48
Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 1 Report No SB/01 Report No. Gifford/Road-S-B/P01 September 2010 IMPLEMENTATION OF FOUR LANING OF BAREILLY SECTION OF NH-24 (FROM KM 262.00 TO KM 413.00) IN THE STATE OF UTTAR PRADESH UNDER NHDP PHASE III ON DBFOT BASIS CONSULTANCY SERVICES FOR REVIEW OF COST ESTIMATE & TRAFFIC VOLUME – 2 (REVIEW OF TRAFFIC REPORT)

Traffic Review Report F 18.09

Embed Size (px)

Citation preview

Page 1: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 1 Report No SB/01

Report No. Gifford/Road-S-B/P01 September 2010

IMPLEMENTATION OF FOUR LANING OF BAREILLY SECTION OF NH-24

(FROM KM 262.00 TO KM 413.00) IN THE STATE OF UTTAR PRADESH UNDER NHDP PHASE III ON DBFOT BASIS

CONSULTANCY SERVICES

FOR

REVIEW OF COST ESTIMATE & TRAFFIC

VOLUME – 2

(REVIEW OF TRAFFIC REPORT)

Page 2: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 2 Report No SB/01

Chapter-0

Executive Summary

0.1 BACKGROUND The National Highways Authority of India is entrusted by Government of India for development of National Highways and as part of this endeavor, the Authority has decided to undertake four Laning of Bareilly - Sitapur Section of NH- 24 from km 262.000 to 413.200 in the State of Uttar Pradesh under NHDP Phase III through private participation on Design, Build, Finance, Operate and Transfer (the "DBFOT") basis, and has decided to carry out the bidding process for selection of the Bidder to whom the Project may be awarded.

National Highways Authority of India (NHAI) had invited Proposals from the shortlisted bidders for the construction of Bareilly to Sitapur (NH 24) in Uttar Pradesh on DBFOT basis.

At Bidding Stage, ERA – Sibmost (JV) examined the Project details and work out their cost and revenue based on traffic, required for submitting bid. In the bidding process of NHAI has found ERA – Sibmost (JV) as preferred bidders and appointed them as Concessionaire for carrying out the assignments. After award of the contract ERA INFRA ENGINEERING LTD worked out the cost and traffic and presented its financial model to the Bankers for seeking the loan.

ERA INFRA ENGINEERING LTD further appointed M/s Gifford India Pvt Ltd (100% subsidiary of Gifford UK) vide their letter dated 23rd July 2010to review the cost and traffic data.

This report consists of review of cost of the project based on data supplied by M/s ERA INFRA ENGINEERING LTD to Gifford India Pvt. Ltd. The report on traffic survey, analysis and forecasting will submitted separately.

0.2 PROJECT SCOPE The present study corridor is two lane road starts from Bareilly at Km.262+000 to Sitapur at Km. 413+200 on NH - 24 in the state of Uttar Pradesh. Total project length is approximately 156.5 Km (including bypass) the project road passes through important Divisional head quarters namely Bareilly, Shahjahanpur and Sitapur in the state of Uttar Pradesh.

The existing carriageway width is generally 6.800 to 7.000m in the stretch of the road section. There are lines of matured trees in some stretches on both the sides of the road at a distance of

Page 3: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 3 Report No SB/01

about 5.5 m to 8.5 m from the centerline of the project road which require cutting to facilitate four laning of the road.

The salient features of project road are as follows

• The project starts at km.262.000 (near Bareilly) and ends at km.413.200 (near

Sitapur) covering a length of 151.200 km on NH-24. The project falls in the state

of Uttar Pradesh.

• The land use pattern of the project area is mostly Agricultural with small portion

of industrial, built up and barren lands.

• The average ROW width varies from 40.00m to 45.00m. The proposed ROW

width for four laning is 60m in Non-Urban areas and 45 m in Urban areas.

• All the permanent structures from minor to major bridges are proposed to be

constructed for 4-lane carriageway. In case of existing major bridge not requiring

reconstruction, the existing 2- lane C/W shall be maintained & 2-lane new C/W

shall be constructed. The project involves improvement of existing 8 nos 2-lane

major bridges and 14 nos. existing minor/small bridges to be reconstructed. All

the 159 culverts have to be dismantled and reconstructed to 4-lanes.

• There are 15 major intersections on the project stretch out of which 2

intersections are proposed for provision of vehicular underpasses,1 intersections

are proposed for provision of ROB, 2 intersections are proposed for provision of

4-lane flyovers and 2 intersections are proposed for provision of 2-lane cross

flyovers across the project road.

• Four ROB’s are proposed at km.289.660, km 334.475, km 398.130 and km

407.660. Existing ROB at km 334.475 have to be reconstructed to accommodate

vertical clearance requirement. The existing 2-lane C/W of ROB at 407.660 has

to be retained and an additional 2-Lane C/W with foot path is proposed. Two new

ROB’s are proposed at existing level crossing at km 289.660 & km 398.130 with

4-lane.

• Truck lay byes and rest areas are proposed at 10 locations at km 263/400, km

274/050, km 286/400, km 304/000, km 320/600, km 331/300, km 346/400, km

368/100, km 380/000 & km 403/000 (Existing chainage)

• Two Toll Plazas are proposed in the project at km.267/000 & km 370/000.

Page 4: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 4 Report No SB/01

• Service roads of 7m width are proposed in selected built up areas aggregating to

a total length of 38.100 km.

• Footpaths of 2m width are proposed in selected built up areas corresponding to

the provision of service roads with pedestrian guard rails.

• The project road passes through 12 important urban areas.

• 29 numbers of bus bays with passenger shelters and 10 numbers passenger

shelters are proposed in the project.

• Five bypasses are proposed to bypass the congested Built-up area, with a total

length of 28.76 km approx. as under: - .

o Faridpur from Km 267.800 to 273.050 for 5.25 Kms.

o Rouza from Km 331.360 to 336.900 for 5.540 Kms.

o Jung Bahadurganj from Km 356.19 to Km 361.020 for 4.83 Kms.

o Maigal ganj from Km 373.950 to Km 380.400 for 6.45 Kms.

o Maholi from Km 389.220 to 395.910 for 6.69 Kms.

• Approx. 21,000 trees of various girths are proposed to be felled for the project.

• Shifting of 1547 electric posts and 333 telephone posts is envisaged.

0.3 Project Traffic Review Based on initial discussions with M/s ERA INFRA ENGINEERING LTD a methodology has been worked out to review the traffic of the project. The broad review has been carried in following manner

M/s ERA INFRA ENGINEERING LTD is requested to supply all the relevant data

related to the project traffic.

Study the Details of Traffic Scenario by experienced Traffic Engineer

Conduct 7 Day Independent traffic volume count at 2 proposed toll plaza locations.

Preparation of traffic report based on the 7 Day CVC conducted at 2 locations

To compare the results with that of M/s ERA INFRA ENGINEERING LTD already

provided to the bank.

Discussions of our observations with M/s ERA INFRA ENGINEERING LTD

0.4 Data Supplied by ERA INFRA ENGINEERING LTD

Page 5: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 5 Report No SB/01

On request from Consultant M/s ERA Infra Engineering Ltd has supplied the following data:

Traffic Survey Report

Traffic Analysis & Growth Projection Report

Page 6: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 6 Report No SB/01

TRAFFIC REPORT BASED ON PRESENT TRAFFIC STUDY

Page 7: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 7 Report No SB/01

General  

National  Highway  Authority  of  India  (NHAI)  has  taken  up  the  rehabilitation  and 

strengthening  of  existing  2‐lane  road  to  4‐lane  dual  carriageway  configuration  of 

Bareilly‐ Sitapur Section of NH‐24 from km. 262.000 to km. 413.200 in  the State of Uttar 

Pradesh. 

 

In order  to  capture  the  traffic  characteristics  along  the project  road a detailed  traffic 

study has been carried out. The main objectives of the traffic surveys are:  

• To assess the volume of traffic flow and their characteristics. 

• To assess the future growth rates of traffic 

• To forecast the future traffic demand for next 30 years 

• To assess the tollable traffic for next 25 years 

 

The location map of the project road is shown below. 

 Fig. 1.1: Location Map 

Traffic Survey Locations 

 

Classified traffic volume counting and Origin‐Destination surveys have been carried out 

at  two  proposed  toll  plaza  locations  along  the  project  corridor.    The  locations  and 

schedule of traffic surveys are as given below. 

 

Page 8: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 8 Report No SB/01

Table 1.1: Traffic Surveys Schedule 

Sl.

NoType of Survey  Duration   Location   Date(s) of Survey 

7 Days  km. 267.000  26‐07‐2010 to 01‐08‐20101  Classified Volume Count (CVC) 

7 Days  km. 370.000  26‐07‐2010 to 01‐08‐2010

24 Hours  km. 267.000  28‐08‐2010 2  Origin – Destination (O‐D) 

24 Hours  km. 370.000  30‐08‐2010 

 

Vehicle Classification System  The vehicle classification used in the survey along with their PCU values, as suggested in 

IRC: 64 – 1990, are presented below in Table 1.2. 

 

Table 1.2: Vehicle Classification and PCU Factors 

Vehicle Type  PCU factor 

Fast Moving Vehicles 

Two Wheeler  0.5 

Three Wheeler (Auto Rickshaw)  1.0 

Car, Jeep and Van  1.0 

Mini Bus  1.5 

Bus  3.0 

Light Commercial Vehicle (LCV)  1.5 

2‐Axle truck  3.0 

3‐Axle Truck  3.0 

Multi Axle Vehicle (MAV) – 4‐6 Axles  4.5 

Multi Axle Vehicle (MAV) – > 6  

Axles 

4.5 

Agriculture Tractor  1.5 

Agriculture Tractor with Trailer  4.5 

Slow Moving Vehicles 

Cycle  0.5 

Cycle‐Rickshaw  2.0 

Animal Drawn Cart  6.0 

 

Page 9: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 9 Report No SB/01

Classified Volume Count Surveys  

The  classified  volume  count  surveys  at  both  the  locations  as mentioned  above were 

commenced w.e.f. 26 July 2010 for 7 consecutive days (both directions) from 8:00 AM 

till 8:00 AM of 01 August 2010.   Traffic counting was carried out manually by  trained 

enumerators  using  hand  tally marks.  The  traffic  flows were  recorded  in  15 minutes 

intervals on the prescribed format and vehicle classification system as specified in TOR. 

 

The analysis of the classified traffic volume count observed at the count  locations was 

carried out to arrive at the:  

• Average Daily Traffic (ADT) • Day wise Variation • Hourly Variation • Traffic composition • Annual Average Daily Traffic (AADT) 

 

Average Daily Traffic (ADT)  

The  7  day  traffic  volume  count  data  collected  at  each  of  the  survey  location  was averaged out  to  arrive  at  the  location wise  average daily  traffic  (ADT) on  the project road sections. The direction‐wise summary of ADT in terms of vehicles at the two survey locations on project road is given in Table 1.3.   

 

Table 1.3: Summary of Average Daily Traffic (ADT) 

At km. 267.000    At km. 370.000 

Vehicle Type  Towards 

Bareilly 

Towards

Sitapur 

Total 

ADT 

  Towards  

Bareilly 

Towards

Sitapur 

Total 

ADT 

2‐Wheeler  1649  1613  3262    556  570  1126 3‐Wheeler  551  550  1101    84  85  169 Car, Jeep, Taxi and Van  1074  1086  2160    637  611  1248 Mini Bus  33  33  66    16  16  32 Bus  256  254  510    149  144  293 LCV  583  592  1175    563  566  1129 2‐Axle truck  1190  1196  2386    1080  1101  2181 3‐Axle Truck  1387  1397  2784    1377  1337  2714 MAV (4‐6 Axles)  251  247  498    243  244  487 

Page 10: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 10 Report No SB/01

At km. 267.000    At km. 370.000 

Vehicle Type  Towards 

Bareilly 

Towards

Sitapur 

Total 

ADT 

  Towards  

Bareilly 

Towards

Sitapur 

Total 

ADT 

MAV (> 6 Axles)  0  0  0    0  0  0 Agriculture Tractor  20  24  44    28  29  57 Agriculture Tractor 

+Trailer 116  121  237    35  27  62 

Cycle  502  513  1015    419  393  812 Cycle‐Rickshaw  4  11  15    106  101  207 Animal Drawn Cart  42  45  87    5  4  9 Toll Exempt Vehicles               Car, Jeep and Van  26  18  44    15  12  27 Mini Bus  3  2  5    1  0  1 Bus  1  3  4    1  0  1 LCV  3  2  5    3  2  5 Truck  5  4  9    2  2  4 Total (Vehicles)  7696  7711  15407    5320  5244  10564 Total (PCUs)  14118  14207  28325    11461  11307  22768 

 

Day  wise  variation  of  the  traffic  in  terms  of  vehicles  and  PCU  at  both  the  survey 

locations are shown below. 

 

15379

15135

15502

15462

15510

1540915447

14900

15000

15100

15200

15300

15400

15500

15600

Monday Tuesday Wednesday Thursday Friday Saturday Sunday

Day of the Week

Traf

fic in

Veh

icle

s

VehADT-Veh

    

Fig. 1.2: Day Wise Variation of Traffic at km. 267.000 (Veh) 

Page 11: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 11 Report No SB/01

2827228299

28072

2858328528

28432

28056

27700

27800

27900

28000

28100

28200

28300

28400

28500

28600

28700

Monday Tuesday Wednesday Thursday Friday Saturday Sunday

Day of the Week

Traf

fic in

PC

Us

PCUsADT-PCUs

 Fig. 1.3: Day Wise Variation of Traffic at km. 267.000 (PCUs) 

10501

10327

10445

10825

10525

10470

10873

10000

10100

10200

10300

10400

10500

10600

10700

10800

10900

11000

Monday Tuesday Wednesday Thursday Friday Saturday Sunday

Day of the Week

Traf

fic in

Veh

icle

s

VehADT-Veh

 Fig. 1.4: Day Wise Variation of Traffic at km. 370.000 (Veh) 

23012

22563

22806

22718

22928

22586

22801

22300

22400

22500

22600

22700

22800

22900

23000

23100

Monday Tuesday Wednesday Thursday Friday Saturday Sunday

Day of the Week

Traf

fic in

PC

Us

PCUsADT-PCUs

 Fig. 1.5: Day Wise Variation of Traffic at km. 370.000 (PCUs) 

Page 12: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 12 Report No SB/01

Hourly Variation and Peak Hour Traffic  

The  hourly  variation  of  traffic  illustrates  the  distribution  of  traffic  over  the  day with 

respect to time and the peak hour factor is the maximum percentage of the total traffic 

that  uses  the  project  highway  in  one  single  hour  of  the  day.  It  is  of  significance  as 

highway  capacities  and  design  calculations  are  based  on  peak  hour  factor.  The  peak 

hour factor observed at the count locations is summarised in Table 1.4. 

 

Table 1.4: Peak Hour Factors 

Sl. No. Survey 

Location 

Peak Hour 

Volume (PCU) ADT (PCU) PHF (%)  Peak Hour 

1  km. 267.000  1496  28325  5.283  5.00 PM ‐ 6.00 PM 

2  km. 370.000  1100  22768  4.831  5.00 PM ‐ 6.00 PM 

 

Hourly variation of ADT (Mode‐wise) observed at both the traffic survey locations are 

shown below. 

 

 

0

50

100

150

200

250

300

350

8 - 9

9 - 1

0

10 -

11

11 -

12

12 -

13

13 -

14

14 -

15

15 -

16

16 -

17

17 -

18

18 -

19

19 -

20

20 -

21

21 -

22

22 -

23

23 -

24

0 - 1

1 - 2

2 - 3

3 - 4

4 - 5

5 - 6

6 - 7

7 - 8

Hours

Traf

fic in

Veh

icle

s 2-WAuto RickCar/Jeep/Taxi/VanMini BusBusTrucksTractorsNon-Motorised

 Fig. 1.6: Hourly Variation (Mode wise) of Traffic at km. 267.000 

Page 13: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 13 Report No SB/01

0

50

100

150

200

250

300

350

8 - 9

9 - 1

0

10 -

11

11 -

12

12 -

13

13 -

14

14 -

15

15 -

16

16 -

17

17 -

18

18 -

19

19 -

20

20 -

21

21 -

22

22 -

23

23 -

24

0 - 1

1 - 2

2 - 3

3 - 4

4 - 5

5 - 6

6 - 7

7 - 8

Hours

Traf

fic in

Veh

icle

s 2-WAuto RickCar/Jeep/Taxi/VanMini BusBusTrucksTractorsNon-Motorised

 Fig. 1.7: Hourly Variation (Mode wise) of Traffic at km. 370.000 

Directional Distribution 

 

Directional distribution of ADT was also analysed and presented below.  

Table 1.5: Directional Distribution of Traffic (ADT) 

Survey Location  Direction Traffic in Direction  

as % of ADT 

Towards Bareilly  49.95 km. 267.000 

Towards Sitapur  50.05 

Towards Bareilly  50.36 km. 370.000 

Towards Sitapur  49.64 

 

Traffic Composition  

Analysis was carried out to  find the composition of traffic  in terms of various types of 

vehicles  plying  on  the  project  road.  The  salient  points  from  the  traffic  composition 

analysis derived from data are shown in Figures 1.8 to 1.9. 

 

Page 14: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 14 Report No SB/01

2-W21.2%

Auto Rick7.1%

Car/Jeep/Taxi/Van14.3%Mini Bus

0.5%Bus3.3%

Trucks44.5%

Tractors1.8%

Non-Motorised7.2%

 Fig 1.8: Traffic Composition at km. 267.000 

 

Non-Motorised9.7%Tractors

1.1%

Trucks61.7%

Bus2.8%

Mini Bus0.3%

Car/Jeep/Taxi/Van12.1%

Auto Rick1.6%2-W

10.7%

 Fig 1.9 : Traffic Composition at km. 370.000 

 Annual Average Daily Traffic (AADT) 

 

 

The  traffic plying on  any  road  generally  varies over  the different periods  of  the  year 

depending  on  the  cycle  of  different  socio‐economic  activities  in  the  regions  through 

which  it passes. Therefore,  in order to have more realistic picture of the traffic on the 

project  road,  it  is  required  to  assess  seasonal  variation  in  traffic  to  estimate  Annual 

Average Daily Traffic (AADT). Therefore, the ADT observed during the survey duration is 

Page 15: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 15 Report No SB/01

divided by a Seasonal Correction Factor (SCF) to derive AADT. For the present study, the 

seasonal  correction  factor  is  derived  from  fuel  sales  of  collected  from  three  filling 

stations along the project road. As the traffic surveys were conducted  in the month of 

July, a SCF for the month of July is considered.  

 

Fuel sales data collected from the petrol pumps and calculation of SCF is shown below.  

 

Sum of 3 Petrol Pumps Data  Seasonal Correction Factors Month and Year 

Petrol (Litres)  Diesel (Litres)  Petrol Driven  Diesel Driven 

July, 2009  110895  904120  0.933  0.946 

August, 2009  97542  941024  0.821  0.984 

September, 2009  127539  964268  1.074  1.009 October, 2009  137052  1084343  1.154  1.134 

November, 2009  129768  1036140  1.092  1.084 

December, 2009  126462  1011631  1.064  1.058 

January, 2010  106863  950587  0.899  0.994 

February, 2010  110526  914130  0.930  0.956 

March, 2010  114795  937893  0.966  0.981 

April, 2010  121500  947074  1.023  0.991 

May, 2010  123768  916095  1.042  0.958 

June, 2010  118956  865327  1.001  0.905  

The following seasonal correction factors are adopted after thorough analysis.  

• A seasonal correction factors of 0.933 for petrol driven vehicles 

• A seasonal correction factors of 0.946 for diesel driven vehicles 

• No  seasonal  correction  factor  for  slow  moving  traffic  as  this  traffic  is  not 

susceptible to seasonal variations. 

 

Page 16: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 16 Report No SB/01

Table 1.6: Summary of Annual Average Daily Traffic (AADT) 

At km. 267.000    At km. 370.000 

Vehicle Type  Towards 

Bareilly 

Towards

Sitapur 

Total  

AADT 

  Towards  

Bareilly 

Towards

Sitapur 

Total  

AADT 

2‐Wheeler  1767  1728  3495    596  611  1207 3‐Wheeler  583  582  1165    89  90  179 Car, Jeep, Taxi and Van  1151  1163  2314    682  655  1337 Mini Bus  35  35  70    17  17  34 Bus  271  269  540    158  152  310 LCV  616  626  1242    595  599  1194 2‐Axle truck  1258  1265  2523    1142  1164  2306 3‐Axle Truck  1467  1477  2944    1456  1414  2870 MAV (4‐6 Axles)  265  261  526    257  258  515 MAV (> 6 Axles)  0  0  0    0  0  0 Agriculture Tractor  21  25  46    30  31  61 Agriculture Tractor +Trailer  123  128  251    37  29  66 Cycle  502  513  1015    419  393  812 Cycle‐Rickshaw  4  11  15    106  101  207 Animal Drawn Cart  42  45  87    5  4  9 Toll Exempt Vehicles               Car, Jeep and Van  28  19  47    16  13  29 Mini Bus  3  2  5    1  0  1 Bus  1  3  4    1  0  1 LCV  3  2  5    3  2  5 Truck  5  4  9    2  2  4 Total (Vehicles)  8145  8158  16303    5612  5535  11147 Total (PCUs)  14926  15017  29942    12106  11948  24054 

 

The details pertaining to day and direction wise distribution of traffic at the survey 

locations is given in Annexure 1.1. 

 

Page 17: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 17 Report No SB/01

Travel Pattern (Origin‐Destination Surveys) 

In order to understand the travel demand pattern in the region, Origin and Destination 

(O‐D) Surveys were carried out  for one day  (24 hours) at both the proposed toll plaza 

locations  i.e., at km. 267+000 and km. 370+000 on 28th  July 2010 and 30th  July 2010 

respectively. The  surveys were  typically  started  in  the morning  and  continued  till  the 

next day morning.   The OD surveys were carried out by roadside  interview method as 

described  in  IRC:  102‐1988.  Police  assistance  was  taken  at  the  survey  locations  for 

successfully carrying out these surveys. Both passenger and commercial vehicles plying 

on the project road were stopped on a random sampling basis and interviewed. 

 

The travel pattern obtained by OD survey  facilitates to study the distribution of traffic 

and potential divertible  traffic  from  the project  road. Trained enumerators under  the 

supervision of senior engineers of Gifford, have collected  the  trip characteristics using 

the survey  forms designed  for  this purpose. The OD survey elicited characteristics  like 

origin,  destination,  frequency,  purpose  and  commodity  etc.  both  for  passenger  and 

goods  vehicles. The  information  collected during  roadside  interviews was analysed  to 

obtain the trip distribution based on a zoning system suitably designed in the study. 

 

Zoning System 

For  delineating  the  zoning  system,  the  entire  country was  broadly  divided  into  two 

regions. These are, Immediate Influence Area (IIA) and Broad Influence Area (BIA) of the 

project.  The  area  adjacent  to  the  project  road, which  contributes most  of  the  trips, 

observed  on  the  project  road,  namely,  Bareilly,  Shahiahanpur,  Kheri, Hardoli,  Sitapur 

etc., & other parts of Uttar Pradesh constitute IIA, where as, other states in the country 

constitute  BIA.  In  all  25  zones  were  defined  for  the  project,  while  defining  zone 

boundaries the following were considered: 

• Important  towns  and  industrial  centers  along  the  project  roads  in  the  total 

stretch. 

• Administrative boundaries of district and state boundaries. 

• Configuration of the project roads  in the regional road network with respect to 

other National Highways. 

 

The zoning system considered for the study is given in Table 1.7. 

 

Page 18: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 18 Report No SB/01

Table 1.7:  List of zones for the project 

Zone  Name of the Zone    Zone  Name of the Zone 1  Bareilly    14  Moradabad, Budaun 2  Shahiahanpur , Faridpur    15  Rampur  3  Kheri    16  Nainital, Almora, Pithoragarh 4  Hardoi     17  Bijnor, Garhwal, Chamoli, Uttarkashi 

5  Sitapur     18 Dehradun, Saharanpur, Muzaffarnagar, Meerut, Ghaziabad 

6  Bara Bamki, Lucknow     19  Delhi  7  Rea Bareli, Fatehpur, Allahabad    20  Haryana, Punjab, Himachal, J&K 8  Sultanpur     21  Rajastan, Gujarat  9  Faizabad, Ghazipur, Ballia    22  Madhapradesh, Maharastra 10  Jaunpur, Varanasi, Mirzapur    23  Bihar, Orissa 

11  Kanpur, Unnao    24 West Bengal, Sikkim, Assam, ArunachalPradesh, Manipur, Mizoram 

12 Jalaun, Jhansi, Hamirpur 

  25 Andhra Pradesh, Tamilnadu, Kerala, Goa, Karnataka 

13  Agra, Mathura, Aligarh, Mainpuri       

Sample Size and Distribution Factors  

During O‐D Surveys, the vehicles were interviewed on a random sample basis. Based on 

the  sample  size of different categories of vehicles  interviewed during  the O‐D  survey, 

expansion  factors were  calculated  to  generate  the  expanded  OD matrices  from  the 

sample  data.  Table  1.8  and  1.9  show  the  direction wise  AADT,  sample  size  (both  in 

absolute  numbers  and  in  percentage  terms)  and  expansion  factors  at  both  of  the 

locations.  

Table 1.8:  Sample Size and Expansion Factors ‐ At km. 267+000 

Sample Size (Nos.)  AADT   Sample Size (%)  Expansion Factor Vehicle 

Type  Towards 

Bareilly 

Towards 

Sitapur 

Towards 

Bareilly 

Towards 

Sitapur 

Towards 

Bareilly 

Towards 

Sitapur 

Towards 

Bareilly 

Towards 

Sitapur 

Car/Jeep  248  328  1151  1163  21.55  28.20  4.64  3.55 Mini Bus  21  11  35  35  60.00  31.43  1.67  3.18 Bus  105  90  271  269  38.75  33.46  2.58  2.99 LCV  130  210  616  626  21.10  33.55  4.74  2.98 2‐AT  302  271  1258  1265  24.01  21.42  4.17  4.67 3‐AT  414  459  1467  1477  28.22  31.08  3.54  3.22 MAV  82  85  265  261  30.94  32.57  3.23  3.07 

Page 19: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 19 Report No SB/01

Table 1.9:  Sample Size and Expansion Factors ‐ At km. 370+000 

Sample Size (Nos.)  AADT   Sample Size (%)  Expansion Factor Vehicle 

Type  Towards 

Bareilly 

Towards 

Sitapur 

Towards 

Bareilly 

Towards 

Sitapur 

Towards 

Bareilly 

Towards 

Sitapur 

Towards 

Bareilly 

Towards 

Sitapur 

Car/Jeep  164  191  682  655  24.05  29.16  4.16  3.43 Mini Bus  5  5  17  17  29.41  29.41  3.40  3.40 Bus  47  40  158  152  29.75  26.32  3.36  3.80 LCV  52  69  595  599  8.74  11.52  11.44  8.68 2‐AT  134  178  1142  1164  11.73  15.29  8.52  6.54 3‐AT  244  213  1456  1414  16.76  15.06  5.97  6.64 MAV  63  34  257  258  24.51  13.18  4.08  7.59 

 

The expanded O‐D Matrices for different vehicles on the project road are presented in 

Annexure 1.2. 

 

Brief Review of O‐D Data Analysis 

In a transportation study, it is often necessary to know the exact origin and destination 

of  the  trips.  It  is  very essential  to know  the group of  trips originating  from particular 

zones  of  the  study  area.  The  other  information  obtained  from  O‐D  studies  are  trip 

pattern  of  the  individuals  from  that  particular  origin  and  destination,  commodity 

movement  pattern,  lead  distribution  etc.  A  brief  review  of Origin‐Destination  survey 

analysis  results  viz.,  commodity movement  pattern,  trips  generating  from  the  study 

zones, trip destinations, lead distribution etc are presented in this section. 

 

Commodity Movement Pattern  

The  O–D  survey  data  has  been  analyzed  to  identify  the  commodity  movement 

characteristics along the project road. The data shows that the major commodity types 

carried along the project road comprises of  machinery, chemicals and pharmaceuticals, 

iron, steel, cement and manufactured goods. The data of composition of the different 

commodities being transported along the project road section  is compiled and  is given 

below.  

Page 20: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 20 Report No SB/01

`Table 1.10:  Commodity Movement Pattern 

Commodity Composition 

at km. 267+000 

Commodity Composition 

at km. 370+000 Sl. 

No. Commodity Group 

Towards  

Bareilly 

Towards 

Sitapur 

Towards  

Bareilly 

Towards  

Sitapur 

1  Empty  15.84%  7.71%  16.63%  5.67% 2  Building materials  2.69%  17.07%  5.68%  9.92% 3  Coal/Ore/Minerals  3.23%  3.41%  31.03%  13.77% 4  Food Grains  5.39%  15.22%  5.07%  16.19% 5  Fruits/Vegetables/Poultry/Fish  3.66%  13.95%  8.32%  7.89% 6  Chemicals/Fertilizers/Medicines 4.74%  10.73%  3.85%  10.93% 7  Petroleum products (Ltr.)  20.69%  8.00%  2.43%  1.42% 8  Milk & Milk products  7.00%  7.51%  9.94%  1.01% 9  Machinery parts  13.25%  7.02%  5.07%  13.16% 10  Clothes/Textiles  15.30%  2.34%  0.20%  6.48% 11  Miscellaneous  2.59%  2.63%  3.04%  8.30% 12  Others  5.60%  4.39%  8.72%  5.26% 

 

Commodity Movement Pattern (Sitapur‐Bareilly) at km. 267.000

Building materials2.69%

Empty15.84%

Others5.60%Miscellaneous

2.59%

Clothes/Textiles15.30%

Machinery parts13.25%

Milk & Milk products7.00%

Petroleum products (Ltr.)20.69%

Chemicals/Fertilizers/Medicines 4.74%

Fruits/Vegetables/Poultry/Fish3.66%

Food Grains5.39%

Coal/Ore/Minerals3.23%

 Fig 1.10: Commodity Movement Pattern towards Bareilly at km. 267+000 

 

Page 21: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 21 Report No SB/01

   

Commodity Movement Pattern (Bareilly‐Sitapur) at km. 267.000

Building materials17.07%

Empty7.71%Others

4.39%

Miscellaneous2.63%

Clothes/Textiles2.34%

Machinery parts7.02%

Milk & Milk products7.51%

Petroleum products (Ltr.)8.00%

Chemicals/Fertilizers/Medicines 10.73%

Fruits/Vegetables/Poultry/Fish13.95%

Food Grains15.22%

Coal/Ore/Minerals3.41%

 Fig 1.11: Commodity Movement Pattern towards Sitapur at km. 267+000  

  

Commodity Movement Pattern (Sitapur‐Bareilly) at km. 370.000

Machinery parts5.07%

Milk & Milk products9.94%

Petroleum products (Ltr.)2.43%

Chemicals/Fertilizers/Medicines 3.85%

Fruits/Vegetables/Poultry/Fish8.32%

Food Grains5.07%

Coal/Ore/Minerals31.03%

Building materials5.68%

Miscellaneous3.04%Clothes/Textiles

0.20%

Others8.72%

Empty16.63%

 Fig 1.12: Commodity Movement Pattern towards Bareilly at km. 370+000 

  

Page 22: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 22 Report No SB/01

 

Commodity Movement Pattern (Bareilly‐Sitapur) at km. 370.000

Machinery parts13.16%

Milk & Milk products1.01%

Petroleum products (Ltr.)1.42%

Chemicals/Fertilizers/Medicines 10.93%

Fruits/Vegetables/Poultry/Fish7.89%

Food Grains16.19%

Coal/Ore/Minerals13.77%

Building materials9.92%

Miscellaneous8.30%

Clothes/Textiles6.48%

Others5.26%

Empty5.67%

 Fig 1.13: Commodity Movement Pattern towards Sitapur at km. 370+000  

  Trips Origin & Destinations Pattern 

 

Mode‐wise  trips  originating  from  the  Immediate  Influence  Area  (IIA)  and  Broad 

Influence Area has been analysed and given below. 

 Table 1.11:  Traffic Origin Pattern 

 

Sl.No.  Region/Zones  Car Mini 

Bus Bus  LCV  2‐AT  3‐AT  MAV 

At km. 267+000 (%ge) 

1‐17  Immediate Influence Area 85.67  100.00 62.94  78.14  73.14  54.17  27.77 

18‐25  Broad Influence Area  14.33  0.00  37.06  21.86  26.86  45.83  72.23 

At km. 370+000 (%ge) 

1‐17  Immediate Influence Area 60.91  50.00  78.50  60.18  53.67  46.34  44.39 

18‐25  Broad Influence Area  39.09  50.00  21.50  39.82  46.33  53.66  55.61 

  Total  100.00 100.00 100.00 100.00  100.00 100.00 100.00

Page 23: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 23 Report No SB/01

Mode‐wise  trips  having  destination  to  the  Immediate  Influence  Area  (IIA)  and  Broad 

Influence Area is presented below. 

 Table 1.12:  Traffic Destination Pattern 

 

Sl.No.  Region/Zones  Car Mini 

Bus Bus  LCV  2‐AT  3‐AT  MAV 

At km. 267+000 (%ge) 

1‐17  Immediate Influence Area 91.18  100.00 65.26  89.83  76.41  59.21  32.54 

18‐25  Broad Influence Area  8.82  0.00  34.74  10.17  23.59  40.79  67.46 

At km. 370+000 (%ge) 

1‐17  Immediate Influence Area 66.38  80.00  71.38  72.04  65.32  45.29  31.27 

18‐25  Broad Influence Area  33.62  20.00  28.62  27.96  34.68  54.71  68.73 

  Total  100.00 100.00 100.00 100.00  100.00 100.00 100.00 

Influence Factors  

Different vehicles  interact  in different degrees with  the different  zones depending on 

their purpose,  commodity  transported,  frequency of  travel etc. Vehicle  category‐wise 

zone‐wise  influence  factors  are  established  for  interpretation  of  OD  patterns  at  the 

surveyed location by using the following formula: 

 

IF = [(Pi + Ai) x 100]/(∑(Pi + Ai))  where,  IF  = Influence Factor Pi    = Total trips produced in Zone i Ai    = Total trips attracted in Zone i 

Mode wise traffic influence at both the locations is given in Table 1.13 to 1.14. 

 

Page 24: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 24 Report No SB/01

Table 1.13:  Mode wise Traffic Influence Areas ‐ At km. 267+000 

Sl.No.  Zone Name/Group  Car Mini 

Bus Bus  LCV  2‐AT  3‐AT  MAV 

1  Bareilly  31.00  41.77  21.32  30.16  18.14  4.19  2.35 

2  Shahiahanpur , Faridpur  33.15  38.20  8.93  27.83  16.69  8.54  4.18 

3  Kheri  0.28  0.00  0.00  0.19  0.09  0.00  0.00 

4  Hardoi   0.40  0.00  0.28  1.34  2.08  1.23  0.61 

5  Sitapur   4.99  5.84  6.04  5.56  6.74  7.28  2.69 

6  Bara Bamki, Lucknow   3.50  0.00  8.21  6.15  8.54  9.56  5.12 

7 Rea Bareli, Fatehpur, Allahabad 

1.63  2.38  1.38  0.50  1.22  0.73  0.60 

8  Sultanpur   0.58  0.00  0.28  0.00  0.09  0.11  0.00 

9  Faizabad, Ghazipur, Ballia  0.50  0.00  3.21  0.60  1.16  1.75  0.60 

10 Jaunpur, Varanasi, Mirzapur 

0.73  0.00  1.82  1.72  3.02  2.95  1.78 

11  Kanpur, Unnao  0.68  2.38  4.77  2.44  3.57  3.87  3.53 

12  Jalaun, Jhansi, Hamirpur  0.10  0.00  0.55  0.69  0.67  1.00  1.80 

13 Agra, Mathura, Aligarh, Mainpuri 

1.33  2.38  4.53  1.31  1.95  2.35  0.89 

14  Moradabad, Budaun  3.33  7.03  0.28  2.32  4.54  5.06  1.81 

15  Rampur   1.91  0.00  1.51  2.42  4.56  5.67  3.27 

16 Nainital, Almora, Pithoragarh 

4.22  0.00  0.24  0.62  1.63  2.00  0.31 

17 Bijnor, Garhwal, Chamoli, Uttarkashi 

0.10  0.00  0.75  0.12  0.09  0.40  0.61 

  TOTAL INFLUENCE OF IIA  88.42  100.00 64.10  83.98  74.78  56.69  30.15 

18 Dehradun, Saharanpur, Meerat etc. 

2.97  0.00  7.86  5.58  8.78  14.07  10.28 

19  Delhi   4.57  0.00  23.40  5.39  6.62  10.20  8.37 

20  Haryana, Punjab, HP, J&K  0.75  0.00  1.31  1.74  2.87  5.41  20.60 

21  Rajastan, Gujarat   0.38  0.00  0.00  0.31  0.34  1.07  0.91 

22  MP, Maharastra  0.00  0.00  0.28  0.00  0.08  0.28  0.31 

23  Bihar, Orissa  1.81  0.00  0.24  0.98  2.70  6.25  10.29 

24  WB, Sikkim, Assam etc.  1.00  0.00  1.19  1.65  3.55  5.86  18.20 

25  AP, TN, Kerala etc.  0.10  0.00  1.62  0.36  0.27  0.16  0.89 

  TOTAL INFLUENCE OF BIA 11.58  0.00  35.90  16.02  25.22  43.31  69.85 

Page 25: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 25 Report No SB/01

 Table 1.14:  Mode wise Traffic Influence Areas ‐ At km. 370+000 

Sl.No.  Zone Name/Group  Car Mini 

Bus Bus  LCV  2‐AT  3‐AT  MAV 

1  Bareilly  4.67  5.00  5.78  10.57  5.00  3.71  3.68 

2  Shahiahanpur , Faridpur  6.56  10.00  13.04  9.37  6.10  4.30  4.48 

3  Kheri  3.88  0.00  6.86  0.48  0.79  0.53  0.00 

4  Hardoi   1.08  0.00  4.76  0.00  0.00  0.22  0.00 

5  Sitapur   14.40  15.00  12.02  9.90  6.32  5.31  1.98 

6  Bara Bamki, Lucknow   11.20  10.00  13.25  11.07  9.41  8.36  10.65 

7 Rea Bareli, Fatehpur, Allahabad 

0.26  0.00  0.00  0.84  0.98  0.75  0.74 

8  Sultanpur   0.26  0.00  0.00  0.96  0.33  0.43  0.00 

9  Faizabad, Ghazipur, Ballia  4.53  15.00  5.78  5.06  7.33  4.83  5.32 

10 Jaunpur, Varanasi, Mirzapur 

4.40  5.00  2.31  2.89  3.31  3.29  1.47 

11  Kanpur, Unnao  4.46  5.00  6.46  5.30  3.75  3.06  4.59 

12  Jalaun, Jhansi, Hamirpur  1.52  0.00  0.61  0.00  1.04  0.74  0.40 

13 Agra, Mathura, Aligarh, Mainpuri 

1.91  0.00  0.61  1.21  2.70  1.31  0.40 

14  Moradabad, Budaun  3.05  0.00  1.70  4.11  5.13  3.29  1.53 

15  Rampur   1.32  0.00  1.23  2.41  2.23  1.50  0.74 

16 Nainital, Almora, Pithoragarh 

0.00  0.00  0.54  1.93  3.66  3.44  1.87 

17 Bijnor, Garhwal, Chamoli, Uttarkashi 

0.16  0.00  0.00  0.00  1.44  0.74  0.00 

  TOTAL INFLUENCE OF IIA  63.65  65.00  74.94  66.11  59.50  45.82  37.83 

18 Dehradun, Saharanpur, Meerat etc. 

11.75  15.00  9.64  5.19  9.53  9.55  9.46 

19  Delhi   8.57  5.00  4.62  5.78  3.32  6.40  8.33 

20  Haryana, Punjab, HP, J&K  8.50  10.00  6.72  8.10  8.59  13.24  17.94 

21  Rajastan, Gujarat   1.21  0.00  0.61  0.84  3.03  3.35  1.98 

22  MP, Maharastra  0.00  0.00  0.00  0.00  0.28  0.12  0.74 

23  Bihar, Orissa  5.13  5.00  3.47  8.91  10.03  11.80  16.82 

24  WB, Sikkim, Assam etc.  1.05  0.00  0.00  5.07  5.45  9.30  6.12 

25  AP, TN, Kerala etc.  0.16  0.00  0.00  0.00  0.28  0.42  0.79 

  TOTAL INFLUENCE OF BIA 36.35  35.00  25.06  33.89  40.50  54.18  62.17 

Page 26: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 26 Report No SB/01

 

The  analysis  of  travel  pattern  for  passenger  and  commercial  vehicles  plying  on  the 

project  road  reveals  that  most  of  the  trips  are  generating  with  in  the  Immediate 

Influence Area  (IIA)  i.e, with  in  the state of Uttar Pradesh.  It  is also observed  that  the 

surrounding states such as Delhi, Haryana, Bihar etc. have a moderate influence on the 

travel pattern along the project road. 

 Lead Distribution 

 

Vehicle‐wise  lead distribution at both  the  locations  is presented  in  the  following  table 

and also shown graphically. 

 

Table 1.15: Vehicle‐wise Lead Distribution 

%ge of Vehicles Lead (km) 

Car  Mini Bus  Bus  LCV  2‐AT  3‐AT  MAV 

AT KM. 267+000 0‐25  14.93%  0.00%  1.84%  0.00%  0.00%  0.00%  0.00% 25‐50  30.05%  50.15%  70.70% 0.00%  0.00%  0.00%  0.00% 50‐100  15.16%  29.54%  22.46% 36.48% 8.51%  5.50%  0.00% 100‐200  8.05%  20.31%  1.89%  39.65% 23.65%  18.98%  29.00%200‐250  11.07%  0.00%  2.65%  14.23% 19.56%  19.26%  32.65%250‐500  18.77%  0.00%  0.46%  6.84%  27.06%  26.34%  24.65%>500  1.97%  0.00%  0.00%  ‐‐  ‐‐  ‐‐  ‐‐ 500‐750  ‐‐  ‐‐  ‐‐  2.80%  10.62%  14.51%  32.65%750‐1000  ‐‐  ‐‐  ‐‐  0.00%  4.69%  7.65%  24.65%1000‐1500  ‐‐  ‐‐  ‐‐  0.00%  2.85%  4.35%  9.25% 

1500‐2000  ‐‐  ‐‐  ‐‐  0.00%  1.65%  1.77%  2.56% 

>2000  ‐‐  ‐‐  ‐‐  0.00%  1.41%  1.64%  1.89% 

AT KM. 370+000 0‐25  5.95%  0.00%  0.00%  0.00%  0.00%  0.00%  0.00% 25‐50  28.69%  55.74%  37.44% 0.00%  0.00%  0.00%  0.00% 50‐100  17.07%  26.49%  40.32% 26.59% 5.66%  5.32%  0.00% 100‐200  17.47%  17.77%  16.35% 43.29% 18.34%  15.61%  18.52%200‐250  13.54%  0.00%  5.89%  19.68% 21.51%  14.53%  49.29%250‐500  12.04%  0.00%  0.00%  6.83%  24.55%  24.32%  21.52%

Page 27: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 27 Report No SB/01

%ge of Vehicles Lead (km) 

Car  Mini Bus  Bus  LCV  2‐AT  3‐AT  MAV 

>500  5.24%  0.00%  0.00%  ‐‐  ‐‐  ‐‐  ‐‐ 500‐750  ‐‐  ‐‐  ‐‐  3.61%  14.52%  16.30%  49.29%

750‐1000  ‐‐  ‐‐  ‐‐  0.00%  7.98%  14.56%  21.52%

1000‐1500  ‐‐  ‐‐  ‐‐  0.00%  4.23%  7.64%  7.35% 

1500‐2000  ‐‐  ‐‐  ‐‐  0.00%  3.21%  1.08%  1.68% 

>2000  ‐‐  ‐‐  ‐‐  0.00%  0.00%  0.64%  1.64%  

 

14.93%

30.05%

15.16%

11.07%

18.77%

1.97%

8.05%

0%

5%

10%

15%

20%

25%

30%

35%

0-25 25-50 50-100 100-200 200-250 250-500 >500

Lead (km)

%ge

of C

ar

 

 50.15%

29.54%

20.31%

0%

10%

20%

30%

40%

50%

60%

0-50 50-100 100-150 150-200 200-250 250-500 >500

Lead (km)

%ge

of M

ini B

us

     

Lead Distribution of Car at km. 267+000    Lead Distribution of M‐Bus at km. 267+000 

     

1.84%

70.70%

22.46%

2.65%1.89% 0.46%0%

10%

20%

30%

40%

50%

60%

70%

80%

0-50 50-100 100-150 150-200 200-250 250-500 >500

Lead (km)

%ge

of B

us

 

 36.48%

14.23%

6.84%

2.80%

39.65%

0%

5%

10%

15%

20%

25%

30%

35%

40%

45%

0-25 25-50 50-100 100-200 200-250 250-500 500-750 750-1000

1000-1500

1500-2000

>2500

Lead (km)

%ge

of L

CV

      

Lead Distribution of Bus at km. 267+000  Lead Distribution of LCV at km. 267+000    

Page 28: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 28 Report No SB/01

8.51%

23.65%

19.56%

27.06%

10.62%

4.69%2.85%

1.65% 1.41%

0%

5%

10%

15%

20%

25%

30%

0-25

25-5

0

50-1

00

100-

200

200-

250

250-

500

500-

750

750-

1000

1000

-150

0

1500

-200

0

>200

0

Lead (km)

%ge

of 2

-Axl

e Tr

ucks

 

 

5.50%

18.98% 19.26%

26.34%

14.51%

7.65%

4.35%

1.77% 1.64%

0%

5%

10%

15%

20%

25%

30%

0-25

25-5

0

50-1

00

100-

200

200-

250

250-

500

500-

750

750-

1000

1000

-150

0

1500

-200

0

>200

0

Lead (km)

%ge

of 3

-Axl

e Tr

ucks

      

Lead Distribution of 2‐AT at km. 267+000  Lead Distribution of 3‐AT at km. 267+000 

   

29.00%

32.65%

24.65%

9.25%

2.56% 1.89%

0%

5%

10%

15%

20%

25%

30%

35%

50-1

00

100-

200

200-

250

250-

500

500-

750

750-

1000

1000

-150

0

1500

-200

0

>200

0

Lead (km)

%ge

of M

ulti

Axl

e Tr

ucks

 

5.95%

28.69%

17.07%

13.54%12.04%

5.24%

17.47%

0%

5%

10%

15%

20%

25%

30%

35%

0-25 25-50 50-100 100-200 200-250 250-500 >500

Lead (km)

%ge

of C

ar

    

Lead Distribution of MAV at km. 267+000  Lead Distribution of Car at km. 370+000 

   

55.74%

26.49%

17.77%

0%

10%

20%

30%

40%

50%

60%

0-50 50-100 100-150 150-200 200-250 250-500 >500

Lead (km)

%ge

of M

ini B

us

 

37.44%

40.32%

5.89%

16.35%

0%

5%

10%

15%

20%

25%

30%

35%

40%

45%

0-50 50-100 100-150 150-200 200-250 250-500 >500

Lead (km)

%ge

of B

us

    

Lead Distribution of M. Bus at km. 370+000  Lead Distribution of Bus at km. 370+000 

   

Page 29: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 29 Report No SB/01

26.59%

19.68%

6.83%

3.61%

43.29%

0%

5%

10%

15%

20%

25%

30%

35%

40%

45%

50%

0-25 25-50 50-100 100-200 200-250 250-500 500-750 750-1000

1000-1500

1500-2000

>2500

Lead (km)

%ge

of L

CV

 

5.66%

18.34%

21.51%

24.55%

14.52%

7.98%

4.23%3.21%

0%

5%

10%

15%

20%

25%

30%

0-25

25-5

0

50-1

00

100-

200

200-

250

250-

500

500-

750

750-

1000

1000

-150

0

1500

-200

0

>200

0

Lead (km)

%ge

of 2

-Axl

e Tr

ucks

    

Lead Distribution of LCV at km. 370+000  Lead Distribution of 2‐AT at km. 370+000 

   

5.32%

15.61%14.53%

24.32%

16.30%14.56%

7.64%

1.08% 0.64%0%

5%

10%

15%

20%

25%

30%

0-25

25-5

0

50-1

00

100-

200

200-

250

250-

500

500-

750

750-

1000

1000

-150

0

1500

-200

0

>200

0

Lead (km)

%ge

of 3

-Axl

e Tr

ucks

 

18.52%

49.29%

21.52%

7.35%

1.68% 1.64%0%

10%

20%

30%

40%

50%

60%

50-1

00

100-

200

200-

250

250-

500

500-

750

750-

1000

1000

-150

0

1500

-200

0

>200

0

Lead (km)

%ge

of M

ulti

Axl

e Tr

ucks

 Lead Distribution of 3‐AT at km. 370+000  Lead Distribution of MAV at km. 370+000 

 

Fig. 1.14 Vehicle‐Wise Lead Distribution at the survey locations  

Travel Demand Forecasting 

Traffic growth rates for the study, to be used subsequently for forecasting traffic on the 

project  road,  have  been  estimated  by  adopting  the  “Elasticity  of  Transport Demand” 

method which is a proven technique worldwide and is the preferred technique in India. 

The method relies on the correlation between 

 

• Past  trends  in  traffic  growth  on  the  project  road  /  vehicle  registration  in  the 

state, and  

• Time series data on population, state income (NSDP) and per capita income (PCI) 

for project influence area.  

Page 30: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 30 Report No SB/01

Regression analysis has been done (using past trends on no. of vehicles on road in Uttar 

Pradesh  and  socio‐economic  indicators  for  the  period  2002‐2003  to  2007‐2008),  to 

estimate elasticities  for each vehicle type. The elasticity values estimated  in this study 

are  then  compared with  those  suggested  in  “Road Development  Plan:  2021”  (Indian 

Road Congress, 2001,  for Ministry of Road Transport and Highways, GoI) and  specific 

elasticities are recommended for deriving traffic growth rates and traffic forecasts. The 

projected growth rates worked out for major vehicle groups, namely, car, bus and trucks 

were moderated based on future economic prospects of the project influence area and 

the  likely  future  shift  among  the  vehicle  categories.  The  probable  shift  of  vehicle 

ownership from 2‐axle trucks to 3‐axle trucks and MAVs and 2/3 wheeler market to car 

have been taken into account while moderating the elasticity values. This is considered 

necessary because as the purchasing power increases there will be a shift from low cost 

vehicles  to high  speed, more expensive and more  comfortable vehicles. Further, with 

the road improvement and realization of economics of scale, goods operators will tend 

to transfer from 2‐axle trucks to 3‐Axle/Multi‐axle vehicles. These market driven forces 

have been realistically considered in the traffic forecast. 

 

Socio‐Economic Indicators and No. of Vehicles on Road in Uttar Pradesh  

The socio‐economic indicators (Net State Domestic Product (NSDP), Population and Per 

Capita  Income  (PCI)  and  no.  of  vehicles  by  vehicle  type  of  Uttar  Pradesh  has  been 

collected from various secondary sources. 

 

Table 1.16: Vehicle Registration Data and Socio‐Economic Indicators of Uttar Pradesh 

No. of Vehicles (Nos.)* Year 

Car  Bus  Truck 

NSDP at 1999‐00 Constant 

Prices (in Crores)* 

Population (‘000)* 

Per Capita Income at 1999‐00 

 Constant Prices  (in Rs.)* 

2002  459215  25357  125010  182652  171536  10648 

2003  533718  26162  151711  200463  174955  11458 

2004  606995  25081  165123  217577  178400  12196 

2005  735528  26549  184428  242156  181867  13315 

2006  767620  25423  191642  271750  185330  14663 

2007  778982  27941  208298  303228  188809  16060 Sources:   

* Economics and Statistics Division, Govt. of Uttar Pradesh  

Page 31: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 31 Report No SB/01

From the above,  it can be seen that no. of vehicles plying  in Uttar Pradesh State has a steady growth and this data has been considered for estimate travel demand elasticities.  

Elasticity of Growth  

Passenger traffic demand  is a function of growth of population, per capita  income and 

growth  of  the  state.  Similarly,  state  income  growth  and  industrial,  mining  and 

agriculture  production  mostly  governs  the  freight  traffic  growth.  In  line  with  this 

philosophy,  the elasticity of  traffic demand has been estimated  for car, bus and  truck 

with respect to the past traffic growth. The resultant elasticity values are presented  in 

the following table. 

 

Table 1.17:  Regression Analysis Results 

Dependent Variable 

Independent Variable 

Period Elasticity Value 

R2  T ‐ stat. 

log of NSDP  2002‐2007  1.087  0.904  6.130 log of Population  2002‐2007  5.857  0.935  7.585 log of Car log of PCI  2002‐2007  1.332  0.895  5.849 log of NSDP  2002‐2007  0.132  0.394  1.613 log of Population  2002‐2007  0.674  0.364  1.514 log of Bus log of PCI  2002‐2007  0.164  0.401  1.635 log of NSDP  2002‐2007  0.933  0.926  7.092 log of Population  2002‐2007  5.019  0.954  9.111 

log of Truck 

log of PCI  2002‐2007  1.144  0.919  6.720  

The elasticity values shown in the above table reflect a substantial co‐relation between 

economic indicators and traffic growth rates as reflected in their R2, elasticity and t‐stat 

values. Hence, it is appropriate to consider the growth pattern that has emerged out of 

the economic model which related the economic growth with the growth in registration 

of  vehicles.  In  the  next  stage,  considering  the  various  factors  such  as  likely  future 

orientation  of  the  economy,  modal  shift,  user  preference,  developments  in  vehicle 

technology, market driven forces and finally the past performance, the elasticity values 

are projected for the analysis period. 

 

Page 32: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 32 Report No SB/01

Moderated Transport Demand Elasticity  The above discussion indicates that the estimated ‘e’ values, as presented in the above 

table could not be considered to represent the future growth pattern. Also, the future 

traffic growth pattern is likely to be affected by the following factors: 

• Recent economic changes taking place in the project influence region. 

• Future  modal  shift  among  vehicle  types,  in  road  traffic  as  well  as  between 

various modes. 

• Development in vehicle technology. 

• Elasticity  values  considered  in  the  recent  road  projects  in  the  study  region  or 

recommended  by  multilateral  funding  institutions  for  Indian  Road/Highway 

Projects. 

With this background, it is necessary to moderate the elasticity values to accommodate 

the  above  factors  discussed  as well  as  to  arrive  at  the  growth  rates  that  are within 

realistic limits. 

 

The elasticity values with PCI/Population for passenger traffic and with NSDP for goods 

traffic  are  considered.  The  elasticity  value  for  cars  and  trucks  have  been  derived  by 

moderating the values arrived at from the regression analysis of past vehicle registration 

data,  such  that  it  is  in  close  agreement  with  the  value  as  specified  in  the  “Road 

Development  Plan  Vision:  2021”,  Indian  Roads  Congress,  2001.The  elasticity  values 

considered for future projection is given below. 

 

Table 1.18:  Recommended Elasticity 

Sl. No.  Vehicle Type  2010‐2014 2015‐2019 2020‐2024  Beyond 2024

1  Car  1.332  1.199  0.959  0.767 2  Bus & Mini  0.947  0.928  0.882  0.705 3  LCV  0.978  0.949  0.901  0.766 4  2‐AT  0.924  0.877  0.807  0.646 5  3‐AT  1.032  0.981  0.902  0.722 6  MAV  1.032  0.981  0.902  0.722 

 

Page 33: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 33 Report No SB/01

Future Economy Prospects  

On‐going economic liberalization measures, introduced in the nineties, were oriented to 

make  the  national  economy  with  a  strong  competitive  base,  leading  to  an  open 

economy  system. With  the  strengths  and weakness  of  the  present  system,  equipped 

with  adequate  safeguards,  Indian  economy  has  performed  fairly  well  during  the 

liberalization period, as well as before, though the targets were mostly never achieved.  

 

The  final growth  rates have been derived by establishing a  relation between  the  time 

series data  available  for Gross Domestic Product  (GDP) of  the  country  and Net  State 

Domestic Product (NSDP) of Uttar Pradesh. The GDP growth rate for the future years are 

based on the growth rates suggested  in “Dreaming with BRICs: the path 2050”’ Global 

Economics Paper No.9, Goldman Sachs, 2003.  

 

Considering the following factors such as past performance of the economy against their 

set targets, recent developments  in economic  liberalization measures, shift  in between 

sectors, opportunities available in local and global markets etc., future economic growth 

scenario is formulated for the following time periods.  

• 2010 ‐ 2014 

• 2015 ‐ 2019 

• 2020 ‐ 2024 

• Beyond 2024 

 

We feel that any projection beyond 15 years will have little relevance in current context 

mainly  because  there  is  certain  policy  variables  that  could  change  in  long  run which 

cannot be predicted based on the past performance. Hence, the entire period beyond 

2024 has been kept as one slab. 

 

Table 1.19:  Future NSDP Growth Rates 

Period  NSDP Growth Rate (%) 

2010‐2014  6.701 2015‐2019  6.352 2020‐2024  6.048 Beyond 2024  6.193 

 

Page 34: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 34 Report No SB/01

Population Projections  

Though,  population  projections  for  the  future  are  available  from  different  sources, 

however,  the  state wise population projections prepared by Register General of  India 

(RGI),  Census Department, GoI  are  found  to  be more  appropriate  as  a  result  of  the 

scientific methodology  followed.  Population  projections  prepared  by  RGI  have  been 

adopted  for  the present  study. The  resultant  future population growth  rates of Uttar 

Pradesh are given below. 

 

Table 1.20:  Future Population Projections 

Period  Future Population Growth Rate (%) 

2010‐2014  1.740 2015‐2019  1.554 2020‐2024  1.312 Beyond 2024  1.071 

 

Future per Capita Income (PCI)  

Future  growth  of  Per  Capita  Income  (PCI)  of  Uttar  Pradesh  is  summarized  as  given 

below. 

 

Table 1.21:  Future per Capita Income 

Period  Future Per Capita Income Growth Rate 

2010‐2014  4.876 2015‐2019  4.725 2020‐2024  4.675 Beyond 2024  5.033 

 

Traffic Growth Rates  

Based  on  the moderated  elasticity  values  and  the  projected  economic/demographic 

indicators,  the  future  average  annual  compound  traffic  growth  rates  by  vehicle  type 

have been estimated by using  the  following  formulae  and presented  in  the  following 

table. 

 

Page 35: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 35 Report No SB/01

For Cars :          Tgr = (PCIgr) x E 

For Bus & Mini Bus :        Tgr = Average of (NSDPgr) and (PCIgr) x E 

For Trucks (LCV, 2‐AT, 3‐AT & MAV):   Tgr = (NSDPgr) x E  

Where 

Tgr  ‐ Traffic Growth Rate POPgr  ‐  Per‐Capita Income Growth Rate PCIgr  ‐  Per‐Capita Income Growth Rate NSDPgr  ‐  Net State Domestic Product Growth Rate E  ‐  Elasticity Value  

Table 1.22: Traffic Growth Rates 

Sl. No.  Vehicle Type  2010‐2014 2015‐2019 2020‐2024  Beyond 2024

1  Car  6.50  5.66  4.48  3.86 2  Mini Bus & Bus  4.00  3.67  3.24  2.56 3  LCV  6.55  6.03  5.45  4.74 4  2‐AT  6.19  5.57  4.88  4.00 5  3‐AT  6.92  6.23  5.46  4.47 1  MAV  6.92  6.23  5.46  4.47 

 

Tollable Traffic Distribution Analysis  

As per rule no. 9 (regarding discounts to tollable traffic) of the notification released by 

MoRTH,  vide GSR  838  (E),  dated  5th December  2008,  the  concessionaire  has  to  give 

discounts to the traffic crossing the toll plaza based on their distribution. The same has 

duly considered in the present study and after a thorough analysis of the O‐D data, the 

following distribution of tollable traffic has arrived. 

 

Table 1.23: Tollable Traffic Distribution at km. 267+000 

Distribution of Tollable Traffic (%) of AADT Sl. 

No. 

Vehicle 

Type  Local 

Monthly 

Through 

Traffic 

Return/Round 

Trip 

Monthly Pass

(50 Single Journeys) 

At Toll Plaza 1: km. 267+000 1  Car  15  54  11  20 2  Mini Bus  N/A  25  12  63 3  Bus  N/A  05  04  91 4  LCV  N/A  96  03  01 5  2‐AT  N/A  98  01  01 6  3‐AT  N/A  99  01  00 7  MAV  N/A  100  00  00 

Page 36: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 36 Report No SB/01

Distribution of Tollable Traffic (%) of AADT Sl. 

No. 

Vehicle 

Type  Local 

Monthly 

Through 

Traffic 

Return/Round 

Trip 

Monthly Pass

(50 Single Journeys) 

At Toll Plaza 2: km. 370+000 1  Car  6  63  12  19 2  Mini Bus  N/A  25  0  75 3  Bus  N/A  35  01  64 4  LCV  N/A  97  02  01 5  2‐AT  N/A  98  01  01 6  3‐AT  N/A  100  00  00 7  MAV  N/A  100  00  00 

 Tollable Traffic Projections  

Tollable  traffic  at  both  the  proposed  toll  plaza  locations  viz  at  km.  267.000  and  km. 

370.000  for  the next 30 years are presented below. Detailed calculations are given  in 

Annexure 1.3. 

 

Page 37: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 37 Report No SB/01

Table 1.24 (a): LOCAL MONTHLY PASS TRAFFIC AT TOLL PLAZA 1 (km. 267.000)  

 

Year  Car Mini  Bus 

Bus  LCV  2‐AT  3‐AT MAV (4‐6 Axles) 

MAV  (>6 Axles) 

Total Tollable Vehicles 

Total Tollable PCUs 

2010  347  N/A  N/A  N/A  N/A  N/A  N/A  N/A  347  347 

2011  370  N/A  N/A  N/A  N/A  N/A  N/A  N/A  370  370 

2012  394  N/A  N/A  N/A  N/A  N/A  N/A  N/A  394  394 

2013  420  N/A  N/A  N/A  N/A  N/A  N/A  N/A  420  420 

2014  447  N/A  N/A  N/A  N/A  N/A  N/A  N/A  447  447 

2015  472  N/A  N/A  N/A  N/A  N/A  N/A  N/A  472  472 

2016  499  N/A  N/A  N/A  N/A  N/A  N/A  N/A  499  499 

2017  527  N/A  N/A  N/A  N/A  N/A  N/A  N/A  527  527 

2018  557  N/A  N/A  N/A  N/A  N/A  N/A  N/A  557  557 

2019  589  N/A  N/A  N/A  N/A  N/A  N/A  N/A  589  589 

2020  615  N/A  N/A  N/A  N/A  N/A  N/A  N/A  615  615 

2021  643  N/A  N/A  N/A  N/A  N/A  N/A  N/A  643  643 

2022  672  N/A  N/A  N/A  N/A  N/A  N/A  N/A  672  672 

2023  702  N/A  N/A  N/A  N/A  N/A  N/A  N/A  702  702 

2024  733  N/A  N/A  N/A  N/A  N/A  N/A  N/A  733  733 

2025  761  N/A  N/A  N/A  N/A  N/A  N/A  N/A  761  761 

2026  790  N/A  N/A  N/A  N/A  N/A  N/A  N/A  790  790 

2027  820  N/A  N/A  N/A  N/A  N/A  N/A  N/A  820  820 

2028  852  N/A  N/A  N/A  N/A  N/A  N/A  N/A  852  852 

2029  885  N/A  N/A  N/A  N/A  N/A  N/A  N/A  885  885 

2030  919  N/A  N/A  N/A  N/A  N/A  N/A  N/A  919  919 

2031  954  N/A  N/A  N/A  N/A  N/A  N/A  N/A  954  954 

2032  991  N/A  N/A  N/A  N/A  N/A  N/A  N/A  991  991 

2033  1029  N/A  N/A  N/A  N/A  N/A  N/A  N/A  1029  1029 

2034  1069  N/A  N/A  N/A  N/A  N/A  N/A  N/A  1069  1069 

2035  1110  N/A  N/A  N/A  N/A  N/A  N/A  N/A  1110  1110 

2036  1153  N/A  N/A  N/A  N/A  N/A  N/A  N/A  1153  1153 

2037  1198  N/A  N/A  N/A  N/A  N/A  N/A  N/A  1198  1198 

2038  1244  N/A  N/A  N/A  N/A  N/A  N/A  N/A  1244  1244 

2039  1292  N/A  N/A  N/A  N/A  N/A  N/A  N/A  1292  1292 

2040  1342  N/A  N/A  N/A  N/A  N/A  N/A  N/A  1342  1342 

Page 38: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 38 Report No SB/01

Table 1.24 (b): THROUGH TRAFFIC AT TOLL PLAZA 1 (km. 267.000)  

 

Year  Car Mini  Bus 

Bus  LCV  2‐AT  3‐AT MAV (4‐6 Axles) 

MAV  (>6 Axles) 

Total Tollable Vehicles 

Total Tollable PCUs 

2010  1250  18  27  1192  2473  2915  526  0  8399  21674 

2011  1331  18  28  1270  2626  3116  562  0  8951  23102 

2012  1418  19  29  1353  2789  3332  601  0  9541  24631 

2013  1510  20  30  1442  2962  3563  643  0  10170  26262 

2014  1608  21  31  1536  3145  3810  687  0  10838  27993 

2015  1699  22  32  1629  3320  4047  730  0  11479  29658 

2016  1795  23  33  1727  3505  4299  775  0  12157  31419 

2017  1897  24  34  1831  3700  4567  823  0  12876  33286 

2018  2004  25  35  1941  3906  4852  874  0  13637  35265 

2019  2117  26  36  2058  4124  5154  928  0  14443  37361 

2020  2212  27  37  2170  4325  5435  979  0  15185  39304 

2021  2311  28  38  2288  4536  5732  1032  0  15965  41347 

2022  2415  29  39  2413  4757  6045  1088  0  16786  43497 

2023  2523  30  40  2545  4989  6375  1147  0  17649  45759 

2024  2636  31  41  2684  5232  6723  1210  0  18557  48142 

2025  2738  32  42  2811  5441  7024  1264  0  19352  50212 

2026  2844  33  43  2944  5659  7338  1321  0  20182  52374 

2027  2954  34  44  3084  5885  7666  1380  0  21047  54626 

2028  3068  35  45  3230  6120  8009  1442  0  21949  56977 

2029  3186  36  46  3383  6365  8367  1506  0  22889  59426 

2030  3309  37  47  3543  6620  8741  1573  0  23870  61982 

2031  3437  38  48  3711  6885  9132  1643  0  24894  64649 

2032  3570  39  49  3887  7160  9540  1716  0  25961  67428 

2033  3708  40  50  4071  7446  9966  1793  0  27074  70329 

2034  3851  41  51  4264  7744  10411  1873  0  28235  73355 

2035  4000  42  52  4466  8054  10876  1957  0  29447  76515 

2036  4154  43  53  4678  8376  11362  2044  0  30710  79807 

2037  4314  44  54  4900  8711  11870  2135  0  32028  83243 

2038  4481  45  55  5132  9059  12401  2230  0  33403  86827 

2039  4654  46  56  5375  9421  12955  2330  0  34837  90567 

2040  4834  47  57  5630  9798  13534  2434  0  36334  94470 

Page 39: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 39 Report No SB/01

Table 1.24 (c): RETURN/ROUND TRAFFIC AT TOLL PLAZA 1 (km. 267.000)  

 

Year  Car Mini  Bus 

Bus  LCV  2‐AT  3‐AT MAV (4‐6 Axles) 

MAV  (>6 Axles) 

Total Tollable Vehicles 

Total Tollable PCUs 

2010  255  8  22  37  25  29  0  0  376  552 

2011  271  9  22  40  27  31  0  0  400  585 

2012  289  9  23  43  29  33  0  0  426  622 

2013  308  9  24  46  31  35  0  0  453  661 

2014  328  9  25  49  33  37  0  0  481  700 

2015  347  9  26  52  35  39  0  0  508  739 

2016  367  9  27  55  37  41  0  0  536  778 

2017  388  9  28  58  39  44  0  0  566  822 

2018  410  9  29  61  41  47  0  0  597  866 

2019  433  9  30  65  43  50  0  0  630  913 

2020  452  9  31  69  45  53  0  0  659  956 

2021  472  9  32  73  47  56  0  0  689  1000 

2022  493  9  33  77  49  59  0  0  720  1045 

2023  515  9  34  81  51  62  0  0  752  1091 

2024  538  9  35  85  53  65  0  0  785  1138 

2025  559  9  36  89  55  68  0  0  816  1183 

2026  581  9  37  93  57  71  0  0  848  1229 

2027  603  9  38  97  59  74  0  0  880  1275 

2028  626  9  39  102  61  77  0  0  914  1324 

2029  650  9  40  107  63  80  0  0  949  1373 

2030  675  9  41  112  66  84  0  0  987  1430 

2031  701  9  42  117  69  88  0  0  1026  1487 

2032  728  9  43  123  72  92  0  0  1067  1547 

2033  756  9  44  129  75  96  0  0  1109  1608 

2034  785  9  45  135  78  100  0  0  1152  1670 

2035  815  9  46  141  81  104  0  0  1196  1733 

2036  846  9  47  148  84  109  0  0  1243  1802 

2037  879  9  48  155  87  114  0  0  1292  1872 

2038  913  9  49  162  90  119  0  0  1342  1944 

2039  948  9  50  170  94  124  0  0  1395  2021 

2040  985  9  51  178  98  130  0  0  1451  2103 

Page 40: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 40 Report No SB/01

Table 1.24 (d): MONTHLY PASS TRAFFIC (50 SINGLE JOURNEY) AT TOLL PLAZA 1 (km. 267.000)  

 

Year  Car Mini  Bus 

Bus  LCV  2‐AT  3‐AT MAV (4‐6 Axles) 

MAV  (>6 Axles) 

Total Tollable Vehicles 

Total Tollable PCUs 

2010  463  44  491  12  25  0  0  0  1036  2097 

2011  493  46  511  13  27  0  0  0  1090  2196 

2012  525  48  531  14  29  0  0  0  1147  2298 

2013  559  50  552  15  31  0  0  0  1207  2406 

2014  595  52  574  16  33  0  0  0  1270  2518 

2015  629  54  595  17  35  0  0  0  1330  2626 

2016  665  56  617  18  37  0  0  0  1393  2738 

2017  703  58  640  19  39  0  0  0  1459  2856 

2018  743  60  663  20  41  0  0  0  1527  2975 

2019  785  62  687  21  43  0  0  0  1598  3100 

2020  820  64  709  22  45  0  0  0  1660  3211 

2021  857  66  732  23  47  0  0  0  1725  3328 

2022  895  68  756  24  49  0  0  0  1792  3448 

2023  935  70  780  25  51  0  0  0  1861  3571 

2024  977  72  805  26  53  0  0  0  1933  3698 

2025  1015  74  826  27  55  0  0  0  1997  3810 

2026  1054  76  847  28  57  0  0  0  2062  3922 

2027  1095  78  869  29  59  0  0  0  2130  4040 

2028  1137  80  891  30  61  0  0  0  2199  4158 

2029  1181  82  914  31  63  0  0  0  2271  4282 

2030  1227  84  937  32  66  0  0  0  2346  4410 

2031  1274  86  961  34  69  0  0  0  2424  4544 

2032  1323  88  986  36  72  0  0  0  2505  4683 

2033  1374  90  1011  38  75  0  0  0  2588  4824 

2034  1427  92  1037  40  78  0  0  0  2674  4970 

2035  1482  94  1064  42  81  0  0  0  2763  5121 

2036  1539  96  1091  44  84  0  0  0  2854  5274 

2037  1598  98  1119  46  87  0  0  0  2948  5432 

2038  1660  101  1148  48  90  0  0  0  3047  5598 

2039  1724  104  1177  50  94  0  0  0  3149  5768 

2040  1791  107  1207  52  98  0  0  0  3255  5945 

Page 41: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 41 Report No SB/01

Table 1.25 (a): LOCAL MONTHLY PASS TRAFFIC AT TOLL PLAZA 2 (km. 370.000) 

 

Year  Car Mini  Bus 

Bus  LCV  2‐AT  3‐AT MAV (4‐6 Axles) 

MAV  (>6 Axles) 

Total Tollable Vehicles 

Total Tollable PCUs 

2010  80  N/A  N/A  N/A  N/A  N/A  N/A  N/A  80  80 

2011  85  N/A  N/A  N/A  N/A  N/A  N/A  N/A  85  85 

2012  91  N/A  N/A  N/A  N/A  N/A  N/A  N/A  91  91 

2013  97  N/A  N/A  N/A  N/A  N/A  N/A  N/A  97  97 

2014  103  N/A  N/A  N/A  N/A  N/A  N/A  N/A  103  103 

2015  109  N/A  N/A  N/A  N/A  N/A  N/A  N/A  109  109 

2016  115  N/A  N/A  N/A  N/A  N/A  N/A  N/A  115  115 

2017  122  N/A  N/A  N/A  N/A  N/A  N/A  N/A  122  122 

2018  129  N/A  N/A  N/A  N/A  N/A  N/A  N/A  129  129 

2019  136  N/A  N/A  N/A  N/A  N/A  N/A  N/A  136  136 

2020  142  N/A  N/A  N/A  N/A  N/A  N/A  N/A  142  142 

2021  148  N/A  N/A  N/A  N/A  N/A  N/A  N/A  148  148 

2022  155  N/A  N/A  N/A  N/A  N/A  N/A  N/A  155  155 

2023  162  N/A  N/A  N/A  N/A  N/A  N/A  N/A  162  162 

2024  169  N/A  N/A  N/A  N/A  N/A  N/A  N/A  169  169 

2025  176  N/A  N/A  N/A  N/A  N/A  N/A  N/A  176  176 

2026  183  N/A  N/A  N/A  N/A  N/A  N/A  N/A  183  183 

2027  190  N/A  N/A  N/A  N/A  N/A  N/A  N/A  190  190 

2028  197  N/A  N/A  N/A  N/A  N/A  N/A  N/A  197  197 

2029  205  N/A  N/A  N/A  N/A  N/A  N/A  N/A  205  205 

2030  213  N/A  N/A  N/A  N/A  N/A  N/A  N/A  213  213 

2031  221  N/A  N/A  N/A  N/A  N/A  N/A  N/A  221  221 

2032  230  N/A  N/A  N/A  N/A  N/A  N/A  N/A  230  230 

2033  239  N/A  N/A  N/A  N/A  N/A  N/A  N/A  239  239 

2034  248  N/A  N/A  N/A  N/A  N/A  N/A  N/A  248  248 

2035  258  N/A  N/A  N/A  N/A  N/A  N/A  N/A  258  258 

2036  268  N/A  N/A  N/A  N/A  N/A  N/A  N/A  268  268 

2037  278  N/A  N/A  N/A  N/A  N/A  N/A  N/A  278  278 

2038  289  N/A  N/A  N/A  N/A  N/A  N/A  N/A  289  289 

2039  300  N/A  N/A  N/A  N/A  N/A  N/A  N/A  300  300 

2040  312  N/A  N/A  N/A  N/A  N/A  N/A  N/A  312  312 

Page 42: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 42 Report No SB/01

Table 1.25 (b): THROUGH TRAFFIC AT TOLL PLAZA 2 (km. 370.000)  

 

Year  Car Mini  Bus 

Bus  LCV  2‐AT  3‐AT MAV (4‐6 Axles) 

MAV  (>6 Axles) 

Total Tollable Vehicles 

Total Tollable PCUs 

2010  842  9  109  1158  2260  2870  515  0  7762  20625 

2011  897  9  113  1234  2400  3069  551  0  8273  21987 

2012  955  9  118  1315  2549  3281  589  0  8816  23436 

2013  1017  9  123  1401  2707  3508  630  0  9395  24981 

2014  1083  9  128  1493  2875  3751  674  0  10013  26631 

2015  1144  9  133  1583  3035  3985  716  0  10605  28213 

2016  1209  9  138  1678  3204  4233  761  0  11232  29889 

2017  1277  9  143  1779  3382  4497  808  0  11895  31661 

2018  1349  9  148  1886  3570  4777  858  0  12597  33538 

2019  1425  9  153  2000  3769  5075  911  0  13342  35529 

2020  1489  9  158  2109  3953  5352  961  0  14031  37380 

2021  1556  9  163  2224  4146  5644  1013  0  14755  39323 

2022  1626  9  168  2345  4348  5952  1068  0  15516  41367 

2023  1699  9  173  2473  4560  6277  1126  0  16317  43519 

2024  1775  9  179  2608  4783  6620  1187  0  17161  45788 

2025  1844  9  184  2732  4974  6916  1240  0  17899  47758 

2026  1915  9  189  2861  5173  7225  1295  0  18667  49809 

2027  1989  9  194  2997  5380  7548  1353  0  19470  51953 

2028  2066  9  199  3139  5595  7885  1413  0  20306  54184 

2029  2146  9  204  3288  5819  8237  1476  0  21179  56514 

2030  2229  9  209  3444  6052  8605  1542  0  22090  58946 

2031  2315  9  214  3607  6294  8990  1611  0  23040  61483 

2032  2404  9  219  3778  6546  9392  1683  0  24031  64129 

2033  2497  9  225  3957  6808  9812  1758  0  25066  66892 

2034  2593  9  231  4145  7080  10251  1837  0  26146  69777 

2035  2693  9  237  4341  7363  10709  1919  0  27271  72781 

2036  2797  9  243  4547  7658  11188  2005  0  28447  75921 

2037  2905  9  249  4763  7964  11688  2095  0  29673  79194 

2038  3017  9  255  4989  8283  12210  2189  0  30952  82609 

2039  3133  9  262  5225  8614  12756  2287  0  32286  86172 

2040  3254  9  269  5473  8959  13326  2389  0  33679  89890 

Page 43: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 43 Report No SB/01

Table 1.25 (c): RETURN/ROUND TRAFFIC AT TOLL PLAZA 2 (km. 370.000)  

 

Year  Car Mini  Bus 

Bus  LCV  2‐AT  3‐AT MAV (4‐6 Axles) 

MAV  (>6 Axles) 

Total Tollable Vehicles 

Total Tollable PCUs 

2010  160  0  3  24  23  0  0  0  210  275 

2011  171  0  3  25  24  0  0  0  223  290 

2012  182  0  3  27  25  0  0  0  237  307 

2013  194  0  3  29  27  0  0  0  253  328 

2014  207  0  3  31  29  0  0  0  270  350 

2015  219  0  3  33  31  0  0  0  286  371 

2016  231  0  3  35  33  0  0  0  302  392 

2017  244  0  3  37  35  0  0  0  319  414 

2018  258  0  3  39  37  0  0  0  337  437 

2019  273  0  3  41  39  0  0  0  356  461 

2020  285  0  3  43  41  0  0  0  372  482 

2021  298  0  3  45  43  0  0  0  389  504 

2022  311  0  3  47  45  0  0  0  406  526 

2023  325  0  3  50  47  0  0  0  425  550 

2024  340  0  3  53  49  0  0  0  445  576 

2025  353  0  3  56  51  0  0  0  463  599 

2026  367  0  3  59  53  0  0  0  482  624 

2027  381  0  3  62  55  0  0  0  501  648 

2028  396  0  3  65  57  0  0  0  521  674 

2029  411  0  3  68  59  0  0  0  541  699 

2030  427  0  3  71  61  0  0  0  562  726 

2031  443  0  3  74  63  0  0  0  583  752 

2032  460  0  3  78  66  0  0  0  607  784 

2033  478  0  3  82  69  0  0  0  632  817 

2034  496  0  3  86  72  0  0  0  657  850 

2035  515  0  3  90  75  0  0  0  683  884 

2036  535  0  3  94  78  0  0  0  710  919 

2037  556  0  3  98  81  0  0  0  738  955 

2038  577  0  3  103  84  0  0  0  767  993 

2039  599  0  3  108  87  0  0  0  797  1031 

2040  622  0  3  113  90  0  0  0  828  1071 

Page 44: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 44 Report No SB/01

Table 1.25 (d): MONTHLY PASS TRAFFIC (50 SINGLE JOURNEY) AT TOLL PLAZA 2  (km. 370.000)  

 

Year  Car Mini  Bus 

Bus  LCV  2‐AT  3‐AT MAV (4‐6 Axles) 

MAV  (>6 Axles) 

Total Tollable Vehicles 

Total Tollable PCUs 

2010  254  26  198  12  23  0  0  0  513  975 

2011  271  27  206  13  24  0  0  0  541  1021 

2012  289  28  214  14  25  0  0  0  570  1069 

2013  308  29  223  15  27  0  0  0  602  1124 

2014  328  30  232  16  29  0  0  0  635  1180 

2015  347  31  241  17  31  0  0  0  667  1235 

2016  367  32  250  18  33  0  0  0  700  1291 

2017  388  33  259  19  35  0  0  0  734  1348 

2018  410  34  269  20  37  0  0  0  770  1409 

2019  433  35  279  21  39  0  0  0  807  1471 

2020  452  36  288  22  41  0  0  0  839  1526 

2021  472  37  297  23  43  0  0  0  872  1582 

2022  493  38  307  24  45  0  0  0  907  1642 

2023  515  39  317  25  47  0  0  0  943  1703 

2024  538  40  327  26  49  0  0  0  980  1765 

2025  559  41  335  27  51  0  0  0  1013  1819 

2026  581  42  344  28  53  0  0  0  1048  1877 

2027  603  43  353  29  55  0  0  0  1083  1935 

2028  626  44  362  30  57  0  0  0  1119  1994 

2029  650  45  371  31  59  0  0  0  1156  2054 

2030  675  46  380  32  61  0  0  0  1194  2115 

2031  701  47  390  34  63  0  0  0  1235  2182 

2032  728  48  400  36  66  0  0  0  1278  2252 

2033  756  49  410  38  69  0  0  0  1322  2324 

2034  785  50  420  40  72  0  0  0  1367  2396 

2035  815  51  431  42  75  0  0  0  1414  2473 

2036  846  52  442  44  78  0  0  0  1462  2550 

2037  879  53  453  46  81  0  0  0  1512  2630 

2038  913  54  465  48  84  0  0  0  1564  2713 

2039  948  55  477  50  87  0  0  0  1617  2798 

2040  985  56  489  52  90  0  0  0  1672  2884 

Page 45: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 45 Report No SB/01

COMPARISION OF TRAFFIC DATA

Page 46: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 46 Report No SB/01

Comparison of Traffic Data  

 

Based on the traffic report presented above, the consultant has compared the tollable 

AADT in the year 2010. w.r.t. tolled vehicles with that presented by M/s ERA and the 

result of comparison is as given below in Table 1.15. 

 

For this comparison, the tollable traffic of ERA in the year 2009 has been projected by 

5% to arrive the traffic in 2010. 

 

Table 1.26: Comparison of AADT 

At km. 267.000  At km. 370.000 

AADT (Veh) in 2010  AADT (PCU) in 2010 Vehicle Type 

GIFFORD  ERA  GIFFORD  ERA Car, Jeep, Taxi and 

Van 2314  2060  1337  1263 

Mini Bus  70  65  34  28 Bus  540  498  310  835 LCV  1242  1188  1194  1127 2‐Axle Truck  2523  2458  2306  2226 3‐Axle Truck  2944  2911  2870  3010 

MAV (4‐6 Axles)  526  519  515  507 

MAV (> 6 Axles)  0  0  0  0 Total (Vehicle)  10159  9699  8566  8996 Total (PCU)  24670  23876  21955  23490  

 

 

Page 47: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 47 Report No SB/01

CONCLUSION & RECOMMENDATION

Page 48: Traffic Review Report F 18.09

Sitapur-Bareilly Section of NH 24 Gifford Review of Traffic Estimate Page 48 Report No SB/01

Conclusion & Recommendation 

The traffic report  is prepared based on 7 Day Volume Count conducted at 2 proposed 

toll plaza locations i.e, km 267.00 & km 370.00. Based on the traffic survey done at site, 

Average Daily Traffic (ADT) and Annual Average Daily Traffic (AADT) are worked out.  

 

Traffic demand forecasting for the project road is worked out based on Socio‐Economic 

Indicators, Elasticity of Growth, Population Projections, Future Per Capita  Income (PCI) 

and Traffic Growth Rates. A comparison of traffic data as collected during the present 

study is compared with that done by M/s ERA and the results are summarised below: 

 

Km 267.00: AADT as per present study is around 4.65 % & 3.34 % more than that of M/s 

ERA in Nos. & PCU respectively. 

 

Km 377.00: AADT as per present study is around 4.82 % & 6.52 % less than that of M/s 

ERA in Nos. & PCU respectively because of the variation of Bus Traffic 

 

However the average tollable traffic of the present study at both the locations, in Nos. 

& PCU are very closely in line with results presented by M/s ERA Report.