6
Installaation Mini Platform CPP Man Power: 1 SPV,1 Safety 4 Scafolder 2 Fitter Material No Discription Dimension Qyt 1 Mini Platform No 06 5730 mm x 1900 mm 1 Ea 95o mm x 725 mm 1 Ea 2 Handraill 2620mm x 1085 mm 1 Ea 1865 mm x 1085 mm 1 Ea 1250mm 1085 mm 1 Ea 1885mm x1085 mm 1 Ea 1400mm x 1085 mm 1 Ea 1900 mm x 1085 mm 1 Ea 3 Gritting 1400mm x 1900 mm 1 Ea 1865mm x 1115mm 1 Ea 4 Ladder 2800 mm x 400 mm 1 Ea 5 Leg Pipe 2.5"x 1770 mm 2 Ea Pipe 2.5"x 2400 mm 2 Ea Pipe 2.5"x 2100 mm 3 Ea 6 Clamp plate 150 mm x 250mm x16 mm 14 Ea 7 Boltnuts 7/8" x 100 mmL 14 ea M 14 28 Ea Gritting clamp - 28 Ea 9 Mini Platform No 02 1645 mm x 1375 mm 1 Ea 10 Handraill 1450 mm x 1085 mm 1 Ea 1305 mm x 1085 mm 1 Ea 900 mm 1085 mm 2 Ea 650 mm x1085 mm 1 Ea 11 Gritting 1645 mm x 1375 mm 1 Ea 12 Leg Pipe 2.5"x 2650 mm 2 Ea Pipe 2.5"x 3260 mm 2 Ea Pipe 2.5"x 1200 mm 3 Ea 13 Clamp plate 150 mm x 250mm x16 mm 8 Ea 14 Boltnuts 7/8" x 100 mmL 14 ea M 14 20 Ea 15 Gritting clamp - 28 Ea Tool No Discription Dimension Qyt

Tools and Equipment Install Mini Platform Ccp Saka

Embed Size (px)

DESCRIPTION

tool

Citation preview

Page 1: Tools and Equipment Install Mini Platform Ccp Saka

Installaation Mini Platform CPP

Man Power: 1 SPV,1 Safety4 Scafolder2 Fitter

MaterialNo Discription Dimension Qyt Status

1 Mini Platform No 06 5730 mm x 1900 mm 1 Ea Complete95o mm x 725 mm 1 Ea Complete

2 Handraill 2620mm x 1085 mm 1 Ea Complete1865 mm x 1085 mm 1 Ea Complete1250mm 1085 mm 1 Ea Complete1885mm x1085 mm 1 Ea Complete1400mm x 1085 mm 1 Ea Complete1900 mm x 1085 mm 1 Ea Complete

3 Gritting 1400mm x 1900 mm 1 Ea Complete1865mm x 1115mm 1 Ea Complete

4 Ladder 2800 mm x 400 mm 1 Ea Complete5 Leg Pipe 2.5"x 1770 mm 2 Ea Complete

Pipe 2.5"x 2400 mm 2 Ea CompletePipe 2.5"x 2100 mm 3 Ea Complete

6 Clamp plate 150 mm x 250mm x16 mm 14 Ea Complete7 Boltnuts 7/8" x 100 mmL 14 ea Complete

M 14 28 Ea CompleteGritting clamp - 28 Ea Complete

9 Mini Platform No 02 1645 mm x 1375 mm 1 Ea Complete10 Handraill 1450 mm x 1085 mm 1 Ea Complete

1305 mm x 1085 mm 1 Ea Complete900 mm 1085 mm 2 Ea Complete650 mm x1085 mm 1 Ea Complete

11 Gritting 1645 mm x 1375 mm 1 Ea Complete12 Leg Pipe 2.5"x 2650 mm 2 Ea Complete

Pipe 2.5"x 3260 mm 2 Ea CompletePipe 2.5"x 1200 mm 3 Ea Complete

13 Clamp plate 150 mm x 250mm x16 mm 8 Ea Complete14 Boltnuts 7/8" x 100 mmL 14 ea Complete

M 14 20 Ea Complete15 Gritting clamp - 28 Ea Complete

ToolNo Discription Dimension Qyt Status

Page 2: Tools and Equipment Install Mini Platform Ccp Saka

1 Chain Block SWL 3 Ton 2 EASWL 2 Ton 1 EASWL 1 Ton 2 EA

2 Combinasion Wrench M 22 ( 34 mm ) 2 EaM 14 ( 21 mm ) 2 Ea

Hammer wrench M 14 ( 21 mm ) 2 EaM 22 ( 34 mm ) 2 Ea

3 Beam Clamp SWL 3 Ton 2 Ea4 Hammer Brush 2 Kg 1 Ea5 WD 1 Btl6 Webing Sling SWL 3 Ton x 2 mtr 2 Ea

SWL 2 Ton x 2 mtr 2 EaSWL 2 Ton x 1 mtr 2 Ea

7 Sequel SWL 3 1/4 Ton 4 Ea8 Rope for tag line 2 Meter 4 EA9 Adjust Wrench 12" 1 Ea

10 Steel Box 1,2 x o,7 x 1 meter 1 Ea11 Steel Basket 6 Meter 1 Ea12 Rachet Wrench 1 Ea13 Hand Saw 1 Ea14 Polkadot 2 lusin

Page 3: Tools and Equipment Install Mini Platform Ccp Saka

Installaation SO2 SCRUBBER ( OPF )

Man Power: 1 spv:1 safety: 1 welder:1 fitter:1 helper:1 scafolder( 6 Person )

MaterialNo Discription Dimension Qyt Status

1 Plate SS 316 T 1 600 mm x 250 mm 1 Ea600 mm x 70 mm 1 Ea

351 mm x 300 mm 2 Ea

2 Argon gas 2 Btl

Welding Stang GTAW Long hose 1 Set3 Grinding disch Flexofit 4"x 2 mm 10 Ea

Resibon 4 " x 3 mm 5 Ea

4 Electrode 316 L 2,4 mm 2o KgKaca Hitam No 11 2 Ea

Kaca Putih 6 EaTig Glove 1 pearMasker 1 Lsn

Tungsten 2,4 mm 1 Ea

ToolNo Discription Dimension Qyt Status

1 Level block SWL 1,5 Ton 1 EA2 Welding Machine 1 Ea3 Welding Cable Negatif+ Positif @ 50 Mtr 1 Ea4 Hammer Brush 2 Kg 1 Ea5 Welding Mask ! Ea6 Webing Sling SWL 2 Ton x 1 mtr 2 Ea5 Grinding Machine 4" 4" 2 Ea5 Grinding Machine 4" 4" 2 Ea6 Rachet Wrench 1 Ea7 Polkadot 1 lusin8 Welding Apron 1 Ea