Total Space Requirements
Art & Art History
Theater and Dance
Music
Museum of Art
General
Interdisciplinary
TOTAL
Existing
37,642
35,099
29,627
7,064
0
0
109,432
Needs
40,732
33,018
29,949
12,075
9,699
23,335
148,808
Difference
(3,090)
2,081
(322)
(5,011)
(9,699)
(23,335)
(39,376)
Space Distribution
CFA (ph1)
0
0
11,821
1,000
6,107
23,335
42,263
+ 42,263
PCAC
22,800
27,760
18,128
11,075
3,592
0
83,355
- 2,887
NHH
0
5,258
0
0
0
0
5,258
0
Service
17,932
0
0
0
0
0
17,932
0
Art & Art History
Theater and Dance
Music
Museum of Art
General
Interdisciplinary
TOTAL
Phase 1 Options
Current CFA Program (Phase 1)
Remove Visualization Suite
Remove 100% Residence
Include Museum (No Storage)
Program Reduction/50% Res
42,263
38,813
39,228
51,338
37,353
Scenario ASF Difference
0
(3,450)
(3,035)
9,075
(4,910)
Center for the Arts Program – Full Build
Center for the Arts Program – Full Build Center for the Arts Program – Phase I Elements
Center for the Arts Program – Full Build Center for the Arts Program – Phase I Elements Center for the Arts Program – Phase I
Option 1 – Add The Museum
Center for the Arts Program – Phase I
Recommended Site: Adjacent to Lot C
Illustration of walking times
Flexible Performance / Presentation HallInstrumental & Vocal Performances, Films, Presentations
Phase 1 – Center for ArtsExamples of the functions that would be included in Phase 1
Arts Residency
White Box Theater
Gallery
Phase 1 Engelhardt Demolished
Center for the Arts adjacent to Lot C, near Lot B, proximate to downtown, and other campus public venue buildings
Full Build toward Lot BHunter & Gibbs Demolished
There are 3 options for the Future Full Build Out of the Center for the Arts.
Full Build on Lot C
There are 3 options for the Future Full Build Out of the Center for the Arts.
Full Build toward Mill Road
There are 3 options for the Future Full Build Out of the Center for the Arts.
The PCAC will continue to be used to satisfy the rest of the space needs for the Arts until the Full Build Out of the Center for the Arts occurs.
Not until all phases of the Center for the Arts are built can the PCAC be decommissioned. This site could then be used for new buildings that would serve science and technology programs.
Phase 1
Lot C
An illustration of the massing and scale of the Center for the Arts