PROJECT TITLE
LOCATION
OWNER
SUBJECT
TOTAL
COST
(in Pesos)
40 836.00 33,440.00
60 610.00 36,600.00
25 320.00 8,000.00
8 240.00 1,920.00
140 750.00 105,000.00
4 1950.00 7,800.00
40 110.00 4,400.00
30 241.00 7,230.00
10 90.00 900.00
20 390.00 7,800.00
213,090.00
20 680.00 13,600.00
8 550.00 4,400.00
10 40.00 400.00
18,400.00
500 376.00 188,000.00
12 252.00 3,024.00
20 494.00 9,880.00
20 190.00 3,800.00
12 494.00 5,928.00
2000 2.50 5,000.00
1000 0.80 800.00
20 2,340.00 46,800.00
263,232.00
ITEM NO.1
2
3
5
6
CONDITIONS:
Sub-Total
BREAKDOWN OF ESTIMTED EXPENDITURES:
LN.M. HI-RIB ROOFING SHEETS
TOTAL MATERIALS
WALL FLASHING
END FLASHING
Sub-Total
Owner
DESCRIPTIONROOF FRAMING
pcs. FACIA COVER
pcs.
Contractor
LABOUR COST
III. PAINTING
kls. WELDING ROD
Sub-Total
Gal LACQUER THINNER
BONITE COMMERCIAL BUILDING
BRGY. TIZA, ROXAS CITY
BENJAMIN BONITE
ROOF FRAMING AND ROOFING QUOTATION
pcs.
pcs.
Cutting Disc
PAINTING WORKS FOR STEEL TRUSSROOF COVERING
UNIT cost
16mmØ x PLAIN BARS
12mmØ x PLAIN BARS
pcs.
IV. ROOFING
pcs.
1 1/2" x 1 1/2" x 3/16" ANGLE BAR
4' x 8" x 1/4" THK. STEEL PLATE
TURN BUCKLE
2" x 6" x 1.5mm C-PURLINS
ROOF FRAMING
RAMIL ARTATES
pcs.
Bags
pcs.
1" x 1" x 1/8" ANGLE BAR
494,722.00
727,241.34 232,519.34
QNTY. UNIT DESCRIPTION OF MATERIALS
pcs.
2" x2" x 1/4" ANGLE BAR
EPOXY PRIMER
Bags
5/32" x 1/2" BLIND RIVETS
STAINLESS SHEETS
pcs.
pcs.
pcs.
GRAND TOTAL
MATERIAL COST213,090.00
18,400.00
263,232.00
CONTRACTOR'S PERFORMANCE THRU PROGRESS BILLING.
pcs.
pcs.
Paint Brush 2"
Gal
1. ALL MATERIAL TO BE USED SHALL BE BASED ON PLANS & SPECIFICATION.
2. ALL ROOFING MATERIAL SHALL BE 0.40mm THICK AS SPECIFIED BY THE ARCHITECT.
pcs. SPANISH GUTTER
2 1/2" TEKSCREW
3. ALL WORKS IN THIS CONTRACT SHALL BE WARRANTED FOR THREE (3) MONTH AND
DEFECTS SHALL BE RECTIFIED AND REPAIRED WITHIN THIS PERIOD.
4. THIS QUOTATION SHALL SERVE AS CONTRACT WHEN APPROVED BY THE OWNER OR
ITS REPRESENTATIVE.
5. UPON APPROVAL OF THIS QOUTATION, 30% OF THE TOTAL QUOTATION SHALL BE PAID
AS MOBILIZATION FUND AND THE SUCCEEDING PAYMENTS SHALL BE BASED ON