_-1, i

#C O STAIN NTERNATIOI'{AL LINTITED

AL YAMAh{AII - I{UIT{TER PROJECT

FACILITIES 5 to 9, 14' 15 & L7

DETAIL METHOD STATEMENT

rRef

Title

cIL/DMSi9.400

TOILET PARTITION

CC}iTROLLT'ilco?Y No 1 Ot

-

O RIGIN AL

Page 2: Toilet Partition

tdF"CO STAIN INTEKNATIONAL LIMITED

# IILTNTER PROJECT FACILITIES 5 to 9, 14, 15 &

Title: Detail Method Statentent MS/9.400 Toilet Partition

TABLE OF COI{TEI{TS

17

Date:Rev 0

13.9.95

1.0

2.0

3.0

4.0

5.0

SCOPE

PRE-INSTALI-ATIOI{

I].{STALLATION

RE\'ISION & A.MEhiDMENT RECORD

APPENDICES

3

3

3

4

4

Page 3: Toilet Partition

,e*,***.

oI. 'I.

. COSTAIN INTERNATIONAL LIMITEDg AI- YAMAh4AH - HLINTER PROJECT FACILITIES 5 tO g,14, T5 &.17

Rev 0Title: Detail Method Statement CIL/DMS/9.400 Toilet Partition Date : 13.9.95

1.0 SCOPE

t. i This Detail Method Statement covers the operations involved in rh; installation of ToiletPartitions in Rooms 40, 50 and i26 of facility 06 and Rooms 006,024 and 120 of faciiity08.

2.A PRE-IN'STALLATIOn-'

2-l Inqpect paneis and finings for damege; damaged items wiil be returned to the stores.

2.2 Check that the conect number ofpanels, doors and hardware are available.

(/' __,. 2.3 Check walls and floors for plumb and level.(-

2.4 Protect adjacent areas &om damage, panicular attention will be made where tiles -havebeen laid.

3.0 INSTALLATIO]V

3. 1 The partition system and associated fittings and fi-xtures will be insalled in accord.ancenith the manufacrurers printed instructions.

3.2 Free standing panitions wiil be instaned on stainless steel legs.

3.3 Care will be taken to ensure that partitions and cubicles are fixed straieht and true to line,level and plumb.

3.4 Ail divisions will be assembled at 90 degrees ro doors.

3.5 Doors wili be hung venically and have a uniform edge clearance along their entire length.

3.6 Sealants and caulking, where required, wil be coiour matched to the toilet cubicles.

3'7 Hard*'are wili be as suppiied by the cubicle manufacturer and fitted in accordance withtheir instructions,

Page 4: Toilet Partition

CO S TAIN INTERNATIONAL LItr{ITEDAr YAI'{AI\4AH - HLTNTER PROJECT FACILITIES 5 to g, t4, 15 &

Title: Detaii Method Statemenr CILIDMS/9.400 Toilet partition

t7

Date'Rev 0

r 3.9.95

4.0 RIVISION & AI{EI\DNfENT RECORI)

This document has been revised and amended as follows

APPEN.:DICES

Quaiity Control Checklist Toilet Partitions - CILiQCC 19.4OO

(_

5.0

5.1

Page 5: Toilet Partition

Doc.Ref CIL-QCC-9.400

Rer"ision: 0

Sheet No. I

QUALITY COI{TROL CMCKLISTAl Yamamah Project - Hunter Phase 3

COSTAINInternational Limited

TOILET PAR.TITIOIT{

DMS No: 9.400

ITP NO:

LOCATION:

ITEM:

DR.AWING NO:

Checklist ComPlete

Signed

Signed

Signed

( For Sub-Contractor ) Date :

( For Costain International ) Date :

( Engtneers RePresentative ) Date :

( Tick boxes as aPPlicable )

Check units for damage

Check walls and floor for plumb and ievel

Adjacent areas protected

Correct number of PanelsCorrect number a:rd tlPe of fningsManufacturers instructions are avail able

Panels are plumb and level

Doors have uniform gaP

Sealants correctly and neatly applied

Hardware has been finedHinges not bindingLocks and bolts fit neatly in their keeps

All screws and bolts ate tightPanels and cioors are cleaa

Area is left clean and tidy

s/c.

nInnDI

C.I,L. ERCI{ECK ITEMS

PRE-

APPLICATION

1

tr!TTnn

!ITn!!!Ttr

nIT!trtr!xLJ

APPLICATION

09_400_0.Doc