Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and Transport Assessment.1b December 2016 | Page 1 Assets | Engineering | Environment | Noise | Spatial | Waste Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Prepared for Aurigen Group Ltd December 2016 Project Number: TW15042

Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

  • Upload
    others

  • View
    13

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Traffic and Transport Assessment

Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean

Aurigen Group Ltd

TW15042 - Traffic and Transport Assessment.1b December 2016 | Page 1

Assets | Engineering | Environment | Noise | Spatial | Waste

Traffic and Transport Assessment

Waste Transfer and Resource Recovery Facility, 25

Jackson St, Bassendean

Prepared for Aurigen Group Ltd

December 2016

Project Number: TW15042

Page 2: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Traffic and Transport Assessment

Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean

Aurigen Group Ltd

TW15042 - Traffic and Transport Assessment.1b December 2016 | Page i

DOCUMENT CONTROL

Version Description Date Author Reviewer

0a Internal Review 7/11/16 RO SC/TM

1a Draft Released to Client 11/11/16 RO/LM AM

1b Final Report 22/12/16 RO/LM AM

Approval for Release

Name Position File Reference

Andrew Mack

Associate Director and Environment

Section Leader

TW15042 - Traffic and Transport

Assessment.1b

Signature

Copyright of this document or any part of this document remains with Talis Consultants Pty Ltd and

cannot be used, transferred or reproduced in any manner or form without prior written consent from

Talis Consultants Pty Ltd.

Page 3: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Traffic and Transport Assessment

Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean

Aurigen Group Ltd

TW15042 - Traffic and Transport Assessment.1b December 2016 | Page ii

Table of Contents

1 Introduction .............................................................................................................................. 1

1.1 Background ............................................................................................................................. 1

1.2 Scope of the Report ................................................................................................................ 1

2 Site Information ......................................................................................................................... 2

2.1 Surrounding Land Uses ............................................................................................................ 2

2.2 Surrounding Road Network ...................................................................................................... 2

2.2.1 Crash Blackspots........................................................................................................ 2

2.2.2 Speed on the Surrounding Road Network ................................................................. 2

2.3 Site Access .............................................................................................................................. 3

2.3.1 Staff Access ............................................................................................................... 3

2.3.2 Pedestrian and Cyclist Access and Networks ............................................................ 3

2.3.3 Public Transport Access ............................................................................................. 4

2.4 On-site Parking ......................................................................................................................... 4

2.5 Loading and Unloading Areas ................................................................................................ 5

2.6 Environmental Noise ................................................................................................................ 5

3 Existing Traffic Volumes ............................................................................................................. 6

4 Development Proposal ............................................................................................................. 8

4.1 Assumptions ............................................................................................................................ 9

4.2 SIDRA Analysis .......................................................................................................................... 9

4.3 Impact on Scenario 1 and 2 ................................................................................................ 11

4.4 Impact on Scenario 3 and 4 ................................................................................................ 12

4.5 Committed Developments ................................................................................................... 12

4.5.1 Lot 10 – Railway Parade, Bayswater ........................................................................ 12

4.6 On-site Vehicle Movements .................................................................................................. 13

4.6.1 Turning Path Movements ......................................................................................... 13

4.6.2 Traffic Safety on-site ................................................................................................. 13

5 Conclusions ............................................................................................................................ 14

Page 4: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Traffic and Transport Assessment

Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean

Aurigen Group Ltd

TW15042 - Traffic and Transport Assessment.1b December 2016 | Page iii

References...................................................................................................................................... 15

Tables

Table 2-1: Heavy vehicles accessing the Site during operation

Table 2-2: Proposed on-site parking facilities

Table 4-1: Future Operational Inbound/Outbound Traffic per day

Table 4-2: Level of Service Ratings

Table 4-3: SIDRA Analysis Summary – Existing Traffic Conditions

Table 4-4: SIDRA Analysis Summary – Scenario 1 and 2

Table 4-5: SIDRA Analysis Summary – Scenario 3 and 4

Diagrams

Diagram 3-1: Existing Weekday Traffic Flow with Heavy Vehicle Percentage over 1 hour (10:00 – 11:00)

Diagram 3-2: Existing Weekday Approach Volumes over 1 hour (10:00 – 11:00)

Plate

Plate 2-1: Perth Bicycle Network surrounding the Site

Appendices

Appendix A : Manual Count Sheets

Appendix B : Drawings

Appendix C : SIDRA Modelling Output

No table of conten ts entries found.

Page 5: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Traffic and Transport Assessment

Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean

Aurigen Group Ltd

TW15042 - Traffic and Transport Assessment.1b December 2016 | Page 1

1 Introduction

1.1 Background

Aurigen Group Limited (Aurigen) is a private waste service provider that specialises in a variety of

services to domestic, industrial and local government clients including resource recovery, waste

logistics, waste disposal and commodity aggregation and trading. Commodity aggregation refers to

the sorting and consolidation of recycled materials in order to prepare them for sale to markets.

Aurigen acquired a lease on 25 Jackson Street, Bassendean (the Site) in late 2015 where they propose

to develop a Waste Transfer and Resource Recovery Facility (the Proposed Development). This will be

an integrated Facility providing a range of recycling and waste management services reflective of

modern, advanced facilities.

Talis Consultants Pty Ltd (Talis) has been engaged by Aurigen to prepare a Traffic and Transport

Assessment (the Assessment) to determine the potential traffic impacts of operating the Facility on the

adjacent road network and also considers the traffic arrangements within the Site. This Assessment has

been requested by the Town of Bassendean (the Town) to support Aurigen’s planning approval sought

for the proposed Facility, in addition to the Environmental Assessment and Management Plan (EAMP).

Operation of the Facility will generate new inbound and outbound vehicle movements accessing the

Site and the Assessment provides evidence that this increase in traffic will not cause an unacceptable

impact to surrounding businesses and other road users.

1.2 Scope of the Report

This Traffic and Transport Assessment has been broadly prepared in general context with the Western

Australian Planning Commission’s (WAPC) Traffic Impact Assessment Guidelines, Volume 4: Individual

Developments (2016) to demonstrate to the Town that the Proposed Development will:

Provide safe and efficient access for all modes of traffic type which will be associated with the

proposed development;

Be well integrated with surrounding land uses;

Not adversely impact surrounding land uses; and

Not adversely impact surrounding transport networks and the users of those networks.

Page 6: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Traffic and Transport Assessment

Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean

Aurigen Group Ltd

TW15042 - Traffic and Transport Assessment.1b December 2016 | Page 2

2 Site Information

The Site is located at 25 Jackson Street, Bassendean in the Bassendean Industrial Area within the

administrative boundary of the Town of Bassendean, approximately 10km from the centre of Perth.

The site is bordered by Jackson Street on its southwestern side with a separate access road to the Site

from Alice Street to the southeast of the Site. The location of the site is shown in Figure 1.

2.1 Surrounding Land Uses

The Site is located in the middle of an industrial zone that is comprised of the Bassendean (or Tonkin)

Industrial Area and the adjoining Bayswater Industrial Area to the west. Consistent with the zoning, the

area is characterised by numerous industrial businesses including manufacturing companies and

warehouses.

The closest residential area to the Site is located approximately 570m away to the north in the

neighbouring suburb of Bayswater (within the City of Bayswater). These residences are situated directly

adjacent to the northern extent of the industrial area, which extends onto the northern side of Collier

Road.

There are also a number of waste management facilities at which similar operations are undertaken

in the vicinity of the Site. Talis is of the opinion that this demonstrates that the Site is located within an

appropriate area for the proposed Facility.

2.2 Surrounding Road Network

The surrounding road network in the immediate vicinity of the Site includes Jackson Street and Alice

Street. Both Jackson Street and Alice Street are on the oversize Restricted Access Vehicle (RAV) network,

as defined by Main Roads Western Australia (MRWA). These streets are considered as RAV Network 2-7

(Main Roads WA) roads, which means that vehicles equal or up to 36.5m in length and up to a mass

of 107.5 tonne can utilise them. According to the MRWA Road Hierarchy, Jackson Street is classified

as a Local Distributor road and Alice Street and Wood Street are classified as Access Roads, all of

which have a speed limit of 50km/h.

2.2.1 Crash Blackspots

In preparation of this report, the Town’s Local Area Traffic Management (LATM) Plan (Opus, 2012) was

reviewed. The LATM Plan sets out local traffic issues and proposed measures to address these issues.

The intersection of Collier Road/Grey Street/Jackson Street was identified as a problematic crash site,

ranking No. 1 based on crash data from 2006 to 2010, which reported 47 collisions. The LATM Plan

indicated that this intersection was proposed for treatment with the construction of a dual lane

roundabout. The Town submitted a nomination for the construction of the roundabout at the Collier

Road/Grey Road/Jackson street intersection to MRWA in July 2012 and MRWA approved funding of the

project under their 2014/15 State Black Spot Program.

2.2.2 Speed on the Surrounding Road Network

The LATM Plan also analysed the incidence of speeding on local roads. Jackson Street, at its northern

end, Alice Street at its northern end and all of Wood Street were flagged as roads with over one quarter

(25%) of road users exceeding the speed limit and in the 85th percentile speeds of 5km or more over

the speed limit.

Page 7: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Traffic and Transport Assessment

Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean

Aurigen Group Ltd

TW15042 - Traffic and Transport Assessment.1b December 2016 | Page 3

2.3 Site Access

The Bassendean Industrial Area is conveniently located in close proximity to a number of major arterial

roads including Collier Road (approximately 100m to the north) and bordered by Railway

Parade/Guildford Road (approximately 750m to the south) and Tonkin Highway (approximately 415m

to the west), which is accessible via Collier or Guildford Roads.

There are three gated vehicle access points to the Site. Two of these are from the front of the Site on

Jackson Street, which are separated from each other by a security fence on a small embankment.

There is a third Site access point from a private access road on the adjacent Alice Street. Most of the

traffic will be dropping off or collecting commodities, recyclables or waste and will access the site via

the northern Jackson Street or Alice Street entrances. Both of these entry points will be equipped with

weighbridges. The Alice Street entry will also have a gatehouse.

Heavy vehicles will enter and exit the Site via two primary Site entrances, namely the northern Jackson

Street entrance and Alice Street entrance. The types of heavy vehicles that will drop-off and collect

waste and commodities are detailed in Table 2-1.

Table 2-1: Heavy vehicles accessing the Site during operation

Vehicle Type Capacity

Kerbside/Front Lift Collection vehicles 6-9 tonnes

Semi-trailers such as side loading 20 tonnes

B-doubles 60 tonnes

Given Waste Transfer and Resource Recovery are logistics operations, it is important that the Site is

easily accessible by road. The Site is in an excellent strategic location, in close proximity to major roads

including Collier Road (to the north) and Tonkin Highway (accessed via Collier Road) which provides

easy access to other associated facilities (e.g. port).

2.3.1 Staff Access

Staff, maintenance and visitor vehicles will enter the Site through the northern of the two Jackson Street

entrances to access the designated small vehicle car parking areas. The parking facilities on-site will

be upgraded to include provision for at least 40 parking bays, as shown in the Conceptual Site Plan

(Drawing G-001 in the EAMP). The number of inbound and outbound staff vehicles from the Site

assumes one vehicle per staff member. Aurigen forecast the fully developed site would operate with

thirty (30) staff members, with 10 parking bays allowed for visitors and maintenance vehicles. Aurigen

will encourage the employment of local people at the Facility, the use of public transport, car sharing,

or other sustainable forms of transport (cycling etc.). Therefore, it is anticipated that the staff vehicle

traffic volumes will be significantly less than those estimated in the Assessment.

2.3.2 Pedestrian and Cyclist Access and Networks

There are no pedestrian footpaths currently located along Jackson Street. However, the Site has

provision for pedestrians and cyclists to have direct access to the Site via the office, which is equipped

with a dedicated path accessible from Jackson Street, north of the two vehicle entrances (see

Conceptual Site Plan Drawing G-001).

According to the Department of Transport, Jackson Street is on the Perth Bicycle Network (

Page 8: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Traffic and Transport Assessment

Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean

Aurigen Group Ltd

TW15042 - Traffic and Transport Assessment.1b December 2016 | Page 4

Plate 2-1) which connects with cycling routes to the east (towards Bassendean), north (towards Morley),

west (towards Embleton) and south (towards Ashfield).

Plate 2-1: Perth Bicycle Network surrounding the Site

2.3.3 Public Transport Access

The closest train station to the Site is Ashfield station on the Perth to Midland line, which is approximately

12 minutes’ walk from the Site. The closest bus stop is on Collier Road where bus no. 955 runs between

Ellenbrook and Morley Bus Station.

2.4 On-site Parking

As mentioned above, there will be on-site parking provided for staff, maintenance and visitors. Details

of the parking including the type, number and dimensions are shown in Table 2-2. The dimensions for

car parking bays were allocated utilising of the following documents as guidance:

Town of Bassendean’s Local Planning Policy No. 8 – Parking Specifications; and

Australian Standard Parking facilities – Part 6: Off-street parking for people with disabilities.

The location of the car parking facilities are shown on the Conceptual Site Plan (Drawing G-001 in the

EAMP).

Table 2-2: Proposed on-site parking facilities

Type of Parking No. of bays Parking angle Dimensions per bay

Upgraded car park 17 0º or 90º 2.5m x 5.4m

Undercover parking 4 0º 2.5m x 2.5m

Parking outside office 3 90º 2.5m x 5.4m

Parallel parking bays 14 45º 2.5m x 5.3m

Disabled parking (with shared area) 2 90º 2.4m x 5.4m

TOTAL 40 - -

The designated small vehicle parking area is located between the Jackson Street entrance and the

main office, which accommodates 17 vehicles. There are an additional 3 parking spaces on the rear

side of the office, along with two accessible (disabled) parking spaces. An additional 14 parallel

So

urc

e: D

ep

artm

ent o

f Tra

nsp

ort

25 Jackson Street

Page 9: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Traffic and Transport Assessment

Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean

Aurigen Group Ltd

TW15042 - Traffic and Transport Assessment.1b December 2016 | Page 5

parking bays along the north-west perimeter of the Site. The parking area will include an upgraded car

park, existing undercover parking and disabled parking facilities totalling 40 bays.

2.5 Loading and Unloading Areas

As shown in Drawings G301- G303, the designated loading and unloading areas are located in close

proximity to each of the Facility’s proposed operations. An undercover unloading area on the south-

eastern side of the Site next to the baler/shredder shed will enable vehicles to unload scrap metals

prior to baling/shredding and consolidation in the Metal Recovery Facility. Once consolidated, scrap

metal will be loaded into sea containers to the south-west of the Metal Recovery Facility ready for

collection and shipment to overseas markets. The Materials Recovery Facility (MRF) and Waste Transfer

Station (WTS) will have designated unloading areas (2 for the MRF and 3 for the WTS) inside the proposed

building to allow vehicles to reverse and unload their waste. The Baling Shed that will bale paper and

cardboard from the MRF will have a loading bay at its north-eastern end.

2.6 Environmental Noise

An Environmental Noise Assessment was undertaken for the Site by Lloyd George Acoustics (Lloyd

George) (full report in Appendix E of the EAMP). The Noise Assessment concluded the Site complies

with noise regulations during the daytime, Monday to Saturday 7:00 to 19:00. To operate the site on

Sundays and public holidays between 9:00 and 19:00, a 5dB reduction in noise would be required.

Noise from trucks currently utilising the site from the Alice Street entrance were predicted to generate

67dB, which after a 5dB penalty for tonal noise emissions, results in an assembled level of 71dB. The

assigned noise level for this industrial area during the day is 65dB. The assessment identified that a 6dB

exceedance must be mitigated to ensure compliance with noise requirements. Lloyd George

recommended that a noise wall be constructed along the east side of the ramp and a section of the

north east boundary to mitigate noise form trucks. Implementing this targeted noise controls is

anticipated to sufficiently reduce the environmental disturbance of any current or future traffic

movements to and from the Site.

Page 10: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Traffic and Transport Assessment

Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean

Aurigen Group Ltd

TW15042 - Traffic and Transport Assessment.1b December 2016 | Page 6

3 Existing Traffic Volumes

As part of this analysis, two intersections were analysed including Jackson Street and Alice Street, as

well as Alice Street and Wood Street, as shown in Diagram 3-1. As mentioned previously, Jackson

Street is classified as a Local Distributor road and Alice Street and Wood Street are Access Roads, both

of which have a speed limit of 50km/h. These three roads surround the Site and will likely experience

the most direct impact of any increase in traffic volume due to the operation of the Facility.

No recent traffic data was available on these roads from MRWA or the Town of Bassendean. As a result,

in order to analyse current traffic movement, Talis performed a manual traffic count on these

intersections. The traffic count was performed between 10:00-11:00 on a weekday to gain an average

representation of peak traffic volumes. Based on advice from the client in relation to anticipated Site

traffic, peak periods of two hours duration are anticipated to occur on weekday mornings (9:00-11:00)

and afternoons (14:00-16:00).

Copies of the original manual count sheets have been attached in Appendix A. The results of the

manual traffic count are shown below in Diagram 3-1, where the number of vehicles passing and

percentage of heavy vehicles are displayed.

Diagram 3-1: Existing Weekday Traffic Flow with Heavy Vehicle Percentage over 1 hour (10:00 –

11:00)

The manual traffic count provided a breakdown of heavy vehicle traffic and overall volumes to be

determined for the hour in question. From these volumes, the traffic flows towards the two primary

Facility entrances can be calculated and used to determine traffic impact. The approach and exit

flow for each direction is shown below in Diagram 3-2.

Page 11: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Traffic and Transport Assessment

Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean

Aurigen Group Ltd

TW15042 - Traffic and Transport Assessment.1b December 2016 | Page 7

As expected, the highest volume of traffic was observed on Jackson Street, as this road creates a

direct connection between Collier Road and Railway Parade. At the time of the traffic count, none of

the traffic movements involved vehicles entering and exiting the Site as the Facility is operating with

limited traffic movements currently.

Diagram 3-2: Existing Weekday Approach Volumes over 1 hour (10:00 – 11:00)

Page 12: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Traffic and Transport Assessment

Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean

Aurigen Group Ltd

TW15042 - Traffic and Transport Assessment.1b December 2016 | Page 8

4 Development Proposal

Talis modelled the vehicle movements based on the quantity of waste and materials anticipated to

be accepted per annum at the Site along with the types of vehicles expected to carry loads. For

completeness, the incoming vehicles to the Waste Transfer Station (WTS) and Materials Recovery

Facility (MRF) are predicted to be primarily kerbside waste collection vehicles with a capacity of

approximately 9 tonnes. The incoming commodity drop-off vehicles may vary in capacity from 15 to

26 tonnes.

Table 4-1 sets out the anticipated daily vehicle movements to and from the Site based on the

following design capacities:

Material Recovery Facility of 100,000 tonnes per annum (tpa);

Commodity aggregation activities of up to 120,000 tpa; and

Waste Transfer Station with capacity for 100,000 tpa.

It is important to note that the calculations have assumed a seven day working week for waste

acceptance. In reality, fewer vehicles are expected on weekends than weekdays.

Table 4-1: Future Operational Inbound/Outbound Traffic per day

Site Operations Vehicle Type

Average

Vehicle

Capacity

(tonnes)

Total No. of

Vehicles

No. of Vehicles

during peak

period (2 hours)

Inbound Traffic

Materials Recovery

Facility

Kerbside/front lift

collection vehicle

6 46 16

Commodity Drop-offs Various 20 50 8

Putrescible Waste Transfer

Station

Kerbside/front lift

collection vehicle

9 30 11

Outbound Traffic

Commodity Removals

(includes MRF Materials)

Various 20 28 5

Putrescible Waste Transfer

Station

Compaction

haulage vehicles

50 7 1

Total Operational

Vehicles - 161 41

Staff

Staff Vehicles Cars - 30 0

Total Staff Vehicles - 30 0

Total Inbound/Outbound Traffic - 191 -

As shown in Table 4-1, the traffic data modelling indicates that there would be an estimated 161

vehicle movements or trucks dropping off and collecting waste and materials to and from the Site

during normal operating hours (06:00-18:30) along with 30 staff vehicles.

Page 13: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Traffic and Transport Assessment

Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean

Aurigen Group Ltd

TW15042 - Traffic and Transport Assessment.1b December 2016 | Page 9

During each of the two hour peak periods occurring in the morning (09:00-11:00) and the afternoon

(14:00-16:00), the following predicted traffic volumes were utilised:

35% of total daily inbound MRF vehicles (16 vehicles);

35% of total daily inbound Putrescible WTS vehicles (11 vehicles);

Inbound Commodity drop-offs (8 vehicles); and

Even distribution of outbound traffic associated with commodity collections and compacted

putrescible waste removal (6 vehicles).

This equates to 41 vehicles over the two hour period or 20-21 vehicles over the one hour peak period.

This is a conservative ‘worst-case’ approach towards expected vehicle movements and volumes are

not anticipated to exceed these volumes. Commodity drop-offs and compaction haulage vehicle

movements are not anticipated to experience ‘peak periods’ and were modelled to arrive and depart

consistently over the duration of 12.5 hour working day.

Operational staff will be required to be present at the Site prior to waste vehicle arrivals and following

the end of the day, so it was assumed that staff vehicle traffic did not impact site operation vehicles

and was analysed separately. Designated staff car parking will also be provided for small vehicles (see

Section 2.4 for more information).

To determine the impact constructing the proposed Facility would have on the surrounding traffic

network, four scenarios were analysed and compared to current volumes, including:

Scenario 1: Jackson Street Entrance (Trucks Only);

Scenario 2: Alice Street Entrance (Trucks Only);

Scenario 3: Staff Arriving Jackson Street Entrance; and

Scenario 4: Staff Departing Jackson Street Entrance.

4.1 Assumptions

When modelling the scenarios, the following assumptions were made:

Manual traffic counts undertaken for one hour between 10:00-11:00 on a weekday on the

intersections of Jackson Street and Alice Street, as well as Alice Street and Wood Street is during

the morning peak period (09:00-11:00) expected at the Facility;

Half of the staff arrive and depart from the Site via Collier Road, whilst the other half arrive and

depart from Railway Parade;

The model assumes that all staff will drive to work and each drive their own vehicle. In reality,

there is potential for staff to carpool, cycle or use public transport with a dedicated pedestrian

and cyclist access gate off Jackson Street; and

Half of the vehicle movements or trucks dropping off and collecting waste will utilise the

Jackson Street entrance, arriving from and departing towards Collier Road, whilst the other half

of vehicles movements or trucks are anticipated to access the Site via Alice Street utilising the

Alice Street and Collier Road access point.

4.2 SIDRA Analysis

In order to assess the operation of the intersections and the impact of additional traffic, analysis was

undertaken using SIDRA INTERSECTION 5.0 (SIDRA), a software package utilised for intersection design

and modelling network capacity.

Page 14: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Traffic and Transport Assessment

Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean

Aurigen Group Ltd

TW15042 - Traffic and Transport Assessment.1b December 2016 | Page 10

SIDRA creates a model based on the lane geometry and traffic volumes and provides a number of

outputs including, but not limited to:

Degree of Saturation: the ratio of demand to capacity on the approach to the intersection;

Average Delay: average of all time delays of vehicles travelling through the intersection; and

Average Speed.

One of the key outputs of the SIDRA analysis is the Level of Service for each approach to the

intersection. Level of Service (LOS) is a qualitative measure used to describe the operating conditions

of a roadway. By performing an analysis of current conditions and predicted traffic, the Level of Service

provides a means of comparison to easily identify overall impact to the intersection. An explanation

of the different Level of Service ratings is shown below in Table 4-2.

Table 4-2: Level of Service Ratings

Level of Service Rating Traffic Condition

LOS A Excellent Free flowing

LOS B Very good Stable flow with minimal delays

LOS C Good Stable with restricted movement

LOS D Fair Movement more restricted

LOS E Poor Traffic is congested with long queues and delays

LOS F Very Poor Traffic demand exceeds intersection capacity

The current traffic volumes, as discussed in Section 3, were modelled in SIDRA to allow a comparison

to be made against the predicted conditions. The results of the analysis are shown below in Table 4-3

including left (L), right (R) and through (T) traffic movements. Output calculations from the SIDRA

modelling are presented in Appendix C.

Table 4-3: SIDRA Analysis Summary – Existing Traffic Conditions

Intersection

Approach Turn

Degree of

Saturation

Average Delay

(sec)

Level of

Service

Average

Speed (km/h)

Jackson Street and Alice Street

Jackson Street:

South East

T 0.088 1.9 LOS A 45.1

R 0.088 9.3 LOS A 42.3

Alice Street:

North East

L 0.058 8.8 LOS A 41.2

R 0.058 10.0 LOS A 41.2

Jackson Street:

North East

L 0.059 7.3 LOS A 43.3

T 0.059 0.0 LOS A 50.0

Alice Street and Wood Street

Wood Street:

South East

T 0.027 7.3 LOS A 42.6

R 0.027 7.7 LOS A 42.4

Alice Street:

North East

L 0.023 7.0 LOS A 43.3

R 0.023 0.0 LOS A 50.0

Page 15: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Traffic and Transport Assessment

Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean

Aurigen Group Ltd

TW15042 - Traffic and Transport Assessment.1b December 2016 | Page 11

Intersection

Approach Turn

Degree of

Saturation

Average Delay

(sec)

Level of

Service

Average

Speed (km/h)

Alice Street:

South West

L 0.029 0.6 LOS A 47.1

T 0.028 8.1 LOS A 42.9

As shown in Table 4-3, the current traffic movements of both intersections are categorised as LOS A

(Excellent) in all directions. Traffic is freely flowing and there are no significant delays experienced by

any of the flow directions.

4.3 Impact on Scenario 1 and 2

When introducing the Facility’s operations into the analysis, the impact of the additional traffic on the

existing volumes entering and exiting the Site could be determined through the SIDRA modelling

process, as shown in Table 4-4.

Table 4-4: SIDRA Analysis Summary – Scenario 1 and 2

Intersection

Approach Turn

Degree of

Saturation

Average Delay

(sec)

Level of

Service

Average

Speed (km/h)

Scenario 1 - Jackson Street Entrance (Trucks Only)

Jackson Street:

South East

T 0.066 1.3 LOS A 45.5

R 0.050 1.3 LOS A -

Site Entrance:

North East

L 0.050 12.6 LOS B -

R 0.054 21.9 LOS C 33.8

Jackson Street:

North West

L 0.068 8.5 LOS A 42.2

T 0.068 0.0 LOS A 50.0

Scenario 2 - Alice Street Entrance (Trucks Only)

Alice Street:

North East

T 0.048 2.0 LOS A 45.7

R 0.048 11.3 LOS B 41.4

Site Entrance:

North West

L 0.020 9.2 LOS A 41.3

R 0.020 0.8 LOS A -

Alice Street:

South West

L 0.025 0.0 LOS A -

T 0.022 0.0 LOS A 50.0

In Scenario 1, the north-west and south-east approaches of Jackson Street experienced no change

to their Level of Service. The only changes appear to affect vehicles exiting the Facility from the

Jackson Street access point turning left (LOS B) and turning right (LOS C), of which only the right turning

vehicles are relevant as vehicles are expected to exit towards Collier Road for Tonkin Highway. The

SIDRA modelling has determined that only vehicles entering and exiting the Facility are going to

experience any sort of delay, with maximum average delays expected to be up to 21.9 seconds. The

entrance has sufficient space for one B-double, the longest vehicle accessing the Site, to queue on

the access road.

With respect to the SIDRA modelling for Scenario 2, all directions of traffic are classified as LOS A,

except for the vehicles entering the Facility turning right from Alice Street. The only vehicles subject to

any delays for Scenario 2 are the vehicles entering the Facility with maximum average delays

Page 16: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Traffic and Transport Assessment

Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean

Aurigen Group Ltd

TW15042 - Traffic and Transport Assessment.1b December 2016 | Page 12

expected to be up to 11.3 seconds. The Alice Street entrance also has sufficient space for one B-

double, the longest vehicle accessing the Site, to queue on the access road.

4.4 Impact on Scenario 3 and 4

The traffic conditions under Scenario 3, when staff arrive at the start of the day (pre-peak) and Scenario

4, when the staff leave at the end of the day (post-peak), in conjunction with the current traffic volumes

is summarised in Table 4-5 below. These movements were modelled on a conservative basis

assuming that morning and afternoon traffic volumes are the same as the Facility’s peak period. In

reality, the traffic volumes at these times will be much lower.

Table 4-5: SIDRA Analysis Summary – Scenario 3 and 4

Intersection

Approach Turn

Degree of

Saturation

Average Delay

(sec)

Level of

Service

Average

Speed (km/h)

Scenario 3 - Jackson Street Entrance Staff Arrival AM

Jackson Street:

South East

T 0.086 1.3 LOS A 45.6

R 0.086 8.1 LOS A 42.8

Site Entrance:

North East

L 0.000 1.5 LOS A -

R 0.000 1.5 LOS A -

Jackson Street:

North West

L 0.066 6.4 LOS A 43.3

T 0.066 0.0 LOS A 50.0

Scenario 4 - Jackson Street Entrance Staff Departing PM

Jackson Street:

South East

T 0.066 1.2 LOS A 45.8

R 0.050 1.2 LOS A -

Site Entrance:

North East

L 0.039 8.0 LOS A 41.9

R 0.039 8.3 LOS A 41.7

Jackson Street:

North West

L 0.050 0.0 LOS A -

T 0.058 0.0 LOS A 50.0

All volumes under these scenarios still maintain the same level of service (LOS A) as the current traffic

conditions. The office and parking areas are located on the Jackson Street side of the Site. All staff

vehicles will enter the Site through the Jackson Street (small vehicle) entrance.

4.5 Committed Developments

4.5.1 Lot 10 – Railway Parade, Bayswater

As part of the Assessment, the Town requested that the Outline Development & Subdivision Concept

Plan – Eastern Access Assessment (Concept Plan) be considered. The Concept Plan was prepared in

relation to a development of vacant industrial land located at Lot 10 Railway Parade, Bayswater, south

of the Site. This plan includes a new access point onto Tonkin Highway, a full movement access point

on Railway Parade and construction of Vincent Street and Wicks Street, with a roundabout at its

intersection with Jackson Street.

The Concept Plan reports on the preferred eastern road connection to the development. The preferred

connection was found to be the proposed new road, Wick Street, onto Jackson Street with provision

Page 17: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Traffic and Transport Assessment

Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean

Aurigen Group Ltd

TW15042 - Traffic and Transport Assessment.1b December 2016 | Page 13

of a new roundabout, at this intersection. The Concept Plan states that traffic would be anticipated to

utilise Jackson Street to access Tonkin Highway however, no vehicle movements are quantified within

the Concept Plan. Traffic produced as a result of this development is expected to interact with traffic

volumes surrounding the Site. However, all vehicles accessing the Site during operations will access

and depart the Site utilising Jackson Street and Collier Road or Alice Street and Collier Road for Tonkin

Highway and are not anticipated to utilise Railway Parade or the new Wick Street/Jackson Street

intersection.

4.6 On-site Vehicle Movements

4.6.1 Turning Path Movements

Vehicle movement mapping was performed for a kerbside collection vehicle, B-double and semi-

trailer as shown in Drawings G-301- G-303 in Appendix B. These turning path movements demonstrate

that the Site has sufficient capacity for all vehicles types modelled to manoeuvre between the loading

and unloading areas, and still enter and exit the Site without major obstruction.

4.6.2 Traffic Safety on-site

A number of management measures will be adopted on-site to safely manage traffic including:

Vehicles will be restricted to a maximum speed of 10km/hour whilst on the Site which will be

signposted at appropriate locations including the entrance to the Site;

Signage providing Site directions, traffic control measures and safety instructions will be

established and maintained at appropriate locations around the Site;

There will be adequate staff supervision to ensure staff safety around moving vehicles; and

Employees and contractors shall wear high visibility and reflective clothing when working in

areas where vehicle movement occurs.

Further information in relation to traffic management on-site can be found in the EAMP.

Page 18: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Traffic and Transport Assessment

Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean

Aurigen Group Ltd

TW15042 - Traffic and Transport Assessment.1b December 2016 | Page 14

5 Conclusions

The conclusions of the Traffic and Transport Assessment are as follows:

The current traffic volumes on the road network surrounding the Site will experience minimal

impact due to the predicted traffic movements during the Facility’s peak periods.

The development of the proposed Facility will generate an estimated 161 heavy vehicle and

30 staff vehicle two-way movements (into and out of the Site) each day under the ‘worst-case’

scenario.

Up to 70% of the total heavy vehicle traffic is expected during the morning and afternoon

peak periods between 09:00-11:00 and 14:00-16:00 for Materials Recovery Facility and Waste

Transfer Station drop-offs. This would result in up to 41 vehicle movements per hour with these

vehicles utilising Jackson Street and Alice Street to access the Site and Collier Road.

Turning path movements undertaken demonstrate that the Site has sufficient capacity for all

vehicle types modelled to manoeuvre between the various loading and unloading points,

and still enter and exit the Site without major obstruction.

SIDRA analysis of the two Site entrances determined that these intersections have sufficient

operational capacity for the Facility’s vehicle movements.

The modelling indicates that the only delays created due to the additional traffic associated

with the Site would be experienced by those vehicles entering and exiting the Site with

maximum average delays expected to be up to 21.9 seconds. Both entrances have sufficient

space for one B-double, the longest vehicle accessing the Site, to queue on the access road.

The modelling indicates that surrounding businesses and other road users will not experience

any significant impact.

The development of Lot 10 Railway Parade, Bayswater has been considered as part of this

Assessment. Traffic produced as a result of the development of Lot 10 Railway Parade is

expected to interact with traffic volumes surrounding the Site. However, all vehicles accessing

the Site during operations will access and depart the Site utilising Jackson Street and Collier

Road or Alice Street and Collier Road for Tonkin Highway and are not anticipated to utilise

Railway Parade or the new Wick Street/Jackson Street intersection.

Based on the modelling, available information and the assumptions made, the Facility will

have limited impact on the surrounding area and should not create a significant disturbance

to surrounding business or other road users in the area.

Page 19: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Traffic and Transport Assessment

Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean

Aurigen Group Ltd

TW15042 - Traffic and Transport Assessment.1b December 2016 | Page 15

References

Australian/New Zealand Standard Parking facilities. Part 6: Off-street parking for people with disabilities

Department of Transport.

Perth, Fremantle and Stirling: Perth bike map. Available:

http://www.transport.wa.gov.au/mediaFiles/active-transport/at_CYC_map_PerthFremantle-Stirling.pdf

Main Roads WA. Approved 2014/15 State Black Spot Program. Available at:

https://www.mainroads.wa.gov.au/Documents/2014-

2015%20Approved%20State%20Black%20Spot%20Program%20-

%20Local%20Roads%20(External%20Web%20Version).RCN-D14%5E23486393.PDF

Opus (2012), Town of Bassendean - Local Area Traffic Management Plan.

Town of Bassendean, Confirmation of Minutes for Ordinary Council Meeting held on 24 July 2012.

Available at: http://www.bassendean.wa.gov.au/3_your_council/agendas_minutes/council-2012-08-

28-agn.htm

Western Australian Planning Commission’s (2016) Traffic Impact Assessment Guidelines, Volume 4:

Individual Developments. Available at:

http://www.planning.wa.gov.au/dop_pub_pdf/TIAGuidelinesVolume4IndividualDevelopments.pdf

1

Page 20: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Traffic and Transport Assessment

Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean

Aurigen Group Ltd

TW15042 - Traffic and Transport Assessment.1b December 2016 | Page 16

Appendix A : Manual Count Sheets

Page 21: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and
Page 22: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and
Page 23: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Traffic and Transport Assessment

Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean

Aurigen Group Ltd

TW15042 - Traffic and Transport Assessment.1b December 2016 | Page 17

Appendix B : Drawings

Page 24: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Document Path: \\server\talis\SECTIONS\Waste\PROJECTS\TW2015\TW15042 - Auricom Jackson St Facility\GIS\Maps\TW15042_01T_TrafficLocality.mxd

!(

!(

LAVAN

ST

JACKSONST

GREY ST COLLIER RD

JACKSON ST

COLLIER RD

CLUNE ST

WOOD STALICE ST

JACKSON ST

JACKSON STDUFFY ST

ALICE ST

COLLIER RD

398,600

398,600

398,800

398,800

399,000

399,000

6,469

,000

6,469

,000

6,469

,200

6,469

,200

6,469

,400

6,469

,400

LEGEND

© Talis Consultants Pty Ltd ("Talis") Copyright in the drawings, information and datarecorded in this document ("the information") is the property of Talis. This document andthe information are soley for the use of the authorised recipient andthis document may not be used, transferred or reproduced in whole or partfor any purpose other than that which it is supplied by Talis withoutwritten consent. Talis makes no representation, undertakes no duty andaccepts no responsibility to any third party who may use or rely upon thisdocument or the information.

Yanchep

PerthArmadale

Mandurah

0 40 80 120 16020 km

LOCALITY

LOCALITY AND SURVEYMAPAurigen - Traffic Impact Assessment

0 10 20 30 405 metres

¤ Coordinate System: GDA 1994 MGA Zone 50Projection: Transverse Mercator, Datum: GDA 1994

RONKReviewed:

Checked:Prepared: TM Date: 4/11/2016

Revision:

Scale @ A3:1:2,000

Project No: TW15042A

Data source: Roads, Suburbs, LGA's - Landgate, 2015 and MRWA. Imagery: Nearmaps, 2015.

Figure

1

Site Boundary!( Manual Count Intersection_̂ Primary Site Access Points

P PO Box 454, Leederville WA 6903 | A Level 1 660 Newcastle St, Leederville WA 6007 | T 1300 251 070 | W www.talisconsultants.com.au

1

2

Page 25: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

:

:

:

70.0

23.4

6.0:

:

:

:

2.50

meters

2.50

2.50

2.50Tractor Width

Trailer Track

Tractor Track

Trailer Width

B-DOUBLE 26M

Steering Angle

Articulating Angle

Lock to Lock Time

12.508.05

1.40 4.50

3.00

0.00

1.40 8.05 9.15

0.45

0.00

Level 1 660 Newcastle Street,

Leederville WA 6007

PO Box 454, Leederville WA 6903

T: 1 3 0 0 2 5 1 0 7 0w w w . t a l i s c o n s u l t a n t s . c o m . au

ASSET MANAGEMENT

CIVIL ENGINEERING

ENVIRONMENTAL SERVICES

SPATIAL INTELLIGENCE

WASTE MANAGEMENT

AutoCAD SHX Text
B-DOUBLE 26M
AutoCAD SHX Text
AUSTROADS 2013 (AU)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
B-DOUBLE 26M
AutoCAD SHX Text
AUSTROADS 2013 (AU)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
B-DOUBLE 26M
AutoCAD SHX Text
AUSTROADS 2013 (AU)
AutoCAD SHX Text
B-DOUBLE 26M
AutoCAD SHX Text
AUSTROADS 2013 (AU)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
B-DOUBLE 26M
AutoCAD SHX Text
AUSTROADS 2013 (AU)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
B-DOUBLE 26M
AutoCAD SHX Text
AUSTROADS 2013 (AU)
AutoCAD SHX Text
B-DOUBLE 26M
AutoCAD SHX Text
AUSTROADS 2013 (AU)
AutoCAD SHX Text
90
AutoCAD SHX Text
OUTSIDE SWEPT PATH
AutoCAD SHX Text
PATH OF FRONT WHEEL
AutoCAD SHX Text
INSIDE SWEPT PATH
AutoCAD SHX Text
STEERING LOCK ANGLE = 33.3 deg.
AutoCAD SHX Text
ACHIEVED STEERING ANGLE:
AutoCAD SHX Text
90 deg. SWEEP ANGLE: 30.7 deg.
AutoCAD SHX Text
Aerial Fire Truck
AutoCAD SHX Text
NCHRP REPORT 659 (US)
AutoCAD SHX Text
[m]
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
0m
AutoCAD SHX Text
5m
AutoCAD SHX Text
10m
AutoCAD SHX Text
NOTES
AutoCAD SHX Text
1. This drawing is the property of Talis Consultants Pty This drawing is the property of Talis Consultants Pty drawing is the property of Talis Consultants Pty drawing is the property of Talis Consultants Pty is the property of Talis Consultants Pty is the property of Talis Consultants Pty the property of Talis Consultants Pty the property of Talis Consultants Pty property of Talis Consultants Pty property of Talis Consultants Pty of Talis Consultants Pty of Talis Consultants Pty Talis Consultants Pty Talis Consultants Pty Consultants Pty Consultants Pty Pty Pty Ltd. It is a confidential document and must not be It is a confidential document and must not be It is a confidential document and must not be is a confidential document and must not be is a confidential document and must not be a confidential document and must not be a confidential document and must not be confidential document and must not be confidential document and must not be document and must not be document and must not be and must not be and must not be must not be must not be not be not be be be copied, used, or its contents divulged without prior used, or its contents divulged without prior used, or its contents divulged without prior or its contents divulged without prior or its contents divulged without prior its contents divulged without prior its contents divulged without prior contents divulged without prior contents divulged without prior divulged without prior divulged without prior without prior without prior prior prior written consent. 2. All levels refer to Australian Height Datum. All levels refer to Australian Height Datum. 3. DO NOT SCALE, use figured dimensions only, if in DO NOT SCALE, use figured dimensions only, if in NOT SCALE, use figured dimensions only, if in NOT SCALE, use figured dimensions only, if in SCALE, use figured dimensions only, if in SCALE, use figured dimensions only, if in use figured dimensions only, if in use figured dimensions only, if in figured dimensions only, if in figured dimensions only, if in dimensions only, if in dimensions only, if in only, if in only, if in if in if in in in doubt please contact Talis Consultants.
AutoCAD SHX Text
Project:
AutoCAD SHX Text
Title:
AutoCAD SHX Text
Drawn by:
AutoCAD SHX Text
Checked by:
AutoCAD SHX Text
Approved by:
AutoCAD SHX Text
Scale:
AutoCAD SHX Text
Date:
AutoCAD SHX Text
Job No:
AutoCAD SHX Text
File No:
AutoCAD SHX Text
Drg. No:
AutoCAD SHX Text
Rev:
AutoCAD SHX Text
Client:
AutoCAD SHX Text
No.
AutoCAD SHX Text
Date
AutoCAD SHX Text
App.
AutoCAD SHX Text
Amendment / Issue
AutoCAD SHX Text
Drwn.
AutoCAD SHX Text
Chk.
AutoCAD SHX Text
JACKSON STREET WASTE TRANSFER AND RESOURCE RECOVERY FACILITY LOT 2 (NO 25) JACKSON ST BASSENDEAN
AutoCAD SHX Text
TW15042
AutoCAD SHX Text
AURIGEN
AutoCAD SHX Text
TW15042-G-301
AutoCAD SHX Text
G-301
AutoCAD SHX Text
VEHICLE MOVEMENT MAP - B-DOUBLE (26m)
AutoCAD SHX Text
1:1000
AutoCAD SHX Text
A
AutoCAD SHX Text
03.11.2016
AutoCAD SHX Text
CDB
AutoCAD SHX Text
TM
AutoCAD SHX Text
RC
AutoCAD SHX Text
A
AutoCAD SHX Text
03.11.16
AutoCAD SHX Text
CDB
AutoCAD SHX Text
TM
AutoCAD SHX Text
ISSUED FOR CLIENT REVIEW
AutoCAD SHX Text
RC
AutoCAD SHX Text
ALICE STREET
AutoCAD SHX Text
JACKSON STREET
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
1. ALL VEHICLE MOVEMENTS ARE MAPPED VIA ALL VEHICLE MOVEMENTS ARE MAPPED VIA STANDARD VEHICLES USING THE AUTOTURN SOFTWARE 2. B-DOUBLE MUST USE ALICE STREET TO ENTER THE B-DOUBLE MUST USE ALICE STREET TO ENTER THE SITE AND ONLY THOSE ENTRY/EXIT MOVEMENTS SHOWN ARE VIABLE WHILST REMAINING LANE CORRECT. ALICE STREET MOVEMENTS NOT SHOWN ON THE DRAWING ARE RESTRICTED DUE TO INSIDE FENCE LINES AND VEHICLES PARKED OPPOSITE THE EXIT ON ALICE STREET. 3. B-DOUBLE SHOULD BE ABLE TO TURN IN THE B-DOUBLE SHOULD BE ABLE TO TURN IN THE COURTYARD AREA TO EXIT VIA ALICE STREET BUT IT WILL BE TIGHT. IT WOULD BE SAFER TO REVERSE INTO BUILDING TO ALLOW THE MOVEMENT SHOWN OR EXIT VIA JACKSON STREET AS SHOWN
AutoCAD SHX Text
WASTE TRANSFER STATION
AutoCAD SHX Text
BIN STORAGE AREA & WORKSHOP
AutoCAD SHX Text
BALE SHED
AutoCAD SHX Text
UNDERCOVER ACCEPTANCE AREA
AutoCAD SHX Text
METAL RECYCLING FACILITY
AutoCAD SHX Text
MATERIALS RECOVERY FACILITY
AutoCAD SHX Text
CONTAINER STORAGE AREAAREA
AutoCAD SHX Text
CAR PARK
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
BALER/SHREDDER SHED
AutoCAD SHX Text
WEIGHBRIDGE
Page 26: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

13.70

1.60 5.30

4.20

0.20

1.40 9.50

Articulating Angle

Lock to Lock Time

: 2.50Trailer Width Steering Angle

Tractor Track

Trailer Track

: 2.50

2.50:

Tractor Width

PM S 19M

2.50:

meters

27.8:

70.0:

6.0:

Level 1 660 Newcastle Street,

Leederville WA 6007

PO Box 454, Leederville WA 6903

T: 1 3 0 0 2 5 1 0 7 0w w w . t a l i s c o n s u l t a n t s . c o m . au

ASSET MANAGEMENT

CIVIL ENGINEERING

ENVIRONMENTAL SERVICES

SPATIAL INTELLIGENCE

WASTE MANAGEMENT

AutoCAD SHX Text
PM S 19M
AutoCAD SHX Text
AUSTROADS 2013 (AU)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
PM S 19M
AutoCAD SHX Text
AUSTROADS 2013 (AU)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
PM S 19M
AutoCAD SHX Text
AUSTROADS 2013 (AU)
AutoCAD SHX Text
PM S 19M
AutoCAD SHX Text
AUSTROADS 2013 (AU)
AutoCAD SHX Text
PM S 19M
AutoCAD SHX Text
AUSTROADS 2013 (AU)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
PM S 19M
AutoCAD SHX Text
AUSTROADS 2013 (AU)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
PM S 19M
AutoCAD SHX Text
AUSTROADS 2013 (AU)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
PM S 19M
AutoCAD SHX Text
AUSTROADS 2013 (AU)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
PM S 19M
AutoCAD SHX Text
AUSTROADS 2013 (AU)
AutoCAD SHX Text
90
AutoCAD SHX Text
OUTSIDE SWEPT PATH
AutoCAD SHX Text
PATH OF FRONT WHEEL
AutoCAD SHX Text
INSIDE SWEPT PATH
AutoCAD SHX Text
STEERING LOCK ANGLE = 33.3 deg.
AutoCAD SHX Text
ACHIEVED STEERING ANGLE:
AutoCAD SHX Text
90 deg. SWEEP ANGLE: 30.7 deg.
AutoCAD SHX Text
Aerial Fire Truck
AutoCAD SHX Text
NCHRP REPORT 659 (US)
AutoCAD SHX Text
[m]
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
0m
AutoCAD SHX Text
5m
AutoCAD SHX Text
10m
AutoCAD SHX Text
PM S 19M
AutoCAD SHX Text
AUSTROADS 2013 (AU)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
PM S 19M
AutoCAD SHX Text
AUSTROADS 2013 (AU)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
PM S 19M
AutoCAD SHX Text
AUSTROADS 2013 (AU)
AutoCAD SHX Text
PM S 19M
AutoCAD SHX Text
AUSTROADS 2013 (AU)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
PM S 19M
AutoCAD SHX Text
AUSTROADS 2013 (AU)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
PM S 19M
AutoCAD SHX Text
AUSTROADS 2013 (AU)
AutoCAD SHX Text
NOTES
AutoCAD SHX Text
1. This drawing is the property of Talis Consultants Pty This drawing is the property of Talis Consultants Pty drawing is the property of Talis Consultants Pty drawing is the property of Talis Consultants Pty is the property of Talis Consultants Pty is the property of Talis Consultants Pty the property of Talis Consultants Pty the property of Talis Consultants Pty property of Talis Consultants Pty property of Talis Consultants Pty of Talis Consultants Pty of Talis Consultants Pty Talis Consultants Pty Talis Consultants Pty Consultants Pty Consultants Pty Pty Pty Ltd. It is a confidential document and must not be It is a confidential document and must not be It is a confidential document and must not be is a confidential document and must not be is a confidential document and must not be a confidential document and must not be a confidential document and must not be confidential document and must not be confidential document and must not be document and must not be document and must not be and must not be and must not be must not be must not be not be not be be be copied, used, or its contents divulged without prior used, or its contents divulged without prior used, or its contents divulged without prior or its contents divulged without prior or its contents divulged without prior its contents divulged without prior its contents divulged without prior contents divulged without prior contents divulged without prior divulged without prior divulged without prior without prior without prior prior prior written consent. 2. All levels refer to Australian Height Datum. All levels refer to Australian Height Datum. 3. DO NOT SCALE, use figured dimensions only, if in DO NOT SCALE, use figured dimensions only, if in NOT SCALE, use figured dimensions only, if in NOT SCALE, use figured dimensions only, if in SCALE, use figured dimensions only, if in SCALE, use figured dimensions only, if in use figured dimensions only, if in use figured dimensions only, if in figured dimensions only, if in figured dimensions only, if in dimensions only, if in dimensions only, if in only, if in only, if in if in if in in in doubt please contact Talis Consultants.
AutoCAD SHX Text
Project:
AutoCAD SHX Text
Title:
AutoCAD SHX Text
Drawn by:
AutoCAD SHX Text
Checked by:
AutoCAD SHX Text
Approved by:
AutoCAD SHX Text
Scale:
AutoCAD SHX Text
Date:
AutoCAD SHX Text
Job No:
AutoCAD SHX Text
File No:
AutoCAD SHX Text
Drg. No:
AutoCAD SHX Text
Rev:
AutoCAD SHX Text
Client:
AutoCAD SHX Text
No.
AutoCAD SHX Text
Date
AutoCAD SHX Text
App.
AutoCAD SHX Text
Amendment / Issue
AutoCAD SHX Text
Drwn.
AutoCAD SHX Text
Chk.
AutoCAD SHX Text
JACKSON STREET WASTE TRANSFER AND RESOURCE RECOVERY FACILITY LOT 2 (NO 25) JACKSON ST BASSENDEAN
AutoCAD SHX Text
TW15042
AutoCAD SHX Text
AURIGEN
AutoCAD SHX Text
TW15042-G-302
AutoCAD SHX Text
G-302
AutoCAD SHX Text
VEHICLE MOVEMENT MAP - SEMI-TRAILER (19m)
AutoCAD SHX Text
1:1000
AutoCAD SHX Text
A
AutoCAD SHX Text
03.11.2016
AutoCAD SHX Text
CDB
AutoCAD SHX Text
TM
AutoCAD SHX Text
RC
AutoCAD SHX Text
A
AutoCAD SHX Text
03.11.16
AutoCAD SHX Text
CDB
AutoCAD SHX Text
TM
AutoCAD SHX Text
ISSUED FOR CLIENT REVIEW
AutoCAD SHX Text
RC
AutoCAD SHX Text
ALICE STREET
AutoCAD SHX Text
JACKSON STREET
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
1. ALL VEHICLE MOVEMENTS ARE MAPPED VIA ALL VEHICLE MOVEMENTS ARE MAPPED VIA STANDARD VEHICLES USING THE AUTOTURN SOFTWARE 2. SEMI-TRAILER SHOULD USE ALICE STREET TO SEMI-TRAILER SHOULD USE ALICE STREET TO ENTER THE SITE AND ONLY THOSE ENTRY/EXIT MOVEMENTS SHOWN ARE VIABLE WHILST REMAINING LANE CORRECT. ALICE STREET MOVEMENTS NOT SHOWN ON THE DRAWING ARE RESTRICTED DUE TO INSIDE FENCE LINES AND VEHICLES PARKED OPPOSITE THE EXIT ON ALICE STREET. 3. PICK UP OF THE COMPACTION TRAILER WILL LEAD PICK UP OF THE COMPACTION TRAILER WILL LEAD TO EASIER ACCESS TO THE JACKSON STREET EXIT
AutoCAD SHX Text
WASTE TRANSFER STATION
AutoCAD SHX Text
BIN STORAGE AREA & WORKSHOP
AutoCAD SHX Text
BALE SHED
AutoCAD SHX Text
UNDERCOVER ACCEPTANCE AREA
AutoCAD SHX Text
METAL RECYCLING FACILITY
AutoCAD SHX Text
MATERIALS RECOVERY FACILITY
AutoCAD SHX Text
CONTAINER STORAGE AREAAREA
AutoCAD SHX Text
CAR PARK
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
BALER/SHREDDER SHED
AutoCAD SHX Text
WEIGHBRIDGE
Page 27: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Lock to Lock Time

Track

Width

:

:

:

metersCAMION2

6.0

2.39

2.50

4.371.40

10.57

Steering Angle 41.8:

Width

Lock to Lock Time

Track

LOS

Steering Angle

1.40

:

:

:

7.4

2.55

2.55

41.2:

5.35

meters

9.40

Level 1 660 Newcastle Street,

Leederville WA 6007

PO Box 454, Leederville WA 6903

T: 1 3 0 0 2 5 1 0 7 0w w w . t a l i s c o n s u l t a n t s . c o m . au

ASSET MANAGEMENT

CIVIL ENGINEERING

ENVIRONMENTAL SERVICES

SPATIAL INTELLIGENCE

WASTE MANAGEMENT

AutoCAD SHX Text
CAMION2
AutoCAD SHX Text
FRANCE (FR)
AutoCAD SHX Text
CAMION2
AutoCAD SHX Text
FRANCE (FR)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
CAMION2
AutoCAD SHX Text
FRANCE (FR)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
CAMION2
AutoCAD SHX Text
FRANCE (FR)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
CAMION2
AutoCAD SHX Text
FRANCE (FR)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
CAMION2
AutoCAD SHX Text
FRANCE (FR)
AutoCAD SHX Text
CAMION2
AutoCAD SHX Text
FRANCE (FR)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
CAMION2
AutoCAD SHX Text
FRANCE (FR)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
CAMION2
AutoCAD SHX Text
FRANCE (FR)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
CAMION2
AutoCAD SHX Text
FRANCE (FR)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
90
AutoCAD SHX Text
OUTSIDE SWEPT PATH
AutoCAD SHX Text
PATH OF FRONT WHEEL
AutoCAD SHX Text
INSIDE SWEPT PATH
AutoCAD SHX Text
STEERING LOCK ANGLE = 33.3 deg.
AutoCAD SHX Text
ACHIEVED STEERING ANGLE:
AutoCAD SHX Text
90 deg. SWEEP ANGLE: 30.7 deg.
AutoCAD SHX Text
Aerial Fire Truck
AutoCAD SHX Text
NCHRP REPORT 659 (US)
AutoCAD SHX Text
[m]
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
0m
AutoCAD SHX Text
5m
AutoCAD SHX Text
10m
AutoCAD SHX Text
CAMION2
AutoCAD SHX Text
FRANCE (FR)
AutoCAD SHX Text
CAMION2
AutoCAD SHX Text
FRANCE (FR)
AutoCAD SHX Text
CAMION2
AutoCAD SHX Text
FRANCE (FR)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
CAMION2
AutoCAD SHX Text
FRANCE (FR)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
CAMION2
AutoCAD SHX Text
FRANCE (FR)
AutoCAD SHX Text
CAMION2
AutoCAD SHX Text
FRANCE (FR)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
CAMION2
AutoCAD SHX Text
FRANCE (FR)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
CAMION2
AutoCAD SHX Text
FRANCE (FR)
AutoCAD SHX Text
CAMION2
AutoCAD SHX Text
FRANCE (FR)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
CAMION2
AutoCAD SHX Text
FRANCE (FR)
AutoCAD SHX Text
(c) 2016 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
CAMION2
AutoCAD SHX Text
FRANCE (FR)
AutoCAD SHX Text
NOTES
AutoCAD SHX Text
1. This drawing is the property of Talis Consultants Pty This drawing is the property of Talis Consultants Pty drawing is the property of Talis Consultants Pty drawing is the property of Talis Consultants Pty is the property of Talis Consultants Pty is the property of Talis Consultants Pty the property of Talis Consultants Pty the property of Talis Consultants Pty property of Talis Consultants Pty property of Talis Consultants Pty of Talis Consultants Pty of Talis Consultants Pty Talis Consultants Pty Talis Consultants Pty Consultants Pty Consultants Pty Pty Pty Ltd. It is a confidential document and must not be It is a confidential document and must not be It is a confidential document and must not be is a confidential document and must not be is a confidential document and must not be a confidential document and must not be a confidential document and must not be confidential document and must not be confidential document and must not be document and must not be document and must not be and must not be and must not be must not be must not be not be not be be be copied, used, or its contents divulged without prior used, or its contents divulged without prior used, or its contents divulged without prior or its contents divulged without prior or its contents divulged without prior its contents divulged without prior its contents divulged without prior contents divulged without prior contents divulged without prior divulged without prior divulged without prior without prior without prior prior prior written consent. 2. All levels refer to Australian Height Datum. All levels refer to Australian Height Datum. 3. DO NOT SCALE, use figured dimensions only, if in DO NOT SCALE, use figured dimensions only, if in NOT SCALE, use figured dimensions only, if in NOT SCALE, use figured dimensions only, if in SCALE, use figured dimensions only, if in SCALE, use figured dimensions only, if in use figured dimensions only, if in use figured dimensions only, if in figured dimensions only, if in figured dimensions only, if in dimensions only, if in dimensions only, if in only, if in only, if in if in if in in in doubt please contact Talis Consultants.
AutoCAD SHX Text
Project:
AutoCAD SHX Text
Title:
AutoCAD SHX Text
Drawn by:
AutoCAD SHX Text
Checked by:
AutoCAD SHX Text
Approved by:
AutoCAD SHX Text
Scale:
AutoCAD SHX Text
Date:
AutoCAD SHX Text
Job No:
AutoCAD SHX Text
File No:
AutoCAD SHX Text
Drg. No:
AutoCAD SHX Text
Rev:
AutoCAD SHX Text
Client:
AutoCAD SHX Text
No.
AutoCAD SHX Text
Date
AutoCAD SHX Text
App.
AutoCAD SHX Text
Amendment / Issue
AutoCAD SHX Text
Drwn.
AutoCAD SHX Text
Chk.
AutoCAD SHX Text
JACKSON STREET WASTE TRANSFER AND RESOURCE RECOVERY FACILITY LOT 2 (NO 25) JACKSON ST BASSENDEAN
AutoCAD SHX Text
TW15042
AutoCAD SHX Text
AURIGEN
AutoCAD SHX Text
TW15042-G-303
AutoCAD SHX Text
G-303
AutoCAD SHX Text
VEHICLE MOVEMENT MAP - WASTE COLLECTION TRUCK (10.5m)
AutoCAD SHX Text
1:1000
AutoCAD SHX Text
A
AutoCAD SHX Text
03.11.2016
AutoCAD SHX Text
CDB
AutoCAD SHX Text
TM
AutoCAD SHX Text
RC
AutoCAD SHX Text
A
AutoCAD SHX Text
03.11.16
AutoCAD SHX Text
CDB
AutoCAD SHX Text
TM
AutoCAD SHX Text
ISSUED FOR CLIENT REVIEW
AutoCAD SHX Text
RC
AutoCAD SHX Text
ALICE STREET
AutoCAD SHX Text
JACKSON STREET
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
1. ALL VEHICLE MOVEMENTS ARE MAPPED VIA ALL VEHICLE MOVEMENTS ARE MAPPED VIA STANDARD VEHICLES USING THE AUTOTURN SOFTWARE 2. 10.5m WASTE COLLECTION VEHICLE USED TO 10.5m WASTE COLLECTION VEHICLE USED TO GENERATE PATHS SHOWN. HOOK LIFT TRUCKS VISITING THE SITE WOULD USE SIMILAR PATHS AS THOSE SHOWN
AutoCAD SHX Text
WASTE TRANSFER STATION
AutoCAD SHX Text
BIN STORAGE AREA & WORKSHOP
AutoCAD SHX Text
BALE SHED
AutoCAD SHX Text
UNDERCOVER ACCEPTANCE AREA
AutoCAD SHX Text
METAL RECYCLING FACILITY
AutoCAD SHX Text
MATERIALS RECOVERY FACILITY
AutoCAD SHX Text
CONTAINER STORAGE AREA
AutoCAD SHX Text
CAR PARK
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
BALER/SHREDDER SHED
AutoCAD SHX Text
WEIGHBRIDGE
Page 28: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Traffic and Transport Assessment

Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean

Aurigen Group Ltd

TW15042 - Traffic and Transport Assessment.1b December 2016 | Page 18

Appendix C : SIDRA Modelling

Output

Page 29: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Traffic and Transport Assessment

Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean

Aurigen Group Ltd

TW15042 - Traffic and Transport Assessment.1b December 2016 | Page 19

SIDRA Analysis - Existing Traffic Flow for Jackson Street & Alice Street Intersection

SIDRA Analysis - Existing Traffic for Alice Street & Wood Street Intersection

SIDRA Analysis - Scenario 1 - Jackson Street Entrance (Trucks Only)

Page 30: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Traffic and Transport Assessment

Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean

Aurigen Group Ltd

TW15042 - Traffic and Transport Assessment.1b December 2016 | Page 20

SIDRA Analysis – Scenario 2 – Alice Street Entrance (Trucks Only)

SIDRA Analysis – Scenario 3 -Jackson Street Entrance Staff Arrival AM

SIDRA Analysis – Scenario 4 – Jackson Street Entrance Staff Departing PM

Page 31: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Traffic and Transport Assessment

Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean

Aurigen Group Ltd

TW15042 - Traffic and Transport Assessment.1b December 2016 | Page 21

Scenario 1 - Jackson Street Entrance Level of Service

Scenario 2 - Alice Street Entrance Level of Service

Page 32: Traffic and Transport Assessment...Traffic and Transport Assessment Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean Aurigen Group Ltd TW15042 - Traffic and

Traffic and Transport Assessment

Waste Transfer and Resource Recovery Facility, 25 Jackson St, Bassendean

Aurigen Group Ltd

TW15042 - Traffic and Transport Assessment.1b December 2016 | Page 22

Scenario 1 – Jackson Street Entrance Average Delay Times (secs)

Scenario 2 – Alice Street Entrance Average Delay Times (secs)