~ The California State University ~ OFFICE OF THE CHANCELLOR
Larry Piper Chief, Facilities Planning Capital Planning, Design & Construction 401 Golden Shore, 2nd Floor Long Beach, CA 90802-4210 (562) 951-4106 [email protected]
May 20, 2016
Ms. Raghda Nassar Finance Budget Analyst Capital Outlay Unit, Department of Finance 915 L Street, 9th Floor Sacramento, CA 95814
Dear Ms. Nassar,
The California State University Quarterly Reports on Capital Outlay Projects
Enclosed are the California State University March 2016 Quarterly Reports on the status of capital outlay projects, as required by Section 6864 of the State Administrative Manual.
If you have any questions, please feel free to contact me at (562) 951-4106.
~/tJd~ Larry Piper Chief of Facilities Planning Capital Planning, Design and Construction
LP:mc
Enclosures
c: Steve Boilard, Director, Higher Education, Legislative Analyst's Office Jason Constantouros, Fiscal & Policy Analyst, Legislative Analyst's Office Shannon Gordon, Assistant Budget Analyst, CSU Office of the Chancellor Elvyra F. San Juan, Assistant Vice Chancellor, CSU Office of the Chancellor
CSU Campuses Fresno Monterey Bay Bakersfield Fullerton North ridge Channel Islands Humboldt Pomona Chico Long Beach Sacramento Dominguez Hills Los Angeles San Bernardino East Bay Maritime Academy San Diego
w/o enclosures w/enclosures w/enclosures w/o enclosures
San Francisco San Jose San Luis Obispo San Marcos Sonoma Stanislaus
Campus: Project: Project No:
CFIS No:
FISCAL DATA
Nw:nW Chapter/Item
Bakersfleld Seismic Upgrade. pore Thptra BA-1Q38
06.50.067
Aopropciatjon Ammm1
EilrlvWork ~
<cumy!atjve $)
Preliminary flm
Transfers CS>
20/13 6610-301-6048(1) PWC $1,784,000
$60,000
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT - STA TE
~ ~
Transfers CS>
$64,000
QUARTER ENDING; March 31 , 2016
Construction Tr;ms{er CU
$0
REVERSION/AUGMENTATIONS
t:l21
Executive Qfikc.1t
PreViously Transferred
w
Previously Traos{erred
((\
htill Al! Transfer5 CNet after Reversion>
$124,000
Comments: Detail of Change Orders Issued/Pending: Construction is 100% complete No contingency used ($245,700)
Project is complete. Remaining funds being used foe additional projects within Dore Theater.
PROJECT SCHEDULE:
Original Date
Revised Date Actual Date
Reasons for delays:
PW8 Apprav1I of
htlimi•"Y """'
05/13
Worbla Dmnn& fund
Jnruttr OOf Appnwll to f'roc:ttd lo lid Corntn.lctlon F"1.1nd lnnsftr
07/13 10/13
09/17/12
Con1tNcbon Compltbon
10114 /)
Contingency Balance$ CS>
so
Amount of Change Order Pending CS>
Funding to be included in 2013/14 budget PWB approval for Preliminary Design received.
=~~w~ Name Larry Piper ·--------li~t
Phont
Chief, Facilities Planni!!.....
(562) 951-4106
Campus: Project: Project No:
CFIS No:
FISCAL DATA
~ Chapter/Item
712/10 6610-301-0658(1)
33/11 6610-301..()668(1)
£lllm Taylor II Replacement Building ~ 06.52.113
PW S2.800.000
c S52.89l,OOO
Prelimmarv fliln
Transfersm
Sl .434,000
so
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT - STATE
~ Q.rurl.ag
Transfers CS>
Sl.366.000
so
QUARTER ENDING: March 31, 2016
Construction Transfer <Sl
so
S52,891,000
REVERSION/AUGMENTATIONS
~
~ ~
Prevjgysly Transferred
ill
Previgusly Transferred
(()
I21fil All Transfers <Net after Reversion>
$2,800,000
$52.891,000
Comments: Detail of Change Orders Issued/Pending: Project kickoff meeting was tleld on 10/5111 . 100'.lr. SD approval at BOT 5/8/2012: PWB approval at Sept 11 meeting. 95% CD submittal received from AJE. Working on agency approvals and 100'.lr. CDs. Demo of Yuba Hall complete (GMAX Phl). 2012113
Reappropriated C: Encumber by 6/30/17 and liquidate by 6/30/19. 1 Dot. CD/ Award submittal to CPDC is complete (less NIP). Project is ready to go. Awaiting bond sale. Design assist of curtain wall continues to be ongoing. Currently steam line work ongoing (GMAX Phll). Existing buflding has been demolished. Site work, piers and foundations are continuing. 6/15: Interior framing is complete, MEP rough-in nearly complete, interior wall finishes and ceilings ongoing. Site demolition and utilities are ongoing. 9/30/15: Interior finishes-ceilings, flooring, wall paneling, and final site work ongoing. 12115: Final finishes and commissioning of the building. Completion estimated for 4/16.
PROJECT SCHEDULE: l'WllAjlp .... alol Woobn10.-n1fund
CO: $3,023, 102 CO Pending: S 128,000 Contingency: S 128,000
Construction complete: 99.9%
Prtlirnuwy rbn1 Trandtr OOF Apprcwal to Ptoettd Toetd CotiiU\ICtiOri Fund Tf'1nsfrt CD1Htructio" CompMttor'I
Original Date
Revised Date
Actual Date
Reasons for delays:
04/11
08/12 ---09/11/12
10/11
09/20/12 07/29/13
02/12
05/13
11/19/13
07113
04116
'J~
Contingency Balances <Sl
Sl.399,000
so
Amguntgf Change Order Pending <Sl
Delay due to completion of due diligence. Bond funding received and GMAX Phase Ill (final) fully executed. NIP issued 11 /14/13.
s;p,tutr
N.,,,, rrtt.
Meaghan Sm~ ----------~--------Universitv Planner
3/15 Status: Interior framing nearly complete, MEP rough-In nearly complete, interior wall finishes and ceilings starting. 3/16 Status: Base building and contract is complete. campus requested changes has extended the schedule to 4129/16.
""'"' (562) 951-4102
Campus: Project: Project No:
CFIS No:
FISCAL DATA
~ Chapter/Item
/15 6610-0
Comments:
PWC
kbk2 Boller-Chlller Plant ModlOcatlon CH-1427 ..
Aooropriation
6m2J.!nt
$10,897,000
Early Work
Iulmfer Ccumulatjve S>
Prel!mjn?rv
flfill Transfers CS>
$450,000
THE CALIFORNIA STATE UNIVERSITY (OEPARTMENl)
QUARTERLY CAPITAL OUTLAY REPORT· STATE
QUARTER ENDING : March 31. 2016
REVERSION/AUGMENTATIONS Ml21
Working
~ Transfers <S>
$383,000
Constryctjon Transfer CS>
so
Executive
~
Previously Transferred
ID
Previously Transferred
ID
Im!. All Tr9nsfers !Net after Reversjonl
$833.000
Detail of Change Orders Issued/Pending
Contingency Balances CU
so
Amount of Change Order
Pending($)
3/16 Status: Aw?rded CM@Rlsk contract to Otto Construction. Currently working on Schem?tic Design/Preliminary
Plans.
PROJECT SCHEDULE:
Original Date Revised Date Actual Date
Reasons for delays:
App.,,.olof
Prtllmw,uy Pbns
12/lS
03/16
App.,,.<lofW""'t
lltM>•i a. Prout<l lo Bid
06/16 ConsUUttJon 5tMt Con\tnt<tlon Comp4ebon
06/16 09/17
5'Jnlblrt
N.,.,.
Till<
"'""'
~ Me~anS~ UniversJSl(_Planner ------------------(S62) 951-4102
Campus: Project: Project No: CFISNo:
FISCAL DATA
~ Chapter/Item
20113 6610-301-6048(2)
0712110 6610-301.()658(3)
33/ll 6610-301-0668(4)
Comments:
Channtl Islands Wist Hall ~ 06.83.004
AporoQCjatjon
6m.wml
E S2,258,000
PW S2.430,000
c $38,021,000
Ei!ClyWork
Irilm.fu Ccumu!atjve Sl
PrcJiminarx
~ Transfers CS>
so
$999,000
JO
P phase began 9/15/11 using ci>mpus funds. Allocation received. Change of scope - increased area and all new construction (no renovation), Approval to Award granted. Project is 40.33% complete through 9/30/14. No contingency used to date.
PROJECT SCHEDULE: PWl_o.,lof w..u., 0-C fun<I
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT - STATE
W200ng l2£iMing
Transfers m
so
Sl.431 .000
so
QUARTER ENDING: March 31, 2016
Construction Transfer m
so
so
S38,021 ,000
REVERSION/AUGMENTATIONS
~
IQlil All Transfers
<Net after Reversion> Executive
Qcd«.!
Previously T[j!ndeCRd
ru
Previously Transferred
'~'
S2.258,000
$2,430,000
S3B,021,000
Detail of Change Orders Issued/Pending:
Change Orders (#1-10): S2,438.194 Pending (#):SO Contingency Balance: S84,944
,,.......,,,..,,, Trartstlr OOF ~,.,.>114-ttd To Sid Con1tnK1>oo f llftd Tnn1ftr CatntnH.bon Corrolttton
Original Date 07/11 -- 03/12
Revised Date 09/12 ---Actual Date !.~ 09/04/l3
Reasons for delays:
Scope Change approved at September 2012 PWB meeting. Preliminary approval at December 2012 PWB meeting. Project included in the Fall 2013 Bond Sale.
09/04/13
08/12
02/14
03/l0/14
:SlcNllHt
N.,,,t
~ - Chief, Facilit ies Plannin
(562) 951-4106
Contingency B;llances ($)
so
Sl,136,000
so
Amount of Chj!nge Order Pendjngm
Campus: Project: Project No:
CFIS No:
FISCAL DATA
~ Chapter/Item
20/13 6610-301-6028(3)
0712/10 6610-301-0658(2)
33/11 6610-301-0668(2)
Comments: Project is in GMP.
E
PW
fmWl Faculty OfflctlLab Bulldlnq f.B:Zli 0§.5§.066
Aoorooriatjoo
AmlllU11
S383,000
$562,000
yr!vWork
~ <cumulative Sl
c $9,819,000
Pre!imjnary
run Transfers CS!
so
$277,000
so
'W' funds reappropriated 12/13. Available for encumbrance until 6/30/15.
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT}
QUARTERLY CAPITAL OUTLAY REPORT - STATE
W2.rhl!l1 ~
Transfers <S>
so
$285,000
so
QUARTER ENDING: March 31 , 2016
Construction Transfer ($)
so
so
$9,819,000
REVERSIONIAUGMENTATIONS
Mm
Execytjye QakrJl
E.0.13114-27
Previously Transferred
ill
Previously Transfs:m:d
'"
$905,000
!ml All Transfers (Net after Reyeajonl
$383,000
$562,000
Sl0,724,000
Detail of Change Orders Issued/Pending:
Group II account fund was setup Incorrectly and reimbursement claims were not processed. Balance in fund will revise on 6/30/16. Campus is working to resolve the issue and claim reimbursement
Approved CO (#1·18): $289,636.92 Pending CO(#): N/A Contingency Balance: S
PROJECT SCHEDULE:
Original Date
Revised Date
Actual Date
Reasons for delays:
rwl~r .. •1•1 ... lotnoiwyl'lan1
06/11
02113 12/14/12
Requires DOF approval of Augml!nl
Worllft& Om.inc Futtd Tr»i1'tt DOf ~pn7ul tofToc:nd fo lid tlf'1trv<• Fund Tunsttr
01/12
05/13
02101/13
07/13
03/17/14
05/12
07/14
07/07/14
Can,truction Complt:bon
10/13
09/15
12103/15
··-H.,,,.
fotlr
""'"'
~~ Eric Chan
Associate University Planner
(562) 951-4109
Contingency Balances m
so
$415,000
so
Amoyntof Chilnge Order
Pending m
Campus: Project: Project No:
CFIS No:
FISCAL DATA
~ Chapter/Item
LosAoqtl11
Seismic UPG@dt. Mmlnlstcatlon LA:Wi 06.73.099
Approprjalion
Amwm1
Early Work
Iulmkr: Ccumulatjve $)
Preliminary
~ Transfers ($)
21/12 6610-301-6048(4) PWC SS,799,000
S207.000
Comments:
PROJECT SCHEDULE: womnt: 0mftnS Fund
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT - STATE
WQrklng l2rilmDg
Transfers<S>
$218,000
QUARTER ENDING: March 31, 2016
Construction Transfer <S>
so
REVERSIONfAUGMENTATIONS
~
~ ~
Preyjously Transferred
ill
Preyjpus!y Trnnsferred
(.:\
Iml All Transfers <Net i!fter Contingency Reversion) Balances <S>
S425,000 so
Detail of Change Orders Issued/Pending:
l'W8Aop ... ~~, ,, . .......,,,.., y.._,,,, DOF Apprwal to f'roct1d Ta ltd ('on1tr\l<Oon hw.I Transru Conttrutbon Completion
Original Date
Revised Date
Actual Date
Reasons for delays:
07/13
08/16
09/13
06/17
01/13
10/18
08/14
04120
1/z~
Amount of Chi!nge Order Pending<S>
The project undertook a non-linear time history analysis as requested by CSU Seismic Review Board as part of verification of scope.
Sls;1'111lttt
Nomt
_M.eaghan sf:ritt? - ---------------Results of Stage IA non-linear time history ;m3lysis indicate deficiencies in building structural system beyond scope and funding of scheme "EM upgrade. Analysis required by Seismic Review Board member and final i!nalysis indici!tes that scope of seismic repair is code.
Tiii> ,,.,,,. Unlversi!Y P.:.:la::;n:!!n~er"-------------------
(562) 9S1-4102
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT· STATE QUARTER ENDING: March 31. 2016
Campus: Project: Project No:
CFISNo:
FISCAL DATA
~ Chaoterfltem
20113 6610-301-6028(2)
E
Mac!tlma Academy pbys!cal Education BH!acement MA:m 06.51.010
Aooropriiltion ADli2lmt
S1.29S.OOO
Ei!clyWork
mmw (cumulative S>
Prelimjnary
~ Transfers CS>
so
0269/08 6610-301-0660(2) PWC S34,751.000
Sl.053,000
Comments: Rei!pprop 12113 requested. Revised encumber by 6130/15; revert by 6/30/17. Signed MOU with PG&E for work: county recording.
W2cking l2wting
Transfers CS>
so
Sl.013,000
Construction Transfer CS>
$0
$32.685,000
REVERSION/AUGMENTATIONS
Execytjye
Qnl!!Ut
E.0.14/15·10 E.0.12113·16
Transferred
ill
!:ml Previously
Transferred ((\
Sl,230.000 S2.052,000
Im! All Transfers !Net after Contjngencv Reversjonl Balances CS>
Sl.295,000 so
$38,033,000 so
Detail of Change Orders Issued/Pending:
Amount of Change Order Pending CS>
Project over bid: normalized GMAX due mid 1/2013. PWB delegated approval to DOF for an augment in February. Received augment 1 /28/13 i!Dd awarded contract 3/27 /13.
CO#S=S71199 deduct alt added back #9/#6=$73190 deduct alt added back #10/ #8=Reduction of scope/cost as related to lime treatment per RFI (RFI 98/-S 14802)/ #9•Add back deduct alt (S42900) #21#10=Add back of deduct alt (S48899) #3,5,6,8-custom trophy case/#11 .. S46028/#12=S313221#13=S24814/#14=$84589 city/site changes/#1S=S39B27 glazing,electrical.HVAC/#16=$48708 additional copper run, stamped concrete/#17=$49579 pedistal for parking kiosk,plumbing.keying/#18=
Project is complete but still open due to S 1.2 million augment
PROJECT SCHEDULE; rv.s-.,p,...llo! Worbc~'""" ,, ..... ""7 ..... 1 ftJmftr DOF..,_alloPnK1tdTollcl (GRitlucbOnft.nd T111ftiftr
Original Date 02110 07/10 08/10 10/10
Revised Date 01112 11112 02113 ---Actual Date 03/09/12 10/22/12 10/22112 03/27113
Reasons for delays:
This project was approved at the 12108 PWB meeting with LRB funding resolution. The 1 /09 PMIA interim financing was not approved due to state financial crisi1. CPDC using old bond funds to fund PW LRB funds approved by PWB on 9/5/12 for C to be funded in 9/2012 bond. Gilbane selected as CM and WRNS for A/E. Kick-off meeting conducted 5/22111 . Schematics approved at November 2011 BOT: PWB approved preliminary pli!ns at 3/9/12 meeting. Received balance PW funds: S 138K in July 2012.
S 17050 add back roof ballast material/Submitted=S 109982; Paving at MA Drive $27383; Credit Allowances S 132000; Soils issues S69000: Corrections to wood ceiling
c ... iinxtioo c~6; Misc issues $76059 see contingency report/#27=Final settlement CO $63685/
0511 f28=credit on unused allowances total S 1787S.39/#29=credit for inadequate payroll
10114ecords $7200 and settlement on polish concrete floors S 15000 for a total of
~m~~ 02103/15
N..,. Meag;i;;;;sm;
Tl!lo University Planner ftlone (562) 951-4102
Campus: Project: Project No:
CAS No:
FISCAL DATA
t!h!mlw: Chaoterlltem
/13 6610-0
Comments:
PWC
Maritime Acadenw University potlca Bulldlng Sltework MA-1233
06.51.016
Appropciatjon
Am2ll.Dl
$980,000
Ei>r!vWork
.ll:iniW: Ccumulatjve $)
Pre!imlni>ry
flID Transfers CS>
Sl06,000
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT· STATE
QUARTER ENDING : March 31, 2016
~ ~
Transfea CS>
S41,000
Construction Transfer <Sl
$755,000
~ ~
REVERSIONfAUGMENTATIONS
~
Previously Transferred
ill
Preyjoyslv Transferred
ill
Im!. All Transfea <Net after Reveaion>
$902,000
Detail of Change Orders Issued/Pending
Contingency Bi>li>nces ($)
SJ0,000
Budget concern exists: Campus reduced mobile modular components and cost estimates for base bid and modifications to value engineer within budget
Campus has issued ii Change Order to Philse A work; $41 ,687.21
Plans delayed from Mobile Modular to coordinate with Strata; cost estimates late. etc. This project consists of 3 phases: Phase A· Sitework Construction 8/13-12113; Phase B - Mobile Modular Delivery 5/14-7/14; Philse C- Building Additions 7/14-9/14
AoP"'"''•' Ao!>'v.,lofW~& PROJECT SCHEDULE: ~-...,,...,. DrMln& A h'O<ttd tn ltd Comtntcbon Sbrt
C.--1tr\Kbon C01r1p4t:tion
Original Date 08/12 09/12 09/12 11/12 Revised Dille 09/13 10/13 08/13 p1s Actual Date 09/01113 10/01113 10/01113 10/09/15
Reasons for delilys: $icNturt .'dr!S<~ N,.... Meaghan snfiftr - -~
Amount of Change Order
Pendjng<s>
7124/12: CPDC became manilger of the project CEQA; Jo-day review period ends 9126112. STRA I A is architectural firm. Campus had KC Engineering for geotech; Brejle & Race for survey; and EBA for construction docs ilnd coordinate SWPPP.
-------------------------------------
11/15: Awaiting DSA approval on inspection reports as related to determination of UPD facility ilS "Essential Services". Approvill of drilwings necessilry to gilin occupancy permit Discrepancy in occupancy lead to uncertal nty ID number of ilccessible exits need in facility_
Tll!t
"''"" University Planner
_(~62)951-4102 --------·----------
Campus: Profect: Project No: CFIS No:
FISCAL DATA
.Mu.m.W Chapter/Item
Monlfm Bay Academic Bulldlnq II JG:all 06.l!l.008
Aooroorjation
AmQJHl1
Early Work
mo.mr Ccumulatjve $)
0269/08 6610-301-0660(3) PWC $40,599,000
Comments: Received DOF approval to bid 8/13.
Preliminary
fli!l Trandeam
Sl ,139,000
Campus received GMAX 9/13. NTP issued 11 /22/13. Project is 98% complete. CMAR Allowance = $2,924,899 OK Authorized = $2,742.574 Balance = $182,325
CMAR Contingency = S 305.670 CMAR Spent = SO
cos approved = S 305,670 CMAR Pending • SO Contingency balance = SO Discovery of unknown 14" water line, Elevator shaft steel issues, fire proofing
PROJECT SCHEDULE: l'Wll-'PPRIY•l•f w.....,,o....,11und
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT - STA TE
~ Qrming
Transfers <S>
s1.120.ooo
QUARTER ENDING: March 31, 2016
Construction Transfer ($)
$38,340.000
REVERSION/AUGMENTATIONS
~
hecutjve Qa1er..tt
E.0.12113-1
E.0.13/14-10
Previously Transferred
ill
Previously Transferred
(t\
52.951,000
Sl .033.ooo
Tull.I Ail Transfers
CNet after Reyersjon>
$44,583,000
Detail of Change Orders Issued/Pending:
Contingency S 1,325,000 Issued to date $508, 104
Current Balance $816,896
Pending COs SO Forecasted Balance SO Global Settlement CO#l 4 Fully Executed
Prt"tt1uu1y f'bn1 lr1ndtr DOF AHnw~ lo Procudta ltd (:oru.trucbon Fund lraru.h:r Co•utntctiorl Conipttt.i01t
Original Date
Revised Date
Actual Date
Reasons for delays:
05/10
07/19112
Project included in Fall 2013 Bond Sale.
01/11 04/11
01/06/14
04/13
11/15
N""• T1tlt
Phont
Chief. Facilities Planning
_!?62) 951-4106
Contingency Balanm!Sl
$1,036.000
Amount of
Cham:e Order Pendjngm
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT· STATE
Campus: Project: Project No:
CFISNo:
FISCAL DATA
~ Chi!ptertttc:m
20113 6610-301.()668(1)
Comments:
PROJECT SCHEDULE:
Originill Date
Revised Date
Actual Date
Rei!50ns for delays:
fmn2DI Administration Replacement fac!lltv (Sa!sm!c) f2:Zii 06,98,100
ADDrooriation Ammm1
PWC S76,546,000
l'WB°'11pro<1lol
Ptt'limtnllY "-''
03/14
06/15 06/30/15
Ei!rlyWork
~ Ccumuli!tjye Sl
Preliminary
~ Transfers CSl
Sl,576,000
'Nod..lfll Omirins Fund
wming lmwing
Transfers CU
Sl,943,000
Tn111r.r DOf °'l!Pro<ll to l'l'O<ttd To Btd
08/14
07115 --- rit/01/Jb 04/07/16
Awaiting PW Funds while in process of securing funding. Parking garage design-schemi!tic delay.
QUARTER ENDING: March 31, 2016
Constructjon Transfer m
so
canurucbOnf~ ltantftr
10/14
06/16
REVERSION/AUGMENTATIONS
~
Executive Qrdllil
Previously Transferred
ill
Preyjously Transferred
'~'
~ All Transfea
<Net after Reversion>
Sl.519,000
Detail of Change Orders Issued/Pending:
Canitnlcbon COMP'-'t»on
10/16
09/18
~ ... ti#.
N-
Tlllt
Phont
Meaghan Smit~ University, Planner
(562) 951-4102
Contjncency Balances CU
so
Amount of Change Order
Pending CU
'
Campus: f.mWml
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
OUARTERL Y CAPITAL OUTLAY REPORT· QUARTER ENDING ; March 31. 2016
STATE
Project: Project No:
Hot Water and Chlllld Water Systems Expansion P0·1273
CFIS No:
FISCAL DATA
Ml.!ln1ru Chapter/Item
/13 6610-0
Comments:
PWC
First NOC dated 9/28/15
06.98.117
Appropriation
6rruWn1
$7.045 ,000
Early Work ~
<cumulative $)
Preliminary f.lim
Transfersm
$162,000
Still have delta T project as part of this funding. 3/16: Completion date revised to 12116
PROJECT SCHEDULE: Original Date Revised Date Actual Date
Reasons for delays:
l'j>pn1 .. 101
,.,.,.,,,..,, ""'' 05/14
12114 01/23/15
Ai. ... otofWo<tins O....,ns & homd lo Bid
06/14
01/15
03/13/15
~ QrnMng
Transfers CS> Construction Transfer C$l
$212,000 $6,671 .000
ComtnKtaon Stlrt
07/14
06115 06/15/15
Construction Compld1011
04/15
12116
REVERSION/AUGMENTATIONS ~ I21fil
~ Qafil.!
~"'" "-TiU.
""'"'
Previously Transferred
ill
Preyjously Iranstmed
ill
All Transfers <Net after Reversion)
S7,04S,OOO
Detail of Change Orders Issued/Pending
~ Me<>Rtans_~
Contingency Bi!lances m
$338,000
Amount of Chance Order
Pendjng<S>
_ Universit.Xflanner:_ _ -----------------(562) 951-4102
Campus: Project: Project No: CFIS No:
FISCAL DATA
~ Chaoter/ltem
I 6610-0
Comments:
PWC
Sacrampoto Chemlstrv Labs Benoyat!on SA-1352
06.76,114
Approprjation Ammm1
$4,000,000
Ei!rlyWork illmftr
(cumulative S>
Pre!imjnilry
&n Traoskcs <S>
S113,000
Process of job scoping for budget Lab 538/540 Jed floor no change
PROJECT SCHEDULE:
Original Date Revised Di!te Actual Oi!te
Reasons for delays:
N>prvolof
Prtlunm"1 "'°' 06/15
Apprvw~ofWorlm&
0.-16"1xtt1Uohl
12/15
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT- STATE
QUARTER ENDING : March 31, 2016
~ lmmng
Iransfers<S>
$149,000
(Oft1truc:tton Swt
06/16
Construction Transkr m
so
Con\tJ\Kbon Comp4tbon
09/17
~ Qa1l:!:..J!
REVERSION/AUGMENTATIONS liQ1
Previously Transferred
w
Previously Transferred
.w
IQW AllTraoders CNet i!fter Reversion>
$262,000
Deti!il of Change Orders Issued/Pending Change Orders (#): SO Pending (#):SO Contingency Balance: SO
Cootjngency Ba!ances m
so
, ~ :Z~v- =----N~~ T1Ut
l'llont
_ Cfilef..£acilities Elannil}L (562) 951-41 06
Amount of Change Order
Pendjog<S>
Campus: Project: Project No:
CFIS No:
FISCAL DATA
liU.mW Chapter/Item
0268/08 PWC 6610-302-6041(1)
San Bamaallno Access Compllanca Barrlpr Rpmoya!
~ 0&.78.073
Approprjj!tion
&nS21lll1
S 1O,S10.000
EarlvWork
mmw: Ccumylatjve Sl
Preliminary
l1m Transfers <S>
$536,000
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPIT Al OUTLAY REPORT - STA TE QUARTER ENDING: March 31 , 2016
REVERSION/AUGMENTATIONS ~
$346.000
Constructjon T[j!Osfer m
S9,628,000
Executive .Q.cslcLJ!
Previously Transtcrrecl
ill.
Previously Transferred
ill
!ml All Transfers <Net after Reversion>
s10.s10.ooo
Comments: 2012113 Reapprop; WC encumber by 6/30115; liquidilte 6/30117. 2009/1 O Re appropriated PWC: Encumber by 6/30/12, Revert by 6/30/14
Detail of Change Orders Issued/Pending Approved COs: S587,857
The 12 Essential Categories Cl-exterior pilth of travel. 2-restrooms, 3-entrilnces. 4-fire alarms. 5-elevators, 6-stairs/ ramps, 7-casework/counters, 8-AlD/phones. 9-signilge. 10-drinking fountains. 11-doors/hardwilre, ilnd 12-areas of refuge) hilve been divided into 48 pckgs or projects. 46 projects complete: 2 under construction. Designed/bid specific components ilnd locations to satisfy mandated time frames.Overall, the project is 99% complete with 100% contingency used. All funds encumbered against the ADA Fund (T A-007)-awaiting final invoices from vendors. All billing to be complete by May 30th. A#...,,.,, ""'""'"ofW""'•1 PROJECT SCHEDULE: """"""""'"' "'-1urom<11o1;a
Original Dille _ Ol/09 05/09
Revised Date Actual Dille
Reasons for delays:
Suspension of funding/Agency reviews (DSA)/Weather AU funding for the project hils been encumbered. Construction of several projects will occur during summer.
ConttnKtion Stxt
07/09
06/15/09
Some projects were not approved by DSA and State Fire Maohal m a timely manner to be completed during this summer, therefore, they hilve been scheduled to be completed next summer to prevent disruption of the clilsses.
ComtnKtion Comp4lbon
09/11
02/16
Si&Nt>lrt
Nam1
T1tlt
.......
Pending COs: SO
~
Eric Chan
Associate Universill_ Planner
(562) 951-4109
Continency 8jilj!nm($)
$574.000
Amount of Chjinge Qcder
Pendjng ($)
Campus: Project: Project No:
CFIS No:
FISCAL DATA
San Jose Spartan Complex Rengyatlon tSg!smlcl ~ 06,86,084
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT - STA TE QUARTER ENDING: March 31 , 2016
REVERSION/AUGMENTATIONS
N21 .il!1ill.
All Transf1:rs
~ Chapter/Item
Mproprjiltjon
Amgwll
EilrlvWork
~ <cumulative $)
Preliminary
flan Trnnsfers CS>
W2r.king
~ Transfers CS>
Construction Transfer ($) fllill1M:
Previously
Transferred Preyj0u$1v
Transferred ('I:\
<Net after Contingency
Qcd.erJi Reversjon) Balances ($)
20/13 6610-301-6028(4)
E S 1,428,000 so so
ill
so $1,428,000 so
712/10 6610-301-0658(4)
PW S3,240,000 $1,529,000 $1,711,000 so $3,240,000 S3,174,000
33/11 6610-301-0668(5)
Comments:
C SS 1.479,000 so so SSl ,479,000
University is funding 100% SD phase of work. Schematics will be presented at the Jan 2012 BOT for approval.
E.0.15/16-1
E.0.13/14-3
$419,588
$2.818,000
$54,716,588
P funds allocated with 10/2011 Bond sale. Campus will be billed for CPDC work on PTR, surveying and legal description/plat
PW-Reappropriated 12113: Encumber 6/30/17 and revert by 6/30/19.
Detail of Change Orders Issued/Pending:
co #1-17: $5,415,551 CO #18: final change order claim settlement for S 1,534.810 Contingency balance: SO
Steel and concrete testing complete. Hazmat survey complete. Working on Hazmat report and interim housing finalizing
staging for construction, Clerkin 95% cost est due 9/12 and Sundts 10/12. 2012113 Reappropriated C: Encumber by 6/30/17. NOC filed 10/9/15.
PROJECT SCHEDULE: Worlln& D,....nC Fund PW8Aj>p""•lol PfrlnninlfY Pl.Mu Tr1nsr" DOF ""'D\'~ to !tn>cH dla Bid Co•ntrucban F-liMITrins"r Constn.Ktion cornotetion
Original Date
Revised Date
Actual Date
Reasons for delays:
06/11
06/12 06/04/12
10/12
10/12
10/01/12
11112
05/01/13
01/13
07/13
07120/13
04/15
09/15
10/09/15
Si patine
N-
Totlf
Phone
~ Meaghan Smi~ Un1vers~anner
(562) 951-4102
so
Amount of
Ch;mge Order
Pending CS>
Campus: Project: Project No:
CFIS No:
FISCAL DATA
liU!n.b.er: Chapter/Item
San Luis Obispo Crandell Gvmnaslum lSelsmlcl ~ Q&.96.127
Approprjatjon AmQJUll
Early Work :wmkr
<cum ulatjve $)
Prelimjmuy
flM Transfers m
21/12 6610-301-6048(5) PWC Sl ,006,000
S41,SOO
Comments: Architect contract awarded 4/5/13. Schemtltics estimated for 11 /1 /13 and preliminary plans 1 /1512014.
Bidding 1/30/16
PROJECT SCHEDULE: l'WllApprov•Lor Worlln,~ ...... ,f .. d
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT - STA TE
W2rking
~ Transfers m
SJS.500
QUARTER ENDING: March 31, 2016
Construction Transfer m
so
REVERSION/AUGMENTATIONS
liQ1
Executive QnlW!
Previously Transferred
ID
Preyjouslv Transferred
((\
~ All Trans(ers
CNet after Reversion)
sao.ooo
Detail of Change Orders Issued/Pending:
PrtLimilnlf)' ftbn1 Trarnffr DOF "9p.,,.>l lo Proutd To lld Construction fund TDn1'ff Can~trucbon Complttton
Original Date 12112 06/13 ---Revised Date 10/14 10/14
Actual Date 12/14/14 01/20/15
Reasons for delays:
Slippage due to urgency of other Major Cap projects. Preliminilry Design approval package to CPDC 8/512014.
09/13 11/13
11/14
02119/16
04/15
06/16
s.lgn~ture
N""t
nt1t
Pllont
~~ Eric Chan Assodtlte University Planner
(562) 951-4109
Contingency Bal;mm<S>
so
Amoynt of Change Order Pending CS>
Campus: Project: Project No:
CFIS No:
FISCAL DATA
~ Chapter/Item
/13 6610-0
Comments:
PWC
San Luis Obispo Campyswlda Ut!llty lmproyemants .sL:1m 06.96.128
Appropriation
Am2lm1
S4,ooo.ooo
Early Work
Iri1mkr <cumulative $)
Pre!imjnary
fWI Transfers <S>
$86,000
Construction Documents @ 50%. Estimated construction completion-June 2016
1'i>P""<iol ""prowillofWO!lm1 PROJECT SCHEDULE: Pr!IHT'llft"J' Plln\ O"*'•I& l'routd to Bod
Original Date 04/14 05/14
Revised Date 09/14 ---.!.QLl!1 Actual Date 09126/14
Reasons for delays:
PG&E failure to provide a scope of work for Design Build. PG&E failure to execute construct1on.
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT - STA TE
QUARTER ENDING : March 31 , 2016
WWiDg .lmY.ting
Transfers <S>
Sl 16,000
Con1lrudJOl'I Sbrt
06/14
04115
11/1 B/14
Construction Transfer ($)
$3,796,000
( on,tn.ld:ion ComP'tbon
10/14
06/16
REVERSION/AUGMENTATIONS Mm Iml
Executjve
Qnlfil
,.....,._~
N'"'t
ti tit
-Phont
Previous Iv Transferred
ill
Previously Transferred
ill
All Transfers <Net after Reversion>
$4,000,000
Detail of Change Orders lssued/Pendi ng
Contingency Balances CS!
$99,757
Added scope for water conservation measures. S 137,620.00
Deductive change order for deletion of transformers SC618.S81 .60)
Amoyntof Change Order
Pending CS)
.c· ~ ----·--- -----------------------~-------------Eric Chao
Associilte University Pl:inn""e"'r-------------------(562) 951-4109
Campus: Bakt[Jfltld Project: Project No:
PE Bul!dlng H\(AC/Boof Raplacamant BA-1296
CFISNo:
FISCAL DATA
Num1w: Chapter/Item
Comments: CSU Bond Funded.
c
..
Approprjation
~
S3B9,000
Notice to Proceed issued 5-29-15. Schemi!lic design underway. Design 100% complete.
Early Work
Il:illllm <cymylatlye U
Pa:limjnary
run Transfers ($)
so
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT- CSU FUNDED
QUARTER ENDING : March 31 , 2016
~ ~
Transfers ($)
so
Construction Transfer m
so
Execytjyc Qa1cr.tl
REVERSION/AUGMENTATIONS NQt
Previously Transferred
ill
Previouslv TQnsfem:d
ill
~ All TQnsfers <Net after Reyers ion)
$0
Detail of Change Orders lssued/Pending
Contingency Balances ($)
so
Amoynt of Change Order
Pendjng ($)
Desrgn complete. Received 3rd party plan check & MRB approvals. NTP issued to one of the Joe contractors. Submittal being reviewed for start of construction in Summer of 2016.
PROJECT SCHEDULE:
Original Date Revised Date Actual Date
Reasons for delays:
~-.. """"""""'' 05/15
~-.io1wot1Jns
Omm&Un><ttdtakl
05/15 Con•tn1"-S"'1
11115
12115
C0011nK1Jon COf!IPl<llo•
10/16
05/16
Todt
,.,..... Chief,Jaci!ities Planninn
~951-4106~~~~~~~~~~~~~~~~~~~
Campus: Bakersfleld Project: Project No:
Human!tlas Office Bu!ldlng <Seismic) BA-1297
CFIS No:
FISCAL DATA
~ Chaoter/ltem
Comments:
PWC
CSU Bond Funded.
..
Aooropriatjon
&ruHml
$7,540,000
Ear!vWods
~ (cumylatjye $!
Received RFP being sent to finalists within two weeks. Design/Build Notice to Proceed sent to contractor 6/8/15. Programming I Schematic design underway. Sent documents needed for Nov 2015 BOT. 75J. SD complete. BOT approval Nov/2015. Preliminary Plans underway.
Preliminary
flan Transfeo m
$226,000
Submittal 1 OOJ. PP to CO office 212016 and Submittal 95% WO for review. A!>p,... .. or Aj>prow .. ofWorU\1
PROJECT SCHEDULE: rn•nw•arr"'"• °'""'"''""'•tdeo•.i Original Date 02/ 16 06/16 Revised Date Actual Date
Reasons for delays:
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT - CSU FUNDED QUARTER ENDING : March 31 , 2016
Working Qmrlng
Transfeo <S> Coo5tn1ctjon Transfer <S>
$265,000 $7,049,000
Executjve Qakr.1l
REVERSION/AUGMENTATIONS t:!m
Previously Transferred
w
Previously Transferred
w
Tu1i!l All Transfers <Net ;ifter Reversion!
$7,540,000
Detail of Change Orders Issued/Pending
Cotu.tnKban Start Con\trvc:boA Co.ple:t>on
07/16 03/18
03118 04/01/16
Phonr
Contingency Balances CS>
$329,000
Amount of Chama: Order
Pendingm
Campus: Project: Project No: CFISNo:
FISCAL DATA
lilunb« Chaoter/ltem
PWC
Bakersfield Nursing Bylldlnq HVAC Btplacemgnt BA-1298 ..
Approorjatjon
AIIli2wl1
Sl.100,000
EilrlyWork
ltiullkr: Ccumulilljve S>
Prellmjmuy
~ Transtecs m
$34,000
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT - CSU FUNDED
QUARTER ENDING : March 31, 2016
Wmkin& Qr;nyjng
Trans{ers <Sl
$48,000
Constructjon Transfer CU
so
Executive
~
REVERSION/AUGMENTATIONS ~
Previouslv Transferred
ill
Previously Transferred
ill
IS2l¥l All Transfers <Net ilfter Reversjon>
SB2.000
Comments: Detail of Change Orders Issued/Pending CSU Bond Funded. Design agreement issued on 7128/15. Working on schematic design. Design complete. Received 3rd party pliln check & MRB approvals. NTP issued to one of the Joe contractors. Submittals being reviewed for start date 5/4/16
PROJECT SCHEDULE:
Original Date Revised Date Actual Date
""' ....... , rni-n.rr"""
07115
Al>-ololWorlJo&
Or.-.c•PnKttdtobl
01/16 ConttnHtlon StMt
07/ 16
12/15
Coo11nKllOnC~l>o•
05117
08116 ......
Contjngency Balances($)
so
Amount of Change Order
Pendjngm
Reasons for delays: Tide- Chief, Facilitie,~s.!...Pl!!!a!.!!nn!.!!i!!o.._ _________________ _
""°"' (562) 951-4106
Campus: Project: Project No: CFIS No:
FISCAL DATA
~ Chapter/Item
PWC
Bakersfield Central Plant Coollng Towpr BHlactmtnl BA-1354 ..
Approprjatjon
Amlllm1
$2,887,000
Early Work
~ Ccumulatjye Sl
Pre!imjn;uy
&ll Transfers <S>
$50,000
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT· CSU FUNDED
QUARTER ENDING : March 31 , 2016
WgWng I2wi.iog
Transfers <Sl Constructjon Transfer m
$58,000 $2,887,000
Executjye
Qa1crll
REVERSION/AUGMENTATIONS t!Q1
Preyjously Transferred
ill
Previously Transferred
ill
~ All Transfers CNet after Reversion)
$2,995,000
Comments: Detail of Change Orders Issued/Pending CSU Bond Funded Work started. Demolition complete. 90% complete. Took beneficial occupancy, and extended completion time by approximately a month to finish punch list and other incidental and this change order.
PROJECT SCHEDULE:
Original Date ReV1sed Date Actual Date
Reasons for delays:
Al>lll'"'llof
"'"""""'""'' 04/15
Al>"""'>lofWorblc °'"""'1•"1K•rclloaid
05/15 (Oftttluctaon Sbtt
10/15
07115 09/09/1 5
Cori1ovctioh Compttbon
0311 6
04/16
Tittt Chief, Facilities J>la!1nio&
Conti agency Bal;mmm
$141 ,857
Amount of Change Order
Pending <S>
"""" ~562}_~ 1~10=6'--~~~~~~~~~~~~~~~~~
Campus: Project: Project No:
CFIS No:
FISCAL DATA
~ Chapter/Item
PWC
&.bl.'2 Boller Rgp!acamtpt. pb. 1 CH.1303 ..
Aporopdalion
Ammm1
$3,383,000
Early Work I.ci1lllfer
(cumulative S>
Preljmin3'V
flm Transfers CS>
$161 ,000
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENl)
QUARTERLY CAPITAL OUTLAY REPORT· CSU FUNDED
QUARTER ENDING : March 31 , 2016
Working J2mting
Transfers{$)
$182.000
Constructjon Transfer ($)
so
Executive
~
REVERSION/AUGMENTATIONS
~
Previously Transferred
ID
Previously Transferred
ID
~ All Transfers <Net after Reversion>
$343.DDD
Comments: Detail of Change Orders Issued/Pending CSU bond funded. 9/15 Status: This project has not stilrted yet RFQ/RFP to out SepVOct 2015. Received $5.004 million in funding. 12/9/1 S received CM proposals. 3/16 Status: Awi!rded CM@Risk contrilct to Otto Construction. Currently workmg on Schematic Design/Preliminary Plans.
PROJECT SCHEDULE:
OrigiDi!I Date Revised Date Actui!IDi!te
Reilsons for delays:
Ji.fJlrrlf•lof
l'ttlnm"7"'"'
06/15
03/16
Apora .. 101 WOf\Jn' lltHln& I -ttd to ltd
12/15
02/16
(Oft11N(-$brt
06/16 ComlN<-Comolt-
12/17 Sip!•IU<'t
N""' Mei!ghanS~ Tidf
~hOftt
Contjngenr,y Balances ($)
$0
Amount of Change Order
Pending($)
Campus: Project: Project No: CAS No:
FISCAL DATA
~ Chi!pter/ltem
PWC
Comments: CSU Bond Funded.
PROJECT SCHEDULE:
Origini!I Date Revised Dille Actual Date
Reasons for delays:
Channal lslapds StHm Haallpg Svstam Raplacamapt
9:1m ..
S240.000
~;I.,
l'nlomnvy ""''
07/lS
Prelimjnary &a
Trans(en <Sl
S6,000
~-~·•won;nc o.-,.h1K .. d1Dlod
01/16
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT}
QUARTERLY CAPITAL OUTLAY REPORT - CSU FUNDED
QUARTER ENDING: March 31, 2016
~ ~
Trnnsfers ($)
S17.000
Con\tru<OO.. SUrt
07/16
Co05tructjon Tra05fer ($)
so
Coft11111c11on C-llo•
06/17
Executive ~
REVERSION/AUGMENTATIONS liQ1
Previously Transferred
.w
Previously Transferred
.w
Im! All Transfers <Net after Reversion>
S23.000
Detail of Change Orders Issued/Pending
Contingency Bi!lances CS>
$0
Amoyntof Change Order
Pending m
Tittt
"'Oftt
_Chief....Eacilities Plannin
(S62X9SHt0=6-------------------
Campus: Project: Project No:
CFIS No:
FISCAL DATA
~ Chapter/Item
Comments:
PWC
CSU Bond Funded.
PROJECT SCHEDULE:
Original Date
Revised Date
Actual Date
Reasons for delays;
ChMn!tl Islands Eltcldcal Pagel Uooradg
&1:1m ..
Approprjatjon
&n!llm1
S301,000
EarlvWork
~ !cumulative Sl
Prelimmary
ftm Transfers <Sl
S7.000
"", ....... ,nlimin#J' '1an1
Ao-al•IWornnc
°"""'' & -•td to Id
07115 01/16 ---
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT - CSU FUNDED
QUARTER ENDING : March 31, 2016
~ ~
Transfers m
S19,000
Coostructjon
Transfer m
so
Executive
QWt..!
REVERSION/AUGMENTATIONS M2l
Previously
Tri>nsferred
ID
Prevjous!y
Transferred
ID
!ml All Transfers
<Net after
Revcrsjonl
$26,000
Detail of Change Orders Issued/Pending
Co•111NC-Sl#t Con1tnlcbon Compltbon
07/16 06/17 5tpitvrl
Nunt
Contjngency
Balanm<S>
so
Amount of
Chilo" Order Pendjagm
Titlt Chief..Jacl!ities ~an.n[!l __ Phont (562) 951-4106
campus: Project: Project No:
CFIS No:
FISCAL DATA
~ Chapter/Item
Comments·
PWC
CSU Bond Funded.
PROJECT SCHEDULE:
Original Date Revised Date Actual Date
Reasons for delays:
Channa! Islands Napa Hall Roof Rtplacpment
kl:m1.
Approprjatjon
Arrll2lm1
SJ15,000
Early Work
~ !cumulative S)
Pceljmjnarv
&a Transfea m
S7,000
,lpsi ....... ,
htllft'lllnMYP'tMI ..,_110rwo,.,,,_
0.-1•-·•d"'lid 07/lS 01/l6
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENn
QUARTERLY CAPITAL OUTLAY REPORT - CSU FUNDED
QUARTER ENDING : March 31 , 2016
Ymr.hlng
12.wting Transfers m
s20.ooo
Con$l[uctign Transfer m
so
Executive
Qrd.rut
REVERSION/AUGMENTATIONS Mot
Previgusly Transferred
ill
Previgusly Transfam:d
ill
~ All Transfers !Net after Reversion>
S27.000
Detail of Change Orders Issued/Pending
('°"'trvcbonStlrt CmHtrvc:Oon CompltbOn
01/16 06/17 5'11'atur'
Namt
T'ttt -·
Cgntingeoc;y Balances CS>
so
Amount gt Change Order
Pendjng<S>
Campus: Project: Project No:
CFISNo:
FISCAL DATA
NILmlw: Chapter/Item
PWC
Comments: CSU Bond Funded.
PROJECT SCHEDULE:
Original Date Revised Date Actual Date
Reasons for delays:
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT - CSU FUNDED QUARTER ENDING ; March 31 , 2016
Cbannal lsland1 Dining Commons Expansion Roof Btplacemant ~ ..
Approprjatjon Amgwtl
ssoo.ooo
Preliminary
flan Transfers CSl
S12,000
~ l2rmi.ng
Transfers CS)
S23,000
Construction JCj!OSfer ($)
so
Executive Qrdfil
REVERSION/AUGMENTATIONS lia1
Previously Transferred
ID
Previou$1v Transterred
ID
~ A!! Transfer$ <Net after Reversion>
us.ooo
Detail of Change Orders Issued/Pending
Cootjngency Balances (S)
so
Amount of Change Order
Peodjngm
~ ... , .... ....,,l'WI. 07115
""...,..i.rw""'°' °"*1n&& Procttd ta Bid
01/16 Contbwbon Stlft
07/16 Con1trvc00h C~tlcn
02/17 ·(}'°="'------S.llUturt
H""'t
Tdjt -
Campus: Project: Project No: CFIS No:
FISCAL DATA
~ Chi!pter/ltem
c
PWC
Comments: CSU Bond Funded.
PROJECT SCHEDULE:
Origini!I Date Revised Date Actual Date
Reasons for delays:
pomlnqutz Hiiis
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT - CSU FUNDED QUARTER ENDING: March 31 , 2016
Central plant Coollng Towgr Baplacamenl Ph. 1 PH-1304 ..
Approprli!tjon
AnHlWl1
$191 ,000
Sl.859.000
Ei!rlyWork
~ Ccumuli!live Sl
Preliminary
.l!liD. Transfers m
$0
$60,000
~ Jlmting
Tr?osfers <Sl
$0
$77,000
Construction Transfer m
$0
so
Execytjye
~
REVERSION/AUGMENTATIONS Mm
Previoos!v Transferred
ill
Previously Transferred
ill
Tutru All Transfers !Net ?ftec Reyersjonl
so
$137,000
Detail of Change Orders Issued/Pending
Aw""'""' ~.iorw.,.,.,
......... "Y""" DBWl•&•'1octtdto lid
04115 06115 -02/16 05/16
03/01/16 ---
(01utructaon sun 08/15
07/16
CanilJ\KbonCM!~
04/16
11/16 Sl&nlt.Ytt ~ N.,.t Eric Ch?n
Contincencv Bi!l?nces ($)
so
so
Amount of Chaoge Order
Pendlnc CSl
y,~f Associ?te University.fl?nne,,r _________________ _
Phont (562) 951-4109
Campus: Project: Project No:
CFIS No:
FISCAL DATA
~ Chapter/Item
Comments: CSU bond funded.
PWC
East Bay E!tctrlcal lpfrastructur11 UPO@de. Ph. 28
9:11ll ..
Aooroorjatjon
6!ru2llnl
s2.121.ooo
Early Work
lrilmW: !cumulative U
Pre!iminarv
flm Transfers m
so
$4,734,000 low bid received for Base Bid, Add Alt #1 . and Add Alt #2. Notice of Intent to Award issued 6/3115.
PROJECT SCHEDULE:
Original Date Revised Date ActUi!IOate
Reasons for delays:
Appronlor ........... .., .......
02/15
1opp,.,..ro1w.....,, Orm•s•Procud totd
04115
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT· CSU FUNDED
QUARTER ENDING: March 31, 2016
~ QCilW.in&
Transfers <S>
S24,000
COl'lstru<tloftSUrt
06/15 07/15
07/07115
Construction Transfer CS>
$2,097,000
con,uvcboft.Comolt bon
12115
05116
Executive
~
REVERSIONfAUGMENTATIONS ~
Previously Transferred
.w
Previously Transferred
.w
~ All Transfers !Net after Reversion>
s2.121 ,ooo
Detilil of Change Orders Issued/Pending
Contincency Balances !$)
S319,000
Amount of Ch;101!! Order Pending m
CO # I : $33.348 issued 9/ 18115 for building substation testing. and credit for ductbank re-route. CO #2: $270.493 for a totill project construction cost of $5,037,841
T1tlt
Subcontractor substitution request i!pproved on 1213/15 due to non-performance. Phont
Campus: Project: Project No:
CFIS No:
FISCAL DATA
~ Chapter/Item
fmwl E!ectrfcal !nfrastructym Upgrade fB:lll
Aooropriatjon
&nsllm1
Early Work
~ Ccumylatiye S>
Prelimjn;uy
f.l.iln Transten CSl
PWC S31.300,000 S650,000
Comments: Original project number requested under Utilities Infrastructure. Funding: SI ,300,000 - CO Funding I SJ0,000,000 Equipment Lease Financing.
PROJECT SCHEDULE:
Original Date Revised Date Actual Date
Reasons for delays:
~,,.,
"'""""°"-· 02/14
07/01/14
~pn1YilofWotl.ift1
lltl*i•& & Plomd lo lid
05114
12/01/14
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT - CSU FUNDED QUARTER ENDING: March 31, 2016
W2rls.i.ag
~ Transfers (S)
Constructjon Transfer (S)
s l, 135,000 $29,515,000
Construlbon SUrt ContllVC~Oft Compktion
08/14 02/16
09/16 01/20115
REVERSION/AUGMENTATIONS Ml21 I.o1al
Executive
Qrdec.tt
Previously Transferred
111
Preyjoysly Transferred
111
All Transfers !Net after Reyersjonl
$31.300,000
Detail of Change Orders Issued/Pending Approved CO (#1-11}: $676,003.82 Pending CO(#): $90,302.03 Contingency Balance: S
So&Nbltl
"""" Eric Chan 1'U• _ Assoc!ate University Planner
Continsency Balances C$l
$5,328,000
Amount of Change Order
Pending CS>
,,..., (562) 951-4109;..._ __________________ _
Campus: Project: Project No:
CFIS No:
FISCAL DATA
li.U.mlm Chapter/Item
PWC
Comments: CSU Bond Funded.
PROJECT SCHEDULE:
Original Date Revised Date Actual Date
Reasons for delays:
.Erliwl Gas. Sawtr and Sloan Line Upgrade
fB:llH .. Approprjatjon
Am.2.Unt
$3,979,000
'""""II ol
Early Work
l£i1lllW: (cymulatjye S)
Pre!imjnary
flill1 Transfers CS>
$135,000
,,. ... ..,,ri.n. 1.p-.iorwoni.1
llmnn& • "1Kctd to lid
07/15
03/16
02/16
08/16
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT - CSU FUNDED
QUARTER ENDING : March 31 , 2016
.wm.ing ll.Wdll.g
Trans{ers CS>
$148,000
Constructjon Transfer <Sl
$0
Executive
Q.cdcr.!
REVERSION/AUGMENTATIONS lim
Previously Transfs:m:d
ill
Previously Transferred
ill
!QW
All Transfers <Net after Reversion)
$283,000
Detail of Change Orders Issued/Pending
ftfl\W111GO SIMt
08/16
12/1 6
COt1strucdonComplct>an
02118
12/17 \11Nlllro ~c::::::::-H Mnt Eric Chan TC. Associate University Phmner
Contlor:ency Balances !Sl
so
Amount of Change Order
Pending($)
rt.Ont (562J.1l51-4J,..:0.:..9 __________________ _
Campus: Project: Project No:
CFIS No:
FISCAL DATA
~ Chaoter/ltem
Comments: CSU bond funded.
PWC
PROJECT SCHEDULE: Original Date Revised D;:ite Actual Date
Reasons for delays:
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT· CSU FUNDED
Fullerton Chilled and Hutlng Hot Water Line Beplacemtnt .E.Ll:1liZ ..
Aooroorjation Ammm1
Eady Work illmm
<cumuli!tjve S>
Preliminary flrul
Transfers <Sl
~ lmwlng
Transfers m
QUARTER ENDING : March 31, 2016
Construction Transfer CS> ~ Qnlru
REVERSION/AUGMENTATIONS ~
Previouslv Transferred
ill
Previously Transferred
ill
$2,582,000 $72.000 $113,000 $0
IQlal All Transfers <Net after Reversion>
$185,000
Detail of Change Orders Issued/Pending
llj>p,..alol
l'ttiirrun"JPIMI
06/15
04/01/16
-'1>!>,..ol olWoob>5 DrMrnna a. ho<ttd to Bid
12115
04/01116
ConiU'UtbOn SW1
06/16 Conttt\ICUon Com"4ttsoh
06117 5'Cn•l:urt
Hom<
lidt
~ Me~h~mlth Universi!k' Planner
Contingency Balimmm
$0
Amount of Chan1e Order
Pendin1 <S>
"'•"' (562)951-4102 - -----------------
Campus: Project: Project No:
CFISNo:
FISCAL DATA
Fullerton Llbrarv ISelsmlcl f.U.:.1.1.111 ..
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT· CSU FUNDED
QUARTER ENDING : March 31, 2016
REVERSION/AUGMENTATIONS ~ !91i!l
~ Chaoter/ltem
Appropriation
6mmml
Preljmjnazy
fun Tran$fers CU
~ ~
Jrrnfen !Sl Construction Transfer CS>
Executive
Qrdru
Previously Transferred
ill
Previously Transferred
ill
All Transfers CNet after Reversion)
Contingency Balances<S>
PW cl S6.DOO,OOO S166,000 $197,000 so
Comments: CSU bond funded. A Task Order and Notice to Proceed was issued to Pfeiffer Partners to commence Pre-Design Services for Programming. Building Systems Assessment. and Code/Accessibility Analysis. Pfeiffer Partners completed Pre-Design Services for Programming. Facilities "Building Systems" Assessment. and Code/Accessibility Analysis.
PROJECT SCHEDULE:
Original Date Revised Dilte Actual Date
Reasons for delays:
AoP111Y.tor
Prtlimo..ry ""''
06/15
03/16
Aopnn.tolWorb\1
°"*'"I &P""ttd to Bid
01/16
09/16
Comtruction Sb.rt
02/16
10/15
Preliminary Plans date 3116 = Pre-Design Services Project Team; Pfeiffer Partners, MHP Structural Engineers and P2S Engineering. Construction start 10/15. Floors completed weeks ahead of schedule.
Can1truction Compl:tbon
06/17
OB/17
$363,000
Detail of Change Orders Issued/Pending
fOC 1341001.00: S2B7,195.56 ·Approved: Fully Executed J341001.01: S2B7,195.56 - Approved: Fully Executed J341001.02: $327,555.76-Approved: Fully Executed )341001.30: SO - Cancelled )341001 .04: S 127.176.51 - Approved: Fully Executed J341001.05: SB0,664.79 -Approved: Fully Executed
_:·"'~ H.,.. Meagtla Jl Titlt
,,,,,.. _ Universi!l!!Janner
~62)_!!5 l :.4102
so
Amount of Change Order Pending CU
Campus: Project: Project No:
CFIS No:
FISCAL DATA
~ Chaoter/!tem
Comments: CSU bond funded.
PWC
PROJECT SCHEDULE:
Original Date Revised Date Actual Date
Reilsons for delays:
Fullerton Cpntral Plant Cbll!er Ugqradp. pb. 1
Bl.:lll!I ..
Aporoorjiltjon
AIIl2.Un1
$1,689,000
...,_ ... ,
Early Work
rumm <cumulative $)
Prelimjmuy
flm Tran5fers CS!
$180,000
,., .... .....,"""' Ajlpnw,.olWcriJo&
"'"""' & Pn><ttd\o Bod 01/16 07115
04/01/16 04/01/16
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT - CSU FUNDED
QUARTER ENDING : March 31 , 2016
Wl2Iking
~ Transfers !Sl
$199,000
(Oftl\rllttion SW!
02/16
Construction Transfer CS!
$0
Canttrucbon Complttion
06/17
~ ~
REVERSION/AUGMENTATIONS
~
Previously Transferred
.w
Previously Transferred
.w
~ All Transfers <Net after Reversjonl
S379,000
Detail of Change Orders Issued/Pending
SIV11tun: ~ H- Meaghan 5~~~----·
Contjngency Bijlanm!Sl
so
Amount of Change Order
Pending CS!
T1t1t _ Univers!!Y.f!anner ···- ---------
Phoot _!?62t 9S 1-4102
Campus: Project: Project No:
CFIS No:
FISCAL DATA
Nu..mlm Chapter/Item
PWC
Humboldt SwHcbgear Reolacament HU-1310 ..
Aggroprjatjon
&nwtn1
Sl.500,000
Early Work
mmtu !cumylj!tiye Sl
Preliminary
f.lil.n Transfers <S>
S35,000
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT - CSU FUNDED
QUARTER ENDING : March 31 , 2016
Yi2rkin& ll.ci!m.ai
Transters CSl
S54,000
Constructjon Trj!ns{er CS)
so
Executive
Qrdei:..tt
REVERSlON/AUGMENTATIONS ~
Pn:vioysly Transferred
ill
Previously Transtem:d
ill
lD.til.I All Transfers <Net after Reversion>
SB9,000
Comments: CSU Bond Funded.
Detail of Change Orders Issued/Pending
None pending. Design getting underway. The RFP wils issued and design recently awarded. We are still working to finalize contract documents but expect such to be complete this month with design underway in May_ Design may further influence the construction schedule based on the opinion of the engineer with regard to how to do the work efficiently while maintainmg operation of the campus.
PROJECT SCHEDULE:
Original Date Revised Date Actual Date
ReilSons for delays:
Awvw ... ,
"'""'"'"" ,..,,, 02116
07/16
~,.orwon.in1
Drmnc. l'nKttd to lid
08/16
02/17
Corntru<Oon Start
05/17
05/17
Currently in the stage of issuing RFP for the design effort. Final funding allocations and budget identificiltion data was delilyed until November thus affecting the start of the on campus procurement effort.
Con11Ncllorl Comol<tioft
10/17
10/17 N-.
Titlt -
Contincency Bj!lances CS!
so
Amount of Change Order
Pending CSl
Campus: Project: Project No:
CFIS No:
FISCAL DATA
~ Chapter[!tem
PWC
Humboldt Fire Suppression SvstlfD Replacement HU·1311 ..
Approprjatjon &lli2Yn1
$250,000
Early Work Irilm.W:
Ccymu!atjye S>
Preliminary fWl
Transfeo CS>
$7,000
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT· CSU FUNDED
QUARTER ENDING ; March 31 , 2016
~ Qmdng
Transfers CS>
$11,000
Constryction Tramf@c CSl
so
Executive Qulru
REVERSION/AUGMENTATIONS ~
Previously Transferred
ill
Previously Transferred
ill
Im! All Transfeu <Net after Reveoionl
$18,000
Comments: CSU Bond Funded. Still on schedule.
Detilll of Change Orders Issued/Pending None pending.
The RFP has been issued and contract recently awarded; we are still in the contract execution stage but expect design to get underway soon. We anticipate being able to complete this project while facilities ilre occupied due to the nilture of the scope of work. If such is not possible as design progresses, we mily choose to execute construction May 17·Aug 17.
PROJECT SCHEDULE:
Original Date Revised Dille Actual Dille
Reasons for delays:
~ .. .., Pn"""-Y """
01116
06/16
AjlprawalolWOltJos .,,..,..,,.,,.,.tdtohl 03/16
09/17
Con,.trvtbon Sbtt
OS/16
12117
Currently in the stage of Issuing RFP for design effort. Final funding allocations and budget identification data was delayed until November thus affecting the start of the on campus procurement effort
Con•t1v<_ C.,.p1t110n
11/16
06/18
"""' fjdt
,,, ...
Contjngency Bahmces<S>
so
A!Dountof Chance Order
Pending CSl
Campus: Project: Project No:
CFISNo:
FISCAL DATA
NLunW Chapter/lls:m
PWC
Humboldt Substation Replacement HU-1312 ..
Aopropcjatjon
Arru2.Un1
$687,000
Early Work
Iriln1W <cumulative Sl
Prelimjoarv
~ Transfs:rs CS>
S16,000
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTtA Y REPORT - CSU FUNDED
QUARTER ENDING : March 31 , 2016
WQddng
~ Transfers CU
S31 ,000
Construetjon Transfer CS>
so
Executjve Qa1crlt
REVERSION/AUGMENTATIONS ~
PCl!!vious!y Transferred
ill
Preyjously Transferrs:d
ill
~ All Transfers
CNs:t i!fter Reversion>
S47.000
Comments: CSU Bond Funded.
Detail of Change Orders Issued/Pending None pending.
Design getting underway. he RFP was issued and design recently awarded. We are still working to finalize contract documents but expect such to be complete this month with design underway in May_ Design may further influence the construction schedule based on the opinion of the engineer with regard to how to do the work efficiently while maintaining operation of the campus.
PROJECT SCHEDULE:
Original Dale Revised Date Actual Date
Reasons for delays:
Apc>""olof Pntitnin,,,,.,,.,
06/16
07/16
Ajl-alolWorlinc
DRMn1 • l'n><ttd to Id Co•Hb'vcbon Swt COftnrvcbOfl Compltbon
11/16 OS/17 12117
02117 05/17 10/17
roe. _ Chief. F-un.• ~..- , ""'""""
Contincency Balanmm
so
Amount of Change Order
Pending <S>
Currently en the stage of issuing RFP for design effort Final funding allocations and budget identification data was delayed until November thus affecting the stilrt of the on campus procurement effort
-· ~2) 951-4106 ___________________ _
Campus: Project: Project No:
CFISNo:
FISCAL DATA
~ Chijotec/ltem
Comments: State Playhouse CSU Bond Funded
PWC
LosApgefas Utll!t!es !nfrastructunt LA:Ali ..
Approorjijtjon AmQWll
$36,253,000
E¥1yWork
l!i!Dmr Ccumu!atjye U
Preliminm
flm Transfers CS>
$1 ,185,000
Waiting for consultant's proposal.
PROJECT SCHEDULE:
Original Date Revised Date Actual Date
Reasons for delays:
"°'""' ... ' ,.,...,,.,llY Plans
08/15
08/ 16
""'""""'won.., DmM1 Ii Proud ta 1.:1
04/16
Q!{!Z
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT - CSU FUNDED
QUARTER ENDING : March 31 . 2016
Wmkin& l2Wiinl
Transfers ($)
Sl .179,000
Construction Transfer m
so
Executive Qulfil
REVERSIONfAUGMENTATIONS ~
Previously Transferred
ru
Previously Transferred
ru
~ All Transfers CNet after Reversion>
$2,364,000
Detail of Change Orders Issued/Pending
C0"11N<l>on Swt
07116
04/1 7
Con\'tf\lttion Com'ltr l!IJn
04/18 11/18 Sil»•!u ..
N..,,.
T1t11:
,,,..,,
~ ~
Meaghan Smith
University Planner
(562) 951-4102
Contingency 8alijnces ($)
so
Amount of Change Order Pending m
Campus: Project: Project No:
CFISNo:
FISCAL DATA
~ Chilpterf!tem
Comments: CSU Bond Funded
PWC
PROJECT SCHEDULE:
Original Date Revised Dilte AdualDate
Reasons for delays:
Los Angeles
Stllmlc Upgcad•. State Playhouse Theatre .LA:1m ..
Aooroprl?tion
Mllllml
Sl ,156,ooo
~p,...alot
Early Work
~ <cumulative S)
~C!:limiDil0£ f.lm
Trilnsfers_Cll
S54,000
"'•"'"""' .,.., Aopivwalotw....,,
Ot_.,&"1Kttdto80!
06/15
09/16
12/15
03/17
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERL V CAPITAL OUTLAY REPORT - CSU FUNDED QUARTER ENDING : March 31, 2016
WQrkin& ~
Transfers !Sl
S45,000
ComtNcbon StJ.tt
05/16
04/17
~QDilC!,"tiQ!l Iransfer_m
so
Co"'tnutionComplttion
10/17
09/18
REVERSION/AUGMENTATIONS ~
Previs;iusly ~
All Transfecs Executive T11msfem:d
ill
Previously Trmferred
ill CNet after Co!]tjagency
Amount of ChaneOrdec Pending CS> Qrdlli! Reversjs;ia> Balilam CS>
$99,000 so
Detail of Change Orders Issued/Pending
$11Nb>rt ~ Mea.1.han ~th
-----------------~
tj-
l11:1:! Universl~ Planner .......
(562) 951-41_92 ------------------
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT - CSU FUNDED
Campus: Project: Project No:
CFISNo:
FISCAL DATA
~ Chijoterfltem
Los Angeles Physical Sciences (Seismic) .LA:11!!!. ..
Approoriatjon
Ammm.t
Ear(vWork
Tulnmr <cumulative S>
Preliminary
ffiln Transfers !Sl
wmi.ng Qmdng
!ransters m
QUARTER ENDING : March 31 . 2016
Construction !rans(er !Sl
Executive Qr.m1t
REVERSION/AUGMENTATIONS ~
Previouslv Transferred
ID
Previously !rans(erred
ID
IQtll
All Transters !Net after Revi:rsion>
Contingency Billances<S>
Amount of Chijnge Order Pending CS>
PWC s 10,000,000 S311,000 S345,000 so S656,000 so
Comments: CSU Bond Funded Study in progress.
PROJECT SCHEDULE:
Original Date Revised Date Actual Date
Reasons for delays:
"iJp..,.olol
PrtLimin"Y-Plln'
07115
11/16
~P""" a1wornn1 -1•Ptvu«lto8id
02/16
11/17
Camtrucbon swt
08/16
12/17
Hiring a CM@Rlsk - this will hold document completion while hiring 'CM'. Possibly Ci.In proceed with early construction (seismic retro). Start with money available while complete. Final interior partition Willls (non-structuri.11).
Detail of Change Orders Issued/Pending
Cotntrvcbon ( ompi. tion
02/18
05119 54n•tu .. ~ N.,,,. Meaghan~h l•d~ _U_l}jy~ihl(a..i:m.er. ___________________ _ ,....,,
~621J!SJ3102~------------------
Campus: Project: Project No: CFISNo:
FISCAL DATA
~ Chapter/Item
Comments: CSU Bond Funded
PWC
LosAngelas E!tctrlcal Qlstrlbutlon Rtplacement. Ph. 1 ~ ..
Appropriatjon
~
$4,818,000
E¥1vWork
illmkr <cumulative S)
Preliminary
llin Transfers {$)
S161,000
Completion date Is for Phase I.
THE CALIFORNIA STATE UNIVERSITY (OEPARTMENl)
QUARTERLY CAPITAL OUTLAY REPORT· CSU FUNDED
QUARTER ENDING : March 31. 2016
Wo.dsin& Q.wrlng
Transfers (S)
S176,000
Construction Transfer <Sl
so
~ Q[gfil
REVERSION/AUGMENTATIONS ~
Previously Transferred
.w
Prcvjously Transferred
.w
!ml All Transfers <Net after Reversjonl
$337,000
Detail of Change Orders Issued/Pending
The total project includes Phase II which is anticipated to be funded in summer 2016. Working on consultant's cantrilCt for schematics design.
PROJECT SCHEDULE:
Original Date Revised Date Actual Date
Reasons for delays:
.-Opro,.lol
P'ttlmnvtrl•• ..
06/15
06/ 16
"OProt>I or w.-c DtJMnc&-.. dtalOI
12/15
12/1 6
( OMtnltfJon SUit
06116
06/17 ~ Co•nV'UC:tion Comptttiorl
12/17
12/18 Sipu1t.Yrt
Nwt Meagh~ -l1Ut Universit.v Planner
"'°"' (562) 951-4102
Contingency Balances CS>
so
Amount of Change Order
Pendjng<S>
Campus: Project: Project No:
CFIS No:
FISCAL DATA
liwnlw: Chapter/Item
Long Beach utU!t!ts lnfrastructym lmproverntnts .LD.:1W ..
Aporoprjatjon
Amwm1
Early Work IGlllW;
Ccymylativc S>
Prelimjnary
&a. Transfers CS>
PWC $21,614,00D $886.000
Comments: CSU Bond Funded.
PROJECT SCHEDULE:
Original Date Revised Date Actual Date
Reasons for delays:
~p,,,.,.!ol
l'rtli-."J""'•
l0/15
___Q.!D6
~-.!olWo""'J
O.-,•l'rll<•tdlollid
05/16 02117
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT- CSU FUNDED
QUARTER ENDING : March 31. 2016
~ ~
Transfers CS)
S906.000
(O.-Jb'\Kbon stut
!!!16 05117
Constryction Transfer CSl
so
Con•tnl<l>oftC ..... bon
DS/18 08/18
REVERSION/AUGMENTATIONS N!21 Im!
Execytjve
OWr.1t
Previously Transferred
.w
Previoystv Transferred
.w
All Transfers <Net after Reversion>
Sl .792.000
Contingency Balances m
so
Amoynt of Change Oeder
Pendjn1 CSl
Detail of Change Orders Issued/Pending
SiP'Jtufl:
H""' Totlt
l'llont
~~~~~~~~Eric Chao
Associate Universiri:J'l=an=n"'e"'"r-----------------(562) 951-4109
Campus:
Project: Project No:
CFIS No:
FISCAL DATA
~ Chanter/Item
Comments:
PWC
CSU Bond Funded.
Lgng Bgcb Hot WiJlar Piping Beplacamtnt .pb. 1 LD:lill ..
Aooroprji!tion
Alru2lm1
S3,560,000
Ei!rlyWork
mmru Ccymyli!tiye S>
Preli mi nm fWl
Transfers m
5345,000
SOiiciting proposals for design documents 3/17 /1 S.
PROJECT SCHEDULE:
Original Date
Revised Date
Actual Date
Reasons for delays:
Appronlof Prtluninary .....,,
05/15
12115
Ajipro.,.lotWoitu.c
Df1Mn&& h'Or:ttd ta 19d
07115
11/15
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENn
QUARTERLY CAPITAL OUTLAY REPORT- CSU FUNDED ,
QUARTER ENDING: March 31, 2016
~ .lmWlng
Tri!nsfm<S>
Construction
Transfer m
$288,000 $2,927,000
Construct>on start. C0r1sb'v~tton Con1'1t:ctl
09/15 06/16 03/16 12116
03/14/16
Executive QrdU
REVERSION/AUGMENTATIONS ~
Pn:v!oys!y
Transferred
ID
Previously Transferred
ID
Im! Al! Transfers
<Net i!fter Reyersjon)
Sl,560,000
Detail of Change Orders Issued/Pending
No chi!nge orders processed.
SO Potentii!l Change Orders.
Stp.11turt ~ N..,,t Eric Chan
T.itlt -~socii!le Univers,ilY Pli!nner Phont _1562) 951-4109
Contingency
Bal;mcesm
$241 ,000
Amount of Change Order
Pending CS>
Campus: Project: Project No: CFISNo:
FISCAL DATA
~ Chiloter/ltem
PWC
Comments: CSU Bond Funded.
Long811cb Electrlcal Subayllon & §witches RH!actmept J&:1fil ..
Prelimjnarv
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT· ' CSU FUNDED
QUARTER ENDING : March 31 , 2016
~ ~
REVERSION/AUGMENTATIONS Mm
Previously Transferred
Previously Transferred Aggroorjillion
Am2lm1
E;Jr!vWork
illmkr Ccumuliltjve $)
flan Transfers !S> Transfers<S>
Constryctjon Transfer CS>
Executive Quk[.1 ill ill
$1,86S,OOO $S2,000 $62,000 $1 ,7S1,000
Iml All Transfers !Net after Reyersjonl
$1,86S,OOO
Contjnunc;y Bal;mccs !Sl
$106,000
Amount of Change Order
Pending CS>
Soliciting proposals for design documents 3/1711 S.
Detail of Change Orders Issued/Pending No change orders proce.ssed. $30,000.00 Potential Change Orders.
PROJECT SCHEDULE:
Original Date Revised Date Actual Date
Reasons for delays:
N>pra'tllaf r..lomftM)'PIMl1
04/15 07115
ApprawJiofWOMl _,•rraurdlo tWI
05/15
10/IS
CoHtrvctton Swt
07/IS 12/\S
01/04/16
COlltb'U<ttonC~
02/16
09116 ~""tu" ~ H..,,r Eric Ch...;il_n _______________________ _
11dt _ Associate Universl~!"a"n""n""e,,_r ________________ _ Phont (562) 951-4109
Campus: Project: Project No: CFIS No:
FISCAL DATA
lli!lll!m Chapter/llem
Comments: CSU Bond Funded
c
Maritime Academy Ememency Generator. SIMIPata Center MA-1317
Approprjatjon
~
S246,000
Early Work
:rumm <cumulative S>
Prelimjnilry
fW. Trans(ers <S>
$0
Project consultant has been hired and project drawings are being completed.
PROJECT SCHEDULE:
Original Date Revised Date Actual Date
Reasons for del;iys:
-'!IPtv<olol Prtllninuy f'tlnl
.AppnwilolWOfl.ln,
°"*1•C lProut<l to ~id
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT - CSU FUNDED
QUARTER ENDING : March 31 , 2016
WQrking
~ Transfers <S>
$0
Construction Tr;msfer CU
$0
~ QNeLll.
REVERSION/AUGMENTATIONS NQ1
Previously Transferred
ill
Previously Transferred
ill
~ AU Transfers <Net after Reversion>
so
Deli!il of Change Orders Issued/Pending
Con1trucbon SW1
06/15
05/16
Con,trv<tlon Comptetio"
12/15
10/16 Soclt>W ..
H..,,.
Title
"""''
~ Meaghan~ University Planner
(562) 951-4102
Contjngency Balilnces CS>
so
Amount of Chi!nge Order
Pendjng <Sl
Campus: Project: Project No:
CFISNo:
FISCAL DATA
~ Chapter/Item
Comments; CSU Bond Funded
c
Maritime Academy Elrp Alarm Upgrade MA-1318 ..
Ei1Clll~Ck ADRCQRCii!ti!m illlllm
Am.!l.Unt. (S:!.l!DUli11i~ il
SB9,000
e~li!DiDil!:ll fli!!l
!CilDifilrs !il
so
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT· CSU FUNDED
QUARTER ENDING : March 31 , 2016
Working
l2mrlm: CQastll!diQa !U1a5f1mm !Cilasfer m
so so
~ Qili.eLJl
REVERSION/AUGMENTATIONS liQ1
Previous Iv Transferred
ill
Previoustii
Imsfecred
ill
Im! All Transfers
<Net after Contingency
Reversion> Balances CS>
so so
Detail of Change Orders Issued/Pending
Campus received proposal from fire alarm consultant and will proceed with hiring firm for the proj ect
PROJECT SCHEDULE:
Original Date
Revised Date Actual Date
Reasons for delays:
""""".tor Pn""'"'"'"''"
App,..&1orwon..1 On.no&• -••d ta Bod Comtrvcbonstart
06/15
06/16 ~ .. ~ Can~truc.tlon CompletJon
12115
08/16
"'"" MeaghanS~ Tide UniversitY Planner -· (562) 951-4102
Amouat of Chaage Order
Pending <S>
Campus: Project: Project No:
CFIS No:
FISCAL DATA
~ Chapter/Item
c
Maritime Academy
Boller Rtplacemant. Ph. 1 MA-1319 ..
~ilrlvWotk
Aop[gpdi!li!:lD Irilmkr Am2l.l!ll (~!!tal!liltivi: Sl
S170,000
fri:llminaQr!
&n IU!a5f!:U (il
so
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT - CSU FUNDED QUARTER ENDING: March 31, 2016
Working
l:!ulriing C12a~n."ti12a I!:i!D5f!:~ isl T[i!n~fi:r IS}
so so
~ Order#
REVERSION/AUGMENTATIONS ~
Previously
Tr;msfe[red
ID
freviously
Tr;msferred
ID
I2tID AU Tran5f1:rs (Ni:tafW
Revi:rsioa>
so
Comments: Detail of Change Orders Issued/Pending CSU Bond Funded
PROJECT SCHEDULE: _ ..... ,
Pr<lmnarl Plan> f.J>prwll orwom.1
Drr"Mnl • Ptoc""d to Bid CDmtrudion SWt
Original Date
Revised Date
Actual Date
Reasons for delays:
Project scope being evaluated and will develop plan to replace or retrofit high NOX
boilers.
06/15
06/16
Conuruct>on Camplt:tJon
12115
10/16 ~ Soln•tuto
11-
Tottt _ Universi!l!_Planner
"""'• (562) 951~102
Cgatiagem;y Balaam($)
so
Amount of Chilage Otder
Pi:ading (Sl
Campus: Project: Project No: CFISNo:
FISCAL DATA
~ Chapter/Item
Comments:
PWC
CSU Bond Funded. C0#2 - add bldg 50
Mont•rev Bay Qemolltlon. Ph. 1 MB-1320 ..
Appropriation AlMUnt
s 10,000,000
Early Work ~
Ccymylatjye S)
Pre!imjnary fliln
Transfers m
$302,000
Pending issues - underground tanks.
PROJECT SCHEDULE:
Original Date Revised Date Actual Date
Reasons for delays:
~tO¥olot
'""""""'"""' 04/01
OB/15
l\j)pmalolWO!bo1
o ..... n& & Pto<•td 1o a.1
Q5/15
03/16
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT - CSU FUNDED
QUARTER ENDING: March 31 , 2016
war.king
Q.c;ming Tr;msfers m
S238,000
Con1truc:'bon Sllrt
06/15
09/16
Consryct1on Transfer CS)
so
Cotub'\ldton Compltbon
09115
07/ 17
Executive .Qulu.!
REVERSION/AUGMENTATIONS lil21
Previously Transferred
w
Previously Transferred
w
!ml All Transfers <Net jlfter Reversion>
S540,000
Detail of Change Orders Issued/Pending Change Orders (#): SO
"""'' fllllt -
Pending (#):SO Contingency Balance: $0
Chief, Facilities Plannin.&.
~_62) 951-4106
Contin&ency Ba!anmm
so
Amount of Change Order
Pendjog m
Campus: Project: Project No:
CFISNo:
FISCAL DATA
~ Chapter/Item
PWc
Comments: CSU Bond Funded. Project Bid on 6/16/1 S. low Bid S2,760.000.
PROJECT SCHEDULE:
Original Date Revised Date Actual Date
Reasons for delays:
Northrfdpa H11tlnp SVstam Raplacamant N0-1321 ..
Appropriation
Amillm1
S4,469,000
.<ppn>nl of
Early Work
fulWu <cumulative Sl
Pre!imjnarv
fl.an Transfers <Sl
so
.... kmillM\'rlM11 Aopnw.al ofWodJn1
Dnwin& • "•md to hi
01/16 05/16
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENn
QUARTERLY CAPITAL OUTLAY REPORT- CSU FUNDED
QUARTER ENDING : Marcil 31 . 2016
Yi!l!hlni D.mtlng
Transfers CU Construction Transfer ($)
S705,000 S3,764,000
Executive Quln1l
REVERSION/AUGMENTATIONS MQ1
Previoysly Transferred
ill
Preyjously Tra05ferred
ill
Iml. All Transfers <Net after Reversjonl
S4,469.,000
Detail of Change Orders Issued/Pending Ch'1Dge Orders (#1-2); SB64,236 Pending: S12.n 2 Contingency Balance: S198,000
Contingency Balances m
S217,000
( orutrv<tton Stilt
09/16 Con11rll<llo6 ~oor.ittan
09/1 7 11/1 6 Sli:n>M• QAA//a/-)___
~ N""o
TdSt
Amount of Chanu Order
Pending CS>
,,, .. , (562)951=1106e_ _________________ _
Campus: Project: Project No:
CFIS No:
FISCAL DATA
liluI1b« Chapter/Item
Comments:
PWC
CSU Bond Funded.
PROJECT SCHEDULE:
Origlnal Date Revised Date Actual Date
Reasons for delays:
Nodbrjdge BullcHgq E!ectdcal Systam ReQlaclfDlpl N0-1322 ..
Appropriation Ams2.Wl1
s 12.139,000
Apt>mal al
Early Work
!cilmkr <cumulatjyt: S>
Prelimjnarv
flin TransfmCS>
$242,000
"""""""' "'"' Attprovll or Won.in&
°"""''.,'""'d!olod ~ 02/16
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT- CSU FUNDED
QUARTER ENDING: March 31, 2016
~ IDilYting
Transfers CS>
$323,000
Con,tnltbOrl SW1
08116
Construction lQnsfcr CS>
so
CondnJtbo" Com~cboh
06117
Executive
~
REVERSION/AUGMENTATIONS ~
Previously Transferred
ID
Prevjously Transferred
ill
Im!. All Transfers <Net after Reveojonl
SS65.000
Delilli of Change Orders Issued/Pending
Contrngency Bi>lances CSl
so
Amount of Change Order
Pi:ns!jng CSl
Tiiie - _£h1ef._Facllities Pla,,,.n="='":.IL-----------------__.ci_62) 951-4106
Campus: Project: Project No:
CFISNo:
FISCAL DATA
~ Chapter/Item
PWC
Comments: CSU Bond Funded.
PROJECT SCHEDULE:
Original Date Revised Date Actual Date
Reasons for delays:
Nocthddga Bldundant Sybslatlon Upgrade N0-1323 ..
Aoorooriation
Ammm1
$6,639,000
,._Jllol
Early Work
Tuln1fer <cumulative S>
Prelimjnarv
fun Transfers m
$198,000
.... """""""'"' oll>-.torworuns
Omnn1&-udto•.t
09/15 01/16
THE CALIFORNIA STATE UNIVERSITY (OEPARTMENn
QUARTERLY CAPITAL OUTLAY REPORT- CSU FUNDED
QUARTER ENDING : March 31 , 2016
~ DLlwln&
Trans(ers CU
$197,000
Cont.trutbon SUrt
05116
02/16
Construction Trans(er CS>
so
Conitructton Camplt'ban
07/17
Executive Qrskr..!
REVERSION/AUGMENTATIONS t:lm
Previously Trans(erred
ru
Preyjously Transferred
ru
I2tl.I All Trans(ers <Net after Reyecsjon>
$395,000
Detail of Change Orders Issued/Pending
5ilpi1tu:r1:
Name
Contingency Balancesm
so
~u.
f'hcuH
_ Chief .. Facilities ~lannin.~---------
(562) 951-4106
Amoyntof Change Order
Pending CS>
campus: Project: Project No:
CFIS No:
FISCAL DATA
Nl!!I!W Chapter/Item
Comments: CSU Bond Funded
PWC
PROJECT SCHEDULE:
Original Date Revised Dilte Actual Date
Reasons for delays:
f.lmmnl F!n1 Alano System Uograde po-1324 ..
Aooroorjatjon &nQWl1
$2,933,000
'ff""""~
Early Work illmkr
Ccymu!ative $l
Prellm.in.itoL fun
Transfers CSl
$90,000
PrtWninlfJ ""11 .oi>p..,..totWamn&
°""1•&1.ho<te<ltoBid
02/16 07115 05/16 08/16
THE CALIFORNIA STATE UNIVERSITY (OEPARTMENn
QUARTERLY CAPITAL OUTLAY REPORT - CSU FUNDED
QUARTER ENDING: March 31, 2016
Wl2rking
~ C1rn~tll!'1i2a Transfers CSl Transfer CSl
$100,000 so
Con1trucbon SUit Co•utn1tt>onC°"""1lJon 08116 02/18
11/16
REVERSION/AUGMENTATIONS ~
Preyjoys!y Previously !21fil
~!:!;l.!tivi: I[i!mfi:m:d ~red All Transfers CNet after Reversion> ~ w w
S190,000
Detail of Change Orders Issued/Pending
~ $i&n•tu ..
MeilghanSm~ N""t
T1tte University Planner
Contingency Balanm<S>
so
Am2untof Changs: Ordi:r
Pi:ndjng<u
Phooo ~6~~1~102~~~~~~~~~~~~~~~~~~-
Campus:
Project: Project No:
CFISNo:
FISCAL DATA
twmJw: Chapter/Item
PWC
Comments: CSU Bond Funded
fmwml Dom15t!c Water Line Upgrades, pb, 1 P0-1325 ..
Aooropriation
am2Wl1
Sl.367,ooo
EarlvWork
illmfer (cymy!atjve S>
PteliminiiIY..
~ Iransfer.s_(i}
SlOl,000
Claimed S28,300 (engineering services)
PROJECT SCHEDULE:
Original Date Revised O;ite Actual Date
Reasons for delays:
""-"·' ,.,.i;..naty ""''
07115
07/16
Al>P,...,.orwon...s Dmnn' & Pron rd to Bid
02116
10/16
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT· CSU FUNDED
QUARTER ENDING : March 31 , 2016
Wmking Drawing
IransfersJ]}
$118,000
( OttSttuttiorlSwt
08/16
11/16
!:on~trl!s;tign
Transfer m
so
Con1truction Complttion
02/18
REVERSION/AUGMENTATIONS ~
Previoyslv Previoysly Io!ru
All Transfers
~xi:cutivi: Icim~f!:rci:d illmfe.[red (Net afti:c Contingi:ncy
Qfil.i:[J1 ill ill Reveajon> Balances <Sl Pi:ndjng !S>
$219,000 so
Detail of Change Orders Issued/Pending
Sicn•lll ..
Nomr
Ti~•
Phonr
~ MeaghansmfuT/---~~~~~~~~~~~~~~~~~~~~ Univers!!I_Planner
__ (5_6llilS 1-4102
Campus: Project: Project No:
CFIS No:
FISCAL DATA
Mu.m.bl.c Chj!pterl!tem
Comments:
PWC
CSU Bond Funded.
Sacramento Undgmround power Lings SA-1326 ..
Approprjj!tjon
Ammm1
$772,000
Early Work
mmru Ccurnylj!tjye S>
Preliminary flj!n
Tramftm ($)
$19,000
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT- CSU FUNDED
QUARTER ENDING : March 31 , 2016
wm:king l2mting
Transfers <S>
$29,000
Coostryction Transfer ($)
so
Executjye
~
REVERSION/AUGMENTATIONS liQ1
Preyjous!y Transferred
.w
Preyjously Iransfem:d
.w
Im! All Transfers !Net j!fter Reyersjon)
$48,000
Detail of Change Orders Issued/Pending
lnitiill field survey hils been completed. Schematic plans hilve been presented for review In design. Final drawings submitted for review. Bid opening 3/23/15 Contract in process.
PROJECT SCHEDULE:
Original Date Revised Date Actual Date
..._ .. ot .... .....,, ri.n. 10/15
°'ll-"1ofWCHt.io1 o ...... ,. l'l'octtd to l id
12115
Co1ntrvtt»on Start
02116 c .. 1tnK11o~c-p1o-
06/l 6 _gtJh-"""' Larry P~ I
Contjncency Balancs:s CU
so
Arnoynt of Change Ords:r
Pendjng CS>
Reasons for delays: Tidt Chiet.'Facilities ~lilnni.,_,n _ _________________ _
Pt.ant (562) 951-4106
Campus: Project: Project No:
CFIS No:
FISCAL DATA
~ Chapter/Item
PWC
Comments: CSU Bond Funded.
Sacramento fl[! Alann System Upgrades. Ph.1 SA-1327 ..
Apprgprjalion
Amowl1
$2,718,000
Ei!r!VWork
mnmr Ccumuli!tive S>
Pn:!imjni!ry
fWl Transfers m
$97,000
Initial field survey is done. Schemiltic drawings hi!ve been presented for review. Fim1! drilWings due )i!nUilry 15th. In design. Sequoiil Hill!· comments bilck from Bueilu Veritils ilnd in review Library· comments bilck from Bueau Veritas and in review
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT· CSU FUNDED
QUARTER ENDING: March 31, 2016
Wmkin& Ql.illtin&
Transfcrsm
Sll,900
Cgnstructjon Transfer ($)
so
Executive
Qrdd
REVERSION/AUGMENTATIONS M21
Previously Transferred
ill
Previously Transferred
ill
Im! All Transfers !Net ilfter Reversion)
S108,900
Detilll of Change Orders Issued/Pending
Contjngency Bi!li!nces CS!
so
Amount of Chi!nge Order
Pending CSl
PROJECT SCHEDULE: """"-.. 6f ,,__,. ..... 1111-ollotworu..1
_, .. ~.tdlo lwl CoollN<- SIMt Coo1 ... ,..., Comjf,<llon \~/a_;L Original Date Revised Date Actuill Date
Reasons for delays:
10/15 12115 02/16 06/16 s..,,1turt:
N1mt \.J.arrx!jplc • nu. Chief.£a~ilities Plilnning -· ..J.?62) 951~106<.__ _________________ _
Campus: Project: Project No: CFIS No:
FISCAL DATA
tillmW Chaoterfltem
Comments:
PWC
CSU Bond Funded.
Sacramento Elayalor Cyl!nder Raplacamant. pb. 1 SA-1328 ..
Aoproprjj)tjon
Ammlnt
SSl0,000
fj)r!yWork
liilmkr (cumulatjve S>
Prellmjnarv
fliln Transfers m
S23.000
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT· CSU FUNDED QUARTER ENDING: March 31, 2016
WWing
.12.wii.n& Trans(ers CU
S24,000
Construction Transfer ($)
so
Execytjve
Qrd.ctJl
REVERSION/AUGMENTATIONS li!l1
Prt!Yiously Transferred
ill
Preyjously Transferred
ill
~ All Transfers CNet after Revecsion>
S47,00o
Detail of Ch;inge Orders Issued/Pending
Contingency ealj)nces m
so
Preconstruction meeting held on 6/1711 S. Field inspection done. Schedule is being developed for work. Complete. Service Order, Capit;il Elevator
Original Service Order for various location: S4•2.337 Approved cos (#1-4): Sl72,529 Pending CO: S
PROJECT SCHEDULE:
Original Date Revised Date Actual Date
Reasons for delays:
.-._ .... ,.._.., ...... 10/IS
Aji-al•IWOll.ins 0.-16-••d to lid
01/16 COAib'vcbon Stitt COft1CN<- C""'Ph-
OS/16 01/17
Contingency Billilnce: S
~-~~ --~ Y:1J=-. Tidt
...... _Chief~acllities Plannin
~)9Sl-4106
Amount of Change Order
Pending m
Campus: Sacramento Project: Project No:
Chll!ar Main Switch Replacements SA-1329
CFIS No:
FISCAL DATA
~ Chapter/Item
Comments:
PWC
CSU Bond Funded.
u
Aooroprjation
&no.Jm1
S42,000
Ei!rlyWork ~
<cumulative $)
Engineer is under contract Design work bas started. Still m design 3n complete. Waiting for final drawings. Review comments back from Bueau Veritas Working on re-submittal.
PreUmjm1ry flan
Transfers <S>
s12.ooo
PROJECT SCHEDULE: Approval of
Prtlim&nuy f'bns Apprawal atWorlrn&
Dr""'•1 • l"To<f0d to Bod
Original Date Revised Date Actual Date
Reasons for delays:
10/15
Waiting for design proposal from engineer.
12115
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT - CSU FUNDED QUARTER ENDING: March 31, 2016
~ Qcming
Transfers<S>
$19,000
(Oft$truCbon StJtt
02116
Constructjon Transfer m
so
CorubVcbon Comi>'ttion
06/16
Executive Qaid
REVERSION/AUGMENTATIONS MS21
Previouslv Transferred
ID
Previously Transferred
ID
I21ill All Transfers <Net after Reversion)
$31 ,000
Detail of Change Orders Issued/Pending
::t¥.//M=
Contingem;y Balances CS>
so
Amount of Change Order
Pending CS>
n~.
.... .... _Chief..fa~!!lt!e.s~ ~Pl=an~n~i~"'------------------(5621:!51-4106
Campus: Project: Project No:
CFIS No:
FISCAL DATA
tl.wn.b.c.c Chapter/Item
PWC
San Beman:llpo Perfonnlpq Ad• HVAC RIDlacament SB-1330 ..
Appropriation
AmlW.D1
$2,881,000
Early Work
~ <cumulatjye Sl
Pa:Umjnarv
~ Transfers CU
$86,000
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT· CSU FUNDED
QUARTER ENDING : March 31 , 2016
W2.chlng
12.wiing Transfers m
$101,000
Construction Transfer <S>
$0
Executive Qnle.c.11
REVERSION/AUGMENTATIONS t:lm
Previously Transfcm::d
w
Preyjousty Transferred
w
Iml All Transfers <Net after Reversion>
$187,000
Comments: Detail of Change Orders Issued/Pending CSU Bond Funded. A/E contract has been processed for P25 Engineers. Schematic Design Drawings phase has be started. Schematic Design drilwings are complete, working on preliminary and working drawings. Main AHUs have been bid, :iwarded ilnd pre-purch:ised. Delivery date is June 20, 2016 Project is currently under State Fire Marshall review (presently addressing plan check comments). Project out to bid with a due date of May 17, 2016. Expect to award around June 6 with construction start date of June 20. Projected Project Completion; October 30, 2016.
~ol
PROJECT SCHEDULE: ,..lunoMty ""''
Original Date Revised Date Actual Date
04/15
11115
Ai>-llofWO<lm1 Dralm& ~ Ph><ud to lid
05/15
01116
Con,truc:taon Swt
06/15
02/16
Co1nln1<1IO'I C.,..l<IOo
04/16
12/16 s.srututt .~ H""t Eric Chan
Contingency Balances CS>
so
Amount of Change Order
rcndincm
Reasons for delays: Trt!t _ Associate Universi!)'J~.lanner. ________________ _
"'"'" (562) 951-4109
campus: Project: Project No:
CFIS No:
FISCAL DATA
~ Chapter/Item
PWC
San Diego Enalnndnq Roof I HyAC ReQlacement m:ll.ll ..
Eilcll! W12r~ ea:lillliDilQ! ADll!llllDiltiQ!l Transfer ~
Alruul.at is:UmUlilti~S} Icmf!:rsm
Sl ,500,000 $61,000
THE CALIFORNIA STATE UNIVERSITY (OEPARTMENn
QUARTERLY CAPITAL OUTLAY REPORT - CSU FUNDED QUARTER ENDING: March 31, 2016
W2rkin& lmWlll1 C12mttl.!!:ti12a
IrilDSf!:!l m Irilasf!:r m
sss.ooo so
~ Qrd.er.1l
REVERSION/AUGMENTATIONS liSl1
Previously Iranderred
ID
ercviously Irilmferred
ID
I2l.ill All Iransteu <Net after Rewsionl
$116,000
Comments: Detail of Change Orders Issued/Pending CSU Bond Funded 6/3011 s: This project has not started yet 211/16: Kitchell will commence Roof Survey of Engineering building roof to determine low points and scope existing drams. Pre-Construction Services S62,349 3/1 /16: Pre-Construction Services 53'- completed
PROJECT SCHEDULE:
Original Date Revised Date Actual Date
Reasons for delays:
..,..,,..ior "'•'""NrY rlant
08/15 03/16
..,p,..,i orwon..1 DrlW'lns& l"roc:ttd to lid
0)/16 04/16
Scheduling impact activities (epoxy flooring) dunngJuly 4th holiday weekend.
( DMtNctlOn swt
09/16 05/16
Con1tru(\IOh Comple:tian
03/18 07/1 6 , ......
1\llo
,,,..,
Contingency Balances <Sl
so
Amount12f Chilnce Order
eendjag m
Campus:
Project: Project No:
CFIS No:
FISCAL DATA
~ Chapter/Item
Comments: CSU bond funded.
PWC
San Diego Lpve Library Ropf/Elevatpr Replacement ~
Aoprpprialion
Aali2.u.n1
$1,966,000
Pre!imjnary
flID Transfers CS)
S79.000
Project is 25% complete. Anticipated completion Janu:11y 201 7. Will be phased lo minimize disruption to library users.
PROJECT SCHEDULE:
Onginal Date Revised Date Actual Date
Reasons for delays:
At>pn:w.al of
""'"""'"" l'l>ns 08115
01/16
~proY~ of WOfbl&
Driwin1 • Procrrd to ltd
03/16
01116
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENl)
QUARTERLY CAPITAL OUTLAY REPORT - CSU FUNDED
QUARTER ENDING : March 31 , 2016
~ ~
Transtersm
$71,000
t:om·it\11:..- *'1_
09/16
02116
Construction Iran5fer m
so
Con1b'\lction CrtntMbon
03/18
01117
REVERSION/AUGMENTATIONS
lio.t
Previously Preyjpysly !ml
Executive Transferred
ill
Transferred
ill
All Transfers !Net after Reversjonl ~
$150,000
Detail of Change Orders Issued/Pending No change orders to date. Full contingency balance.
Sip.1turt
Notnt
TiUt Chief,_Facilities flan_nin& - (562).951-4106
Contingency Bal?nces CS!
so
Amount of Change Order
Pending IS>
Campus: Project: Project No:
CFIS No:
FISCAL DATA
~ Chi!pter/ltem
Comments: CSU bond funded.
PWC
..
Approorjation
AmlllUl1
SS00,000
6/30/1 S: This project has not started yel
Prelimjmuy
fW. Trnnsters <Sl
$46,000
211116: C. W. Driver will conduct existing conditions survey for AHU 1-8. Pre-Construction Services S74,273
PROJECT SCHEDULE:
Original Date Revised Date Actual Date
Reasons for deli!ys:
'"9P""""' "''"'""'' "°"'
08/15 03/16
~prvrn.1 atWad . .,,
°""""I • Ptoutd to ltd
03/16 04/16
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT · CSU FUNDED
QUARTER ENDING: March 31. 2016
WQrls.lng
~ Transfers <$1
$46,000
Construction Transfer CSl
so
~ Qrgfil
REVERSION/AUGMENTATIONS t:l21
Previously Transferred
w
Previously Transferred
ill
Tulil All Transfers CNet i!fter Reyersjonl
S92,000
Detail of Change Orders Issued/Pending
Can1trud.ion SU.rt
09/16 05/16
Co1ut1vction C'~plrtio"
03/18 07/16
l '1dt Chief. Facilities Plan_ning,
Contingency Bi!lances !S>
so
Amount of Change Order
Pending CS!
- ~621_9.Sl-410=6------------------
Campus: Project: Project No:
CFISNo:
FISCAL DATA
~ Chapter/Item
Comments: CSU bond funded.
PWC
PROJECT SCHEDULE:
Original Date Revised Date Actual Date
Reasons for delays:
San Diego H\{AC Controls Upqcade Sl2:1lli ..
Aooroorjatjon Armllmt
$553,000
Early Work
~ <cymu!atjye $)
Preliminary
flan Transfers CSl
$40,000
"i>proV>lol
"""'""'"1""'' AHrovM of Worbs
Drlwll'& 6 flrocttd to Bd
08115
06/16
03/16
07/16
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT· CSU FUNDED
QUARTER ENDING : March 31 . 2016
~
$9,000
Comtrvction Start
09/16
Constryctjon Transfer m
so
conttn.l<tion c~
03/IB 05/17
REVERSION/AUGMENTATIONS ~ !ml
Executive Previously
Transferred
Preyjoysly Transferred
ill
Al! Transfers CNet after Reversion>
Contingency Balances CS>
Amount of Change Order
Pendjng CS> Qrslru ill
$49,000 so
Detail of Change Orders Issued/Pending Design fees are $98,000 (this includes design work of the central control system).
~n /L uJ~ ----""' -·
_L~r
Chi!f..f acilit1es Plannin.s_
(562} 951-4106
Campus: Project: Project No:
CFIS No:
FISCAL DATA
lil!.!J.lW Chapter/Item
Comments: CSU Bond Funded
PWC
PROJECT SCHEDULE:
Original Date Revised Date Actual Date
Reasons for delays:
San Francisco Electdctl Substation Replacement ~ ...
Appropriation
~
$4,280,000
_ .... ,,,.....,"'_'
09/15
02116
02101116
Preliminary elm
Transfers CSl
$157,000
-'Pt>""alorw.....,, °""'"''-"~lolol
12115
06116
THE CALIFORNIA STATE UNIVERSllY (DEPARTMENT)
QUARTERLY CAPITAL OUTlAY REPORT- CSU FUNDED
QUARTER ENDING : March 31, 2016
WQrls.ing Qrnwing
Transfers CSl
S170,000
(OMtruttionStlrt
03116
Construction Transfer <Sl
so
(o,.ltnltbon C0tnp4ction
03117
04117
Executive Qmru
REVERSION/AUGMENTATIONS Mm
Previous Iv Transferred
ID
Previouslv Transferred
ID
!ml All Transfers <Net after Reversion>
$327,000
Detail of Change Orders Issued/Pending
Socn•(Urt
"""' Titlt
........
~ Meaghan~ University Pli!nn.er
_ts_62)_9S1-4102_
Contingency Billilnm<Sl
$0
Amoynt of Change Ords:r
Pendjng ($)
Campus: Project: Project No:
CFIS No:
FISCAL DATA
~ Chi!pter/ltem
Comments: CSU Bond Funded
PWC
PROJECT SCHEDULE:
Original Date Revised Date Actual Date
Reasons for delays:
San Francisco Science Bul!dlnq Repairs ~ ..
$8,115,000
llpprunlof
.......... ..,""". 04/15
05/01/15
Pre!imjnary
~ Transtea m
$280,000
-alofWorl.1>1
-·•-r<111oa;ci 06/15
08/15 10127/15
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT - CSU FUNDED
QUARTER ENDING : March 31, 2016
WQrking Drawing
Iransfea CS! Constructjon Transfer ($)
$303,000 SG.822,000
ComtnK- SIMt Con\trUction Cont,lttio" 07115 02/16
03/16 08/17/15
Executive
Qrdru
REVERSION/AUGMENTATIONS liS21
Prevlouslv Transferred
ID
Prevlously Transferred
ID
ImKl Al!Transfea CNet i!fter Reyeajon>
$7,405,000
Detail of Change Orders Issued/Pending
M~ Soplotllrr
H.,,..
T•Ut Universi~ Planner ....... (562) 951-4102
Contingency ealj!aces m
$349,000
Amount of Change Order
Pendjngm
Campus: Project Project No:
CFISNo:
FISCAL DATA
~ Chaoter/ltem
PWC
Sen Jou puncan Hall Roof Replacement .:iJ:1ll1 I&
Aporoorlation
&n2IHlt
SZ.681 ,000
Early Work Transfer
Ccymu !alive $l
Pre!lmjnary
flim Transfea m
S104,000
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT}
OUARTERL Y CAPITAL OUTLAY REPORT· CSU FUNDED
QUARTER ENDING ; Marcil 31, 2016
WWing
~ Transfers CSl
S106,000
Construction Transfer CS)
so
~
Qrdfil
REVERSION/AUGMENTATIONS rim
Previously Transferred
ID
Previously Transferred
ID
Iml AllTransfea <Net j!{ter Reveajon>
S210,000
Comments: Detail of Change Orders Issued/Pending CSU Bond Funded. Plilflning Design phase. Memo d;ited 2/9/16 from CO revises the funding ;imount to $2,681 ,000 by combining roof with the ste;im pipe funding.
PROJECT SCHEDULE: ""_ ....
"'""'""" """' AoPf11V&lolwon...,
Dr...,.J& PIV<r<d to B<d
Original Date Revised Date Actual Date
Reasons for delays:
03/16
04/16
6/30/1 S: Adam B;iyer will review with Meaghan Smith. 913011 S: University is in the process of hiring an architect 12/1 /1 S: University hired an architect for the design.
04/16 (GMtn.ICtJoft SUit
06/16
3125/16: The estimated total budget is $3,016,000. The University's deferred maintenance reserves will fund the difference. 4120/16: Project in bidding phase. Bid Opening scheduled for 4/28/16.
Corntru<tion Complttion
09/16 Slpuiturt
Namt
lith~
........
M~ Uniy.trsit;y Planner
_ (S62]J151-4102
Contincency Bi!lances !Sl
so
Amount of Chance Order
Pending CS>
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT - CSU FUNDED
Campus: Project: Project No:
CFIS No:
FISCAL DATA
~ Chapter/Item
San Jou Ut!l!tles lnfrastructu19. Ph. 1 A ~ ..
Approorjatjon AmgwU
Prelimjnary
flan Transfers CSl
WarlilD& l2mti.ng
Transfea CSl
QUARTER ENDING : March 31 , 2016
Construction
Transfer CS> ~ Qnlfill
REVERSION/AUGMENTATIONS Nm
Previously
Transferred
ID
Preyious!y
Transferred
ID
Tutru All Traasfea <Net after
Reversion>
Contingency Bijlanmm
Amount of
Change Order Pending CS>
PWC $2,545,000 S317,000 $217,000 so S534,000 so
Comments: CSU Bond Funded. The scope of work for this project was added to the Utilities lnfrastru'cture. Phase IV project
Project is in the Design Phase.
PROJECT SCHEDULE:
Original Date Revised D;ite Actu;i1 Date
Reasons for delays:
1211 /1 S: Under Design
"c>p.,,. .. 01
rrtllmiwy ""''
08/15
11/15 ----
°'l>P""'JlofWortm1
Dr-.1 &Procttd to Bod
12115
04/16
Construction Stitt
03/16
06/16
Corutruction CCWT1pl1tia"
03/17
12117
Detail of Chilnge Orders Issued/Pending
5'p1•bl ..
N""t
nue
"'""'
~ Me~~th'------~~-----------~ Universlt:t..Plilnn.,,,er'-------------------l562) 951-4102
Campus: Project: Project No:
CFIS No:
FISCAL DATA
~ Chanter/Item
PWC
Comments: CSU Bond Funded.
San Lyla Oblsog Ulll!dgrAccass Upgrade m.:tli1. ..
Aooroprjation
amount
S500,000
E;irlyWork
~ Ccumulatlve Sl
Construction 80" complete. Construction complete.
Preliminary flM
Transfers !Sl
S15,000
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT· CSU FUNDED
QUARTER ENDING : March 31 , 2016
WQWng
l2w!ing Transfers ($)
S20,000
Constryctjon Transfer !Sl
so
Executive QrdCL1t
REVERSION/AUGMENTATIONS ~
Previously Transferred
ill
Previously Transferred
ill
~ All Transfers <Net after Reversion>
S35,000
Detail of Chilflge Orders Issued/Pending No change orders Total final cost $273,010.20
Campus requested use of project savings for use towards project number 5l-1342 Central Heating 8c Chilled Water System Repairs.
PROJECT SCHEDULE:
Original Date Revised Date Actual Date
Reasons for delays:
_ ... , ,,...,....,,..,,,
07/lS
<lo>p,,,.,,.orWOfbl&
°""""' 6 l'n><••d lo'"' 02/16
con,tr4t9ft swc
OB/16 08/15
Conllrvcl>orl Comol<-
02/18
11/20115
Slsn>lllrt
N""' r.u. _ Associate University Planner
Cont!ngs:ncy Bi!li!nces (S)
so
Amoyntof Chi!nge Orner
Pendincm
Pho•• (562) 951~\09. _ _ _________ ---------
Campus: Project: Profect No: CFIS No:
FISCAL DATA
li.u..r:nbu Chapter/Item
Comments:
PWC
CSU Bond Funded.
San Lyls Obispo Central Haat & Chi!! Water SVs RHalrs, pb, 1 ~ ..
Appropriation
Aml2.Wl1
$4,965,000
Early Work
fillllKr Ccumylative S)
Pre!imjnary
fW. Transfers CSl
$280,000
1 !mi SD submitted to CPDC 9/23/15. Bidding May 2016.
PROJECT SCHEDULE:
Original Date
Revised Date Actual Date
Reasons for delays:
.-...--.iar
... ~-· 07115
10/15
~p,,,.JlofW0""'1
DQW'lf'I 6 Pfoc uct to I Id
02116
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT - CSU FUNDED
QUARTER ENDING : March 31 , 2016
Ymrls.inc ID:ilWing
Trnnsrers m
$351,000
ConitnKbon Sf.Mt
06/16
Constryct!on
Transfer !Sl
so
Con1trvcbcm Compk:tion
02/18
REVERSION/AUGMENTATIONS ~ Ifill
Executjye
Qrdu.!
Previoysly
Transferred
ID
Preyjoysly Transferred
ID
A!I Transfers <Net after
Reveaionl
$631 ,000
Contingency Bi!li!nces CS>
$0
Amoyntof
Change Order Pendjng!Sl
Detail of Change Orders Issued/Pending
~"uw,.
N.,.,t
nu.
Phont
~ c ------~----
Eric Chi!n
Associate Universi~Planner'----------------
~62L9S~1-4~10=9'-----------------~-~
Campus: Project: Project No: CFISNo:
FISCAL DATA
~ Chapter/Item
Comments: CSU Bond Funded
PWC
San Marcos Central Haallna and Coo!lng Line Uogrades SM-1343 ..
Approprl;Jtion
&rullm1
$1 ,646,000
Early work
~ Ccumulative $)
Prelimjnacy
~ Transfers CS>
SS0,000
Pending funding approwl.
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT}
QUARTERLY CAPITAL OUTLAY REPORT · CSU FUNDED
QUARTER ENDING : March 31, 2016
worw Quwing
Transfers <S>
S65,000
Construction Transfer ($)
so
Executlve
~
REVERSION/AUGMENTATIONS ~
Prs;vioysly Transferred
w
Previously Transferred
ill
I21i!I All Transfers <Net after Reversjonl
Sl 15,000
Detail of Ch;Jnge Orders Issued/Pending Contr.ict not executed.
RFQ/RFP process re-bid as Design-Build and not Collaborative Design-Build. Expected to have D-B team selected by March 2016.
PROJECT SCHEDULE:
Original Date Revised Date ActU;JI Date
Reasons for delays;
~P,.,.•hl
"'""'">IY l'W>s 06/15 06/16
Al>P""" olWotl.rla o....ms &Pnxttdlo Bid
12115
10/16 -- -
ComU"U<bon$.t&tt
05/1 6
01/1 7
CondNction COl'fti>(ttian
08/17
03/17 Stcn'Wr.
N""t
T':St
,,. ....
~ Meaj!lanS~
_ Universi!Y Planner
_l562)_951.:..41 02_
Contings;ncy Balances CU
so
Amount of Changs; Order
Ps;nding CS>
Campus: Project: Project No:
CFIS No:
FISCAL DATA
~ Chapter/Item
PWC
~ Domestic Water Tank Rtplacement. Ph. 1 S0-1314 ..
Appropriation
Am2wl1
S3,4S9,000
ea:limiailci ~
Transfer.s.m
S14S,OOO
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENT)
QUARTERLY CAPITAL OUTLAY REPORT· CSU FUNDED
QUARTER ENDING : March 31 . 2016
Ymrkin& ~ CQmt!l!!;tiQD
Iransfe11J'.U Transfer__(]}
SlSS,000 so
~ Qrdd
REVERSION/AUGMENTATIONS Nm
Previously Transferred
w
Preyjous!y Transferred
w
Im.I All Traasfers <Net after Reversion>
S300,000
Comments: Detail of Change Orders Issued/Pending CSU bond funded. Awaiting signed agreement for Kennedy-Jenks to begin working on drawings and specs. S 193.200. Agreement issued on 1112/l S. 7S% CDs due to SSU by end of 3/16. 100% CDs appro~imately due 4/1 S/16. Will send to CPDC.
Ajlpnw.Jor
PROJECT SCHEDULE;
Original Date Revised Date Actual Date
Pnlimm"Y ,..., Ajlpnwal or WofllnJ
°'"""l • Praurd ta Bid COtlstrvction~ ConLtru<\lon Comptetion
Reasons for delays:
06/15 02116
12115
04/16
CSU legal has to approve agreement and it took longer than planned.
06/16
06/16 10/17 ----12116 5'Cft.llllre
N..,,t
1111'
Ph0!1•
~ ~
Me£ an5mith
Universittf lanner
~62) 951-4102
Contingency Bali!aces <Sl
so
Amoyatof Ch;mge Order
reading m
Campus: Project: Project No:
CFISNo:
FISCAL DATA
Nu.tnbf[ Chaplt:rlltt:m
PWC
Comments: CSU Bond Funded.
PROJECT SCHEDULE;
Original Date Revised Date Actual Date
Rei!Sons for delays:
Stanislaus PE Gym Coo!lng Infrastructure ll:1.H5 ..
Approprjation AlnQWl1
S3,000,000
'""""11 ol
~rlyWork
mmf!!r Ccumulative $)
Prel!mjnary
fWl TCi!nsfers {S)
S103,000
,..~ .. WI'"''" ,,,,p<V'lllofW ...... &
Driwll'&Unxud to lid
07115 10/15
02126116
THE CALIFORNIA STATE UNIVERSITY (DEPARIMENl)
QUARTERLY CAPITAL OUTLAY REPORT· CSU FUNDED
QUARTER ENDING : Marcil 31. 2016
~ Qrming
Transfers <Sl Construction Transfer <Sl
S 135,000 S2.762.000
Constru<tron Stu1 Constru<tlonComplcbon 03/16 06/17
08/16 03121/16
Execytiv!! Qrdd
REVERSION/AUGMENTATIONS Mm
Prt:vious!y Transferrt:d
ID
Prt:viouslv TCi!nsft:rred
ID
Imai AllTCi!nsfen !Net after R!!Yersjpnl
n .000.000
Detail of Change Orders Issued/Pending
51&Nturo ~
Contlnency Bijlances !Sl
$158,000
Ampyotpf Change Order
Pending !Sl
,..,,., Eric Cha __ n ____________________ __ _
t11:it _ Associate University Pla,,,n""'n'""e,_r ________________ _ ........ (562) 951-4109
Campus: Stanislaus
THE CALIFORNIA STATE UNIVERSITY (DEPARTMENl)
QUARTERLY CAPITAL OUTLAY REPORT· CSU FUNDED
QUARTER ENDING : March 31. 2016
Project: Project No:
PE Pool Btnoyatlon and !nfcastructura Uograd• liI::1Hi
CFIS No:
FISCAL DATA
Nwnlm Ch;1pts:r/1tem
Comments:
PWC
..
Approprjatjon
AmS2.lmt
S2.698,000
$2,698,000 CSU Bond Fundeds $1 ,540,000 Ci!mpus Funds
AH-.tor
EilrlyWork
Iilmfi:.c Ccumu!?tive S>
Prs:!jmjnilrv
llin Transfers CS!
$85.000
Aopniv.to!W°""'I PROJECT SCHEDULE: ,,. • ......,y ...... ~···-·•d111 lod
Orfginill Dilte 01/15 _ 06/15
Revised Date Actual Date 03/01/15 03/01/15
Reasons for del<1ys:
YmWng 12.wti.ng
Tri!nsfers CS)
Constructjpn Tr;1nsfs:r CU
s 127,000 $2.486,000
Co•utrucuon SUit COlucruc:boft Campl1t1on
09/15 02116 06/15 05/16
06/15/15
Executive Qu1fil
REVERSION/AUGMENTATIONS ~
Pa:viously Tranderred
ill
Previously Transferred
ill
~ All Tramfers !Net ilftl!r R!!lll!!Jjon>
S2.698,000
Detail of Chilnge Orders Issued/Pending Approved CO (#1-2): $2,878 Pending CO (#): S Contingency Balilnce: $
S.p.1turt ~ Namo Eric Chilo nu. Associate_Uniy_~rsity Pli!nner
"'- _!$_62)_951-4109
Contingency Ba!?nmm
$162,000
Amount of Change Order
Pendjng CS>