TOPCON INSTALLATION PROCEDURE FOR ROADTEC MILLING MACHINES This procedure has been developed to provide the user’s of ROADTEC milling equipment the information needed to install and utilize the TOPCON positioning system in conjunction with their milling machine. INSTALLATION POINTS: Each component of the TOPCON unit has a pre-set mounting location for ease of installation. There are (6) mounting locations on your machine. These locations are for the following components: (1) Sonic tracker (2) Jog box ( mill installation only ) (3) Junction box (4) Slope Sensor (5) Control box (6) Control box ( for ground control operation ) Sonic Tracker & Jog Box Junction Box SONIC TRACKER JOG BOX JUNCTION BOX SLOPE SENSOR Slope Sensor

TOPCON INSTALLATION PROCEDURE FOR ROADTEC MILLING · PDF fileTOPCON INSTALLATION PROCEDURE FOR ROADTEC MILLING MACHINES This procedure has been developed to provide the user’s of

  • Upload
    lequynh

  • View
    225

  • Download
    2

Embed Size (px)

Citation preview

Page 1: TOPCON INSTALLATION PROCEDURE FOR ROADTEC MILLING · PDF fileTOPCON INSTALLATION PROCEDURE FOR ROADTEC MILLING MACHINES This procedure has been developed to provide the user’s of

TOPCON INSTALLATION PROCEDURE FOR ROADTEC MILLING MACHINES This procedure has been developed to provide the user’s of ROADTEC milling equipment the information needed to install and utilize the TOPCON positioning system in conjunction with their milling machine. INSTALLATION POINTS: Each component of the TOPCON unit has a pre-set mounting location for ease of installation. There are (6) mounting locations on your machine. These locations are for the following components:

(1) Sonic tracker (2) Jog box ( mill installation only ) (3) Junction box (4) Slope Sensor (5) Control box (6) Control box ( for ground control operation )

Sonic Tracker & Jog Box Junction Box

SONIC TRACKER

JOG BOX

JUNCTION BOX

SLOPE SENSOR

Slope Sensor

Page 2: TOPCON INSTALLATION PROCEDURE FOR ROADTEC MILLING · PDF fileTOPCON INSTALLATION PROCEDURE FOR ROADTEC MILLING MACHINES This procedure has been developed to provide the user’s of

CONTROL BOX

REAR CONTROL BOX( GROUND CONTROL LOCATION )

Control Box Control Box ( Console Location ) ( Ground Control Location ) Identify each of the TOPCON components and mount to machine in its proper location using the supplied hardware.

JOG BOX

JUNCTION BOX

CONSOLE CONTROL BOX

CONSOLE CONTROL BOX

SLOPE SENSOR

Page 3: TOPCON INSTALLATION PROCEDURE FOR ROADTEC MILLING · PDF fileTOPCON INSTALLATION PROCEDURE FOR ROADTEC MILLING MACHINES This procedure has been developed to provide the user’s of

From the TOPCON junction box, begin attaching the appropriate cables to each TOPCON unit as required. Note that the slope sensor cable is directed threw a bulkhead to the unit located on the front console floor.

TO REAR GROUND CONTROL BOX ( IF USED )

TO CONSOLE CONTROL BOX & JOG BOX

TO SONIC READER

TO SLOPE SENSOR ( IN FRONT CONSOLE )

The sonic tracker is mounted to an arm attachment located on either side of the machine. The tracker is connected to the junction box via a coiled wire that is directed underneath the sidewall.

SONIC TRACKER MOUNTING ARM

SONIC TRACKER

Page 4: TOPCON INSTALLATION PROCEDURE FOR ROADTEC MILLING · PDF fileTOPCON INSTALLATION PROCEDURE FOR ROADTEC MILLING MACHINES This procedure has been developed to provide the user’s of

The rear control box is mounted to the machine just above the rear track assembly. The box is connected to the junction box via a cable that is run under the floor plate.

REAR CONTROL BOX (FOR GROUND CONTROL)

IN FROM JUNCTION BOX

Once the system Is installed then it will need to be calibrated. The following is a chart that will aid in system calibration.

TOPCON SYSTEM 5 SETTINGS

Mills with proportional valves (access menu by cycling power on and off while holding the set/menu button).

DESCRIPTION SYMBOL

ROADTEC SYMBOL

GAIN (ELEVATION) gAN* 40 GAIN (SLOPE) <gAN 40 BEEPER bEP OFF DEADBAND ELEVATION db* 3 DEADBAND SLOPE <db 0.075 LH VALVE OFFSET UP OFS 400 LH VALVE OFFSET DOWN 400 RH VALVE OFFSET UP 400 RH VALVE OFFSET DOWN 400 UNITS unt INS VALVE TEST tst * SET POINT SPt 1 AVERAGING Avg 50