Alan Davis, PE, PTOE State Signal Engineer Alan Davis, PE, PTOE State Signal Engineer Traffic Signal Software

Traffic Signal Software · 2015. 10. 1. · • Training • Maintenance and support. Alan Davis, PE, PTOE State Signal Engineer 404‐635‐2838 [email protected]. GeorgiÅ of

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Traffic Signal Software · 2015. 10. 1. · • Training • Maintenance and support. Alan Davis, PE, PTOE State Signal Engineer 404‐635‐2838 aladavis@dot.ga.gov. GeorgiÅ of

Alan Davis, PE, PTOEState Signal Engineer

Alan Davis, PE, PTOEState Signal Engineer

Traffic Signal Software

Page 2: Traffic Signal Software · 2015. 10. 1. · • Training • Maintenance and support. Alan Davis, PE, PTOE State Signal Engineer 404‐635‐2838 aladavis@dot.ga.gov. GeorgiÅ of

Important Dates

• September 15, 2013

• November 18, 2013

• September 1, 2015

Page 3: Traffic Signal Software · 2015. 10. 1. · • Training • Maintenance and support. Alan Davis, PE, PTOE State Signal Engineer 404‐635‐2838 aladavis@dot.ga.gov. GeorgiÅ of
Page 4: Traffic Signal Software · 2015. 10. 1. · • Training • Maintenance and support. Alan Davis, PE, PTOE State Signal Engineer 404‐635‐2838 aladavis@dot.ga.gov. GeorgiÅ of

Procurement Process

• Unique challenges

• Lessons learned

Page 5: Traffic Signal Software · 2015. 10. 1. · • Training • Maintenance and support. Alan Davis, PE, PTOE State Signal Engineer 404‐635‐2838 aladavis@dot.ga.gov. GeorgiÅ of

Procurement Process

• Scan tour

• System evaluations

• Peer resources

Page 6: Traffic Signal Software · 2015. 10. 1. · • Training • Maintenance and support. Alan Davis, PE, PTOE State Signal Engineer 404‐635‐2838 aladavis@dot.ga.gov. GeorgiÅ of

Functional Requirements

• Ongoing development, 

future vision

• Not just technical: 

customer service

Page 7: Traffic Signal Software · 2015. 10. 1. · • Training • Maintenance and support. Alan Davis, PE, PTOE State Signal Engineer 404‐635‐2838 aladavis@dot.ga.gov. GeorgiÅ of

Functional Requirements2070 Firmware

Page 8: Traffic Signal Software · 2015. 10. 1. · • Training • Maintenance and support. Alan Davis, PE, PTOE State Signal Engineer 404‐635‐2838 aladavis@dot.ga.gov. GeorgiÅ of

Functional Requirements2070 Firmware

• Open standards

• Reliable and robust

• Operates a signal

Page 9: Traffic Signal Software · 2015. 10. 1. · • Training • Maintenance and support. Alan Davis, PE, PTOE State Signal Engineer 404‐635‐2838 aladavis@dot.ga.gov. GeorgiÅ of

Functional Requirements

Primary objectives of signal operations

i. Monitoring of traffic signals frequently enough to identify when

maintenance or operational intervention is warranted;

ii. Good allocation of green times; and

iii. Good progression on selected arterials at selected times of day.

Page 10: Traffic Signal Software · 2015. 10. 1. · • Training • Maintenance and support. Alan Davis, PE, PTOE State Signal Engineer 404‐635‐2838 aladavis@dot.ga.gov. GeorgiÅ of

Functional Requirements

Page 11: Traffic Signal Software · 2015. 10. 1. · • Training • Maintenance and support. Alan Davis, PE, PTOE State Signal Engineer 404‐635‐2838 aladavis@dot.ga.gov. GeorgiÅ of

Communications

Detection

Timing

Coordination OPERATIONS

MAINTENANCE

Page 12: Traffic Signal Software · 2015. 10. 1. · • Training • Maintenance and support. Alan Davis, PE, PTOE State Signal Engineer 404‐635‐2838 aladavis@dot.ga.gov. GeorgiÅ of

Deployment

• Phase 1 ‐ RTOP

– SR 42, SR 3, SR 8, SR 9, SR 

237, SR 141 (S)

• Phase 2 – GDOT Districts

• Phase 3 – Locals, off‐

system

Page 13: Traffic Signal Software · 2015. 10. 1. · • Training • Maintenance and support. Alan Davis, PE, PTOE State Signal Engineer 404‐635‐2838 aladavis@dot.ga.gov. GeorgiÅ of

Deployment

Services Provided: Turn‐key

• 1‐C CPUs

• Database conversion

• Central configuration

• Training

• Maintenance and support