Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 1
www.eera-set.eu
EERA is an official part of the EU SET-Plan.
http://setis.ec.europa.eu/
EERA JP on Energy StorageSteering Committee Meeting
[SCM-12]
TOP 4.1: JP ES Proposals 2018
FET Flagship BATTERY 2030+Edel Sheridan (SINTEF)
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 2
FET Battery Workshop January 2018
• Hosted by DG Connect – January 9th Brussels
• Indications were made that a Flagship on Battery technology should be proposed
• Presentations and Report of workshop available on line
• https://ec.europa.eu/digital-single-market/en/news/workshop-future-battery-technologies-energy-storage
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 3
Consortium of the CSA proposal
No. Organization name Short name Type Country
1 Uppsala University, coordinator UU U Sweden
2 Westfaelische Wilhelms Universitaet Muenster MEET U Germany
3 Forschungszentrum Julich GMBH FZJ I Germany
4 Politecnico di Turino POLITO U Italy
5 Kemijski Institut (also representing Alistore-ERI) NIC I Slovenia
6 Vrije Universiteit Brussel VUB U Belgium
7 Advanced Rechargeable and Lithium Batteries Association
(represented by EC Consulting)
RECHARGE A France
8 Commissariat a L’Energie Atomique et Aux Energies Alternative CEA I France
9 Danmarks Tekniske Universitet DTU U Denmark
10 Fundacion CIDETEC CIDETEC I Spain
11 Sintef AS SINTEF I Norway
12 Centre National de la Recherche Scientifique CNRS (also
representing RS2E)
CNRS
RS2E
I/U France
13 Energy Materials Industrial Research Initiative AISBL EMIRI A Belgium
14 Frauenhofer Gesellschaft zur Foerderung der Angewandten
Forschung E.V.
Fraunhofer I Germany
15 Karlsruher Institut fuer Technologie KIT U Germany
16 European Association for Storage of Energy EASE A Belgium
Kristina EdströmUppsala UniversityBATTERY 2010+Coordinator
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 4
BATTERY 2030+ INITIATIVEThe heart of the connected green society
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 5
Preparatory Action stakeholdersC
on
sort
ium
Ad
viso
ryB
oar
d
+ NorthVolt+ FaradayChallenge
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 6
BATTERY 2030+
Preparatory Action
objectives
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 7
Steps to Building a Flagship 1.1
Call : FETFLAG-01-2018: Preparatory Actions for new FET Flagships – CSA
Step 1 : Stage 1 CSA proposal – conceptDeadline : 20th January Response expected 16th May
Step 2 : Stage 2 CSA proposal – implementationDeadline: 18th September
Step 3 : IF CSA is granted – 12 months (2019) and ca 1M euro to build a flagship proposal
Step 4: Flagship proposal is evaluated
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 8
Next stage
Step 2 : Stage 2 CSA proposal –Detailed description of the implementation methodology for the preparation of the flagshipDeadline: 18th September
We will describe the groups of stakeholders which will be involved and how we will best connect with them:
Battery research communityBattery industryModelling communityAdvanced manufacturing
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 9