TP48200A-H15A3: Components Summary TP48200A-H15A3 B a t t e r y B r e a k e r p a n e l R e c t i f i e r s E q u i p m e n t

TP48200 +RFC installation guide-V4_

  • Upload
    pradeep

  • View
    271

  • Download
    22

Embed Size (px)

DESCRIPTION

Huawei TP48200 guide

Citation preview

BTS3900 DEMO SITE

TP48200A-H15A3: Components SummaryTP48200A-H15A3BatteryBreaker panelRectifiersEquipment

TP48200A-H15A3: Interior of the CabinetPage 1

(1) Maintenance socket(2) AC input circuit breakers (3) Ground bar(4) Cable hole(5) Storage battery circuit breakers(6) Load circuit breakers(7) Space monitoring unit(8) Space for rectifiers(9) Battery rack

Cabinet cooling air flow

TP48200A-H15A3: Typical ImplementationPage 3

Installing Equipment (BBU)Page 4Space 2U for BBU close below Rectifiers.Use all 6X12mm nuts to fix the mounting ears into the bolt holes at both sites of BBU.BBU

Installing cards to BBUUse below mention slots for 3G configuration (already plugged; pls check)

768CE site: WBBPD3448CE site: WBBPD1

Use 0,2 & 4 to connect RRUsPage 5WBBPD3WBBPD3WBBPD3UTRPWMPT024 CPRIconnectionUEIUUPEU

2.1 Install LTE BBUUse below mention slots for 4G configuration (already plugged; pls check)

1Use 0,1,2 to connect RRUs, with Muti-mode optical module.2Use TX/RX 0 to connect to the Transmission Equipment (SWITCH/OSN/Microwave )Page 6WBBPD3WBBPD3LBBPD3WMPT CPRIconnectionUEIUUPEU44

0120

CPRI cable should be connected to right position of WBBP cardUse Bottom slot WBBP card in Slot 3 (slots start from 0)Page 7CPRI0 Port Connected to Sector0Installing Equipment (BBU)CPRI2 Port Connected to Sector1CPRI4 Port Connected to Sector2

Need Actual TP48200A Picture7Transmission Cable Connection

Page 8UELPUELPUTRPTransmission network

Installing Power Equipment (DC Output cables)Page 9Installing DC Output CablesInstall DC output cables, as shown in FigureDC Out put requirementsLLVD F7,F8 & F9 connected to RRU0, RRU1, RRU2BLVD F4 connected to BBU

BBU power is connected to BLVD F4 on Breaker PanelRRU0, RRU1, RRU2 power is connected to LLVD F7,F8,& F9 on Breaker PanelRRU0 powerRRU2 powerRRU1 powerBBU powerInstalling Power Equipment (DC Output cables)Page 10

Need Actual TP48200A Picture

10Installing Power Equipment (Batteries)Page 11Install the copper bar, as shown in Figure

Installing the power cables for storage batteries, as show in Figure

Installing Power Equipment (Batteries)Page 12 -48V DC connection points connected at the same point on left site of the rack.0V DC connection points connected at the same point on right site of the rack.Battery drain tube need to be lay to outside

Need Actual TP48200A Picture

12

Connect of the storage battery to the Battery positive-pole in the power cabinet.Installing Power Equipment (Batteries)Page 13

Need Actual TP48200A Picture

13

Loose the bolt on top of battery negative-pole access fuse base, connect -48V input cable to the bolt, and use torque wrench to tighten the bolt. Only one pair of Power cable enough. Function fuse is 125A.Page 14Installing Power Equipment (Batteries)

Installing Power Equipment (AC output Cables)Page 15Install AC output cables, as shown in Figure

Installing Power Equipment (AC output Cables)Page 16

Installing Power Equipment (AC input Cables: three phase)Page 17Install three-phase AC input cables refer to Figure

Installing Power Equipment (AC input Cables: single phase)Page 18Install single-phase AC input cables, Remove the copper bar from the cable bridge on the side panel and connect the copper bar to the AC input circuit breaker to short-circuit the breaker, as shown in Figure

Sensors in TP48200APage 19

Temperature & Humidity SensorSmoke Sensor

WaterSensor

Installing Cables (UIM02C )Page 20The UIM02C provides eight dry contact outputs, six Boolean value inputs, and seven ports for connecting to the smoke sensor, door status sensor, water sensor, ambient temperature and humidity sensor, and so on

Installing Cables (UIM02C) Port DetailPage 21Port TypeSilkscreenDescriptionDefault ModeSensor PortsTEMP_HUMTemperature and humidityWATERWater sensorTEMP1Connected to environment temperature sensor and used for fan speed adjustmentTEMP2ReservedGATEDoor status sensorSMOKESmoke sensorBTEMPBattery temperature sensorBoolean value input portsDIN1Boolean value input 1Close: alarmOpen: normalDIN2Boolean value input 2Close: alarmOpen: normalDIN3Boolean value input 3Close: alarmOpen: normalDIN4Boolean value input 4Close: alarmOpen: normalDIN5Boolean value input 5Close: alarmOpen: normalDIN6Boolean value input 6Close: alarmOpen: normalPort TypeSilkscreenDescriptionDefault ModeDry Contact Output PortsDefault Mode: (Close: Alarm; Open: normal)Can be modified as required.ALM1AC power failure alarmClose: alarmOpen: normalALM2DC undervoltage alarm or DC overvoltage alarmClose: alarmOpen: normalALM3Rectifier faults, Protect and No Response alarmClose: alarmOpen: normalALM4SPD failure alarmClose: alarmOpen: normalALM5Fuse burn-out alarmClose: alarmOpen: normalALM6Battery or environment temperature alarmsClose: alarmOpen: normalALM7Door alarmsClose: alarmOpen: normalALM8Heater faults alarms and Fan faults alarmsClose: alarmOpen: normalCommunication PortCOMRS485

Installing Cables (UIM02C) sensor portsPage 22Silk ScreenPinPin DefinitionTEMHUM112V2ENV_TEMP312V4ENV_HUMWATER112V2WATER3GND4-TEMP11TEMP12GNDTEMP21TEMP22GNDGATE1DIN7+2JTD7SMOKE112V2SMOKEBTEMP1BTEMP1212V

Connector sideSensor side14233241TEMHUM sensor side cable connection

Page 23 Use the straight through cable to connect the Power alarm between MON0/UPEU or MON1/ UPEU and RS485port of SMU.Installation Cables (Communication) If TP cabinet only : MON1 port to connect SMU of TPRFC cabinet present : MON0 port to connect RFC and MON1 port to connect SMU of TP

Need to Clarify

23RFC: Interior of the CabinetPage 24(1) Fan assembly(2) ELU(3) Door status sensor(4) DCDU-1 2A(5) Filler panel(6) RFU(7) Junction Box

RFC Cabinet MRFU InstallationPage 25

Special handle is needed to remove the DRFU Insert MRFU of relevant bands (900/1800) into RFC cabinet900MHz use slot 0, 2, 4 and 1800MHz use 1, 3, 5 slots (start with Slot 0)

RFC Cabinet Power Cable connectionPage 26

Use 2 pair of 16mm2 DC cables to connect power from TP cabinet to RFC cabinet

RFC Cabinet Cabling - RF cablesPage 27Usually, one cabinet has 6 jumpers, refer to the picture for the jumper and RF cable connection.One end of the jumper is straight DIN connector, the other end (BTS side) is right angle DIN connector. The connectors need to be made on site.The configuration of the cell is as showing in the picture:S2, S2 PBT, S3, S4Tie yellow color label to the jumper.

Upper 6 jumper to be installedUsually, the lower 6 jumper is not needed

S2S2 PBT, S3, S4

Lay the AC power cablePage 28Dig a channel between meter cubicle and plinth.Lay the AC power cable with GI pipe, and flexible GI hose used as bend. The armor of the AC cable need to be grounded.Ground the GI pipe with M8 x 25mm bolt & nut, using 25mm^2 grounding cable.Bury the pipe

Dig a channel and lay the AC cable Make the bend with GI flex hose Ground the AC cable armor with the hose clip

Install the SPDPage 29Install the SPD on meter cubicle or pole, the SPD should be grounded with 25mm2 cable, and cable need to be protected.

Method 1:Install SPD on the meter cubicle Method 2: Install SPD on the pole

Tri-band Antenna InstallationTri-band antenna support three RF unitsRed Band (824-960MHz) : Use for 2G 900MHzBlack Band (1710-2180MHz) : Use for 3GBlue Band (1710-2180MHz) : Use for 2G 1800MHz

Page 30

Antenna system installationPage 31

Adjust the tilt angle of the antennaUsing the scale on the upper supportPage 32

Adjust the inclinometer according to the engineering design and stick the inclinometer to the rear of the antenna. Push or pull the antenna till the bead in the inclinometer is located in the middle horizontally.Mobitel requirement is to set the tilt from electrical tiltingTherefore set mechanical tilt to zero and adjust required tilt from electrical tilt

Electrical tilt of AntennaPage 33When tilting form Electrical Tilt aware with select correct antenna subsystem.

Red Band (824-960MHz/ 2G 900MHz.Black Band (1710-2180MHz) / 3GBlue Band (1710-2180MHz / 2G 1800MHz

Antenna InstallationKeep Water LoopPage 34

Connector Waterproof ProcessWrap the connector from the point 20 mm [0.79 in.] away from the end of the connector to the point 20 mm [0.79 in.] away from the other end of the connector. When wind the waterproof adhesive tape, draw it equably to be the half of the primary width. The winding position of the cable tie should be 10mm distance to the waterproof adhesive tape. The color of the cable tie is black, and it is ultraviolet. Waterproof processing should be operated after the VSWR test result satisfying the request.

Page 35

Coil the adhesive insulating tape (three layers)

Connector Waterproof ProcessA: PVC tapeB: Insulation tapeC: ConnectorPage 36

Ensure that each layer covers at least 50% surface of the layer below it.

AB

from bottom to topfrom top to bottomfrom bottom to top

Grounding of feederInstall the grounding clip at the specified distance.Page 37

Make DIN male connectorPage 38

Make DIN female connectorPage 39

RRU InstallationThree kind of RRUs used for different systemsRRU3829 3GRRU 3926 2G 900MHzRRU 3928 2G 1800 MHzPage 40

RRU InstallationUse CPRI0 port to connect CPRI cablePage 41

RRU Installation Page 42Antenna Pole is design for install three RRUs in single pole

RRU Installation

Page 43