17
Tony Doyle - University of Glasgow 12 January 2005 Collaboration Board Beyond GridPP2 Tony Doyle

Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Beyond GridPP2 Tony Doyle

Embed Size (px)

Citation preview

Page 1: Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Beyond GridPP2 Tony Doyle

Tony Doyle - University of Glasgow

12 January 2005 Collaboration Board

Beyond GridPP2

Tony Doyle

Page 2: Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Beyond GridPP2 Tony Doyle

Tony Doyle - University of Glasgow

12 January 2005 Collaboration Board

Outline

• Beyond GridPP2: what are the estimated resource requirements in the LHC exploitation era?

• Background:• PMB preliminary discussions in September• PPAP presentation in October:• Resources needed in medium-long term?

• (09/07-08/10) Exploitation medium• (09/10-08/14) Exploitation long-term• Focus on resources needed in 2008

• GridPP Oversight Committee outline on Monday• initial ideas for discussion here..

Page 3: Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Beyond GridPP2 Tony Doyle

Tony Doyle - University of Glasgow

12 January 2005 Collaboration Board

Tier 0 and LCG: Foundation

Programme

• Aim: build upon Phase 1

• Ensure development programmes are linked

• Project management:GridPP LCG

• Shared expertise:

• LCG establishes the global computing infrastructure

• Allows all participating physicists to exploit LHC data

• Earmarked UK funding being reviewed

Required Foundation: LCG Deployment

F. LHC Computing Grid Project (LCG Phase 2) [review]

Page 4: Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Beyond GridPP2 Tony Doyle

Tony Doyle - University of Glasgow

12 January 2005 Collaboration Board

Tier 0 and LCG: RRB meeting

(October)

• Jos Engelen proposal to RRB members (Richard Wade [UK]) on how a 20MCHF shortfall for LCG phase II can be funded

• Spain to fund ~2 staff. Others at this level? • Funding from UK (£1m), France, Germany

and Italy for 5 staff. Others?• Now vitally important that the LCG effort

established predominantly via UK funding (40%) is sustained at this level (~10%)

• Proposal to SC in preparation

Value to the UK? Required Foundation: LCG Deployment

Page 5: Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Beyond GridPP2 Tony Doyle

Tony Doyle - University of Glasgow

12 January 2005 Collaboration Board

Grid and e-Science Support

in 2008What areas require support?IV Running the Tier-1 Data CentreIV Hardware annual upgrade

IV Contribution to Tier-2 Sysman effort (non-PPARC) hardware IV Frontend Tier-2 hardware

IV Contribution to Tier-0 support

III One M/S/N expert in each of 6 areasIII Production manager and four Tier-2 coordinators

II Application/Grid experts (UK support)

I ATLAS Computing MoU commitments and supportI CMS Computing MoU commitments and supportI LHCb Core Tasks and Computing SupportI ALICE Computing supportI Future experiments adopt e-Infrastructure methods

• No GridPP management: (assume production mode established + devolved management to Institutes)

III. Grid Middleware

I. Experiment Layer

II. Application Middleware

IV. Facilities and Fabrics

Page 6: Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Beyond GridPP2 Tony Doyle

Tony Doyle - University of Glasgow

12 January 2005 Collaboration Board

1/Jan/2005

£3.65m

£5.67m

£3.65m

£2.05m£1.87m

CERN

DataGrid

Tier - 1/A

ApplicationsOperations

PPARC Financial Input:

GridPP1 Outturn

LHC Computing Grid Project (LCG)Applications, Fabrics, Technology and Deployment

European DataGrid (EDG)Middleware Development

UK Tier-1/A Regional CentreHardware and Manpower

Grid Application DevelopmentLHC and US Experiments + Lattice QCD

Management Travel etc

Page 7: Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Beyond GridPP2 Tony Doyle

Tony Doyle - University of Glasgow

12 January 2005 Collaboration Board

Jan 2005

£0.81m

£2.77m

£2.86m

£0.82m

£0.66m

£2.99m

£2.70m

£1.00m

£2.40m

Tier-1/AHardware

Tier-2Operations

Applications

M/S/N

LCG-2

MgrTravel

Ops

Tier-1/AOperations

C. Grid Application DevelopmentLHC and US Experiments + Lattice QCD + Phenomenology

B. Middleware Security NetworkDevelopment

F. LHC Computing Grid Project (LCG Phase 2) [review]

E. Tier-1/A Deployment:Hardware, System Management, Experiment Support

A. Management, Travel, Operations

D. Tier-2 Deployment: 4 Regional Centres - M/S/N support and System Management

PPARC Financial Input:

GridPP2 Components

Page 8: Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Beyond GridPP2 Tony Doyle

Tony Doyle - University of Glasgow

12 January 2005 Collaboration Board

IV. Hardware Support

 UK Tier-1 2008

CPU Total (MSI2k) (7.8) 5.2

Disk Total (PB) (3.8) 1.6

Total Tape (PB) (2.3) 1.6

UK Tier-2 2008

CPU Total (MSI2k)

8.0

Disk Total (PB) 1.0

ALICE ATLAS CMS LHCb Total

CPU (MSI2K) 9.1 16.6 12.6 9.5 47.8 41.4 -13%

Disk (PBytes) 3.0 9.2 8.7 1.3 22.2 10.1 -55%

Tape (PBytes) 3.6 6 6.6 0.4 16.6 17.8 7%

Notes 1. 2.

Total resources required and planned in all Tier-1 Centres (except CERN)

Requirements will be reviewed by LHCC in January 2005Current planning includes estimates of resources for which funding has not yet been secured

Total resources planned at Tier-1 centres (note 2)

BalanceResource type

First full year of data taking (2008)

All data is preliminary

Estimated requirements (note 1)

1. Between (October) and December UK Tier-1 LHC estimates reduced (see Dave’s talk): now more realistic

2. Global shortfall of Tier-1 CPU was (-13%) and Disk (-55%) in October

3. UK Tier-1 estimated input in December now corresponds to ~20% (~7%) of global disk (CPU)

4. LCG MoU commitments required by April 2005

5. UK Tier-2 CPU and disk resources significant

6. Rapid physics analysis turnaround is a necessity

7. Priority is to ensure that ALL required software (experiment, middleware, OS) is routinely deployed on this hardware well before 2008

Page 9: Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Beyond GridPP2 Tony Doyle

Tony Doyle - University of Glasgow

12 January 2005 Collaboration Board

III. Middleware, Security and

Network

M/S/N builds upon UK strengths as part of International development

Configuration Management

Storage Interfaces

Network Monitoring

Security

Information Services

Grid Data Management

SecurityMiddleware

Networking

Require some support expertise in each of these areas in order to maintain the Grid

Page 10: Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Beyond GridPP2 Tony Doyle

Tony Doyle - University of Glasgow

12 January 2005 Collaboration Board

II. Application Middleware

Fabric

TapeStorage

Elements

RequestFormulator and

Planner

Client Applications

ComputeElements

Indicates component that w ill be replaced

DiskStorage

Elements

LANs andWANs

Resource andServices Catalog

Rep licaCatalog

Meta-dataCatalog

Authentication and SecurityGSISAM-specific user, group , node, st at ion regis tration B bftp ‘cookie’

Connectivity and Resource

CORBA UDP File transfer protocol s - ftp, b bftp, rcp GridFTP

Mass Storage s ystems protocol se.g. encp, hp ss

Collective Services

C atalogproto co ls

S igni fi cant Event Log ger Naming Servi ce Database ManagerC at alog Manager

SAM R es ource M an ag em entB at ch Sys tems - LSF, FB S, PB S,

C ondorData Mov erJob Services

Storage ManagerJob ManagerCache ManagerRequest Manager

“Dataset Editor” “File Storage Server”“Project Master” “Station Master” “Station Master”

Web Python codes, Java codesCommand line D0 Framework C++ codes

“Stager”“Optimiser”

CodeRepostory

Name in “quotes” is SAM-given software component name

or addedenhanced using PPDG and Grid tools

GANGA

SAMGridLattice QCD

AliEn

CMS

BaBar

Require some support expertise in each of these areas in order to maintain the Grid applications. Need to develop e-Infrastructure portals for new experiments starting up in exploitation era.

Pheomenology

Page 11: Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Beyond GridPP2 Tony Doyle

ATLAS UK e-science forward look (Roger Jones)

Both will move from development to optimisation & maintenance

Current core and infrastructure activities:

Run Time Testing and Validation Framework, tracking and trigger instantiations

Provision of ATLAS Distributed Analysis & production tools

Production management GANGA development Metadata development ATLFast simulation ATLANTIS Event Display Physics Software Tools

~11 FTEs mainly ATLAS e-science with some GridPP & HEFCE

Current Tracking

and Trigger e-science:

Alignment effort ~6FTEs

Core software ~2.5FTEs

Tracking tools ~6FTEs

Trigger ~2FTEs

The current eScience funding will only take us (at best) to first data

Expertise required for the real-world problems and maintenance

Note for the HLT, the installation and commissioning will continue into the running period because of staging

Need ~15 FTE (beyond existing rolling grant) in 2007/9 - continued e-science/GridPP support

Page 12: Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Beyond GridPP2 Tony Doyle

CMS UK e-science forward look (Dave Newbold)

NB: ‘First look’ estimates; well inevitably change as we approach running

Need ~9 FTE (beyond existing rolling grant) in 2007/9 - continued e-science/GridPP support

Work area Current FTEs FTEs 2007-9 FTEs 2009 -

Cmp sys / support (e-science WP1)

2.0 3.0 - ramp UP for running phase

3.0 - steady state

Monitoring / DQM

(e-science WP3)

2.5 2.0 - initial running 1.5 - support / maintenance

Tracker software

(e-science WP4)

2.0 1.5 - initial deployment running

1.0 - support / maintenance

ECAL software

(e-science WP5)

2.0 1.5 - initial running 1.0 - support / maintenance

Data management(GridPP2)

1.5 1.5 - final dplymnt / support

1.5 - support / maintenance

Analysis system(GridPP2)

1.5 1.0 - final dplymnt / support

1.0 - support / maintenance

11.5 10.5 9.0

Computing system / supportDevelopment / tuning of computing model + system; managementUser support for T1 / T2 centres (globally); liaison with LCG ops

Monitoring / DQMOnline data gathering/‘expert systems’ for CMS tracker, trigger

Tracker /ECAL softwareInstallation / calibration support; low-level reconstruction codes

Data managementPhedex system for bulk offline data movement and trackingSystem-level metadata; movement of HLT farm data online (new area)

Analysis systemCMS-specific parts of distributed analysis system on LCG

Page 13: Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Beyond GridPP2 Tony Doyle

LHCb UK e-science forward look (Nick Brook)Current core activities: GANGA development Provision of DIRAC & production

tools Development of conditions DB The production bookkeeping DB Data management & metadata Tracking Data Challenge Production

Manager

~10 FTEs mainly GridPP, e-science, studentships with some HEFCE support

Will move from development to maintenance phase - UK pro rata share of LHCb core computing activities ~5 FTEs

Current RICH & VELO e-science:

RICH: UK provide bulk of the RICH s/w team including s/w coordinator ~7 FTEs about 50:50 e-science funding+rolling grant/HEFCE

VELO: UK provide bulk of the VELO s/w team including s/w coordinator ~4 FTEs about 50:50 e-science funding+rolling grant/HEFCE

ALL essential alignment activities for both detectors through e-science funding

Will move from development to maintenance and operational alignment

~3FTEs for alignment in 2007-9Need ~9 FTE (core+alignment+UK support) in 2007/9 - continued e-science support

Page 14: Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Beyond GridPP2 Tony Doyle

Tony Doyle - University of Glasgow

12 January 2005 Collaboration Board

Grid and e-Sciencefunding

requirements

Category Sub-Cat FTEs FTE Cost FY08Exploitation

LCG Staff £500,000 Contribution to Tier-0 supportTier-1 Staff 15.00 £75,000 £1,125,000 Running the Tier-1 Data CentreTier-1 Hardware £1,000,000 Hardware annual upgradeTier-2 Staff 19.00 £65,000 £1,235,000 Contribution to Tier-2 Sysman effort in proportion to (non-PPARC) hardware Tier-2 Hardware £100,000 Frontend Tier-2 hardwareApplications Staff 8.00 £65,000 £520,000 Application/Grid experts for UK supportM/S/N Staff 6.00 £75,000 £450,000 One expert in each of 6 areasOperations Managers £0 Assume production mode established + devolved management to InstitutesOperations Staff 5.00 £75,000 £375,000 Production manager and four Tier-2 coordinatorsOperations Misc £100,000 Operations responsive budgetTravel Support 53.00 £3,000 £159,000 Supported staff travel GRID TOTAL 53.00 £5,564,000 Grid Computing for PPNew Expts. Staff 8.00 £65,000 £520,000 Future experiments adopt e-Infrastructure methodsATLAS Staff 15.00 £65,000 £975,000 Computing MoU commitments and supportCMS Staff 8.00 £65,000 £520,000 Computing MoU commitments and supportLHCb Staff 8.00 £65,000 £520,000 Core Tasks and Computing SupportALICE Staff 1.00 £65,000 £65,000 Computing supportTravel Support 40.00 £3,000 £120,000 Supported staff travel

E-SCIENCE TOTAL 93.00 £8,284,000 Computing support for experiments (currently assumed to be in experiments line)Road Map £5,900,000

• Simple model

Page 15: Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Beyond GridPP2 Tony Doyle

Tony Doyle - University of Glasgow

12 January 2005 Collaboration Board

LCG 9%

Tier-118%

Tier-222%

Applications9%

M/S/N8%

Operations7%

Operations2%

Travel3%

Tier-1 20%

Tier-22%

• Priorities in context of a financial snapshot in 2008• Grid (£5.6m p.a.) and e-Science (£2.7m p.a.)

• Assumes no GridPP project management• Savings?

– EGEE Phase 2 (2006-08) may contribute– UK e-Science context is

1. NGS (National Grid Service)2. OMII (Open Middleware Infrastructure Institute)3. DCC (Digital Curation Centre)

• Timeline?

Grid and e-Sciencefunding

requirements

New Expts.19%

ATLAS37%

CMS19%

LHCb19%

ALICE2%

Travel4%

To be compared To be compared withwith

Road Map: Not a Road Map: Not a BidBid

- Preliminary Input- Preliminary Input

Page 16: Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Beyond GridPP2 Tony Doyle

Tony Doyle - University of Glasgow

12 January 2005 Collaboration Board

Grid and e-ScienceExploitation Timeline?

• PPAP initial input Oct 2004• Science Committee initial input• PPARC call assessment (2007-2010) 2005• Science Committee outcome Oct 2005• PPARC call Jan 2006• PPARC close of call May 2006• Assessment Jun-Dec 2006• PPARC outcome Dec 2006 • Institute Recruitment/Retention Jan-Aug 2007• Grid and e-Science Exploitation Sep 2007 -

….

• Note if the assessment from PPARC internal planning differs significantly from this preliminary advice from PPAP and SC, then earlier planning is required.

Page 17: Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Beyond GridPP2 Tony Doyle

Tony Doyle - University of Glasgow

12 January 2005 Collaboration Board

Summary

Resources needed for Grid and e-Science in medium-long term? • Current Road Map

~£6m p.a. • Resources needed in 2008 estimated at

£8.3m p.a.• Timeline for decision-making outlined..

• PP community-supported strategy required