19
I-210 Connected Corridor Presentation to County Of Los Angeles Department Of Public Works Sept 17, 2013 1

to County Of Los Angeles Department Of Public Works

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: to County Of Los Angeles Department Of Public Works

I-210 Connected Corridor Presentation

to County Of Los Angeles Department Of

Public Works

Sept 17, 2013

1

Page 2: to County Of Los Angeles Department Of Public Works

• Coordinated Signal Timing

• Corridor Adaptive Ramp Meters & Traffic Signals

• Traveler Information

• Active Corridor Management

• Active Corridor Management will enable Caltrans and its Partners to address both transportation demand and supply issues to maximize system performance

• Benefit cost ratios for new freeway construction is often less than 2:1 while ITS system management projects achieve 8:1or better cost benefit ratios.

• We can’t build our way out of congestion, but we can attempt to manage what we have better. Active Corridor Management gives all Partners more bang for the buck

Investing in the Future Highlight taken from Caltrans 2013 Transportation Management Business Plan

Page 3: to County Of Los Angeles Department Of Public Works

What can a I-210 ICM Project Achieve?

Will allow individual transportation systems within the corridor, regardless of size, to be operated and be managed as unified corridor network.

An overall vision of what the I-210 CC project will achieve is yet to be determined as all Partners need to be consulted for input to determine their individual priorities and needs, with the goal of improving mobility and maximizing system efficiency within the corridor.

3

Page 4: to County Of Los Angeles Department Of Public Works

Facts

Current Partners Identified (but are not limited to): Caltrans, LA Metro, PATH, LA County, Pasadena, Arcadia, Monrovia, Duarte, Irwindale, Azusa, Glendora, San Dimas, and La Verne.

The Corridor will extend from SR-134 to SR-57, approximately 20 miles in length.

Due to the magnitude of the project their has been some discussion on breaking the project out into two segments. The first phase will consist of the segment between SR-134 and I-605, and the second phase will consist of the segment between I-605 and SR-57. This is subject to change as all Partners still need to be consulted

4

Page 5: to County Of Los Angeles Department Of Public Works

Teams

Three teams have been formed to get the ball rolling! Participation from all the Partners is essential and encouraged. Team participation is open to all

Outreach Team (Metro, PATH, CT)

Metrics Team (Metro, PATH, CT)

Data Collection Team (Metro, PATH, CT)

5

Page 6: to County Of Los Angeles Department Of Public Works

Caltrans Funding

Effective data collection, and being able to collect the data from all the right places is essential in analyzing and evaluating the performance of the corridor.

SHOPP funds may have been identified to augment ITS elements within the Corridor. District 7’s ITS staff is in the process of preparing a comprehensive list of those elements to submit to HQ next week so that we can capture funding to make the improvements.

6

Page 7: to County Of Los Angeles Department Of Public Works

Cities within the I-210 CC 7

Pasadena (137,122)El Monte (116,249)West Covina (106,870)Alhambra (85,961)Baldwin Park (75,940)Arcadia (56,769)Rosemead (54,154)

South Pasadena (25,806)Duarte (21,486)San Marino (13,241)Sierra Madre (10,996)Irwindale (1,472)Bradbury (1,268)

Covina (50,954)Glendora (50,435)Azusa (46,678)San Gabriel (40,005)Monrovia (36,857)Temple City (35,816)San Dimas(35,064)

3

2

1

4

5

7

8

9

0

6

Unincorporated LA County AreasSan Pasqual (2,082)East Pasadena (6,144)East San Gabriel (14,874)Mayflower Village (11,649)North El Monte (3,723)

Vincent (15,922)Citrus (11,964)Charter Oak (9,310)West San Dimas (309)Ramona (4,053)

3

4

2

1

5

8

9

7

6

0

Congressional District Boundary

Page 8: to County Of Los Angeles Department Of Public Works

Supporting Arterials 8

Orange Grove Blvd

Walnut St

Foothill Blvd

Colorado Blvd Huntington Dr

Foothill Blvd Route 66 / Alosta Ave

Arrow Hwy

Gladstone St

Freeway Interchange Freeway

Arterial N Not to

scale

Corson St

Maple St

Sant

a A

nita

Ave

Ros

emea

d B

lvd

Azu

sa A

ve

Del Mar Blvd

Alle

n

Hill

Lake

Ave

Los

Rob

les

Fair

Oak

s

Alta

dena

Sier

ra M

adre

Myr

tle

Mou

ntai

n

Buen

a Vi

sta

Citr

us

Gra

nd

San

Dim

as C

anyo

n

San

Dim

as A

ve

Lone

Hill

Amel

ia

Irwin

dale

San

Gab

riel

Colorado Street

Colorado Place

Page 9: to County Of Los Angeles Department Of Public Works

Role Of Caltrans District 7 Traffic Management Team Incidents play a major role in the Corridor and need to be managed with input of all the Partners

9

Traffic Management Team (TMT) consists of a group of Caltrans Engineers and Technicians responding to major incidents. The TMT works in concert with the TMC, Caltrans Maintenance forces and CHP at the incident scene in hopes of clearing the incident as soon as possible.

TMT responds to complicated incidents or events that may have a lengthy and/or significant impact on Los Angeles and Ventura County freeway traffic Incidents blocking 2 or more lanes for 2 or more hours Fatalities Haz Mat Events Brush Fires & Police Activity Special Events (Major Concerts, Rose Bowl and Coliseum Games, etc.)

Page 10: to County Of Los Angeles Department Of Public Works

Incidents Involving a Traffic Management Team (TMT) Response

10

Bald

win

Alle

n

Hill

Lake

Los

Rob

les

Fair

Oak

s

Alta

dena

Sier

ra M

adre

Myr

tl

Mou

ntai

n

Buen

a Vi

sta

Citr

us

Gra

nd

San

Dim

as C

anyo

n

San

Dim

as A

ve

Lone

Hill

Amel

ia

Irwin

dale

Azus

a

Sant

a An

ita

San

Gab

riel

6.8

5.0

3.2

5.6

3.7

2.9

15.7

3.8

1.9

6.7

2.8

1.2

5.9

25.5

25.2

25.2 25.5

8.2

25.8

3.9

26.3

8.5

28.4 2.9

31.9

2.8

26.4

1.2

27.8

13.3

28.0

5.9

28.6

11.2 29.7

2.9 29.9

9.5 31.5

3.1

35.0

3.5

35.5

3.6

36.1

1.2

39.1

3.8 36.3

3.3 0.8

36.5

3.4

37.0

2.4

38.4

5.8

42.5

6.3

44.9

37.0

2.5

42.5 1.5

42.1

3.8

39.6

13.9

39.5

3.2

39.0

9.4

8.5

2.6 4.5

37.5

9.7

38.3 4.9

5.0

38.4

2.5

38.9

Duration (hours) of incidents responded to by Caltrans District 7 Traffic Management Team, 2009-2012

Page 11: to County Of Los Angeles Department Of Public Works

General Corridor Information

Corridor geometry Linear corridor (east-west alignment).

Several parallel arterials in close proximity of I-210.

I-10 running parallel to I-210, 4 to 5 miles to the south.

Several possibilities for crossover between I-210 and I-10 I-605 and SR-57 freeways SR-19 (Rosemead) and SR-39 (Azusa) arterials

One-way frontage streets on each side of I-210 within Pasadena

11

Page 12: to County Of Los Angeles Department Of Public Works

General Corridor Information

Highly directional traffic control needs AM peak Westbound

PM peak Eastbound

Need to manage time-specific/event traffic patterns Higher congestion levels on Friday afternoon due to weekend traffic

Traffic associated with events at the Rose Bowl stadium & Santa Anita racetrack

Events associated with Caltech, Cal Poly Pomona and other colleges

Average truck traffic disruptions Trucks only represent 3-5% of traffic Typical of many urban freeways.

12

Page 13: to County Of Los Angeles Department Of Public Works

General Corridor Information

Traffic sensing infrastructure Very good PeMS coverage of freeway mainline, HOV

lanes, and ramps

Many intersections within Pasadena already equipped with traffic sensors

SMART test deployment site along Orange Grove Blvd in Pasadena System collecting event-based high resolution traffic data from multiple

intersections and generating real time arterial performance measures, such as intersection queue length and arterial travel time

13

Page 14: to County Of Los Angeles Department Of Public Works

General Corridor Information

Freeway traffic control All I-210 ramps metered, including interchanges with I-605

and SR-57

SWARM test corridor A good ramp metering infrastructure is already in place.

HOV lane along entire length of I-210 in both directions.

Arterial traffic control Traffic-responsive system exist along some arterials of interest in

Pasadena and Arcadia

Los Angeles County (IEN Network)

Local TMC in Pasadena

14

Page 15: to County Of Los Angeles Department Of Public Works

General Corridor Information

Transit coverage Metro Gold Line along I-210

Direct connection with downtown Los Angeles Current terminus at the Pasadena/Arcadia boundary, but to be

extended to Glendora by 2015 and further west subsequently Stations typically within ½ mile of the freeway

Metro Silver line along I-10 Terminus in El Monte, just west of I-605 Direct connection with downtown Los Angeles

Several express buses running along I-10 and I-210 Additional transit connections with downtown Los Angeles

Several park-and-ride facilities within the corridor

15

Page 16: to County Of Los Angeles Department Of Public Works

16

Emissions Reduction and Congestion Relief Graph Improved speeds through the Corridor will reduce amount of green house gas emissions, this helps to meets the State’s objective

of enhancing the livability, sustainability, and economic performance of California

Page 17: to County Of Los Angeles Department Of Public Works

Areas of Concern

Freeway and arterial congestion levels High level of congestion along I-210 may limit ICM

benefits during peak hour

Some intersections along local street networks already operating near capacity, constraining potential traffic management solutions during peak hour

Traffic signal infrastructure Limited information on traffic signal control equipment for most cities along

the corridor (Data Committee will explore)

Parking availability High occupancy (> 80%) at many park-and-ride facilities

17

Page 18: to County Of Los Angeles Department Of Public Works

• Make better use of existing transportation infrastructures by working together

• Maximize corridor performance (safety, mobility, reliability, quality of life)

• Fully implement real-time traffic management. Transition from “reactive” to “proactive/predictive”

• Develop trust, and enhance regional, local, and private sector partnerships

Summary: I-210 Connected Corridor What can be accomplished by the Partners?

Page 19: to County Of Los Angeles Department Of Public Works

Essential Next Steps

19

To do list: Identify vision, goals and objectives Define corridor boundaries Identify Partners Begin to develop strong working

relationships amongst all partners Develop work plan Inventory existing systems Identify user needs Develop strategies Produce Con Ops plan High-level system architecture System Engineering & Integration Identify risks Define success Select performance measures Measure performance Continue to foster trust and

cooperative relationships amongst all partners

Stakeholder Involvement ICM Message Outreach process Agency contacts/leaders User needs workshops Develop MOU’s

Risk Mitigation Plan

Additional Funding Needs/Opportunities

I-210 Connected Corridor Pilot Project