43
192

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

192192

Appendices

Page 2: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

193

Appendices

193

Page 3: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

194

Appendix One - Glossary of key terms

Annual Monitoring Report (AMR) A annual report submitted to the Government by the Council assessing the progress and effec-tiveness of the Local Development Framework.

Area Action Plans (AAP) A type of Development Plan Document that is used when there is a need to provide the plan-ning frame¬work for areas where significant change or conservation is needed (for example key regeneration areas).

Building Schools for Future (BSF) A national investment programme with the aim of either refurbishing or rebuilding nearly all of the sec¬ondary schools in England.

Clear Zone An integrated area initiative comprising an incre-mental package of measures to improve air qual-ity and reduce CO2 emissions by lowering motor traffic levels, improving the public realm, together with en¬couraging a shift to walking, cycling and public transport to make our streets and spaces better, more liveable places

Connectivity Refers to the number of connections and their in-tegration, layout and relationship to one another and the impact this has on getting from A to B, by foot, bicycle and vehicle.

District Heating Facilities Localised power plants used to provide heat and electricity to specific sites and local areas.

Development Plan Document (DPD) Statutory required spatial planning documents including Core Strategy, Site and Placemak-ing, Develop¬ment Management and any Area Action Plans as prepared by the Local Planning Authority. These are subject to independent ex-amination and together with the Regional Spatial Strategy (London Plan) form the development plan for the borough.

District Centres Town centre that provide convenience goods and services for local communities.

Equalities Impact Assessment (EqIA) An EqIA is carried out to analyse the impact of the three DPD engagement documents and assess the implications of these on the whole community.

Evidence base Technical research documents and consultation results that have been used to inform the de-velopment of the three DPD engagement docu-ments.

Family housing Houses and flats which contain three or more bedrooms.

Green Grid A network of interlinked high quality and multi functional open spaces, waterways and other corridors.

Page 4: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

195

Idea Stores Owned and run by Tower Hamlets Council, Idea Stores provide traditional library services as well as additional services including IT facilities and places for socialising as well as access to life-long learning courses.

Infrastructure Services that are necessary for the day-to-day functions of the community and economy such as roads, railways, and social and community facilities. Infrastructure includes utility services, transport, schools, health and leisure services, and energy.

Large scale housing development A housing development of over 500 new net-additional homes

Legibility The degree to which a place can be easily understood and moved around in. Ensuring leg-ibility within a place helps to create a clear image for a place.

Local Development Framework Statutory plans produced by the Council that comprises a portfolio of Development Plan Docu-ments, Supplementary Planning Documents, Statement of Community Involvement, Local Development Scheme, Annual Monitoring Report and others.

Local Industrial Location (LIL) An area or site identified as being important to local employment and required for the reservoir of indus¬trial employment land, to be safeguard-ed for industrial employment uses.

Local Office Location An area identified as being important to local employment and required for the retention and provision of office stock.

Local views A local line of sight from a particular point to an important local landmark, view or skyline.

London Plan The Regional Spatial Strategy for Greater Lon-don prepared by the Mayor of London, which the LDF must be in conformity with.

Major Centre Canary Wharf town centre which is an important shopping and service centre with a borough-wide catchment. Major centres normally have over 50,000 square metres of retail floorspace.

Neighbourhood Centres Town centres that contain a range of shops in-cluding a range of essential uses (for example a pharma¬cy) that serve a very local catchment in the region of a ten minute walking radius and are located within walking distance to public trans-port facilities and strategic road network.

Page 5: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

196

Permeability The degree to which an area has a variety of pleasant, convenient and safe routes through it and the capacity to which those routes can en-able the movement of pedestrians, cyclists and vehicles.

Placemaking A process and philosophy which promotes bring-ing all those involved in shaping the quality of their place together in an inclusive and multi-di-mensional manner, in order to create sustainable communi¬ties and great places. Placemaking capitalises on a local community’s assets, inspi-ration, and potential, ultimately creating places that people feel proud of and have a stake in.

Placemaking Elements Placemaking elements will complement the site and spatial policy area suggestions. These pro-vide guidance specifically for the design of place and can include identifying locations requiring improved public realm, removal of barriers to pedestrians and cyclists and local views.

Planning for Population Change and Growth Model

The PPCGM is used by the Council and Tower Hamlets Partnership to plan for population change for the timely and adequate provision of infrastructure and services.

Preferred Office Location (POL) Area with major office development as the focus, with supporting uses such as gyms, hotels, restau¬rants and retail uses helping to achieve a sustainable office environment.

Public realm The space between and surrounding buildings and open spaces that are accessible to the public and include streets, pedestrianised areas, squares, river frontages.

Spatial planning Approach to planning which goes beyond the traditional land use planning. Spatial planning brings to¬gether and integrates policies for the development and use of land with other policies and programmes which can influence the nature and function of places.

Spatial Policy Area Spatial Policy Areas are defined geographical areas used to implement specific policies relating to uses, activities and / or locations.

Statement of Community Involvement Sets out how and when the Council will consult with local and statutory stakeholders in prepar-ing, alter¬ing and reviewing Tower Hamlets plan-ning documents.

Page 6: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

197

Strategic Industrial Location (SIL) This locations exist to ensure that London provides sufficient quality sites, in appropriate locations, to meet the needs of general business, industrial, warehousing, waste management and some utilities and transport sectors.

Strategic open space Open space that is recognised as having the qualities of a “Local Park” and above in the Lon-don Plan’s public open space hierarchy.

Streetscape The appearance of the street as a whole in-corporating the road, kerb and gutter, verges, fences, trees and building frontages.

Suggested site A site which has been identified through the site selection process as having the potential to ac-commodate large-scale housing development and/or key infrastructure and services.

Supplementary Planning Documents (SPD) A Local Development Document that may cover a range of issues either focusing on a specific area or theme, and provides further details on policies and proposals in a ‘parent’ document.

Sustainability Appraisal (SA) An appraisal of the economic, environmental and social effects of a plan from the outset of the prepara¬tion process to allow decisions to be made that accord with sustainable development.

Tall buildings Any building that is significantly taller than their surroundings and/or have a significant impact on the skyline.

Thames Policy Area A policy area in which detailed appraisals of the riverside will be required.

Tower Hamlets Activity Areas These are the City Fringe Activity Area and the Canary Wharf Activity Area. These areas follow the principles set out in the Town Centre Spatial Strategy which are flexibility, anchors, concentra-tion, stack¬ing, scale and accessibility.

Transport Interchange Area An area covering one of more transport inter-change facilities, creating a multi-modal hub, and public spaces to be focuses of public realm improvements.

Waste management facilities Facilities enabling the Council to meet its waste management targets; theses will be implemented in accordance with SP05 in the adopted Core Strategy (2010).

Water space Bodies of water including rivers, canals, docks, basins, ponds and marshland.

Page 7: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

198

The following evidence base documents have been used to inform the development of the suggested sites, spatial policy areas and placemaking elements within this engagement document.Overarching (applies to all sections)CLG Planning Policy Statement 1 - Delivering Sustainable Development (2005)CLG Planning Policy Statement 12 - Local Spatial Planning (2008)GLA London Plan (2008)GLA Draft Replacement London Plan (2010)GLA Minor alteration to the consultation draft replacement London Plan (2010)LBTH Core Strategy (2010) LBTH Unitary Development Plan (1998)LBTH Interim Planning Guidance (2007)LBTH Development Management DPD (engagement draft)LBTH Planning Obligations SPD (engagement draft)LBTH Community Plan (2008)LBTH Infrastructure Delivery Plan Report (2009)LBTH Planning for Population Change and Growth Capacity Assessment - Baseline Report (2009)LBTH Call for Sites Consultation Summary Report (2010)LBTH Core Strategy Statement of Representations (2009) LBTH Core Strategy – Options and Alternatives for Places Consultation Summary report (2009)Location specificLBTH Bishopsgate Goods Yard Interim Planning Guidance (2010)LBTH Blackwall Reach Regeneration Framework (2008)LBTH Bromley-by-Bow Masterplan (2006)LBTH Bromley-By-Bow Land and Use Design Brief (2009)LBTH Bromley-by-Bow Masterplan (engagement draft)LBTH Ailsa Street Development Brief (2003)LBTH St. Clements Hospital Planning Brief (2005)LBTH Wood Wharf Masterplan (2003)LBTH Aldgate Masterplan (2007)LBTH Millennium Quarter Masterplan (2000)LBTH Millennium Quarter Public Realm Guidance Manual (2008)LBTH Marshwall East Masterplan (engagement draft)LBTH Whitechapel Masterplan (2007)

Placemaking elementsCLG Planning Policy Statement 5 - Planning for the Historic Environment (2010)LBTH Urban Structure and Characterisation Study (2009)Urban Design Compendium 1 and 2 (2007)DETR By Design (2000)English Heritage Streets For All (2004)Building for Life (2008)TfL Streetscape Guidance (2009)Link & Place: A Guide to Street Planning and Design (2007)DfT Manual for Streets (2007)Jan Gehl Cities for People (2010)English Heritage Enabling Development and the Conservation of Significant Places (2008)English Heritage Moving Towards Excellence in Urban Design (2003)English Heritage and CABE Guidance on Tall Buildings (2007)DCLG World Class Places (2009)RTPI A New Vision for Planning (2001)DETR Towards an Urban Renaissance (1999)

Appendix two - General evidence base

Page 8: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

199

Large-scale housing developmentCLG Planning Policy Statement 3 - Housing (2010)Open spaceLBTH Open Space Strategy (2006)LBTH Open Space Strategy Refresh (draft)LBTH Green Grid Strategy (2011)LBTH Green Grid Baseline Report (2009)LTGDC Welcome to the Lea River Park document Town centresLBTH Town Centre Policy Development Study (draft)LBTH Town Centre Spatial Strategy (2009)LBTH Town Centre Spatial Strategy Spatial Baseline (2009)Idea StoresLBTH Idea Store Strategy (2009)

Employment areas (SIL / LIL / POL / LOL)CLG Planning Policy Statement 4 - Planning for Sustainable Economic Growth (2009)LBTH Spatial Economic Study (draft)LBTH Employment Land Study (2009)Primary and Secondary SchoolsDfE Building Bulletin 99: Briefing Framework for Primary School Projects (2009)DfE Building Bulletin 98: Briefing Framework for Secondary School Projects (2009) Health facilitiesLBTH Healthy Spatial Planning Report (draft)NHS Tower Hamlets Improving Health and Wellbeing Capital Scheme (Internal document) (2010)Gypsies and Travellers sitesGLA Minor alteration to the consultation draft replacement London Plan Draft Policy 3.9 Gypsies and Travellers (including travelling show people) (2010)GLA Gypsies and Travellers Accommodation Needs Assessment (2008)LBTH Gypsies and Travellers Criteria for additional sites in Tower Hamlets (2009)Multi-faith burial groundLBTH Criteria for Multi-Faith Burial Ground Report (2009)LBTH Options for a Multi-Faith Burial Facility for Tower Hamlets Cabinet Report (2008)Leisure facilitiesCLG Planning Policy Guidance 17 - Planning for Open Space, Sport and Recreation (2002)LBTH Leisure Facilities Strategy (Sporting Places) (2009)LBTH Poplar Baths Development Plans Cabinet Report (2010)Transport interchangesLBTH Sustainable Transport Strategy 2 (draft)CLG Planning Policy Guidance 13 - Transport (2011)GLA Mayors Transport Strategy (2010)TfL East London Sub Regional-Transport-Plan (2010)LBTH Local Implementation Plan (2005)LBTH Local Implementation Plan 2 (draft)LBTH Making Connections: Towards a Climate Friendly Transport Future (2008)LBTH Clear Zone Plan (2010)

Page 9: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

200

LBTH Transport Interchange Area paper (2010)

District heating systemLBTH London Heat Map Study (2011) CLG Planning Policy Statement: Planning and Climate Change - Supplement to Planning Policy Statement 1 (2007)CLG Planning Policy Statement 22 - Renewable Energy (2004)CLG Planning Policy Statement 25 - Development and Flood Risk (2010)LBTH Climate Change Mitigation and Adaptation Report (2009)LBTH Opportunities for Sustainable Energy and Biodiversity Enhancement (2008)LBTH Strategic Flood Risk Assessment (2008)

Waste management facilitiesCLG Planning Policy Statement 10 - Planning for Sustainable Waste Management (2005)LBTH Waste Strategy (draft)LBTH Waste Municipal Waste Management Strategy (2003)LBTH Waste Evidence Base Report (2009)

Page 10: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

201

Page 11: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

202

Sites InformationGeneralAdopted Core Strategy (2010) - The Core Strategy indicatively identifies the places within the east of the borough as being able to deliver higher levels of new housing (with the exception of Bow and Vic-toria Park) alongside Shoreditch and Spitalfields in the west. This has an impact on the requirements for strategic physical, social and green infrastructure in these locations.

LBTH Planning for Population Change and Growth Capacity Assessment Baseline Report (2009) - The Planning for Population Change and Growth Model identified the levels of housing growth used to inform the Core Strategy, thereby identifying the amount of infrastructure required across the borough.

LBTH Infrastructure Delivery Plan Report (2009) - The Sites and Placemaking DPD is supported by the Infrastructure Delivery Plan Report (2009) that provides further information on where strategic physical, social and green infrastructure will be required until 2025 based on the PPCGM Baseline Report (2009).

Large-scale housing developmentsThe LBTH Planning for Population Change and Growth model has identified locations suitable for delivering sites of over 500 net-additional new homes across the borough. Sites submitted as part of the Call for Sites consultation have also been analysed to determine their potential for delivering over 500 net-additional new homes.

Strategic open spaceAdopted Core Strategy (2010) - The Core Strategy identifies the need to create new publicly accessi-ble open spaces of a range of sizes, through areas of search, in the following places:

Poplar Riverside Bethnal Green Fish Island Bromley-by-Bow Aldgate (open space now complete) Spitalfields and Shoreditch

Specifically it provides areas of search for new publicly accessible green open space. These areas of search have been used to focus the search for development sites suitable for new strategic open space.

LBTH Open space strategy (2006) - The Sites and Placemaking DPD is supported by the Open Space Strategy (2006) which identifies locations within the borough that have poor access to open space and was used to inform the areas of search for new publicly accessible green open space.

LBTH Place-specific guidance - The following place-specific guidance identify that new open space should be provided within their area:

Bishopsgate Goods Yard Interim Planning Guidance (2010) Bromley-by-Bow masterplan (2006) Fish Island Area Action Plan (engagement draft)

Idea StoresAdopted Core Strategy (2010) - The Core Strategy spatial policies guide community facilities to be

Appendix three - What does the evidence base say?

Page 12: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

203

located within accessible town centres. It also identifies the need to provide new Idea Stores, through areas of search, in the following places:

Shadwell Bethnal Green Cubitt Town

The spatial policies and areas of search have been used to focus the search for development sites that would be suitable for new Idea Stores.

LBTH Idea Store Strategy (2002) - The Sites and Placemaking DPD is supported by the Idea Store Strategy that states town centres to be the preferred locations for Idea Stores. Following the devel-opment of a number of Idea Stores during previous years it continues to identify the town centres of Bethnal Green and Crossharbour as potential locations due to the following reasons:

Bethnal Green - ‘The Council recognises the affection some members of the community have for the Bethnal Green Library building. An Idea Store Bethnal Green was identified in the original Idea Store Strategy and there continues to be a need to provide 21st century library, learning and information services in this part of the borough.

As well as investigating the most accessible location for library and information services in the area, the Council will continue to work towards securing the long-term future of the building within the con-text of developing the best possible solutions for local residents.’

Crossharbour - An Idea Store in this location was proposed in the original Idea Store Strategy and remains relevant. It would help bring people at the southern part of the Isle of Dogs within easy reach. Crossharbour has been identified as a new multi-use town centre. Alongside the existing supermarket provision, it is expected that the town centre will provide a range of other retail outlets as well as com-munity facilities and a health centre. The town centre will be adjacent to Crossharbour DRL station and will be served by buses from across the Isle of Dogs.

The lease of Idea Store Canary Wharf will come to an end in 2019 and forward planning for replacing this facility will need to commence well in advance. The Council has secured a potential replacement facility within the Wood Wharf development to the east of the existing Canary Wharf estate and this may be a suitable alternative to a Crossharbour location. Both Crossharbour and Wood Wharf would place the facility within an accessible shopping district. Unlike the Canary Wharf mall, Wood Wharf and Crossharbour are expected to be more focused on day to day shopping rather than fashion retail making them more everyday destinations for local residents. Further details feasibility work will need to be undertaken to determine the best way forward for Idea Store provision on the Isle of Dogs.’

Leisure facilityAdopted Core Strategy (2010) - The Core Strategy spatial policies guide community facilities to be located within accessible town centres. It also identifies the need to provide new and improved leisure facilities, through areas of search, in the following places:

Shadwell and Wapping Poplar Cubitt Town

The spatial policies and areas of search have been used to focus the search for development sites that would be suitable for new and improved leisure facilities.

Page 13: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

204

LBTH Leisure Facilities Strategy (Sporting Places) (2009) - The Sites and Placemaking DPD is sup-ported by the Leisure Facilities Strategy identifies the need to provide additional swimming pool and sports hall capacity in the east of Tower Hamlets (including the Isle of Dogs). Poplar Baths was identi-fied as a potential location to address a portion of this need which, as an option, was supported by Cabinet in March 2010. The strategy also promotes the consolidation of existing leisure facilities.

Gypsies and Travellers accommodationLondon Plan (2008) - The current London Plan requires boroughs to set out criteria for identifying the suitability of new Gypsies and Travellers sites to meet borough requirements stated in the London Borough’s Gypsy and Traveller Accommodation Needs Assessment (2008).

London Borough’s Gypsy and Traveller Accommodation Needs Assessment (2008) - This report iden-tifies individual borough requirements for the provision of new Gypsies and Travellers accommoda-tion. The report identified Tower Hamlets as requiring 19 to 33 additional pitches in the next 5 years and a further 6 to 7 in the following 5 years to meet growing demands.

Minor alteration to the consultation draft replacement London Plan Draft Policy 3.9 Gypsies and Trav-ellers (including travelling show people) (2010) - this proposed alteration to the draft replacement Lon-don Plan proposes to decrease the target for the number of pitches within the borough to 14 pitches between 2007-2017 and approximately 5-6 pitches between 2018-2025 (covering the lifetime of the current adopted Core Strategy) using the Mayor's methodology.

Adopted Core Strategy (2010) - The Core Strategy identifies the need to allocate sites within the Sites and Placemaking DPD for new Gypsies and Travellers sites to meet the targets within the current London Plan. It provides three criteria to be used during the site allocation process for the Sites and Placemaking DPD; new sites should be:

Those that have been identified as suitable for housing Have good means of access from roads and be near bus routes and other transport modes Not be located in areas of high flood risk (Flood Risk Zone 3)

LBTH Gypsies and Travellers Criteria for additional sites in Tower Hamlets (2009) - The Sites and Placemaking DPD is supported by the Gypsies and Travellers Criteria for additional sites in Tower Hamlets (2009) document which identifies the need for new sites in accordance with the targets set out in the London Plan (2008). This document provides the context and background for the develop-ment of the three criteria used within the Core Strategy (2010).

Multi-faith burial groundAdopted Core Strategy (2010) - The Core Strategy identifies the need to plan for a multi-faith burial ground and sets out three criteria for the Sites and Placemaking DPD to use in allocating a site. These state that any site for a multi-faith burial ground should meet the following:

Site must be of an appropriate size that ensures sufficient burial space for an appropriate number of years.

Site must be accessible to all sections of the community. Sites must be suitable for the purpose of burial.

LBTH Criteria for Multi-Faith Burial Ground Report (2009) - The Sites and Placemaking DPD is sup-

Page 14: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

205

ported by the Criteria for Multi-Faith Burial Ground Report (2009) which identifies that there are pres-ently no active burial sites within Tower Hamlets. Residents requiring burial sites therefore have to find locations outside of the borough. This usually incurs a premium charge for residents regardless of whether the cemetery is operated privately or by a local authority.

In 2007 the Council attempted to find a suitable location for a multi faith burial site. This led to the identification of two potential sites within the borough, Bow Common Gas Works and Tower Hamlets Cemetery and one outside the borough boundaries in Hainault.

Using the work carried out in 2007, the Council developed criteria within the Multi-Faith Burial Ground Report (2009) to inform the Core Strategy and in identifying a site in the Sites and Placemaking DPD. These criteria were used in identifying the suggested sites within the engagement document:

Any potential site must be of an appropriate size to ensure sufficient burial space is available for an appropriate number of years. For Tower Hamlets, this is assumed to be 30 years.

Potential site(s) must be easily accessible by Tower Hamlets residents and therefore must have good access from roads, be accessible by public transport.

Sites must be suitable for the purpose of burial e.g. topography of land should generally be flat, water table must be low etc.

Whilst the above criteria guide the identification of sites, there are a number of sites which will not be suitable for use as a burial site. They include sites which are:

In areas with Public Transport Access Level (PTAL) 5-6 as these are locations suitable for high density activities, such as residential and employment.

In town centre locations due to the nature, locations and setting of these centres and the key services they currently provide or will provide in the future.

Health facilityAdopted Core Strategy (2010) - The Core Strategy spatial policies guide community facilities to be located within accessible town centres. It also identifies the need to provide new and improved leisure facilities, through areas of search, in the following places:

Cubitt Town / Millwall Eastern parts of the borough (3-4 facilities) Western parts of the borough (2-3 facilities)

The spatial policies and areas of search have been used to focus the search for development sites that would be suitable for new health leisure facilities. However it should be noted that the majority of new health facilities have been secured since the development of the Core Strategy and are not required to be represented in the Sites and Placemaking DPD.

NHS Tower Hamlets Improving Health and Wellbeing Capital Scheme - The Sites and Placemaking DPD has been informed by the NHS Tower Hamlets Improving Health and Wellbeing Capital Scheme that has review the current status of the delivery of new health facilities and refurbishment of existing ones. This has identified the following sites for new and/or expanded health facilities:

Mile End Hospital Royal London Hospital

Page 15: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

206

Goodman’s Fields Wood Wharf Crosshabour town centre

In addition to these locations Fish Island may require a new health facility dependant on the Olympic Legacy proposals.

Secondary SchoolAdopted Core Strategy (2010) - The Core Strategy identifies the need to provide new secondary schools in the following places by using areas of search:

Fish Island Mile End Bromley-by-Bow

The areas of search have been used to focus the search for development sites that would be suitable for new secondary schools. Searches for development sites have also been carried out across the borough given the size requirements of size and in light of public transport accessibility levels.

DfE Building Bulletin 98: Briefing for Secondary School Projects (2009)This document outlines the physical requirements (including minimum size) for secondary schools which have been used in identifying suitable sites.

Primary SchoolAdopted Core Strategy (2010) - The Core Strategy identifies the need to provide new primary schools in the following places by using areas of search:

Fish Island Bromley-by-Bow Poplar Riverside Cubitt Town Millwall

The areas of search have been used to focus the search for development sites that would be suitable for new primary schools. Searches for development sites have also been carried out in other places in the east of the borough where medium to very-high housing growth is expected (Core Strategy SP02).

DfE Building Bulletin 99: Briefing for Primary School Projects (2009)This document outlines the physical requirements (including minimum size) for primary schools which have been used in identifying suitable sites.

Combined primary and secondary schoolPotential sites for combined primary and secondary schools have been identified using criteria for new secondary schools.

Waste management facilityAdopted Core Strategy (2010) - The Core Strategy identifies the need to provide new primary schools in the following places by using areas of search:

Page 16: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

207

Fish Island Bromley-by-Bow Poplar Riverside Blackwall

The areas of search have been used to focus the search for development sites that would be suitable for a new waste management facility.

LBTH Waste Evidence Base Report (2009) - The Sites and Placemaking DPD is supported by the Waste Evidence Base Report which identified initial potential site options that was later refined in the Core Strategy.

District heating facilitiesLondon Borough of Tower Hamlets London Heat Map Study (2011) - The borough's heat map study identifies eight 'focus areas' or 'clusters' which are most suitable for the implementation of district heating facilities (see p.100). The clusters have been determined by grouping as many heat users together as possible and where an energy strategy is already underway or where planning permission is being sought or given to a larger residential and / or mixed use development.

The clusters have been ranked in order by their potential for delivery:

Stepney - High Mile End - High Aldgate/ Whitechapel - High Bethnal Green - High Blackwall - High Canary Wharf - Medium Bromley by Bow - Medium Wapping - Medium

NB: The clusters are not the same as the place boundaries

Page 17: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

208

Shoreditch & SpitalfieldsBishopsgate Goods YardPA/07/03220 Permitted Erection of a permanent three sided enclosure around the new East

London Railway, which is to be constructed across the former goods yard site as a new viaduct enclosure and shown on drawing P-E017-DD-990-00009.

PA/07/03220 Permitted Erection of a permanent three sided enclosure around the new East London Railway, which is to be constructed across the former goods yard site as a new viaduct enclosure and shown on drawing P-E017-DD-990-00009.

PA/06/00196 Permitted Erection of a five storey building to provide five residential units com-prising 1 x 1 bedroom and 4 x 2 bedrooms and one commercial unit (Use Class B1) on part of a vacant car parking lot.

PA/05/00889 Permitted Change of use of workshop unit at ground floor front to a retail shop.PA/05/02010 Permitted Erection of a part four and part five storey building to provide three

commercial units (Land Use Classes B1, A1 or A2) and six flats on ground floor with 28 flats on the upper floors.

PA/04/00208 Permitted Change of use of the first and second floors from ancillary storage and office use (A1) to residential (C3) to provide a one-bedroom maisonette.

PA/03/00512 Withdrawn Change of use of ground floor front unit from workshop (B1) to restau-rant (A3) with associated alterations to shopfront and installation of an extract flue at the rear of the unit, rising from the central courtyard.

PA/03/01491 Refused Change of use of the first and second floors from ancillary storage and office use (A1) to residential (C3) to provide one two-bedroom maison-ette.

PA/02/00039 Unknown Extension of duration of listed building consent granted by the Secre-tary of State for the Environment on 14th January 1997 by two years.

PA/01/00770 Permitted Erection of a basement plus four storey building comprising open plan residential unit on basement and ground floors and three one bedroom flats above.

PA/00/01643 Withdrawn Change of use for a Traders Sunday Market (approx, 30 stalls), along southern boundary of site.

PA/00/00485 Permitted Erection of three temporary structures on top of the viaduct and open court to provide sports facilities (5 a-side football pitches/tennis courts, electric go-karting), reception area to corporate entertainment venues and car parking.

Bethnal GreenHollybush GardensPA/08/00464 Withdrawn Erection of 5x Loft studios on existing flat roof at eighth floor level, plus

the construction of a new pitched roofPA/04/01333 No further

actionErection of 5 loft studios on existing flat roof at eighth floor level plus the construction of a new pitched roof.

Appendix four - Planning histories

The following table provides information relating to relevant planning applications submitted for each of the suggested sites since 2000. This provides an overview of the recent histories of the sites. All of these applications can be found on the Council’s online planning register.

Page 18: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

209

Marian Place gas works and The OvalPA/08/01753 Permit Cjhange of use form B8 to B1, B2, B8PA/07/107 Article 25 Construction of new mixed use development comprising 568sq.m com-

mercial floorspace on ground floor and 116 residential flats consisting (31 x 1, 61 x 2 beds, 12 x 3 beds and 8 x 4 beds).

PA/06/00071 Permit Non residential education and training centrePA/05/663 Withdrawn Construction of buildings up to 11 storeys to provide 511 sq.m. of com-

mercial space on ground floor, 129 residential units and associated car parking

PA/05/00421 Permit Demolition of existing building and redevelopment to provide a five storey buildingcomprising 3 Use ClassB1 unitson the g.f. and 14 flats above

PA/04/00640 Withdrawn Demolition of existing buildings and the redevelopment of the site to provide a nine storey building comprising a single Class B1 (business) unit on the ground floor, and 72 self-contained flats on the upper floors.

PA/03/754 Unknown Change of use from light industrial to place of worship on Sundays and employment training Monday - Saturday.

AldgateGoodman’s FieldsPA/09/00965 Permitted Redevelopment to provide four courtyard buildings of 5-10 storeys

incorporating 6 buildings of 19-23 storeys, erection of a 4 storey terrace along Gower's Walk, change of use to residential, and construction of an additional storey to 75 Leman Street. Overall scheme comprises of 788 residential units, student accommodation, hotel, PCT Centre, Com-mercial uses, Public open space, landscaping, servicing, plant accom-modation, car parking, access and associated works.

PA/08/01634 Withdrawn Redevelopment to provide four courtyard buildings of 5-10 storeys incorporating 6 tower elements of 22-28 storeys, erection of a 4 storey terrace along Gower's Walk, change of use to residential (Class C3) and construction of an additional storey to 75 Le

PA/08/2102 Not known Outline permission for change of use from offices to mixed use includ-ing residential, financial and professional, restaurant/public house, retail, offices, live/work and ancillary services

PA/07/2108 EIA re-quired

Scoping opinion for mixed use development including demolition of structures on site and constructing 1200 residential units, hotel with 240 rooms, 630 rooms of student accommodation and other mixed, com-mercial/ community activities with a total of 139,500sm.

PA/04/1916 Permitted Amendments to Phase 1 of the Goodmans Fields Masterplan to form 252 residential units with associated works. Reduction in the basement car park to 108 car parking spaces (from 150)- status completed

PA/03/1305 Permitted The erection of 212 flats (comprising 33 studio units, 88x1bed, 70x2bed and 21x3bed) in one 5-storey building, two 6-storey buildings and one 7-storey building together with a basement car park providing 112 car parking spaces, 23 motorbike spaces and 104

PA/02/00678 Permitted Outline permission (siting and means of access) for change of use from offices to mixed development including residential (class C3); financial and professional (class A2), restaurant/public house (class A3), retail (class A1), offices (class B1), live/wo

Page 19: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

210

WhitechapelRoyal London HospitalPA/05/01413 Permitted Provision of a temporary Gas Bottle store for the duration of the rede-

velopment of the hospitalPA/04/00611 Permitted Redevelopment and refurbishment of the Royal London Hospital. The

application includes the submission of an Environmental Statement, which addresses all revisions and issues raised under Regulation 19 in addition to the general provisions of the Town and Country Planning (Environmental Impact Assessment) Regulations 1999.

PA/03/01353 Permitted Waybury Ward: erection of ground floor extension to provide additional bedspace for dialysis treatment plus storage space

WappingJohn Orwell Sports Centre & Vaughan WayNoneNews InternationalPA/09/00548 Permitted Remodelling of the existing print works building and the adjoining Rum

Wharehouse building as a campus type office facility incorporating the creation of retail, and a museum, revised vehicular and pedestrian ac-cess routes and servicing provision.

ShadwellSt. George’s PoolsNoneFish IslandFish Island Area Action PlanPA/09/1051 Refused Provision of temporary barge loading/unloading facilities to transfer

recyled waste using barges to McGrath's Recycling facility. Provide pe-destrian protection scheme over British Waterways towpath and provide large gate into McGrath's boundary wall. Protection works to to canal works and grass area.

PA/07/00257 Withdrawn Demolition of the existing buildings on site and the construction of bus garage with ancillary two storey office building and associated facilities (7,781sqm),

PA/07/00464 Withdrawn A temporary change of use until 2011 from storage and distribution (Land use Class B8) to offices (Land use Class B1), general industry (Land use Class B2) and storage and distribution (Land use Class B8) including a concrete batching plant.

PA/06/1506 Permitted Erection of a new single storey flat roof building on the corner of Roth-bury Road and Hepscott Road to be used as a Bagel Cafe (Class A3).

PA/05/2130 Permitted Redevelopment to provide 98 live / work units & 2255m² of A1, A3, A4 & B1 uses. (REVISED SCHEME)

PA/04/00953 Not known Redevelopment of site to provide 106 live / work units and 1428sq.m of B1 floorspace

PA/04/00001 Permitted A mixed use comprehensive regeneration and redevelopment scheme initially to enable the Olympic and Paralympic Games to be held in the Lower Lea Valley in 2012 by the construction of facilities

PA/03/01045 Refused Erection of new 7 and 9-storey buildings

Page 20: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

211

PA/02/1705 Permitted Erection of part 5, part 6 and part 8 storey buildings in connection with the redevelopment of the site and its use as 86 live/work units (sui generis), 2062 square metres of class B1 (office) floorspace and 43 car parking spaces.

PA/00/1564 No further action

Demolition of the existing buildings and the site's redevelopment includ-ing the erection of a 6-storey riverside block (Block A) to be used as 40 live / work units (sui generis), a part-5 and part-8 storey central block (Block B) to be used as 37 live / work units

PA/00/353 Permitted Erection of 6-storey and part 7-storey building to provide 59 live/work units (sui generis) with ground floor car parking/servicing and landscap-ing

Mile EndMile End HospitalPA/08/2066 Permitted Refurbishment and extension to Therapy Unit comprising: single storey

extension to provide new reception area; demolition of existing linking structures and construction of new single storey corridor link. Demoli-tion of existing external metal fire escape stair and construction of new enclosed 3 storey accommodation/escape stairs; demolition and recon-struction of entrance to Hydrotherapy building; alteration to windows in existing building; new roof top mechanical air handling plant on existing single storey flat roof building

PA/03/01574 Permitted demolition of existing buildings and erection of 4 storey buildingSouthern GroveNoneToby Lane Depot & 11-13 Solebay StreetPA/06/00248 Permitted Demolition of an existing store building in NW corner of depot and

construction on the same site of a two storey building to contain com-mercial kitchens for Council’s contract catering services.

PA/01/01771 Permitted Demolition of existing warehouse building and erection of a part two storey warehouse and a part four storey office/showroom building to-gether with parking, servicing and loading areas.

Bromley-by-BowBow LocksPA/02/01808 Unknown Redevelopment comprising in total 300 residential units, seven live/

work units, 140 bedroom hotel and 1900 sq. metres Class B1 (busi-ness) floorspace involving the erection of a 12 storey apartment build-ing of 83 flats and a 14 storey apartment building

Page 21: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

212

Bromley-by-Bow RedevelopmentPA/09/0257 Approved

(LTGDC)Hybrid planning application for comprehensive mixed-use redevelop-ment of the site comprising: Outline Application All matters reserved ( except for access)· Demolition of all existing buildings; · Creation of 454 residential units (Use Class C3) (5 to 19 Storeys – Blocks E, G, H, J, K and L);· 1,086m2 (GIA) Flexible retail (Use Class A1), financial services (Use Class A2), restaurants & cafes (Use Class A3), drinking establish-ments (Use Class A4), takeaway establishments (Use Class A5), office (Use Class B1) (Units North of Imperial Street) (Ground Floor Level – Blocks G, J, K);· 1,547m2 (GIA) Flexible financial and professional serv-ices (Use Class A2), office (Use Class B1), non-residential institutions (Use Class D1), assembly and leisure (Use Class D2) (Units Fronting Imperial Row, Hancock Road & Three Mills Lane) (Within Blocks E, H and K);· Two form entry primary school and children’s centre (Use Class D1) (2 Storeys – Block B);· Hotel (104 bedroom) (Use Class C1) (19 storeys - within Block E);· Public Open Space;· Petrol Filling Station (2 storeys - Blocks K and H);· Associated infrastructure, including the crea-tion of new access roads;· Principles of landscaping and public realm together with Riverside Walk; · Means of access; and· Car, motorcycle and bicycle parking spaces, and servicing.

PA/06/0178 Unknown The demolition of existing building and development of 4 buildings rang-ing from 6 to 20 storeys in height to provide mixed use development comprising 530 residential units, 1335 sqm of commercial space within Use Classes A1, A2, A3, B1, D1, and associated car parking. (AMEND-ED DESCRIPTION)

PA/04/01055 Unknown Demolition of existing buildings and construction of new mixed develop-ment from 5 to 15 storeys high comprising 478 dwellings and 9 units totalling 1,650 sq. metres for Class A1 (Shop), A2 (Financial and profes-sional services) or B1 (Business) use.

Bow CommonBow Common gas worksPA/06/01847 Refused Erection of a 15 metre high telecommunications monopole with head-

frame to support three panel antennas (overall height 15.5 metres) and installation of associated ground based cabinets within a fenced com-pound.

PA/00/01551 Permitted Erection of a 15 meter extendable telecommunications tower with an-tenna, dishes, equipment cabinet and a fenced compound.

PoplarChrisp Street town centreNoneCording StreetPA/07/01966 Withdrawn Demolition of existing buildings and redevelopment ranging from 6 to 8

storeys to provide 276 residential units (95 x 1 bed, 102 x 2 bed, 55 x 3 bed & 6 x 4 bed), 1182sq.m of commercial (retail) floorspace at ground floor and basement parking.

Poplar BathsNone

Page 22: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

213

Poplar RiversideAilsa StreetPA/02/00710 Refused Redevelopment by the erection of 4 storey building to provide 9 No.

live/work units, 29 No. two bedroom flats and 10 No. one bedroom flats.PA/02/00808 Permitted Change of use from school to office accommodation (B1) and storage

(B8).Leven Road gas works

PA/10/00596 Permitted Construction of a new bridge with stepped and ramp access to con-nect the existing public footpath along the prologis Industrial Estate to the east bank of the River Lea with new open space on the west bank together with associated landscape works to create a new park area on the west bank of the River Lea including construction of a way-finding structure, planting, new surfacing, seating and ramped link to Oban Street as part of Phase 1 of the Fatwalk.

PA/06/01525 Withdrawn Change of use from the storage, parking and preparation of motor vehi-cles to a depot for vehicle plant and material storage, the retention of a temporary two storey office building, the erection of a temporary office building to accommodate training facilities and electricity cabinet, a soils recycling facility incorporating temporary office accommodation, soils recycling plant, crusher, materials storage structure and vehicle storage areas together with the widening of the existing shared access road and enhancements to the junction with Leven Road.

Poplar Riverside & BlackwallSorrel LanePA/07/00391 Unknown Erection of nine new buildings: Block A being 36 storeys high, Block

B 20 storeys, Block C and D 8 storeys, Block E 12 storeys, Block F 8 storeys, Block G 21 storeys, Block H 11 storeys and Block I 33 Storeys.Use of the new buildings as 796 residential

LeamouthLeamouth PeninsulaPA/10/01864 Unknown Hybrid planning application for the comprehensive redevelopment of

the site for mixed-use purposes to provide up to 185,077 sq.m (GEA) of new floor space and up to 1,706 residential units (use class C3)

PA/07/01730 Permitted Erection of a building (25.5m) in the south-western part of the Leamouth Peninsula North to accommodate the proposed community centre (with a temporary interim use as a marketing suite) and electrical sub-station. 22 temporary car parking spaces and associated tempo-rary and part permanent landscaping

Page 23: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

214

PA/06/00748 Permitted Combined outline and full planning application (hybrid application): Demolition of all existing buildings and structures; Comprehensive phased mixed-use development comprising 177,980sqm GEA of new floorspace for the following uses: residential (C3), business including creative industries, flexible workspace and offices (B1), retail, financial and professional services, food and drink (A1, A2, A3, A4, A5), leisure (D1 & D2), arts and cultural uses (D1), primary school (D1), community (D1), and 36,150sqm for energy centre, storage and car and cycle parking. The development includes formation of a new pedestrian ac-cess across the River Lea connecting to land adjacent to Canning Town Station, formation of a new vehicular access and means of access and circulation within the site, new private and public open space and land-scaping including a riverside walkway. This application is accompanied by an Environmental Statement as required by the Town and Country Planning (Environmental Impact Assessment) (England and Wales) Regulations 1999. (FURTHER AMENDED PROPOSAL)

PA/05/01409 Unknown Combined Outline and Full Planning Application (Hybrid application) for a mixed use redevelopment comprising a total of 2,460 residential units (Use Class C3) in addition to 21 459m2 of non residential development including arts and cultural centre (Use Class D1/D2), leisure (Use Class D2), management offices (Use Class B1), of retail (Use Class A1/A2), food and drink (Use Class A3/A4), healthcare facility (Use Class D1) and the provision of public open space, including a bridge linking to Canning Town.

BlackwallReuters LTDPA/03/01515 Permitted Redevelopment to provide six buildings of 11 to 29 storeys compris-

ing 708 residential units (C3) and leisure (D2), non-residential institu-tion (D1), business (B1a) and retail (A1,A2,A3) uses, new open space, access arrangements and car parking. Involves works to listed dock structure.

Blackwall & PoplarBlackwall Reach Regeneration ProjectPA/08/00118 No further

actionRedevelopment keeping/replacing Robin Hood Gardens to provide ap-proximately 3,000 residential units.

PA/01/01118 Permitted Use of land as a contractors office in connection with repair works to the Blackwall Tunnel involving the installation of 4x32ft portakabin of-fices, 1x24ft portakabin office, 2x40ft container stores, 2 sleeper lined storage pens and toilet facilities.

PA/00/00557 Permitted Use of land as a contractors office in connection with repair works to the Blackwall Tunnel involving the installation of 4x32ft portakabin of-fices, 1x24ft portakabin office, 2x40ft container stores, 2 sleeper lined storage pens and toilet facilities.

Blackwall & Canary WharfAspen WayPA/06/1720 Permit Renewal of planning permission ref. PA/01/991 for the retention of 3

storey container structure to provide 6 temporary classrooms to the rear of the building and linked to the college buildings by a covered walkway

Page 24: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

215

PA/02/1183 Permit The erection of a new part five and part six storey extension to the western edge of the college and its use as 3399 sqm of additional teaching accommodation (Class D1).

PA/01/00760 Permit Outline application for erection of new four storey block to the western edge of the college and its use as 2946 sq.metres of teaching facilities (Class D1).

PA/01/00991 Permit Erection of a 3 storey structure to provide temporary classrooms to the rear of the building and linked to the college buildings by a covered walkway

Canary WharfWood WharfPA/08/01215 permitted Hybrid application for comprehensive mixed-use redevelopment of

Wood Wharf comprising:1) Outline Application (all matters reserved, save for access & layout) 2) Full Application

PA/05/00495 withdrawn Demolition of existing building and redevelopment to provide a 26 sto-rey office building with ancillary parking plus external plant compound at roof level.

Billingsgate MarketPA/06/00577 Permitted Construction of freezer container linked to main cold store on north side

of building.PA/06/00578 Permitted Construction of freezer container linked to main cold store on north side

of building.PA/06/01526 Withdrawn Temporary use of car park and service yards, for three years, to host a

general retail Sunday Market with approx 200 pitches and 500 parking spaces.

PA/06/01735 Permitted Erection of a Tempastore (prefabricated tent style structure) building for a temporary period of 6 months.

PA/01/00067 Permitted Erection of a single storey building to house an electrical transformer.PA/00/01819 Permitted Creation of a pedestrian access route via a new path and gateway set

adjacent to existing gatehouse.MillwallMillennium QuarterPA/09/1942 Withdrawn Redevelopment of both sites to provide a mixed use scheme includ-

ing 9 buildings reaching between 7 and 46 storeys, comprising 1,643 residential units (Use Class C3), 44,938 sqm of office space (Use Class B1), 2,859 sqm of flexible retail space

PA/09/2670 Refused Change of use of second floor from offices (Use Class B1) to college (Use Class D1).

PA/08/00550 Withdrawn Demolition of all existing buildings and developing 227 residential units above ground floor and retail with associated car parking and landscap-ing

PA/08/2590 Permitted Change of use of part of two storey office block (400sqm) from busi-ness use (Use Class B1) to a place of worship with ancillary uses (Use Class D1).

Page 25: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

216

PA/07/1785 Permitted Outline application for redevelopment to provide an eight storey building plus plant (not exceeding 29.5m in height) comprising retail/restaurant (Class A1/A3) use at ground floor with 89 residential units above and reconfiguration of existing basement car park, associated servicing and landscaping

PA/07/1145 Withdrawn Demolition of all existing buildings and developing 219 residential units above ground floor and retail with associated car parking and landscap-ing

PA/07/3282 Permitted Demolition of the existing buildings on site and construction of a mixed use development comprising of two buildings. The main building ranges from 12 to 32 storeys with a maximum height of 95 metres (99.5 AOD) and a 10 storey 'Rotunda' building

PA/07/209 Permitted Change of use from warehouse/offices (Class B8/B1) to sales offices, demonstration flats, general offices and storage in conjunction with re-development of Indescon Court.

PA/07/00347 Permitted Redevelopment of site to provide a 16 storey and 26 storey plus plant (119m AOD to top of plant) office building including retail / restaurant use on part of the ground floor and basement car park (79,244 sq. m gross), dockside walkway and landscaped plaza

PA/07/1834 Permitted Change of use of vacant office premises (Class B1) at ground floor level to medical consulting purposes (Class D1).

PA/06/893 Permitted In outline, redevelopment to provide 143 residential units in buildings of up to 10 storeys in height with A1 and A3 use at ground floor level with reconfiguration of existing basement car park, associated servicing and landscaping.

PA/06/534 Permitted Creation of two additional flats within consented schemePA/05/1269 Permitted Change of use of part of the first-floor from offices (B1) to a place of

worship and for training purposes (D1 Use).PA/05/1782 Permitted Erection of two buildings of 48 storeys and 39 storeys to provide 820

residential units, retail (Class A1), food and drink (Class A3, A4), busi-ness (B1) and leisure (D2) uses with new vehicular access, parking, open space and landscaping.

PA/05/1294 Permitted In outline, the redevelopment of the eastern side of Indescon Court by a building of a maximum height of 84 metres to accommodate a Use Class C1 (hotel) of 2,775 sq m, 962 sq m for use as an apart-hotel or further hotel floor space, 35,000 sq m of Class C uses

PA/05/1781 Permitted Erection of buildings up to 21 storeys in height comprising 190 residen-tial units, retail (Class A1) or food and drink (Class A3/A4) and commu-nity uses (ClassD1/D2) together with new access arrangements, park-ing, open space and landscaping

PA/04/182 Permitted Amendments to Planning Permission dated 4/12/1997 ref. T/97/324 involving: increasing the number of units by 6 creating to a total of 192 units, replace the approved vehicle ramps to the basement levels with vehicle lifts, relocation of the swimming pool

PA/04/551 Permitted Erection of a 14-22 storey building comprising 512 apartments, 917 sq.m retail/commercial floorspace with four basement levels providing car parking spaces, bicycle spaces and motor-cycle parking.

Page 26: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

217

PA/04/1186 Withdrawn Erection of a 21 storey building to be used for office purposes, a 10 storey 216 bedroom hotel, 5 retail units, 359 residential units in build-ings between 8 and 22 storeys together with basement parking and servicing.

PA/04/01454 Permitted Temporary mooring of floating pontoon to serve as embarkation stage point from existing jetty at Arrowhead Quay

PA/04/704 Permitted Change of use from office (B1 use class) to physiotherapy (D1 use class).

PA/03/638 Permitted Amendments to planning permission T/96/580 (Granted by the former London Docklands Development Corporation) to change the use of part of the first floor from retail to residential use,

PA/03/659 Permitted Outline application (siting and means of access unreserved) for the redevelopment of site for predominantly residential purposes (639 units in total, ranging in height between 4-18 storeys) plus commercial uses (A1, A2 & A3) at ground level

PA/02/1605 Permitted Two new residential buildings (48 and 40 storeys high), linked at ground and 1st floor level, comprising a total of 790 residential units with retail, restaurant, leisure and community uses at ground floor; basement car parking, landscaped gardens

PA/02/1330 Permitted Outline application for a mixed use development up to a maximum height of 19 storeys (78.5 metres) comprising residential (Class C3), offices (B1), shops/financial and professional services/food and drink units (A1,A2,A3), B1 workspace units, public open

PA/02/1842 Permitted Change of use of premises to motor vehicle workshop (class B2) with ancillary office use.

PA/02/01606 No further action

Redevelopment of site to provide a 13-16 storey office building, a 36 storey building comprising 298 residential units with leisure use on ground floor, basement parking and servicing, new retail unit adjacent to Admirals Way, public plaza, dockside walkw

PA/02/01774 No further action

Duplicate application for redevelopment of site to provide a 13-16 sto-rey office building, a 36 storey building comprising 298 residential units with leisure use on ground floor, basement parking and servicing, new retail unit adjacent to Admirals Way

PA/02/1391 Permitted Change of use of ground floor from business use (B1) to professional and financial services office (A2) and/or Business Use (B1).

PA/01/00346 Permitted Erection of residential building of up to 15 storeys comprising 352 flats plus A1/A2/A3 (253sqm floorspace) and B1 uses (343sqm floorspace) at ground and podium levels together with associated car parking at basement level, landscaping,

PA/01/345 Permitted Erection of residential building of up to 15 storeys comprising 352 flats plus A1/A2/A3 (253 sq.m. floor space) and B1(343sq.m.) uses at ground and podium levels with associated car parking at basement level, landscaping, new access off Millharbour

PA/01/1514 Withdrawn Outline application to determine siting and means of access for redevel-opment to provide 270 flats in four blocks from 6 to 22 storeys in height including leisure use with restaurant, retail and bar use at ground floor level and basement level car parking

Page 27: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

218

PA/01/00392 Permitted Dual use of the existing building for office (Class B1) or health (Class D1) purposes

PA/00/946 Withdrawn Erection of a new residential buildings comprising of 207 Flats extend-ing up to 15 storeys and incorporating a restaurant and retail unit on the ground floor, and car parking on the ground floor and two basements

PA/00/387 Permitted Redevelopment to provide a 25 storey building plus 5-9 storeys of pavil-ion and plant space. Gross floorspace approximately 70,750m2, com-prising mainly offices, but including retail/ restaurant uses, public toilets, job seekers internet cafe, creche facilities

PA/00/661 Permitted Demolition of existing buildings and erection of 3 blocks of flats of be-tween 3 and 11 storeys in height (totalling 544 units), including afford-able housing units, a nursery (365 sq. metres), gymnasium and pool (676 sq.metres), public open space,

PA/00/423 Permitted Redevelopment to provide a 16/ 25 storey office building (plus plant), including retail/ restaurant use on part of the ground floor (59,250m2 gross), plus car parking, dockside walkway and landscaped plaza.

PA/00/00235 No further action

Redevelopment to provide a building of 29 storeys plus plant containing 67,000 sq.m of floorspace for offices with, leisure and retail uses, public open space, dockside walkway and associated car parking and servic-ing (REVISED SCHEME)

Westferry PrintworksNoneCubitt TownCrossharbour town centrePA/09/1959 Scoping

opinion issued

Request for Scoping Opinion as to the information to be contained within an Environmental Impact Assessment to be submitted in support of an application for major retail, commercial and residential develop-ment.

PA/01/00873 Permitted Demolition of existing petrol filling station and the erection of a new filling station, car wash, bus terminus and CCTV cameras together with alterations to access and parking arrangements.

Marshwall East MasterplanPA/00/1621 Permitted Change of use from A2 to A3 (fast food restaurant), with some seating

provisionPA/00/430; PA/07/166

Permitted Change of use from vacant A3 (public house) to B1 (office use)

PA/01/00068 Permitted Change of use of vacant ground floor into a new plantroom for genera-tors and diesel store.

PA/07/2933 Permitted Change of use from retail to restaurant (use class A3) at ground floor level and change of use from office to restaurant (use class A3) at first floor level. Infilling and extensions to provide 903 sq.m. additional floor-space;

PA/08/1989 Withdrawn Erection of GF+42 storey building with adjoining GF+ 10 storey build-ing comprising residential units (C3), servived apartments (sui generis), Office (B1 uses), retail (A1-A4) and Leisure uses (D2) and associated amenity space, parking and plant

Page 28: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

219

PA/09/1637 Refused Demolition of existing building and erection of a building of between 11 and 43 storeys in height, comprising of 265 residential units (Use Class C3), a 56-bedroom hotel (Use Class C1), office floorspace (Use Class B1), retail floorspace (Use Classes A1,

PA/09/2308 Permitted Change of use from office (Use Class B1) to dual use class of B1 and education (Use Class D1)

PA/10/00182 Refused Demolition of all existing buildings within Skylines Village and the erec-tion of buildings with heights varying from 2 to 50 storeys in height, comprising of the following:806 residential units (Use Class C3);A 123-bedroom hotel (Use Class C1);

PA/10/2466 Permitted Change of use from office (Use Class B1) to education (Use Class D1)PA/11/00472 Change of use from B1 to A3 to the office space in the wings of the

building at ground floor and first floor.

Page 29: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

220

Appendix five - Planning policy context

Shoreditch & SpitalfieldsBishopsgate Goods Yard

LBTH Core Strategy (2010)

Place of Shoreditch (SP12)Central Activities Area (SP01)High housing growth (SP02)Area of search for new publicly accessible open space (SP04)Preferred Office Location (SP06)Public realm improvement area (SP09)Protecting areas of established character and townscape (SP10)Low carbon area (SP11)

LBTH Interim Planning Guidance (2007) Development Site No. CF2A

Location specific guidance Bishopsgate Goods Yard Interim Planning Guid-ance

Conservation and heritage guidanceFournier Street Conservation AreaListed building - Braithwaite viaduct – Grade II

Bethnal GreenHollybush Gardens

LBTH Core Strategy (2010)

Place of Bethnal Green (SP12)Encouraging as a priority comparison and con-venience retail in town centres (SP01)Direct public investment in housing to facilitate the delivery of new housing (SP02)Improve the quality, useability and accessibility of existing health facilities (SP03)Maximise opportunities for new publicly acces-sible open space, (SP04)Support the role and growth of Idea Stores and libraries in accessible locations and providing new Idea Stores (SP07)Improve the quality, useability and accessibility of existing health facilities (SP03)

LBTH Unitary Development Plan (1998)Strategic View Consultation AreaDistrict Centre, Secondary Frontage- CP15

Marian Place gas works and The Oval

LBTH Core Strategy (2010)

Place of Bethnal Green(SP12)Regeneration of under used sites (SP12)Bethanl Green North Regeneration AreaGreen Grid (SP04)Area of search for new open space (SP04)Protecting areas of established characeter and townscape (SP10)Low Carbon Area (SP11)

Page 30: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

221

LBTH Unitary Development Plan (1998) LDF Development Site C22Conservation and heritage guidance Regent's Canal Conservation AreaAldgateGoodman’s Fields

LBTH Core Strategy (2010)

Place of Aldgate(SP12)Central Activities Area (SP01)Low housing growth (SP02)Area of search for a new health facility (SP03)Clear Zone (SP03)Area for air management and improvement (SP03)Protecting areas of established character and townscape (SP10)Low carbon area (SP11)

Interim Planning Guidance (2007)City Fringe Area Action PlanDevelopment Site CF12A

Location specific guidance Aldgate MasterplanWhitechapelRoyal London Hospital

LBTH Core Strategy (2010)

Place of Whitechapel (SP12)Investment and expansion of Royal London Hos-pital (SO12)Area of search for secondary school?? (SP07)New health facilities (SO10)District Centre (SO4)Sub regional Transport Interchange Area (SP 08)Low carbon Area (SP11)

Interim Planning Guidance (2007)LDF Development Site C27LDF Development Site CF21City Fringe AAP

Conservation and heritage guidance

London Hospital Conservation AreaListed building - Medical school Library - Grade II*Listed building - London Hospital, 22-34 Mount Terrace, telephone kiosk outside the hospital, telephone kiosk opposite 209 Whitechapel Road, King Edward VII Jewish Memorial Drinking Foun-tain – Grade II

WappingJohn Orwell Sports Centre & Vaughan Way

LBTH Core Strategy (2010)Place of Wapping (SP12)Provide a high quality leisure centre (SP03)

LBTH Unitary Development Plan (1998) Flood protection area

Page 31: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

222

Conservation and heritage guidance

Wapping Pier Head Conservation AreaLocally listed building - Tench StreetListed building - Wall along east side of Sports Centre – Grade II

News International

LBTH Core Strategy (2010)

Place of Wapping (SP12)Expansion and regeneration of News Interna-tional site as media hub. Alongside regeneration of Tobacco Dock for mixed uses (SP12)Wthin Wapping Regeneration AreaLeisure Centre (SP03)Green Grid (SP04)Protecting areas of established character and townscape (SP10)Low carbon Area (SP11)

Interim Planning Guidance (2007) LDF Development Site (CF20)ShadwellSt.George’s PoolsLBTH Core Strategy (2010) Place of Wapping (SP12)Conservation and heritage guidance St George in the East Conservation AreaFish IslandFish Island Area Action Plan

LBTH Core Strategy (2010)

Place of Fish IslandFish Island neighbourhood centre (SP01)Medium housing growth (SP02)Area of search for health facilities (SP03)Area of search for new publicly accessible open space (SP04)Area of search for a new waste management facility (SP05)Strategic Industrial Location (SP06)Fish Island Regeneration AreaOlympic Delivery Authority areaArea of search for a primary school (SP07)Area of search for a secondary school (SP07)Public transport improvement area (SP08)Improvements to connectivity (SP09)Areas of priority to protect and improve local dis-tinctiveness, character and townscape in areas of high growth (SP10)Low carbon area (SP11)

Page 32: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

223

Interim Planning Guidance (2007)

Leaside Area Action PlanDevelopment Site LS1Development Site LS2Development Site LS3Combined Flood Zones 2 and 3

Location specific guidance Fish Island Area Action Plan (draft)Conservation and heritage guidance Fish Island Conservation AreaMile EndMile End Hospital

LBTH Core Strategy (2010)

Place of Mile End (SP12)Area of medium housing growth (SP02)Area of search for a new health facility (SP03)Universities as employment hubs (SP07)Protecting and enhancing areas of existing character around waterways and open spaces (SP10)

Conservation and heritage guidance

Carlton Square Conservation AreaListed building - 273 Bancroft Road – Grade IIListed building - Tower Hamlets Library – Grade II

Southern Grove

LBTH Core Strategy (2010)

Place of Mile End (SP12)Green Grid Strategy (SP 04)Identified as area for regeneration of sites for mixed uses (SP12)Area of search for secondary school (SP07)Low carbon Area (SP11)

Interim Planning Guidance (2007) LDF Development Site C27Conservation and heritage guidance Tower Hamlets Cemetery Conservation AreaToby Lane Depot & 11-13 Solebay Street

LBTH Core Strategy (2010)

Place of Mile End (SP12)Queen Mary University Knowledge Hub (SP12)Mile End Town Centre (SP01)Medium housing growth (SP02)Area of search for new health facility (SP03)Universities as employment hub (SP07)Protecting and enhancing areas of existing character around waterways and open spaces (SP10)

Page 33: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

224

Bromley-by-BowBow Locks

LBTH Core Strategy (2010)

Place of Bromley-by-Bow (SP12)Medium housing growth (SP02)Area of search for a secondary school (SP07)Public transport improvement area (SP08)Lower Lea Valley Regeneration Area

Interim Planning Guidance (2007)Leaside Area Action PlanLDF Development Site LS11Combined Flood Zone 2 and 3 (SP04)

Bromley-by-Bow Redevelopment

LBTH Core Strategy (2010)

Place of Bromley By Bow (SP12)Bromley-by-Bow district centre (SP01)Medium housing growth (SP02)Area of search for health facilities (SP03)Area of search for new publicly accessible open space (SP04)Area of search for a primary school (SP07)Public transport improvement area (SP08)Improvements to connectivity (SP09)Public realm improvement area (SP09)Areas of priority to protect and improve local dis-tinctiveness, character and townscape in areas of high growth (SP10)Low carbon area (SP11)Lower Lea Valley Regeneration Area

Interim Planning Guidance (2007)Leaside Area Action PlanLDF Development Site LS 32 and 07

Conservation and heritage management Three Mills Conservation AreaBow CommonBow Common gas works

LBTH Core Strategy (2010)

Place of Bow Common (SP12)Medium housing growth (SP02)Lower Lea Valley Regeneration AreaLow carbon area (SP11)

Interim Planning Guidance (2007) LDF Development Site C29

Page 34: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

225

PoplarChrisp Street Town Centre

LBTH Core Strategy (2010)

Place of Poplar (SP12)Chrisp Street district centre (SP01)Medium housing growth (SP02)Area of search for health facilities (SP03)Area of search for leisure facilities (SP03)Public realm improvement area (SP09)Areas of priority to protect and improve local dis-tinctiveness, character and townscape in areas of high growth (SP10)Lower Lea Valley Regeneration Area

Interim Planning Guidance (2007) Combined Flood Zone 2 and 3 (SP04)Conservation and heritage management Lansbury Conservation Area

Cording Street

LBTH Core Strategy (2010)

Place of Poplar (SP12)Medium housing growth (SP02)Area of search for health facilities (SP03)Area of search for leisure facilities (SP03)Areas of priority to protect and improve local dis-tinctiveness, character and townscape in areas of high growth (SP10)Lower Lea Valley Regeneration Area

Interim Planning Guidance (2007)Combined Flood Zone 2 and 3Leaside Area Action Plan

Poplar Baths

LBTH Core Strategy (2010)

Place of (SP12)Lower Lea Valley Regeneration & Growth AreaRegeneration of Poplar Bath Site (SP12)Area of priority to protect and improve local dis-tinctiveness, character and townscape (SP10)Low Carbon Area (SP11)

Page 35: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

226

Conservation and heritage managementListed Building - Poplar Baths Grade IIListed Building - Statue of Richard Green Grade II

Poplar RiversideAilsa Street

LBTH Core Strategy (2010)

Place of Poplar Riverside (SP12)Medium housing growth (SP02)Area of search for a new waste management facility (SP05)Area of search for a primary schools (SP07)Areas of priority to protect and improve local dis-tinctiveness, character and townscape in areas of high growth (SP10)Lower Lea Valley Regeneration Area

Interim Planning Guidance (2007)Combined Flood Zone 2 and 3Leaside Area Action PlanDevelopment Site No. ID 14, and part 15

Conservation and heritage management

Listed Building - Bromley Hall Grade II* Listed Building - 25-37 Gillender Street Grade IIListed Building - Poplar Library Grade IILimehouse Cut Conservation Area

Leven Road gas works

LBTH Core Strategy (2010)

Place of Poplar Riverside (SP12)Within Lower Lea valley Regeneration and Growth AreaFocus for family homes (SP12)New publicly accessible green open space (SP04)Area of search for a new Primary School (SP07)Green Grid (SP04)Public transport improvemnet area (SP08)Public realm improvemnts area (SP09)Area of priority to protect and improve local dis-tinctiveness, character and townscape in areas of light growth (SP10)Low carbon Area (SP11)

Page 36: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

227

Poplar Riverside & BlackwallSorrel Lane

LBTH Core Strategy (2010)

Place of Blackwall (SP12)Identifying areas suitable to accommodate a waste management facility (SP05)Improve public transport in and accessibility to growth areas (SP08)Creating attractive and safe streets A12 Black-wall Tunnel Approach (SP09)Promote sustainable transportation of freight (in-cluding waste) by safeguarding wharfs for cargo handling (Northumberland Wharf) SP05)

Interim Planning Guidance (2007)Flood protection areasDevelopment Site LS21

LeamouthLeamouth Peninsula

LBTH Core Strategy (2010)

Place of Leamouth (SP12)Deliver the majority of new housing in the east-ern part of the borough (SP02)Promote sustainable transportation of freight (in-cluding waste) by safeguarding wharfs for cargo handling (Orchard Wharf) SP05)Implement the consolidation and managed re-lease of industrial land (SP08)

Interim Planning Guidance (2007) Flood protection areas

BlackwallReuters LTD

LBTH Core Strategy (2010)

Place of Blackwall (SP12)Identified for Redevelopment of waterside areasIdentified as public transport improvement area (SO19)Identified as area of priority to protect and im-prove local distinctiveness, character and town-scape in areas of growth (SP10)Low Carbon Area (SO24)

Interim Planning Guidance (2007) Isle of Dogs AAPConservation and heritage management Listed Building - Dry Dock Grade II

Page 37: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

228

Blackwall & PoplarBlackwall Reach Regeneration Project

LBTH Core Strategy (2010)

Place of Blackwall (SP12)Blackwall neighbourhood centre (SP01)Very high housing growth (SP02)Improvements to connectivity (SP09)Public realm improvement area (SP09)Areas of priority to protect and improve local dis-tinctiveness, character and townscape in areas of high growth (SP10)Low carbon area (SP11)Lower Lea Valley Regeneration Area

Interim Planning Guidance (2007)Leaside Area Action PlanDevelopment Site No. LS26Combined Flood Zone 2 and 3

Conservation and heritage managementNaval Row Conservation AreaListed Building - Bridge Parapet - Grade II

Blackwall & Canary WharfAspen Way

LBTH Core Strategy (2010)

Place of Blackwall (SP12)Identifying areas suitable to accommodate a waste management facility (SP05)Improve public transport in and accessibility to growth areas (SP08)Creating attractive and safe streets A12 Black-wall Tunnel Approach (SP09)Promote sustainable transportation of freight (in-cluding waste) by safeguarding wharfs for cargo handling (Northumberland Wharf) SP05)

LBTH Unitary Development Plan (1998) Archeological Priority Area (CP59)Interim Planning Guidance (2007) Flood protection Area

Page 38: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

229

Canary WharfWood Wharf

LBTH Core Strategy (2010)

Place of Canary Wharf (SP12)New leisure centre (SP03)New health facility (SP03)Tower Hamlets Activity Area (SP01)Regeneration Area Tall buildings location for economic clusters of large floor plate (SP12)Preferred Office Location? (SP06)Within Public Transport improvement area (SP08)Low Carbon Area (SP11)

Interim Planning Guidance (2007)Isle of Dogs Area Action PlanLDF Development site ID5

Masterplan Woodwharf Masterplan AreaConservation and heritage management Cold Harbour Conservation AreaBillingsgate Market

LBTH Core Strategy (2010)

Place of Blackwall (SP12)High housing growth (SP02)Lower Lea Valley Regeneration AreaOvercoming barriers to movementAreas of priority to protect and improve local dis-tinctiveness, character and townscape in areas of high growth (SP10)Low carbon area (SP11)

Interim Planning Guidance (2007) Combined Flood Zone 2 and 3Conservation and heritage management Listed Building - Accumulator Tower Grade IIMillwallMillennium Quarter

LBTH Core Strategy (2010)

Place of Millwall (SP12)Tower Hamlets Activity Area (SP01)Very high housing growth (SP02)Public transport improvement area (SP08)Improvements to connectivity (SP09)Areas of priority to protect and improve local dis-tinctiveness, character and townscape in areas of high growth (SP10)Low carbon area (SP11)

Interim Planning Guidance (2007)Isle of Dogs Area Action PlanDevelopment sites ID - 19, 48, 41, 39, 13, 22, 43, 42, 20, 14, 34, 33, 35, 44, 23, 21, 25

Page 39: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

230

Westferry Printworks

LBTH Core Strategy (2010)

Place of Millwall(SP12)Millenium Quarter & Crossharbour Regeneration AreaNew primary schoolWithin Public Transport improvement area (SP08)Within Area of priority to protect local distictive-ness character and townscape (SP10)Low carbon Area (SP11)Combined Flood Zone 2 & 3 (SP04)

Area Action Plan Isle of Dogs Area Action PlanLDF Proposals map LDF Development site ID 6Cubitt TownCrossharbour town centre

LBTH Core Strategy (2010)

Place of Cubitt Town (SP12)Crossharbour district centre (SP01)Very high housing growth (SP02)Area of search for health facilities (SP03)Area of search for leisure facilities (SP03)Area of search for Idea Store (SP07)Area of search for primary school (SP07)Public transport improvement area (SP08)Improvements to connectivity (SP09)Public realm improvement area (SP09)Areas of priority to protect and improve local dis-tinctiveness, character and townscape in areas of high growth (SP10)Low carbon area (SP11)

Interim Planning Guidance (2007)Isle of Dogs Area Action PlanDevelopment Site ID9Combined Flood Zones 2 and 3

Page 40: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

231

Marshwall East Masterplan

LBTH Core Strategy (2010)

Place of Canary Wharf(SP12)Millenium Quarter and Crossharbour Regenera-tion AreaTower Hamlets Activity Area (SP01)Public transport improvement area for Isle of Dogs (SP08)Area of priority to protect and improve local dis-tictiveness, character and townscape in araes of high growth (SP10)Low carbon area (SP11)

Interim Planning Guidance (2007) LDF Development Site ID 45-47, ID 7-8, ID 11, ID 37

Master Plan Marshwall East Master Plan

Page 41: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

232

Call for sites number

Site name Place Call for Sites consultation suggested use types (modified to relate to relevant sectors)

3 Bishopsgate Goods Yard

Shoreditch / Spitalfields

Housing, retail, health, open space, business and com-mercial, education, sports and leisure, tourism, commu-nity facilities

12 Marian Place Gas Works (amended site boundary)

Bethnal Green Housing

25 Goodman’s Fields

Aldgate Housing, health, business and commercial, open space, tourism,

35 Royal London Hospital

Whitechapel Retail, health, business and commercial, education

41 John Orwell Sports Centre

Wapping Education, sports and leisure

50 News Interna-tional

Wapping Housing, retail, business commercial

94 Bow Locks Bromley by bow

Housing, business and commercial

101 Bow Common gas works

Bow Common Housing

125 Chrisp Street town centre

Poplar Housing, retail

148 Blackwall Reach Regen-eration Project

Blackwall / Poplar

Housing, retail, business and commercial, education, sports and leisure, community facilities

154 Ailsa Street Poplar River-side

Housing, business and commercial

160 Leven Road gas works

Poplar River-side

Housing, business and commercial

168 Leamouth Pe-ninsula (portion of submitted site)

Leamouth Housing, retail, business and commercial

173 Reuters LTD Blackwall Housing, retail, health, business and commercial, sports and leisure

176 Billingsgate Market

Canary Wharf housing, retail, buiness and commercial

177 Wood Wharf Canary Wharf housing, retail, buiness and commercial

Appendix six - Call for Sites consultation- sites used

The following sites were submitted by respondents during the Call for Sites consultation and have been identified as being suitable for delivering infrastructure and large-scale housing developments. The table below details what uses were suggested for the sites by respondents.

Page 42: TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK · TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK 197 Strategic Industrial Location (SIL) This locations exist to ensure that London provides

TOWER HAMLETS LOCAL DEVELOPMENT FRAMEWORK

233

Call for sites number

Site name Place Call for Sites consultation suggested use types (modified to relate to relevant sectors)

179 Innovation Centre (incor-porated as part of Marshwall East Masterp-lan)

Canary Wharf / Cubitt Town

Housing, retail, health, business and commercial, sports and leisure

186 Westferry Print-works

Millwall Housing, retail, health, business and commercial, sports and leisure

201 Vaughan Way (merged with John Orwell Sports Centre)

Wapping Sports and leisure

208 Aspen Way (amended site boundary)

Blackwall Commercial led mixed use