    Chapter 2

    PROJECTLIFE

    CYCLE

  • 8/12/2019 Topic2- Project Life Cycle

    2/31

    PROJECT LIFE CYCLE

    - Period between the beginningor start and end or completion

    of a project.

    - Understanding of project life

    cycle phases permits

    managers to better control

    resources to achieve goals.

  • 8/12/2019 Topic2- Project Life Cycle

    3/31

    3 Prentice Hall, 2002 1-3

    lesson outcomes

    students are able to:

    Describe phases involved in

    project life cycle.

  • 8/12/2019 Topic2- Project Life Cycle

    4/31

    4 Prentice Hall, 2002 1-4

    REVISION

    What is project? What is characteristics of project?

    What is project management? What is elements in project management?

    Projects Life Cycle?

  • 8/12/2019 Topic2- Project Life Cycle

    5/31

    5 Prentice Hall, 2002 1-5

    QUIZ !!

    Connect the nine circles below using no morethan four straight continuous lines, without

    removing your pen/pencil from the paper.

  • 8/12/2019 Topic2- Project Life Cycle

    6/31

    Projects life-cycle phase:

    Phase 1 : Concept (Pre-

    construction)

    Phase 2 : Planning & design

    (Procurement)

    Phase 3 : Execution

    (Construction)

    Phase 4 : Finish (Close-out)

  • 8/12/2019 Topic2- Project Life Cycle

    7/31

    7 Prentice Hall, 2002 1-7

    Conceptual Design & Planning

    Execution(Planning,

    Scheduling,Monitoring &

    Control)

    Evaluation &Termination

    The early stage of all

    phases

    Question must be

    asked whether there

    is any real need to

    establish a project

    Having two stages:

    info gathering and

    taking decisionSelect a team

    members that will

    answers to: What?

    How? When?

    Where? and What?

    Baseline schedule,

    budget, time and cost

    managementIssues, risk,

    reporting,

    monitoring,

    approvals,

    communication etc

    Celebrate project

    finish

    Contract close-out,

    Team feedback etc

    PreconstructionPhase

    ProcurementPhase (Bidding

    & Award)

    ConstructionPhase

    Closeout Phase

    3. Characteristic of Project (cont.)Project life-cycle phase

  • 8/12/2019 Topic2- Project Life Cycle

    8/31

    8 Prentice Hall, 2002 1-8

    3. Characteristic of Project (cont.)Project life-cycle phases

  • 8/12/2019 Topic2- Project Life Cycle

    9/31

    9 Prentice Hall, 2002 1-9

    3. Characteristic of Project (cont.)

  • 8/12/2019 Topic2- Project Life Cycle

    10/31

    PHASE 1 : CONCEPTUAL/ FEASIBILITY

    STAGE

    - Preliminary evaluation of an idea

    (conceptual analysis, schematic design &

    design development )

    - Preliminary analysis of risk and impact

    on time, cost and performance

    requirement

    - Technical & economic feasibility

    - EIA

  • 8/12/2019 Topic2- Project Life Cycle

    11/31

    - Location?

    - Supply of skills & productive workers?

    - Available of raw material?

    - Adequate sources of energy ( water, oil,ect)?

    - Environment impact?

    - Access to the most appropriate &

    Economical form of transportation?

  • 8/12/2019 Topic2- Project Life Cycle

    12/31

    12 Prentice Hall, 2002 1-12

    3. Characteristic of Project (cont.)Conceptual planning

    Very important for the owner (e.g., big storechains)

    During this stage the owner hires key consultants

    including the designer and project manager, selects

    the project site, and establish a conceptualestimate, schedule, and program

    The owner must gather as much reliable

    information as possible about the project The most important decision is to proceed with the

    project or not

  • 8/12/2019 Topic2- Project Life Cycle

    13/31

    PHASE 2 : PLANNING & DESIGN

    - Engineering & Design:

    Preliminary

    engineering and

    design

    Detail engineering

    and design

  • 8/12/2019 Topic2- Project Life Cycle

    14/31

    14 Prentice Hall, 2002 1-14

    3. Characteristic of Project (cont.)Design Development

    Designing the main systems andcomponents of the project.

    Good communication between owner,

    designer, and construction manager iscritical during this stage because selections

    during this design stage affect project

    appearance, construction and cost.

  • 8/12/2019 Topic2- Project Life Cycle

    15/31

    Preliminary Engineering &

    Design:

    - Architectural concept

    - Evaluation technology

    - Process alternatives

    - Size and capacity decision

  • 8/12/2019 Topic2- Project Life Cycle

    16/31

    Detail Engineering & Design:

    - Involved the process of breaking

    down, analysis the structure and its

    element to comply to the standard ofsafety and performance

    - Sets a working drawing

  • 8/12/2019 Topic2- Project Life Cycle

    17/31

    PHASE 3 :

    EXECUTION/IMPLIMENTATION

    -

    Procurement

    Construction

  • 8/12/2019 Topic2- Project Life Cycle

    18/31

    Procurement

    - Contractor selection phase

    - Involving 2 major activities

    contracting Sub-contracting

    - Single contracting

    - The main

    contractor handle

    all sub-contracting

    -Design-built project

    - Contractor handle the

    procurement

    responsibility

  • 8/12/2019 Topic2- Project Life Cycle

    19/31

    Homework

    - Discuss the methods used for

    obtaining tenders.

  • 8/12/2019 Topic2- Project Life Cycle

    20/31

    Contract Document

    Final preparation of the documents necessary for the bid

    package such as the drawings, specifications, general

    conditions, and bill of quantities

    All documents need to be closely reviewed by theconstruction manager and appropriate owner personnel to

    decrease conflicts, and changes

    With the contract documents are almost complete;a detailed and complete cost estimate for the

    project can be done Designing the main systems and

    components of the project

  • 8/12/2019 Topic2- Project Life Cycle

    21/31

    The project formally transits from design into

    construction

    This stage begins with a public advertisement for allinterested bidders or an invitation for specific bidders

    In fast-track projects, this phase overlaps with the design

    phaseIf the project is phased, each work package will

    be advertised and bid out individually

    It is very important stage to select highly

    qualified contractors. It is not wise to select

    the under-bid contractors

  • 8/12/2019 Topic2- Project Life Cycle

    22/31

    Construction stage

    - The stage where designers plans and specification arerealized into physical structures and facilities

    - Involving organization and coordination of all

    resources for the project including:

    - labor

    - materials

    - equipment

    - money

    - method and technology

  • 8/12/2019 Topic2- Project Life Cycle

    23/31

    - Construction stage

    Project mobilization phase

    Mobilize all the equipment, resources etc

    Project Operation Phase

    Involved in Planning, scheduling &

    Monitoring (cost, progress, documentation,

    resources, quality & time)

  • 8/12/2019 Topic2- Project Life Cycle

    24/31

    24 Prentice Hall, 2002 1-24

    Constructed according to construction drawing.

  • 8/12/2019 Topic2- Project Life Cycle

    25/31

    25 Prentice Hall, 2002 1-25

    Constructed according to construction drawing.

  • 8/12/2019 Topic2- Project Life Cycle

    26/31

    PHASE 4 : CLOSURE/FINISH

    Testing &

    commissioning

    Operation &Utilization

  • 8/12/2019 Topic2- Project Life Cycle

    27/31

    Testing & commissioning

    - To see the system operate efficiently

    - The activities involve mainly :

    - Testing- Analyzing

    - Correcting

    - The major electrical & mechanical system

    as a total system

  • 8/12/2019 Topic2- Project Life Cycle

    28/31

    Transition from design and construction to the actual use

    of the constructed facility

    In this stage, the management team must providedocumentation, shop drawings, as-built drawings, and

    operation manuals to the owner organization (as-built

    drawings are the original contract drawings adjusted to

    reflect all the changes that occurred) Assessment of the project teams performance is crucial

    in this stage for avoiding mistakes in the future.

    Actual activity costs and durations should be recordedand compared with that was planned. This will serve as

    the basis for the estimating and scheduling of future

    projects

  • 8/12/2019 Topic2- Project Life Cycle

    29/31

    29 Prentice Hall, 2002 1-29

    3. Characteristic of Project (cont.)Risk during project life cycle

    29

  • 8/12/2019 Topic2- Project Life Cycle

    30/31

    30 Prentice Hall, 2002 1-30

    Homework.

    DISCUSS ON THE PROJECT

    DELIVERY METHOD..

  • 8/12/2019 Topic2- Project Life Cycle

    31/31

    31 Prentice Hall, 2002 1-31

    THANK YOU