the
required deadlines.
Page 144 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
10. Any other requirements that the Director deems necessary to implement and
enforce the PAL.
G. PAL effective period and reopening of the PAL permit.
1. PAL effective period. The Director shall specify a PAL effective period of 10
years.
2. Reopening of the PAL permit.
a. During the PAL effective period, the Director must reopen the PAL
permit to:
i. Correct typographical/calculation errors made in setting the PAL
or reflect a more accurate determination of emissions used to
establish the PAL,
ii. Reduce the PAL if the owner or operator of the major source
creates creditable emissions reductions for use as offsets under
R18-2-404, and
iii. Revise the PAL to reflect an increase in the PAL as provided
under subsection (J).
b. The Director shall have discretion to reopen the PAL permit for the
following:
i. Reduce the PAL to reflect new federal applicable requirements
with compliance dates after the PAL effective date;
ii. Reduce the PAL consistent with any other requirement, that is
enforceable as a practical matter, and that the state may impose
on the major source under the State Implementation Plan; and
iii. Reduce the PAL if the Director determines that a reduction is
necessary to avoid causing or contributing to a NAAQS or PSD
increment violation of a national ambient air quality
standard or a maximum increase allowed under R18-2-208,
or to an adverse impact on an air quality related value that has
been identified for a Federal federal Class I area by a Federal
Land Manager and for which information is available to the
general public.
c. Except for the permit reopening in subsection (G)(2)(a)(i) for the
correction of typographical/calculation errors that do not increase the
PAL level, all other reopenings shall be carried out in accordance with
Page 145 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
the public participation requirements of subsection (D).
H. Expiration of a PAL. Any PAL that is not renewed in accordance with the procedures in
subsection (I) shall expire at the end of the PAL effective period, and the following
requirements shall apply.
1. Each emissions unit (or each group of emissions units) that existed under the
PAL shall comply with an allowable emission limitation under a revised permit
established according to the following procedures.
a. Within the time-frame specified for PAL renewals in subsection (I)(2),
the major source shall submit a proposed allowable emission limitation
for each emissions unit (or each group of emissions units, if such a
distribution is more appropriate) by distributing the PAL allowable
emissions for the major source among each of the emissions units that
existed under the PAL. If the PAL had not yet been adjusted for an
applicable requirement that became effective during the PAL effective
period, as would be required under subsection (I)(5), such distribution
shall be made as if the PAL had been adjusted.
b. The Director shall decide how the PAL allowable emissions will be
distributed and issue a revised permit incorporating allowable limits for
each emissions unit, or each group of emissions units, as the Director
determines is appropriate.
2. Each emissions unit(s) shall comply with the allowable emission limitation on a
12-month rolling basis. The Director may approve the use of monitoring systems
(source testing, emission factors, etc.) other than CEMS, CERMS, PEMS, or
CPMS to demonstrate compliance with the allowable emission limitation.
3. Until the Director issues the revised permit incorporating allowable limits for
each emissions unit, or each group of emissions units, as required under
subsection (H)(1)(b), the source shall continue to comply with a source-wide,
multi-unit emissions cap equivalent to the level of the PAL emission limitation.
4. Any physical change or change in the method of operation at the major source
will be subject to the applicability criteria set forth at subsection (C) the
nonattainment major NSR requirements if such change meets the definition
of major modification.
5. The major source owner or operator shall continue to comply with any applicable
requirements that may have applied either during the PAL effective period or
Page 146 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
before the PAL effective period except for those emission limitations that
had been established pursuant to R18-2-403(C) or R18-2-406(H), but were
eliminated by the PAL in accordance with subsection (A)(2)(c). Emission
limitations that were eliminated by the PAL in accordance with subsection
(A)(2)(c) shall not be reinstated.
I. Renewal of a PAL.
1. The Director shall follow the procedures specified in subsection (F) (D) in
approving any request to renew a PAL for a major source, and shall provide both
the proposed PAL level and a written rationale for the proposed PAL level to the
public for review and comment. During such public review, any person may
propose a PAL level for the source for consideration by the Director.
2. Application deadline. A major source owner or operator shall submit a timely
application to the Director to request renewal of a PAL. A timely application is
one that is submitted at least six months prior to, but not earlier than 18 months
from, the date of permit expiration. This deadline for application submittal is to
ensure that the permit will not expire before the permit is renewed. If the owner
or operator of a major source submits a complete application to renew the PAL
within this time period, then the PAL shall continue to be effective until the
revised permit with the renewed PAL is issued.
3. Application requirements. The application to renew a PAL permit shall contain
the following information.
a. The information required in subsections (B)(1) through (3).
b. A proposed PAL level.
c. The sum of the potential to emit of all emissions units under the PAL
(with supporting documentation).
d. Any other information the owner or operator wishes the Director to
consider in determining the appropriate level for renewing the PAL.
4. PAL adjustment. In determining whether and how to adjust the PAL, the Director
shall consider the options outlined in subsections (I)(4)(a) and (b). However, in
no case may any such adjustment fail to comply with subsection (I)(4)(c).
a. If the emissions level calculated in accordance with subsection (F)(E) is
equal to or greater than 80% of the PAL level, the Director may renew
the PAL at the same level without considering the factors set forth in
subsection (I)(4)(b); or
Page 147 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
b. The Director may set the PAL at a level that the Director determines to
be more representative of the source’s baseline actual emissions, or that
the Director determines to be more appropriate considering air quality
needs, advances in control technology, anticipated economic growth in
the area, desire to reward or encourage the source’s voluntary emissions
reductions, or other factors as specifically identified by the Director in
the Director’s written rationale.
c. Notwithstanding subsections (I)(4)(a) and (b):
i. If the potential to emit of the major source is less than the PAL,
the Director shall adjust the PAL to a level no greater than the
potential to emit of the source; and
ii. The Director shall not approve a renewed PAL level higher than
the current PAL, unless the PAL has been increased in
accordance with subsection (J).
5. If the compliance date for an applicable requirement that applies to the PAL
source occurs during the PAL effective period, and if the Director has not already
adjusted for such requirement, the PAL shall be adjusted at the time of PAL
permit renewal or renewal of the source’s Class I permit, whichever occurs first.
J. Increasing a PAL during the PAL effective period.
1. The Director may increase a PAL emission limitation only if the following
requirements are met:
a. The owner or operator of the major source shall submit a complete
application to request an increase in the PAL limit for a PAL major
modification. Such application shall identify the emissions unit(s)
contributing to the increase in emissions so as to cause the major
source’s emissions to equal or exceed its PAL.
b. As part of this application, the major source owner or operator shall
demonstrate that the sum of the baseline actual emissions of the small
emissions units, plus the sum of the baseline actual emissions of the
significant and major emissions units assuming application of BACT or
LAER equivalent controls, plus the sum of the PAL allowable emissions
of the new or modified emissions unit(s) exceeds the PAL. The level of
control that would result from BACT or LAER equivalent controls on
each significant or major emissions unit shall be determined by
Page 148 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
conducting a new BACT or LAER analysis at the time the application is
submitted, as applicable for the particular PAL pollutant, unless the
emissions unit is currently required to comply with a BACT or LAER
requirement that was established within the preceding 10 years. In such a
case, the assumed control level for that emissions unit shall be equal to
the level of BACT or LAER with which that emissions unit must
currently comply.
c. The owner or operator obtains a major NSR permit for all emissions
unit(s) identified in subsection (J)(1)(a), regardless of the magnitude of
the emissions increase resulting from them (that is, no significant levels
apply). These emissions unit(s) shall comply with any emissions
requirements resulting from the major NSR process (for example,
BACT), even though they have also become subject to the PAL or
continue to be subject to the PAL.
d. The PAL permit shall require that the increased PAL level shall be
effective on the day any emissions unit that is part of the PAL major
modification becomes operational and begins to emit the PAL pollutant.
2. The Director shall calculate the new PAL level as the sum of the PAL allowable
emissions for each modified or new emissions unit, plus the sum of the baseline
actual emissions of the significant and major emissions units (assuming
application of BACT or LAER equivalent controls as determined in accordance
with subsection (J)(1)(b), plus the sum of the baseline actual emissions of the
small emissions units.
3. The PAL permit shall be revised to reflect the increased PAL level pursuant to
the public notice requirements of subsection (D).
K. Monitoring requirements for PALs.
1. General requirements.
a. Each PAL permit must contain enforceable requirements for the
monitoring system that accurately determines plantwide emissions of the
PAL pollutant in terms of mass per unit of time. Any monitoring system
authorized for use in the PAL permit must be based on sound science and
meet generally acceptable scientific procedures for data quality and
manipulation. Additionally, the information generated by such system
must meet minimum legal requirements for admissibility in a judicial
Page 149 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
proceeding to enforce the PAL permit.
b. The PAL monitoring system must employ one or more of the four
general monitoring approaches meeting the minimum requirements set
forth in subsections (K)(2)(a) through (d) and must be approved by the
Director.
c. Notwithstanding subsection (K)(1)(b), the owner or operator may also
employ an alternative monitoring approach if approved by the Director
as meeting the requirements of subsection (K)(1)(a).
d. Failure to use a monitoring system that meets the requirements of this
Section renders the PAL invalid.
2. Minimum performance requirements for approved monitoring approaches. The
following are acceptable general monitoring approaches when conducted in
accordance with the minimum requirements in subsections (K)(3) through (9):
a. Mass balance calculations for activities using coatings or solvents,
b. CEMS,
c. CPMS or PEMS, and
d. Emission factors.
3. Mass balance calculations. An owner or operator using mass balance calculations
to monitor PAL pollutant emissions from activities using coating or solvents
shall meet the following requirements:
a. Provide a demonstrated means of validating the published content of the
PAL pollutant that is contained in or created by all materials used in or at
the emissions unit;
b. Assume that the emissions unit emits all of the PAL pollutant that is
contained in or created by any raw material or fuel used in or at the
emissions unit, if it cannot otherwise be accounted for in the process; and
c. Where the vendor of a material or fuel, which is used in or at the
emissions unit, publishes a range of pollutant content from such material,
the owner or operator must use the highest value of the range to calculate
the PAL pollutant emissions unless the Director determines there is site-
specific data or a site-specific monitoring program to support another
content within the range.
4. CEMS. An owner or operator using CEMS to monitor PAL pollutant emissions
shall meet the following requirements:
Page 150 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
a. CEMS must comply with applicable Performance Specifications found in
40 CFR 60, Appendix B; and
b. CEMS must sample, analyze and record data at least every 15 minutes
while the emissions unit is operating.
5. CPMS or PEMS. An owner or operator using CPMS or PEMS to monitor PAL
pollutant emissions shall meet the following requirements:
a. The CPMS or the PEMS must be based on current site-specific data
demonstrating a correlation between the monitored parameter(s) and the
PAL pollutant emissions across the range of operation of the emissions
unit; and
b. Each CPMS or PEMS must sample, analyze, and record data at least
every 15 minutes, or at another less frequent interval approved by the
Director, while the emissions unit is operating.
6. Emission factors. An owner or operator using emission factors to monitor PAL
pollutant emissions shall meet the following requirements:
a. All emission factors shall be adjusted, if appropriate, to account for the
degree of uncertainty or limitations in the factors’ development;
b. The emissions unit shall operate within the designated range of use for
the emission factor, if applicable; and
c. If technically practicable, the owner or operator of a significant
emissions unit that relies on an emission factor to calculate PAL
pollutant emissions shall conduct validation testing to determine a site-
specific emission factor within six months of PAL permit issuance,
unless the Director determines that testing is not required.
7. A source owner or operator must record and report maximum potential emissions
without considering enforceable emission limitations or operational restrictions
for an emissions unit during any period of time that there is no monitoring data,
unless another method for determining emissions during such periods is specified
in the PAL permit.
8. Notwithstanding the requirements in subsections (K)(3) through (7), where an
owner or operator of an emissions unit cannot demonstrate a correlation between
the monitored parameter(s) and the PAL pollutant emissions rate at all operating
points of the emissions unit, the Director shall, at the time of permit issuance:
a. Establish default value(s) for determining compliance with the PAL
Page 151 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
based on the highest potential emissions reasonably estimated at such
operating point(s), or
b. Determine that operation of the emissions unit during operating
conditions when there is no correlation between monitored parameter(s)
and the PAL pollutant emissions is a violation of the PAL.
9. Re-validation. All data used to establish the PAL pollutant must be re-validated
through performance testing or other scientifically valid means approved by the
Director. Such testing must occur at least once every five years after issuance of
the PAL.
L. Recordkeeping requirements.
1. The PAL permit shall require an owner or operator to retain a copy of all records
necessary to determine compliance with any requirement of this Section and with
the PAL, including a determination of each emissions unit’s 12-month rolling
total emissions, for five years from the date of such record.
2. The PAL permit shall require an owner or operator to retain a copy of the
following records for the duration of the PAL effective period plus five years:
a. A copy of the PAL permit application and any applications for revisions
to the PAL, and
b. Each annual certification of compliance pursuant to R18-2-309(2) and
the data relied on in certifying compliance.
M. Reporting and notification requirements. The owner or operator shall submit semi-annual
monitoring reports and prompt deviation reports to the Director in accordance with R18-
2-306(A)(5). The reports shall meet the following requirements:
1. Semi-annual report. The semi-annual report shall be submitted to the Director
within 30 days of the end of each reporting period. This report shall contain the
following information:
a. The identification of owner and operator and the permit number.
b. Total annual emissions (tons/year) based on a 12-month rolling total for
each month in the reporting period recorded pursuant to subsection
(L)(1).
c. All data relied upon, including, but not limited to, any Quality Assurance
or Quality Control data, in calculating the monthly and annual PAL
pollutant emissions.
d. A list of any emissions units modified or added to the major source
Page 152 of 153
NSR AMENDMENTS: STAKEHOLDER REVIEW DRAFT July 23, 2015
during the preceding six-month period.
e. The number, duration, and cause of any deviations or monitoring
malfunctions (other than the time associated with zero and span
calibration checks), and any corrective action taken.
f. A notification of a shutdown of any monitoring system, whether the
shutdown was permanent or temporary, the reason for the shutdown, the
anticipated date that the monitoring system will be fully operational or
replaced with another monitoring system, and whether the emissions unit
monitored by the monitoring system continued to operate, and the
calculation of the emissions of the pollutant or the number determined by
method included in the permit, as provided by subsection (K)(7).
g. A certification by the responsible official consistent with R18-2-304(H).
2. Deviation report. The major source owner or operator shall promptly submit
reports of any deviations or exceedance of the PAL permit requirements,
including periods where no monitoring is available, in accordance with R18-2-
306(A)(5). The reports shall contain the following information:
a. The identification of owner and operator and the permit number,
b. The PAL permit requirement that experienced the deviation or that was
exceeded,
c. Emissions resulting from the deviation or the exceedance, and
d. A certification by the responsible official consistent with R18-2-304(H).
3. Re-validation results. The owner or operator shall submit to the Director the
results of any re-validation test or method within three months after completion
of such test or method.
Page 153 of 153