CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
A. SCOPE
The purpose of this document is to provide written and graphic descriptions of the methods ofmeasurement to be applied for the quantities calculation of the works executed
These methods of measurement have been developed in such a way to facilitate and simplify theaccounting jobs relevant to the civil works.
The SUBCONTRACTOR shall take into consideration these methods of measurement for thequotation of his own unit prices.
7/31/2019 TM930!1!04E Methods of Measurements
3/62
TM 930.1/04E
PAGEPagina 3
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
RELATIONSHIP BETWEENWORK ACTIVITY AND CODE LIST
Point Work activity Unit of meas. Code Page
1. GRUBBING AND SCRAPING m2 AA00AA, AA00BA 5
2. PILES AA01 62.1 Driven and cast in place piles m AA01.. 62.2 Reinforcements of cast in place pile Kg AA10.. 6
3. EXCAVATIONS AA02.. 7
3.1 General Excavations with depth > 80 cm. m3
AA02A.. 73.2 General Excavations with depth
7/31/2019 TM930!1!04E Methods of Measurements
4/62
TM 930.1/04E
PAGEPagina 4
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
Point Work activity Unit of meas. Code Page
12. GEOTEXTILE SHEET, GEOMEMBRANES,WATERPROOFING AND THERMALAND ACOUSTICAL INSULATION m
2AA07.., AA16.., AA21.. 19
13. FIREPROOFING m2
AA17.. 20
14. MASONRY WORKS(External wall and partition) m
2AA18.., AA20.. 21
15. PLASTERING AND FINISHING COATS m2
AA24.. 22
16. FLOOR WALL LININGS m2
AA26.., AA27.. 2316.1 Floor and wall linings m
2AA26.., AA27.. 23
16.2 Removable floor m2 AA26CD 23
17. FALSE CEILING m2
AA28 24
18. DOOR - WINDOW - SHUTTERINGLOUVER - GLAZING m
2AA31.., AA32.., AA33.., AA35.. 25
19. GUTTERS, FLASHINGS AND DOWNSPOUTS AA34 2619.1 Gutter and flashing Kg AA34AA, AA34BA 2619.2 Downspouts m - Kg AA34AB, AA34BB 26
20. PAINTING OF WALLS m2
AA36 27
21. ROADS AND YARDS WORKS AA50 2821.1 Roads/yards m - m
2AA50AA.., AA50AB.., AA50AC,
m3
AA50BA.., AA50BC.. 2821.2 Finishing of unpaved areas m
2AA50BB 28
22 STEEL STRUCTURES METAL SHEETS,SIDING, ROOFING AND FLOORING AI30 29
22.1 Steel structures, access stairs, platforms,handrails, ladders, frame supports etc. Kg AI30.. 29
22.2 Siding, roofing and flooring m2
AI30 30
23. ELECTRIC INSTALLATION CIVIL BUILDING LS AN41 31
24. UNDERGROUND EARTHING SYSTEM m - N AQ42 32
25. UNDERGROUND SEWER AND PIPING SYSTEMS AQ49.. 3325.1 Concrete, gres and plastic piping system m AQ49AA.., AQ49AB.., Q49AC,
AQ49AD.., AQ49AE.. 3325.2 Steel piping system kg AQ49AF.., AQ49AH.. 33
26. HVAC SYSTEM INSTALLATION LS AZ43 34
27. PAINTING OF WOODEN AND STEEL WORKS AW37 3527.1 Pipes m
2AW37A.. 36
27.2 Steel structures m2
AW37B.. 3728. ANNEX 38
7/31/2019 TM930!1!04E Methods of Measurements
5/62
TM 930.1/04E
PAGEPagina 5
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
1. GRUBBING AND SCRAPING (m2) (Code list AA00AA.., AA00BA..)
The surface area of these works is to be calculated on the basis of the planimetric dimensionsmeasured by SUBCONTRACTOR and verified by CONTRACTOR.
7/31/2019 TM930!1!04E Methods of Measurements
6/62
TM 930.1/04E
PAGEPagina 6
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
2. PILES (Code list AA01..)
2.1 Driven and cast in place piles (m) (Code AA01..)
The pile length is defined as follows:
L = Q2 Q4 (see Annex 1)
Q1 is the elevation of soil that can be:- NGE (natural ground elevation)- PTS (prepared soil elevation)- PSG (general excavation soil elevation)
Q2 is the elevation of the pile head shown in the drawings issued for construction.
Q3 is the elevation of the cut-off head of pile
Q4 is the elevation of the tip of pile as per the daily report of piles driving.
Blank crossing is the length (between Q1 and Q2 elevations) without pile construction.The blank crossing up to 1 m of length is included in the unit price of pile.
2.2 Reinforcements of cast in place piles (kg) (Code AA10..)
The weight of plain and deformed steel bars is to be calculated on the basis theirs theoretical
weight per unit length (see enclosed Annex 11), multiplied by the number of rebars and cage lengthof pile shown on drawing issued for construction. All charge as per point 8.1.
The weight of extrarebar used for cages assembly and/or laying, if not indicated on constructiondrawings, is not to be accounted.
7/31/2019 TM930!1!04E Methods of Measurements
7/62
TM 930.1/04E
PAGEPagina 7
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
3. EXCAVATIONS (code list AA02)
3.1 General Excavations with depth > 80 cm. (m3) (Code AA02A..)
Any wide excavation area, with a depth more than 80 cm., belongs to this category
The volume of this work is to be calculated on the basis of the average of the surface area of thesections (a1a2etc.) multiplied by the distance taken along the axis, between the consideredsections.
See ANNEX 3.
- The surface area of the section is to be calculated on the basis of the dimensions shown inconstruction drawing multiplied by the depth of excavation.
- The depth of excavation is the average of the values measured between the natural groundelevation (by topographic survey) and the bottom elevation of excavation shown on drawingsissued for construction.
- The elevation of ground level shall be defined by topographic survey; its relevant cost shall beSUBCONTRACTOR care.
- The slopes are not to be accounted, unless sizes specifically indicated on the drawings issuedfor construction.
3.2 General Excavations with depth
7/31/2019 TM930!1!04E Methods of Measurements
8/62
TM 930.1/04E
PAGEPagina 8
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
3.3 Limited section excavation (m3) (Code AA02B..)
Any limited excavation works for R.C. foundations, basins with limited surface, pits, trenches,underground pipe systems, cable ducts, ditches, etc. and any other excavation with limited sectionbelongs to this work category.
a) The volume of excavation for items as R.C. foundations, basin, pits, etc., shall be calculatedon the basis of the planimetric area of the item, shown on construction drawings, multiplied bythe average depth taken between ground elevation (NGE or PTS or PSG) and bottom designelevation of the concrete item, included lean concrete thickness if any, regardless to actualvolume excavated.
See ANNEX 2 4 5.
b) The excavation volume relevant to trench, duct, channel with limited section and trench for
underground pipes shall be calculated on the basis of the average of the surface area(a1a2a3etc.) multiplied by the distance, taken along the axis, between the consideredsections.
- The surface area of the section is to be calculated on the basis of the dimensions shownin construction drawing multiplied by the depth of excavation.
- The depth of excavation is the average of the values measured between the naturalground elevation (by topographic survey) and the bottom elevation of excavation shownon drawings issued for construction.
- The theoretical width for underground pipes trench is to be calculated by adding to thenominal diameter of pipes (DN) the coefficient "K" for each side, as shown onANNEX 6.
7/31/2019 TM930!1!04E Methods of Measurements
9/62
TM 930.1/04E
PAGEPagina 9
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
3.4 Sheet piling (m2) (Code AA02DA)
The surface area of sheet piling to be accounted, of any shape, dimension and weight, shall becalculated on the basis of its perimeter multiplied by the excavation depth, as shown onANNEX 7Where:
NGE = Natural ground elevation by topographic survey
PTS = Prepared top soil elevation shown on construction drawings
BOE = Bottom of excavation, this elevation is specified in construction drawings.
h = is the value obtained by NGE/PTS minus BOE elevation.
L1, L2, L3, L4, L.. = is the length of the sides of sheet piling
The surface area shall be calculated as follows:
A = (L1+L2+L3+L4+) x h
7/31/2019 TM930!1!04E Methods of Measurements
10/62
TM 930.1/04E
PAGEPagina 10
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
4. DEMOLITIONS / DISMANTLING (Code list AA03..)
4.1 General information for any kind of demolition/dismantling
The demolition/dismantling etc, work shall be evaluated only on the basis of each volume or surfacecalculated by the dimensions (width, length and height) shown in the drawing or taken at site beforedemolition. The actual demolition volume or surface in no case shall be considered.
4.2 Demolition of concrete and R.C. structures (m3) (Codes AA03B.., AA03D..)
4.3 Demolition of masonry works (m3) (Codes AA03C.., AA03E..)
4.4 Demolition of floor slabs (m2) (code AA03F..)
4.5 Others (Codes AAO3GA.., AA03GB.., AA03GC.., AA03HA.., AA03HB..,AA03IA01, AA03AB1, AA03LA01)
4.6 Piles head demolition (m3) (Code AA03AA)
The demolition volume of this work is to be calculated on the basis of the section pile areamultiplied the height of demolition indicated on the drawings issued for construction.
7/31/2019 TM930!1!04E Methods of Measurements
11/62
TM 930.1/04E
PAGEPagina 11
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
5. EMBANKMENTS AND BACKFILLINGS (Code list AA05)
5.1 Embankment (m3
) (Code AA05A)
This work is to be evaluated on the basis of its volume after compaction.
The volume is obtained by the average of the surface area of the sections (a1a2a3etc.)multiplied by the distances, taken along the axis, between the considered sections(a1a2a3etc.)See ANNEX 8.
The surface area of the section is to be calculated by multiplying the average of the widths, as perconstruction drawings by the height.
The height is the average of the values measured on the axis, between the top elevation of theembankment and the bottom elevation of excavation, according to the drawing issued for
construction.
Any part exceeding the dimensions required in the construction drawing is too not to be accountedfor.
See the following explanatory example:
a1+a2 a2+a3 a3+etc.VEM = ---------- x L1 + --------- x L2 + ---------- x L3 etc.
2 2 2
w1+w2 w1.2+w2.2.a1 = ---------- x h1 a2 = -------------- x h2 etc.
2 2
5.2 BACKFILLING (m3) (Code AA05B..)
This work is to be evaluated on the basis of its volume after compaction.
The volume of the backfilling is to be calculated on the basis of the dimensions (width, height andlength) show in the drawings issued for construction regardless of the actual volume of thebackfilling executed.
See ANNEX 2 and 9
Following the calculation formula indicated in Annex 2 and 9, the Volume of Backfilling ( VB ) is thefollowing:
a) VB = (VGE + VE1 + VE2) (volume of subbase crushed stone and concreteincorporated in the backfilling)
b) VB = VE3 (volume of the concrete incorporated in the backfilling)
c) VB (of subbase crushed stone) = a2 x b2 x hs
7/31/2019 TM930!1!04E Methods of Measurements
12/62
TM 930.1/04E
PAGEPagina 12
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
6. TRANSPORT (Code list AAO6..)
6.1 Transport off site of rubbish material m3 (Code AA06AAA01)
Transport off site of material arising from excavation shall be measured by Volume.Final measurement shall be quantified when all the earthwork is completed, as using the followingformula:
V = Vex - Vbf + Vus
Where:
Vex = all Volume of excavation based on drawings issued for construction
Vbf = all Volume of backfilling based on drawings issued for construction
Vus = all Volume of unsuitable materials, measured with excavation measurament criteria, andcertified by CONTRACTOR representative.
7/31/2019 TM930!1!04E Methods of Measurements
13/62
TM 930.1/04E
PAGEPagina 13
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
7. CONCRETE AND R.C. WORKS (Code list AAO8..)
7.1 Lean concrete (m2
- m3) (Code list AA08AA)
7.1.1 Bedding lean concrete (m2)
The surface area of bedding lean concrete with thickness upto 10 cm is conventionally consideredto be the same as the concrete foundation area, regardless of the lean concrete surface areaactually executed, unless otherwise quoted on the drawings issued for construction.
However the lean concrete layer shall extend a minimum of 100 mm beyond all concrete edge.
The surface area shall be paid conventionally considering as the same of concrete foundation area.
The limited section excavation shall be paid as per conventionally area. (see par. 3.3.a)
The piles surface area shall not be deducted.
7.1.2 Other lean concrete (m3)
The concrete volume is to be calculated on the basis of the dimensions indicated on drawingsissued for construction.
The concrete volume for Electrical/Instrumental bundle shall be considered as net volume. (Pipesvolume shall be deducted)
7.2 Concrete foundation (m3) (codes AA08AB..)
7.2.1 Definition
Foundation is any concrete work with a maximum elevation up to 60 cm, above PTS (prepared topsoil) of the area, for supporting steel structures, vessels, pipes, cables trays, tanks, equipments.Foundation is also considered any concrete work for supporting machineries (compressors,extruders, pumps, etc.) even with elevation more than 60 cm above PTS.
See examples shown inANNEXES 10, 10.1, 10.2, 10.3, 10.4, 10.5, and 10.6
7.2.2 Volume Calculation
The foundation concrete volume is to be calculated on the basis of the dimensions indicated inconstruction drawings.
The volume of embedded items, anchor bolts and anchor bolts sleeves are not to be deducted
The volume of embedded pipes, ducts, etc., up to 15 cm, diameter or equivalent individual surfaceis not to be deducted from the calculation of the concrete volume of the relative foundation.
7/31/2019 TM930!1!04E Methods of Measurements
14/62
TM 930.1/04E
PAGEPagina 14
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
7.3 Elevated concrete (m3) (Codes AA08AD)
7.3.1 Definition
An elevated concrete is any concrete starting from the first offset of the foundation mat, notincluded in the previous para 7.2, see examples shown on inANNEXES 10, 10.1, 10.2, 10.3,10.4, 10.5, 10.6
7.3.2 Volume Calculation
The elevated concrete volume is to be calculated on the basis of the dimensions indicated inconstruction drawings.
The volumes of embedded items, anchor bolts and anchor bolts sleeves are not to be
deducted.
The volume of embedded pipes, ducts, etc., up to 15 cm, diameter or equivalent individualsurface is not to be deducted from the calculation of the concrete volume of the relativeelevated structure.
7.4 Concrete ground floor paving (m3) (Codes AA08AG)
The surface area of floor paving is to be calculated on the basis of the dimensions shown in
construction drawings.
Blank concrete areas having individual surface area smaller than 1 m2
are not to be deductedwhen calculating the surface of ground floor paving.
The concrete volume of this work is to be calculated on the basis of the surface paving areamultiplied by the average height of the concrete shown in the construction drawings.
The reinforcement is to be accounted for separately.
Formation of paving joints and its sealing is included in concrete paving price according to TM909.1, excluded isolation joints only.
The formworks are included in the unit price of concrete paving.
7/31/2019 TM930!1!04E Methods of Measurements
15/62
TM 930.1/04E
PAGEPagina 15
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
8. FORMWORKS AND BOXES FOR ANCHOR BOLTS. (Code list AA09)
8.1 Formwork (m2
) (Codes AA09A.., AA09C..)
The formwork surface area to be considered is the formwork surface wetted by the concrete to becast, that is to be calculated by the dimensions shown in construction drawings.
The surface area of boxes for anchor bolts is not to be accounted for the calculation of formworksurface unless otherwise specified in contractual documents.
No allowance shall be made for overlaps and passing at angle and no deduction shall be made foropening not exceeding 0.25 m
2each.
8.2 Boxes for anchor bolts (N.) (Code AA09B..)
The anchor bolts boxes shall be accounted for per number.
The code list rate shall be based on a wet contour area of each box shown in the constructiondrawings.
7/31/2019 TM930!1!04E Methods of Measurements
16/62
TM 930.1/04E
PAGEPagina 16
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
9. REINFORCEMENTS (Kg) (Code list AA10..)
a) The reinforcement steel weight is to be calculated on the basis of steel bar theoreticalweight for unit length of each diameter (see enclosed table ANNEX 11) multiplied byreinforcement total length resulting from construction drawing bar bending schedule.
The weight of electrowelded steel mesh is to be calculated on the basis of theoreticalweight, by square meter, multiplied by surface laying area as indicated on constructiondrawing bar bending schedule. The overlapping shall not be accounted, but it shall beincluded in the unit price,
The nominal dimension of deformed bar is equivalent to that of a plain round bar havingthe same weight per meter as the deformed bar. (See enclosedANNEX 11)
Scraps and waste reinforcement are not to be accounted for.
Spacers, blocks, chairs, binding wires, etc., are not to be accounted for.
b) In case of plain and deformed steel bar and/or welded wire fabric reinforcement suppliedby CONTRACTOR, the allowance weight of scraps for each diameter shall not exceed15% of the total weight of reinforcement to be installed according to the drawings issuedfor construction.
The SUBCONTRACTOR shall be backcharged for any unjustified greater allowance.In any case, the quantity to be accounted for is relevant to reinforcement shown in thedrawings.
Any overlaps made by convenience, easily execution, etc. are at SUBCONTRACTOR care.
7/31/2019 TM930!1!04E Methods of Measurements
17/62
TM 930.1/04E
PAGEPagina 17
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
10. ANCHOR BOLTS AND EMBEDDED WORKS (Code list AA11..)
10.1 Anchor bolt (Kg - N.) (Code AA11A..)
10.1.1. Supply (kg):
The anchor bolts weight calculation is to be made according to theoretical weight, shown inCONTRACTOR specification (TM 903.10 standard) multiplied by number of anchor bolts indicatedon drawing issued for construction.The nuts and washer weight shall not be accounted but it shall be included into unit price.
In case the dimensions of the anchor bolts, indicated in the construction drawings, do notcorrespond to TM 903.10, the relevant weight is to be the theoretical one, taking into account thespecific weight of steel (7.85 kg/dm
3).
The nuts and washer weight shall not be accounted but it shall be included into unit price.
10.1.2. Installation (No.)
The unit of measurement to be used for quantity calculation is the number divided in-groups ofdiameters.
10.2 Embedded items (Kg) (Code AA11B..)
10.2.1. Steel plates supply and/or installation (kg)
The weight to be considered is as follows:
a) For steel plates, according to specification TM 905.06, the relevant weight is indicated in theabove TM.
b) For steel plates not in according to TM 905.06, the relevant weight is to be calculated usingthe dimensions shown in construction drawing multiplied by the specific conventional weightof steel (7.85 kg/dm
3)
10.2.2. Minor steel sections - supply and/or installation (kg)
The weight is to be calculated on the basis of the conventional unit length weight of each shape,multiplied by the total length indicated on construction drawings taken along its axesThe weight of the relevant welded rods is not to be accounted for.
10.2.3. Steel pipes supply and/or installation (kg)
The weight is to be calculated on the basis of the conventional unit length weight of each diameterand schedule type, multiplied by the total length measured along the axes, corner to corner asshown in construction drawings.
10.2.4. Non steel pipes (m)
The length is to be calculated on the basis of the measuring along the axes, corner to corner asshown in construction drawings.
7/31/2019 TM930!1!04E Methods of Measurements
18/62
TM 930.1/04E
PAGEPagina 18
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
11. GROUTING (m3) (Codes AA12A)
The volume of grouting is to be calculated on the basis of the grouting dimensions indicated inconstruction drawings, regardless of the actual volume of grouting executed.
The volume of any embedded item (anchor bolts, plates, etc.) is not to be deducted.
The volume of grouting for anchor bolts sleeves is not to be accounted for.
The anchor bolts pocket volume is to be accounted for.
The contour finishing (45 slope) and sealing shall be included in unit price.
7/31/2019 TM930!1!04E Methods of Measurements
19/62
TM 930.1/04E
PAGEPagina 19
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
12. GEOTEXTILE SHEET, GEOMEMBRANES, WATERPROOFING AND THERMAL AND
ACOUSTICAL INSULATION (m2
) (Codes AA07.., AA16.., AA21..)
The surface area is to be calculated on the basis of the dimensions, indicated in the drawingsissued for construction, relevant to the surface to be protected, regardless of the actual executedsurface protected.
Waterproofing, vapour barriers and insulation layer, if any, are to be evaluated by taking intoaccount the above criteria.
The non-waterproofed surfaces as openings, holes, foundations, etc. , having individual surfacearea smaller than 0.25 m
2are not to be deducted.
Any accessory work and charge necessary for the work completeness is included in the unit price(Example: caulking material, metallic or plastic stop strips, cap flashing for protecting and fixing thewaterproofing edges, vents, etc.).
7/31/2019 TM930!1!04E Methods of Measurements
20/62
TM 930.1/04E
PAGEPagina 20
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
13. FIREPROOFING (m2) (Code list AA17..)
The fireproofing surface area evaluation method should follow the subsequent criteria.
The surface to be considered is the external surface of fireproofing as resulting from multiplying theheight or length of the involved item by the external design fireproofing perimeter.
Where is considered for:
a) Structural steel structures (See ANNEXES 12, 12.1) :
- Length of beam if measured centre to centre line of supports.
- Height of columns is measured from the bottom of base plate to the top of fireproofing.
- The external perimeter shall be considered as per ANNEX 12 and 12.1, in two ways:Box shape up to 300 mm. and contour shape above 300 mm.
b) Skirts or support of vessels (See ANNEXES 12.2):
- Height is measured from the lower face of steel base to the top of fireproofing.
c) The surface area so achieved includes any overthickness due to the anchor bolts of
baseplates, for plates and bolts connections of beams, columns, braces, etc.
7/31/2019 TM930!1!04E Methods of Measurements
21/62
TM 930.1/04E
PAGEPagina 21
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
14. MASONRY WORKS (external wall and partition)(m
2) (Codes list AA18, AA20.)
Shall be considered any type of internal or external masonry and/or partition.
The surface area is to be calculated on the basis of the dimensions indicated in constructiondrawings.
Openings and holes, having individual surface area smaller than 1,00 m2
are not to be deductedwhen calculating masonry surface area.All the reinforced concrete works, such as lintels, buttress, etc. shall not be accounted, but theyshall be included into unit price.
All the Charge for worked scraps and waste, joints and sealing are not to be accounted for.
7/31/2019 TM930!1!04E Methods of Measurements
22/62
TM 930.1/04E
PAGEPagina 22
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
15. PLASTERING AND FINISHING COATS (m2) (Code list AA24..)
The plaster surface area is to be calculated on the basis of the dimensions indicated inconstruction drawings.
Openings and holes, having individual surface area smaller than 1,00 m2
are not to bededucted in the calculation of plastered surface area, that compensate the reveals execution,etc.
The plaster surface area of vaults and arches is to be calculated by multiplying its horizontalprojections by 1,2 times.
7/31/2019 TM930!1!04E Methods of Measurements
23/62
TM 930.1/04E
PAGEPagina 23
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
16. FLOOR WALL LININGS (m2) (Code list AA26, AA27)
16.1 Floor and wall linings (m2) (Codes AA26.., AA27..)
The surface area of floor and wall linings is to be calculated on the basis of the dimensionsindicated in the construction drawings.
Openings, holes and blank areas having individual surface smaller than 1,00 m2
are not to bededucted.
The scraps of floor and wall lining due to cut for slope line, corner, edge, etc. are included in the unitprice.
16.2 Removable floor (m2) (Code AA26CD)
The removable floor (also called pedestal floor, false paving etc.) surface area to be considered, isthe surface covered by the false paving, having the surface finishing and dimensions, as shown inconstruction drawings.
Holes and voids in the false paving having individual surface area smaller than 1.00 m2
are not tobe deducted, to compensate for the major charges due to adjustments and cut-off of the base frameand panels.
All the Charge for worked scraps and waste are not to be accounted for.
The skirting board is included in the false paving unit price.
See ANNEX 13.
7/31/2019 TM930!1!04E Methods of Measurements
24/62
TM 930.1/04E
PAGEPagina 24
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
17. FALSE CEILING (m2) (Code list AA28)
The false ceiling surface area is to be calculated on the basis of the dimensions indicated in theconstruction drawings without any deduction for blank areas due to the presence of column or itemscrossing it having individual surface area smaller than 1.00 m
2.
The charge for scraps and cuts due to any openings, holes and void spaces (i.e. air conditioningdiffusers, electrical fixtures, etc.) and the relevant adjustment of frame, if necessary, are included inthe false ceiling unit price.
The electrical fixtures, if any, are accounted for separately.
7/31/2019 TM930!1!04E Methods of Measurements
25/62
TM 930.1/04E
PAGEPagina 25
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
18. DOOR - WINDOW - SHUTTERING - LOUVER - GLAZING(m
2) (Codes AA31, AA32, AA33, AA35)
The unit of measurement to be used for quantity calculation of these works regardless of themanufactured material, is the m
2.
The surface area of single element, to be calculated, is obtain multiply the length per height, usingthe dimensions shown on CONTRACTOR "doors & windows schedule" drawings issued forconstruction.In absence of doors & windows schedule drawings shall be considered the following:
For openable element is always considered the net opening
For fixed element is always considered the frame axis
All the accessory works and ancillary items necessary for doors, windows, shutterings, louvers and
glazings installation completeness are included in the previously calculated surface area.
All the Charge for worked scraps and waste are not to be accounted for.
7/31/2019 TM930!1!04E Methods of Measurements
26/62
TM 930.1/04E
PAGEPagina 26
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
19. GUTTERS, FLASHINGS AND DOWNSPOUTS (Code list AA34)
19.1 Gutter and flashing (Kg) (Code AA34AA, AA34BA)
The unit of measurement to be used for caps ridge, flashing, gutter, downspout, roof rainwaterout-let etc. made by metal sheets (aluminium, copper, zinc, lead, etc.) is the Kg.
The weight is to be calculated on the basis of dimension indicated on construction drawings,multiplied by the conventional weight of each material,
19.2 Downspouts (m - Kg) (Code AA34AB, AA34BB)
The unit of measurement to be used for downspouts is the following:
a) Supply:
- kg for downspout made by metal sheets (aluminium, copper, zinc, lead, etc.
The weight is to be calculated on the basis of the length dimension indicated onconstruction drawings, multiplied by the conventional weight (Kg/m) of eachmaterial,
The weight of anchorage items and/or accessory shall not be accounted but shallbe included in the unit price.
- m for downspout made by plastic pipes (PVC, PP, etc.), fibber cement pipes
The charge for anchorage items and/or accessory shell not be accounted but shall
be included in the unit price.
The total length is to be calculated on the basis of the downspouts length,indicated on construction drawings, measured along the axes
b) Erection:
- m for downspout made by metal sheets and plastic pipes, fibber cement pipes.
The quantity shall be accounted as indicated in `point a)
7/31/2019 TM930!1!04E Methods of Measurements
27/62
TM 930.1/04E
PAGEPagina 27
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
20. PAINTING OF WALLS (m2) (Code list AA36)
The surface area of painting works (walls, ceilings, paving, etc.) is to be calculated on the basis ofthe dimensions indicated in construction drawings.
Openings, holes and blank areas having individual surface area smaller than 1.00 m2
is not to bededucted to compensate the charges for the relevant reveals, etc. painting execution.
7/31/2019 TM930!1!04E Methods of Measurements
28/62
TM 930.1/04E
PAGEPagina 28
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
21. ROADS AND YARDS WORKS (Code list AA50)
21.1 Roads/yards (Codes AA50AA, AA50AB, AA50AC, AA50BA, AA50BC)
The quantity calculation of volume and surface area to be accounted for is to be made on the basisof the dimensions indicated in the construction drawings regardless of the actual executed quantity,taking into consideration the following methods of measurement:
a) Excavation (m3): calculation as per applicable para 3 or 5 of this Methods of
Measurement
b) Embankment (m3): calculation as per applicable para 8 of this Methods of
Measurement
c) Subbase/base
course (m3) : the volume is obtained by the average of the surface area of thesections (a1a2a3etc.) multiplied by the distance measuredalong the axes, between the considered sections(a1a2a3etc.). The surface area of the sections is to becalculated on the basis of the dimensions indicated in constructiondrawings.The volumes of road catch basins and inspection pits, if any, are notto be deducted.
d) Binder / wearing courseasphalt concrete (m
2): the surface area is to be calculated on the basis of the width and the
length measured along the axes indicated on the constructiondrawings.
f) Road kerb (m) : the length of road kerb is to be calculated on the basis of thedimensions shown in construction drawings.Any necessary work for kerbs installation as excavation, bedding andside support concrete, sealing, etc. are not to be accounted for.
21.2 Finishing of unpaved areas (m2) (Code AA50BB)
The surface area of final soil arrangement, as grading, gravelling etc. is to be calculated on thebasis of the dimensions indicated in the drawings issued for construction.
The areas without soil arrangement of individual surface smaller than 3,00 m2
are not to bededucted.
7/31/2019 TM930!1!04E Methods of Measurements
29/62
TM 930.1/04E
PAGEPagina 29
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
22 STEEL STRUCTURES METAL SHEETS, SIDING ROOFING AND FLOORING(Code list AI30)
22.1 Steel structures (Kg)
The method of measurement of "Theoretical weight" for the supply and erection of steel work suchas beams, columns, stairs, ladders, walkways, handrails, gratings, chequered plates, and otherancillary works, shall be as per the following criteria based on erection drawings:
a) Main and secondary steel structures:
Length of beams and bracings taken from centre to centre line of supports, multiplied by thetheoretical conventional weight per unit length (Kg/m) of relevant sections
Height of columns measured between the underneath face of the base plate and the top ofcolumn multiplied by the theoretical conventional weight per unit length (Kg/m) of relevantsections.
Any ancillary materials such as gussets, plates, all connection items for structural joints(flanges, gussets, bolts, expansion bolts, weldings, all equipment anchorings bolts, etc.)necessary for fabrication and erection completeness are not to be accounted for.The weight of these materials shall be included in unit price.
However all these materials, to be installed, must be supplied free of charge, including5% of surplus of any type and length of bolts.
The only plates to be taken into account shall be the base plates of columns.These base plates, quoted on erection drawings, are to be calculated on the basis of theactual dimensions multiplied by the specific weight of steel (7.85 kg/dm
3)
b) Handrail (according to TM 914.11):
The handrail theoretical weight is to be calculated on the basis of the length measured alongthe axis of supporting beams multiplied by the all-in weight (Kg/m) of handrail and toeplate.The weight is indicated in the TM 914.11.
c) Ladder (according to TM 914.8):
The theoretical weight of ladder is to be calculated on the basis of the length of ladder and
guard cage (if any) shown in the erection drawings multiplied by the relevant all-in weight(kg/m) of ladder and guard cage. The weight is indicated in the TM 914.8.
d) Grating (according to TM 914.4):
The theoretical weight of grating is to be calculated on the basis of the theoretical surface areaas resulting from the dimensions measured, with reference to the centerline of supportingbeams shown in erection drawings, multiplied by the weight (Kg/m
2) indicated in the TM 914.4
of the used type.
The holes having individual surface area less than 1.00 m2
are not to be deducted.
7/31/2019 TM930!1!04E Methods of Measurements
30/62
TM 930.1/04E
PAGEPagina 30
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
e) Stair tread (according to TM 914.9):
Supply:
- The theoretical weight of grating stair tread shall be accounted multiplying the surface bythe square unit weight of grating. Edge, fixing items shall not be accounted but includedinto unit price
- The weight of stair tread, made of any type of metal sheet, is to be calculated using itssurface dimensions, shown in erection drawing, multiplied by the specific conventionalweight of steel (7.85 kg/dm3). Edge, fixing items shall not be accounted but included intounit price
Installation:
- The stair tread installation is to be calculated per number.
f) Chequered and buckled plate (according to TM 914.3):
The theoretical weight of chequered/buckled plates is to be calculated on the basis of thetheoretical surface area as resulting from the dimensions measured with reference to thecenterline of supporting beams shown in erection drawings, multiplied by the weight (Kg/m
2)
indicated in the TM 914.3 of the used type. The holes having individual surface area less than1.00 m
2are not to be deducted.
22.2 SIDING , ROOFING AND FLOORING (m2) (Code AI30)
The surface area calculation of these works is to be made according to the dimensions indicated inerection and/or construction drawings (any overlap is not to be accounted for).
Opening / hole having individual surface area smaller than 1,00 m2
is not to be deducted.
All the relevant flashing of any type is included in the roof and side sheeting unit price.
7/31/2019 TM930!1!04E Methods of Measurements
31/62
TM 930.1/04E
PAGEPagina 31
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
23. ELECTRIC INSTALLATION FOR CIVIL BUILDING(LUMP SUM) (Code list AN41)
The lighting system supply and installation is to be evaluated on lump sum on the basis of the typeand quantity of any component, belonging to this system, indicated on drawings and/or in technicalspecifications annex to Work Requisition.
7/31/2019 TM930!1!04E Methods of Measurements
32/62
TM 930.1/04E
PAGEPagina 32
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
24. UNDERGROUND EARTHING SYSTEM (code list AQ42.)
The quantity of the components belonging to the earthing system work(TM 708.1 708.6 708.7 708.8 - 773.3) are to be calculated on the basis number anddimensions indicated on construction drawings, taking into consideration the following criteria foreach item:
1. Earthing conductors installation (m):
The length to be accounted for is to be calculated according to the dimensions obtained fromthe earthing system layout and CONTRACTOR documents regardless of the actual installedlength.
2. Earthing connectors installation (N.):
the quantity of connector to be accounted for is the quantity shown in construction drawingsregardless of the actually installed quantity.All fixing accessories, if any, are included in unit price
3. Pipe for earthing conductor protection (N.) :
The quantity of pipes to be accounted for is the quantity shown in construction drawingsincluding the fastening of pipes to the structural concrete supports.
4. Earthing rod and bars (N) :
The quantity of earthing rod and bar is to be calculated by the number of earthing rod and barshown in construction drawings, fixing of the relevant earthing conductors to the rod are
included.
7/31/2019 TM930!1!04E Methods of Measurements
33/62
TM 930.1/04E
PAGEPagina 33
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
25. UNDERGROUND SEWER AND PIPING SYSTEMS (Code list AQ49)
25.1 Concrete, gres and plastic piping system (m)(Codes AQ49AA, AQ49AB, AQ49AC, AQ49AD, AQ49AE..)
The unit of measurement to be used for quantity calculation of these works is the linear meter.
The length is to be calculated by the following measuring criteria:
A) Conventional length of the line shall be determined by summing the straight lengths by theconstruction drawings of every diameter measured from one angle to another along thepiping centerline (corner to corner), without taking in to consideration the actual developmentof special pieces such as elbows, T, etc.
B) The piping interruption due to the presence, along the piping centerline, of valves, meters,etc. and any type of sum pits up to internal dimension of 1.30 m as a maximum shall not be
deducted.
25.2 Steel piping system (kg) (Codes AQ49AF.., AQ49AH..)
The unit of measurement to be used for quantities calculation of the materials, such as pipes,valves, meter, etc., belonging to this work is the kg.
a) Pipe: the weight of piping is to be obtained by multiplying the straight length, measured inconstruction drawings from one angle to another along the piping centerline (corner tocorner), for every diameter and class of pipe, by the relevant theoretical conventional weightper unit length. (Net weight excluding any type of coating)
Piping interruption due to the presence of valves, meters, etc. are not to be deducted.
b) Piping special pieces such as elbows, T, reductions, etc. are considered as pipe.
c) Valves, flanges, meters etc.: the weights of these items are the conventional theoreticalweight of every diameter and class according to the Manufacturers documents.
d) Connection bolts, gaskets, etc. are not to be accounted for.
7/31/2019 TM930!1!04E Methods of Measurements
34/62
TM 930.1/04E
PAGEPagina 34
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
26. HVAC SYSTEM INSTALLATION (Lump Sump) (Code list AZ43)
The HVAC system installation is to be evaluated on Lump Sum on the basis of type and quantityof any components belonging to this system, indicated on construction drawings, bill of quantities,specifications and standards. Including all civil works services relevant to execution of holes, fixingof steel supports, restoration of plastering, sealing of holes, etc.
7/31/2019 TM930!1!04E Methods of Measurements
35/62
TM 930.1/04E
PAGEPagina 35
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
27. PAINTING OF WOODEN AND STEEL WORKS (Code list AW37)
The painting surface area to be accounted for is to be calculated as follows:
A) Doors, main doors, glazed doors and equivalent:
Two times the surface area as resulting from multiplying the clear width by the clear heightindicated in construction drawings.
The surface area of glazings is not to be deducted. Painting surface area of the relevantembedded heelposts, frames, borderings, etc. is not to be accounted for.
B) Windows, glazed frames and equivalent:
One time the surface area as resulting from multiplying the clear width by the clear heightindicated in construction drawings.
Painting surface of the relevant embedded frames and accessory is not to be accounted for.
If the individual clear surface area of glasses is less than 0.50 m2, the resulting surface area
is to be multiplied two times.
C) Shuttering (roller shutters, venetian blind, etc.), louvers
Two and a half time, the surface area as resulting from multiplying the clear width by theclear height indicated in construction drawings. The painting surface areas due to therelevant shutter box, embedded frame, roller shutter guides and any other accessory itemsare not to be accounted for.
D) Radiators (any type)
Two and half time the surface area as resulting from multiplying the width by the height of theminimum rectangle or square circumscribing the radiator.
The painting of accessories (supports, etc.) which are parts of the radiator is not to beaccounted for.
E) Windows gates, bars gates, grills and nets
One time the surface area resulting from multiplying the clear width by the clear height or thetop of items shown in construction drawings.
F) Parapets handrails
One time the surface area resulting from multiplying the length measured along the axisbetween the first and last post by the height measured from the walking elevation to the topof parapet.
G) Rung Ladders
One time the surface areas of the rung ladders and safety cage (if any) as resulting frommultiplying the width of rung ladder by the height plus the development of cage multiplied bythe height indicated in construction drawings.
7/31/2019 TM930!1!04E Methods of Measurements
36/62
TM 930.1/04E
PAGEPagina 36
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
H) Corrugated sheets
One time the surface area of each painted face as resulting from multiplying the clear lengthby the section development of sheets shown on construction drawings. Openings and holeshaving individual surface less than 1 m
2are not to be deducted.
I) Chequered, buckled plate
One time the surface is of each painted area as resulting from multiplying the clear width andlength indicated in construction drawings. Openings and holes having individual surface lessthan 1 m
2are not to be deducted. Painting of bordering up to 10 cm height of the above
holes and openings are not to be accounted for.
L) Lath plates
Two and half times the surface area as resulting from multiplying the clear width and length
indicated in construction drawings. Openings and holes having individual surface less than 1m
2are not to be deducted. Painting of borderings up to 10 cm height of the above openings
and holes are not to be accounted for.
27.1 Pipes
Measurement of piping surfaces:
a) When calculating the surface, both the external diameter and the conventional length of theline shall be considered as indicated in construction drawings.
b) The conventional length of the line shall be determined by summing the various straightlengths L, to be measured from one angle to another on the piping centerline (corner tocorner length), without taking the actual development of elbows and the presence ofcomponents like valves, meters, etc. into account (See Annex 14) ;
c) When calculating the surfaces, reducers shall be conventionally regarded as equal to the pipehaving the greatest diameter;
d) Piping brackets, such as bolted clamps, U-bolts and other minor accessories, such as rollers,guides, etc., shall not involve any increase in surface.
Conventional surface addition
- For lines > NPS 2 a conventional surface corresponding to 2 m pipe for each valve,flowmeter, meter and expansion joint to be painted, provided on same line, shall be addedto the surface calculated in compliance with provisions of point 7.b.
- For lines NPS 2, no conventional surface addition shall be considered for componentseither painted or to be painted provided in the line.
7/31/2019 TM930!1!04E Methods of Measurements
37/62
TM 930.1/04E
PAGEPagina 37
OFdi 62
CIVIL DEPT.
CIVIL WORKSMETHODS OF MEASUREMENT
DS
ThisdocumentisTecnimontspropertyandc
annotbeused
by
others
forany
purpose
withoutpriorw
ritten
consent
Questo
documento
proprietdiTecnimonte
non
pu
esse
re
utilizzato
inalcunmododa
terzisenzapreventiva
autorizzazion
e
Measuring criteria Typical example
S = 3, 14 x [D1 x l1 + D2 (L2.1 + L2.2) + D3 x L3](m
2)
Where:
S = SurfaceD1-D2-D3 = External diameter (m) of a line sectionL1-L2-L3 = Length (m) of a line section
Note: Typical installations as pressure plugs, temperature plugs, vents, drains, etc. must notbe considered.
27.2 Steel structures (m2)
The painting surface area of steel structures is to be calculated by multiplying the length ofbeams, columns and bracings shown on construction drawings measured at centre to centre
of relative supports by theoretical perimeter of each section. Connection plates, connectionangles, gussets, bolts are not to be accounted for.
7/31/2019 TM930!1!04E Methods of Measurements
38/62
7/31/2019 TM930!1!04E Methods of Measurements
39/62
7/31/2019 TM930!1!04E Methods of Measurements
40/62
7/31/2019 TM930!1!04E Methods of Measurements
41/62
7/31/2019 TM930!1!04E Methods of Measurements
42/62
7/31/2019 TM930!1!04E Methods of Measurements
43/62
7/31/2019 TM930!1!04E Methods of Measurements
44/62
7/31/2019 TM930!1!04E Methods of Measurements
45/62
7/31/2019 TM930!1!04E Methods of Measurements
46/62
7/31/2019 TM930!1!04E Methods of Measurements
47/62
7/31/2019 TM930!1!04E Methods of Measurements
48/62
7/31/2019 TM930!1!04E Methods of Measurements
49/62
7/31/2019 TM930!1!04E Methods of Measurements
50/62
7/31/2019 TM930!1!04E Methods of Measurements
51/62
7/31/2019 TM930!1!04E Methods of Measurements
52/62
7/31/2019 TM930!1!04E Methods of Measurements
53/62
7/31/2019 TM930!1!04E Methods of Measurements
54/62
7/31/2019 TM930!1!04E Methods of Measurements
55/62
7/31/2019 TM930!1!04E Methods of Measurements
56/62
7/31/2019 TM930!1!04E Methods of Measurements
57/62
7/31/2019 TM930!1!04E Methods of Measurements
58/62
7/31/2019 TM930!1!04E Methods of Measurements
59/62
7/31/2019 TM930!1!04E Methods of Measurements
60/62
7/31/2019 TM930!1!04E Methods of Measurements
61/62
7/31/2019 TM930!1!04E Methods of Measurements
62/62