Training For The Future Training For The Future TRAINING COURSES DRIVER TRAINING CONSTRUCTION PLANT FORKLIFTS ADR / DGSA NEBOSH / IOSH CPC & MANAGEMENT COURSES

Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

Embed Size (px)

Citation preview

Page 1: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

Training For The Future

Training For The Future

TRAINING COURSES

DRIVER TRAINING CONSTRUCTION PLANT

FORKLIFTS ADR / DGSA

NEBOSH / IOSH CPC & MANAGEMENT COURSES

Page 2: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

2

THIS TRAINING PACKAGE

HAS BEEN DEVELOPED AND PRODUCED

BY

THE TRAINING DEVELOPMENT UNIT

OF

RITCHIES TRAINING CENTRE

HOBDEN STREEET, SPRINGBURN GLASGOW G21 4AQ

We have made every effort to ensure that the information contained within this publication is accurate. It’s content should be used as guidance material only and not as a replacement of current regulations, company safety policies or existing standards

DONALD RITCHIE RITCHIES TRAINING CENTRE

Page 3: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

3

Further information on products / training / queries contained in this handout can be obtained from the manufactures listed below.

Rud Chains Ltd Parsons Chain Company Units 10-14 Worcester Road John Wilson Business Park Stourport-on-Severn Whitstable Worchestershire Kent CT5 3QT DY13 9AT Tel: 01227 276611 Tel: 01299 827700 Fax: 01227 276586 Fax: 01299 827659 Web: www.rud.com.uk Web:www.parsonschain.co.uk/

Crosby Europe ltd Spanset Unit 10, Fall Bank Industrial Estate Telford Way Dodworth / Barnsley Middlewich South Yorkshire S75 3LS Cheshire CW10 OHX Tel: 01226 290516 Tel: 01606 737494 Fax: 01226 Fax: 01606 735502 Web: thecrosbygroup.com Web: www.spanset.com/

National Plant Operators Registration Scheme Ritchie’s Training Centre Ltd PO Box 204, Northwich Hobden Street, Springburn Cheshire, CW9 7FY Glasgow G21 4AQ Tel: 01606 49909 Tel: 0141 5572212 Fax: 01606 352239 Fax: 0141 5588252 Web: www.npors.com/ Web: www.ritchiestraining.co.uk

Ritchie’s Training Centre Ltd would like to thank the company’s list above for the use of their products and copyright

Page 4: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

4

Health & Safety at Work Act 1974. Employers Duties Section 2(2).

A Provide and maintain plant and equipment including a safe system of work. B Provide safe transport and storage of materials and substances including safe handling. C Provide information, instruction, training and supervision. D Provide and maintain safe place of work under his control without risk to health including

safe access and egress. E Provide a safe working environment without risk to health, including welfare facilities. Section 2(3). Prepare a written safety policy and bring it to the attention of all employees. Section 9. Must not levy any charge for any PPE required by law.

Employees Duties Section 7 & 8. 7(a) Take reasonable care for their own safety and that of others who may be affected by

their acts or omissions. 7(b) Co-operate with employer to enable them to comply with their legal obligations. 8 Not to interfere with or misuse any equipment provided in the interest of health and

safety.

Page 5: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

5

Provision and Use of Work Equipment Regulations 1998

Interpretation (Regulation 2) The following definitions and terms are important in understanding the requirements laid down by these Regulations. Inspection This means a visual or more rigorous inspection, as required by regulation 6 carried Out by a competent person, and may include appropriate testing. Thorough examination. This means a thorough examination, as required by Regulation 32, carried out by a competent person, and may include appropriate testing. Work equipment. This includes all machinery, appliances, apparatus, tools or installations for use at work — the definition will cover single machines such as guillotines right through to complete entities such as bottling plant. Use. This includes any activity that may be associated with the work equipment, such as starting, stopping, programming, setting, transporting, repairing, modifying, maintaining, servicing and cleaning. Unless otherwise stated the requirements of these Regulations are absolute, i.e. they must be achieved. Application (Regulation 3) The Regulations apply to :

� Work equipment provided by employers for use by their employees at work � Work equipment provided by self-employed persons for their own use at work � Persons who have any control of work equipment, or who use, supervise or manage its

use � The way work equipment is used.

The Regulations do not apply to work equipment supplied by way of sale, agreement for sale, or hire purchase agreement. Various exemptions also apply to work equipment used in relation to work on or off ships. The guidance points out that the duty on employers also extends to personal work equipment provided by the employees, where the employer agrees to this practice and that on multi-occupancy sites arrangements should be made for one employer to be responsible for compliance. The "co-operation and co-ordination" requirement under regulation 9 of the Management of Health and Safety at Work Regulations 1999 (MHSW) is relevant.

Page 6: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

6

Information and Instructions; Training (Regulations 8 and 9) These regulations require employers to make available to all persons using work equipment adequate health and safety information, and where appropriate written instructions on the use of such equipment. In addition, the employer must also provide adequate health and safety training in the use of the work equipment, including any associated risks and necessary precautions. Adequate information and training, and written instructions where appropriate, must also be made available to persons who supervise or manage the use of work equipment. The information and instructions must be comprehensible and include: the conditions and methods of use of the equipment; foreseeable abnormal situations and any necessary actions, and any conclusions drawn from experience in the use of the equipment. With regard to training, the guidance specifically points out the importance of considering additional requirements for young and/or inexperienced persons. LIFTING EQUIPMENT: Under s.2 of the Health and Safety at Work Act 1974, employers have a duty to ensure any plant or equipment provided for use at work is safe — this includes lifts and any other lifting equipment. More specific requirements are contained in the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), which remove and replace many of the previous provisions in the Factories Act 1961 and other Regulations.

Page 7: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

7

The Lifting Operations and Lifting Equipment Regulations 1998. Definitions (Regulation 2). Accessory for lifting: Any work equipment used to attach loads to the lifting machinery. Lifting equipment: Work equipment used for lifting or lowering loads — attachments used for anchoring, fixing or supporting the lifting equipment are included in the definition. Lifting operation: Any activity involving the lifting or lowering of a load. Load: The item being lifted or lowered and includes people. Work equipment: Any machinery, appliances, apparatus, tools or installations used at work. Application (Regulation 3) Employers have duties under these Regulations in situations where employees at work use lifting equipment. Self-employed persons have a similar duty with regard to lifting equipment they use at work. In addition, persons who have any control of lifting equipment, or who use, supervise or manage the use of lifting equipment also have a duty under the Regulations but only to the extent of their control — these duties do not apply in cases where the lifting equipment has been supplied by way of sale, agreement for sale or hire purchase agreement. Strength and Stability (Regulation 4) Lifting equipment must be of adequate strength and stability for each individual load raised or lowered and particular attention must be paid to the stresses incurred at the mounting or fixing points. Load parts and any attachments used in the lifting operation must also be of adequate strength. Lifting Equipment for Lifting Persons (Regulation 5) Lifting equipment used for lifting people must prevent anyone using it from being crushed, trapped or struck, or from falling from the carrier. Similar precautions are required for work activities being carried out from the carrier, as far as reasonably practicable. There must also be suitable devices to prevent the risk of a carrier from falling. If this risk cannot be prevented the carrier must have an enhanced safety coefficient suspension rope or chain which must be inspected on each working day. People trapped inside a carrier must be protected from danger and be able to be freed.

Page 8: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

8

Positioning and Installation (Regulation 6) Lifting equipment must be positioned and installed so as to be safe, and minimise the risks, as far as reasonably practicable, of the lifting equipment or its load striking a person, or its load drifting, falling freely or being unintentionally released. Suitable devices must be provided to prevent people from falling down lift shafts or hoist ways. Marking of Lifting Equipment (Regulation 7) Lifting equipment must be clearly marked with its safe working loads. In situations where the safe working load is reliant on the equipment configuration, the safe working load for each configuration must be clearly marked on the lifting equipment. Alternatively, information containing these details must be kept with the lifting equipment. Accessories used in lifting operations must be marked with any information necessary to ensure their safe use. Lifting equipment intended for lifting people must be clearly marked as such. Any lifting equipment not intended for lifting people but which may be mistakenly used as such must also be clearly marked to this effect. Organisation of Lifting Operations (Regulation 8) Lifting operations involving lifting equipment must be properly planned by a competent person, appropriately supervised and carried out in a safe way. Thorough Examination and Inspection (Regulation 9) Lifting equipment must be thoroughly examined for defects before it is put into service for the first time. This does not apply in situations where the lifting equipment has not been used before and there is an accompanying EC declaration of conformity (where this is appropriate) which is less than 12 months old before the lifting equipment was put into service. Lifting equipment obtained from a third party must be accompanied by physical evidence of the last thorough examination before it is used in the new employer's premises. Lifting equipment must also be thoroughly examined to ensure correct installation and safe operation after it has been installed and before being put into service for the first time, or after it has been relocated, if its safety is dependent on its installation. Where lifting equipment is exposed to conditions that may cause deterioration likely to result in danger it must be thoroughly examined as follows:

� Lifting accessories and lifting equipment for lifting persons: at least every 6 months � Other lifting equipment: at least every 12 months.

In both cases a competent person must draw up an examination scheme, i.e. a suitable scheme that determines the frequency of the thorough examinations. Lifting equipment must also undergo a thorough examination if exceptional circumstances have occurred that may adversely affect the safety of the lifting equipment.

Page 9: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

9

A competent person may inspect lifting equipment at suitable intervals between thorough examinations if necessary. Lifting equipment, which was required to be thoroughly examined under specified legislation that has been repealed or revoked by these Regulations, must undergo another thorough examination before the date on which the previous thorough examination is due for renewal. Reports and Defects (Regulation 10 and Schedule 1) The person undertaking the thorough examination must notify the employer immediately of any defects that are, or could be, a danger to people, and as soon as practicable submit a written and signed report to the employer and, if appropriate, the person hiring or leasing the lifting equipment. The enforcing authority must also receive a copy of any report where there is an existing or imminent risk of serious personal injury due to a defect in the lifting equipment. For lifting equipment that has been hired or leased the enforcing authority is the Health and Safety Executive (HSE), in other cases it is the enforcing authority for the premises. The information required to be included in a thorough examination report is as follows: 1. Name and address of employer. 2. Address of premises at which the thorough examination was made. 3. Lifting equipment identity marks, including date of manufacture if known. 4. Date of last thorough examination. 5. Safe working loads, including those associated with equipment configurations. 6. Where the thorough examination relates to the installation or assembly of the lifting

equipment, notification of that fact and that it has been installed correctly and is safe to operate.

7. Information as to whether the thorough examination relates to a 6 or 12 monthly examination carried out under an examination scheme, or an examination carried out in cases of exceptional circumstances where the safety of the lifting equipment may have been jeopardised. The report should also state that the lifting equipment is safe to operate.

8. Details and identification of any parts found to be defective, including a description of the defect, where the defect is or could become a danger to people.

9. Details of any necessary repairs, renewals or alterations to correct a defect. 10. In cases where the defect may represent a danger to people the following must be

included: � The time in which the defect could become a danger � Details of repairs, renewals or alterations necessary to correct the defect � The latest day on which the next thorough examination must be carried out � Details of any tests if these are included in the thorough examination � The date.

11. Name, address, qualifications and employment status of the person making the Report — if the person is an employee then the name and address of his or her employer must be included.

12. Name and address of the person signing or authenticating the report. 13. Report date. Defects noted during an inspection of the lifting equipment, which pose or may pose a danger to people, must also be notified to the employer immediately. A written record of the inspection must be made. Employers may not use any lifting equipment notified as having a defect before the defect is corrected. In cases where the defect could become a danger, the lifting equipment may not be used after the time specified in the report (i.e. the time after which the defect is deemed by the competent person to be dangerous) until the defect is corrected.

Page 10: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

10

Keeping of Information (Regulation 11) Employers must retain EC declarations of conformity that relate to lifting equipment obtained after 5 December 1998 for as long as they operate the lifting equipment. Thorough examination reports for lifting equipment must be retained until the lifting equipment ceases to be used, while the thorough examination reports for lifting equipment accessories must be kept for two years. Thorough examination reports relating to the installation or assembly of lifting equipment must be kept until the equipment ceases to be used at the location where it was installed or assembled. Finally, thorough examination reports that relate to the deterioration in condition of lifting equipment must be kept either until the next report is made, or for two years, whichever is the later. Records relating to the inspection of lifting equipment must be kept until the next record is made. PERSONAL PROTECTIVE EQUIPMENT: The Personal Protective Equipment at Work Regulations 1992 (PPE Regulations) came into force on 1 January 1993, and were introduced under the provisions of the Health and Safety at Work Act 1974 (HSW Act) to enable Great Britain to implement the requirements of European Directive 89/656/EEC. The Directive obliges Member States to introduce minimum health and safety requirements for the use by workers of personal protective equipment (PPE) at the workplace. The following regulations are part of the Personal Protective Equipment at Work Regulations 1992. Interpretation (Regulation 2) PPE means all equipment and clothing which is intended to be worn or held by a person at work and which affords protection against one or more risks to health or safety. This includes clothing designed to protect against adverse weather conditions. Protective clothing includes, for example: aprons, gloves, safety footwear, safety helmets and high visibility jackets. Protective equipment includes, for example: eye protectors, safety harnesses, respirators and life jackets. Disapplication (Regulation 3) Ordinary working clothes and work uniforms that do not offer specific protection are not covered. Therefore caterer's overalls and similar clothing provided solely in the interests of food hygiene do not constitute PPE, whilst a re-enforced glove provided to a chef to safeguard against injury would count as PPE. Modifications, Repeals and Revocations (Regulation 14) Much of the older legislation on PPE has been revoked, notably the Protection of Eyes Regulations 1974.

Page 11: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

11

Provision and Compatibility (Regulations 4 and 5) Except where risks are adequately controlled by other means, employers must provide suitable PPE to employees who may be exposed to those risks (regulation 4). The self-employed must make provision to themselves in respect of their own activities. There is no duty under these Regulations to supply PPE to non-employees such as visitors or voluntary workers. However, s.3 of HSW Act imposes a duty of care towards non-employees and this may indicate a need for the supply of PPE. Persons gaining work experience are entitled to the same provision for PPE as if they were employees, by virtue Of the Health and Safety (Training for Employment) Regulations 1990. The employer should consider PPE as a last resort, or as an interim solution to a risk of exposure pending control by engineering or other means. The reasons are: PPE only protects the person wearing it and not others in the vicinity; wearing PPE may give a false sense of security as it is seldom fully effective and PPE can be cumbersome which may give rise to other risks or adversely affect performance. Examples of processes that may require the provision of PPE, subject to an assessment by the employer include the following. 1. Head protection:

� Construction and building, particularly in the vicinity of scaffolding � Underground work including working in pits, trenches and tunnels � Ship repair � Tree felling � Work near hoists, lifting plant and cranes.

2. Eye protection:

� Handling chemical substances such as acids, alkalis and other corrosive or irritant substances

� Working with molten metals � Working with abrasive wheels or any machine likely to eject particles � During welding operations where intense light may otherwise cause damage to the eye.

3. Hand protection:

� Handling chemical substances where there is a risk of dermatitis or of damage to skin tissue

� During construction and outdoor work � Where there is a risk of cuts or abrasions � Where articles may be hot, cold or slippery � Where there is a risk of electrical shock � When using vibratory tools.

Page 12: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

12

4. Foot protection:

� Where there is a risk from molten metal splashes � To prevent injury from falling objects � Where special slip-resistance is required � In flammable atmospheres, where the build-up of static electrical charges creates a risk

of explosion � Where there is a risk of sharp objects piercing the sole, such as in the use of nails on a

construction site. 5. Body protection:

� Warm clothing when working outdoors in low temperatures, or in cold-stores � Protection against intense heat and/or flame retardant clothing when working at a

foundry, or with welding equipment � High visibility clothing when working in the vicinity of moving traffic, airports, etc � Cut-resistant clothing when using chain saws or butcher's knives � Life jackets when working near deep water.

Employers must take all reasonable steps to ensure that PPE is properly used. This includes giving proper and adequate information, instruction, training and supervision, and the use of disciplinary procedures where appropriate. Where there is a statutory requirement for PPE to be used, this should be indicated by use of safety signs to BS 5378. These are in the form of a blue circle upon a white background (see SAFETY SIGNS).

CHARGES Section 9 of the Health and Safety at Work Act 1974

states: No employer shall levy or permit to be levied on any employee of his any charge in respect of anything done or provided in pursuance of any specific requirements of the relevant statutory provisions.

Suitability To be suitable, PPE must:

(a) Be appropriate for the risk(s) involved and the conditions at the place where exposure may arise

(b) Take ergonomic considerations into account, and be capable of being fitted to, and used by, the worker

(c) So far as is practicable, prevent or adequately control the risk of exposure without creating overall risk

(d) Be designed and manufactured to an approved standard. Where more than one sort of PPE has to be used simultaneously, each must be compatible with the other and full effectiveness must be maintained (regulation 5)

Page 13: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

13

Assessment (Regulation 6) Prior to selecting PPE, the employer or self-employed person must ensure that an assessment has been made to ascertain whether the proposed PPE is suitable (regulation 6). A risk assessment made under this regulation need not be duplicated in order to meet the requirement for assessment under regulation 3 of the Management of Health and Safety at Work Regulations 1999 (MHSW) although it should be easily identifiable and well cross-referenced. Except in the most simple and obvious of cases, or where the exercise can be quickly and easily repeated, the significant findings of an assessment should be recorded in retrievable form. The record should be readily accessible to those who may need to know the results. Employees should be involved in the selection of types and styles of PPE, and should have an informed choice wherever possible. Selection should be made with the individual in mind — what is suitable for one person may be useless for another. For example, a worker who requires spectacles with prescription lenses will be unable to work whilst wearing non-prescription eye shields. In selecting PPE, the employer or self-employed person must consider:

� Risks to health or safety that have not been avoided by other methods � The sort of performance and characteristics that the PPE would need to have, for it to be

effective � Comparison of the proposed PPE with the required performance and characteristics.

The assessment must be reviewed where there is reason to suspect that it is no longer valid.

Maintenance and Storage (Regulations 7 and 8) PPE must be maintained (e.g. cleaned, repaired or replaced) in an efficient state (regulation 7). A stock of spare PPE, spare parts and cleaning materials should be kept to facilitate this. Suitable storage should be available to prevent damage to PPE, including that which has been issued to users. PPE that has been supplied free of charge by an employer for use at work remains the property of that employer. It is in order for the employer to instruct that it is kept at the workplace and is not used for non-occupational purposes. Information, Instruction and Training (Regulation 9) Under this regulation employees must be given adequate and comprehensible instructions, information and training in:

� The purpose for which PPE has been provided � The risks that it will protect against � The correct method of use � The employee's part in ensuring that PPE remains in an efficient state, properly

working and in good repair.

Page 14: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

14

Employee's Duties (Regulations 10 and 11) Employees are obliged to use PPE in accordance with the instructions and training that they have been given (regulation 10). Employees and the self-employed must also take all reasonable steps to return PPE to designated storage or accommodation after use. Sections 7 and 8 of the HSW Act lay down general duties for employees. The MHSW Regulations 1999 further require each employee to properly use any equipment, system of work or other measure provided by the employer in accordance with the instruction and advice that has been given. This general duty extends to the proper use of PPE. Where an item of PPE becomes defective or is lost, the employee must report the loss or defect immediately to the employer (regulation 11).

CONCENTRATION OBSERVATION MACHINE CONDITION - VISUAL CHECKS, DAILY INSPECTION MACHINE KNOWLEDGE – MECHANICS, CAPABILITIES, CONTROLS ONLY ACT ON YOUR OWN JUGEMENT NEVER TAKE A CHANCE – ALWAYS TAKE CARE SELECT CORRECT SLINGS – LIFTING EQUIPMENT EXPERIENCE OF SIMILAR LIFTS – LIFTING EQUIPMENT NEVER BE HURRIED – KEEP WITHIN YOUR OWN LIMITATIONS S.L.I. CORRECT FOR JIB LENGTH & CRANE/RADIOUS PLATE EXERCISE YOUR RIGHT TO QUESTION ANY LIFT

REMEMBER

You are the person in charge of the lift, and the lives of

your workmates depend upon your ability

BETTER TO BE SAFE THAN SORRY

Page 15: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

15

The Basic duties of a slinger:

• To prepare the load for lifting.

• To prepare the sling and connect it to the load and crane

• To steady the load whilst lifting and moving it from one position to another.

• To be fully responsible for the safe transfer of the load from one position to another.

• To be solely responsible for giving the orders to the crane operator.

• To be conversant with the standard crane signals and to use them at all times.

• To examine the lifting gear before and after use as required by the LOLER Regs.

Rules for safe slinging.

It is difficult to lay down rules that will cover all slinging methods, as these must vary according to circumstances, but certain general rules and precautions should be followed to ensure safe working practices.

The following points are designed to assist the slinger in the safe handling and transfer of loads:

• Know the weight of the load to be lifted and ensure that it does not exceed the Safe Working Load (SWL) of the tackle and crane.

• Use only authorised tackle, which is marked with the SWL. Unmarked tackle should be reported to the Supervisor.

• Inspect ALL tackle before use. Report damaged tackle and have it destroyed.

• Remember that with 3 or 4-legged slings, 2 legs may take all the weight.

• When reeving slings around a load the angle at the bight must not exceed 120 degrees.

• NEVER tie knots in slings or shorten by wrapping them around crane hooks or by using a nut and bolt.

• ALWAYS use the correct pins in shackles and fasten them securely.

• NEVER use rusty wire ropes, or fibre ropes, which have been in contact with acids or alkalis.

• Rings and shackles must ride freely on the crane hook. NEVER lift with the point of the hook.

• NEVER put sharp bends in wire ropes. Always protect slings from sharp corners by using packing.

Page 16: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

16

• NEVER drag slings along the floor.

• Keep wire rope slings away from welding and flame cutting operations.

• Use chain slings when lifting hot metal.

• Check that all parts of the load are safely slung. Keep hands away before lifting and stand clear while the load is being lowered.

• NEVER stand under a suspended load.

• NEVER allow a load to pass over people’s heads.

• DO NOT trap slings under a load. Use dunnage to give clearance for sling removal.

• Use only the correct signals and make sure that they are clearly understood by the crane operator.

• NEVER store lifting tackle in your own locker. It must be freely available for regular inspection.

• NEVER store lifting tackle on the floor.

• NEVER attempt to raise or lower a load unless it is completely free from all obstructions.

• Never hammer a chain to straighten a link, or to force a link into position.

• Always “SPOT” the load and lift vertically to prevent swinging.

• Use steadying lines (tag lines) to gain complete control.

• Always make sure you are in a position where the crane operator can see you.

• When working with uneven loads, always find the centre of gravity by trial and error without actually lifting the load clear of the ground.

• When using multi-leg sling assemblies, remember that the angles between the legs will reduce the safe working load of the assembly. Consult the Sling Chart and Safe Load Tables available.

• Endless wire rope slings are prone to misuse. And in practice they are often found to be difficult to handle. It is preferable that they are used only when they have been purpose made for applications requiring a very short effective length, or for single lifts where a single sling of the required Safe Working Load is not available.

• Do not use any sling that contains a severe kink.

• When loads are being carried on a crane hook, slings not in use should not be carried on the same hook.

• A sling, which has been “doubled” around a shackle, has a Safe Working Load equivalent to that of a single part of the rope.

Page 17: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

17

• Check that the crane hook is positioned over the load’s centre of gravity to prevent swinging when the load is raised.

• Make sure that the load is free before lifting, and that all legs have a direct lead.

• When not in use, wire rope slings should be kept in a dry store, to prevent corrosion-taking place.

FACTS

•••• Lifting equipment is involved in more serious accidents than any other type of construction equipment.

• Accidents involving lifting equipment are more costly in terms of insurance.

• Cranes and lifting equipment and the use of are one of the major causes of construction site fatalities.

Cranes

Before commencing a lift with a crane it may be required for the banksman to assist with the on site planning and positioning of the crane and associated equipment. Check the work site with the supervisor and the crane operator and assess the crane suitability for the whole job. Assess access, room, soil, lift capacity and lifting equipment. Decide where to set up and how to set up This is part of:

Site and job planning

Before commencing lifting operations the crane driver and banksman must ensure that proper site planning has taken place.

The procedure to be followed in preparing an operational plan for lifting includes:

• Job requirements

• Priorities of the job

• Workplace rules and procedures

• Identifying hazards

• Hazard control measures

Persons to consult with when planning the proposed work:

• Building owners

• Statutory authorities where necessary

• Local councils

• Site manager and supervisor

• Other trades working on site

Page 18: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

18

This will ensure that the crane driver and banksman are aware of, comply with, any statutory or workplace rules, regulations or restrictions that may apply. This is required under the DUTY of CARE of every person at that work site. Types of hazards to be considered for you work plan.

• Unstable ground surface, i.e. recently back filled excavations

• Other personnel working on the area

• Under ground services (Proximity hazards)

• Dangerous materials

• Power lines overhead or underground

• Trees

• Surrounding structures

• Bridges, access restrictions

• Other work equipment on site Hazard control strategies to be included in the plan for lifting procedures; must include

• The task being preformed

• Any site hazards – trenches and filled ground, power lines, obstructions in the working radius of the crane, trees, scaffolding, access and exit points

• PPE required when working with hazardous or non-hazardous materials

• Warning signs displayed properly

• Barriers and barricades to restrict access

• Traffic control

• Lighting

• Public safety Ground conditions If the ground on which you require to set the crane up on is waterlogged or soft, Appropriate steps must be taken prior to the crane setting up to assess the soil and ground condition. This may well be required to be completed by a competent person (civil engineer or equivalent) Excavations

A crane should not be set up close to an excavation as the weight of the crane causes Additional pressure to adjoining soil and cause the excavation to collapse and result in The crane overturning. As a general rule the distance of the cranes outrigger pad from The edge of the excavation should be at least the same as the depth of the excavation +1 metre Free on wheel duties (lifting and carrying a load)

If you are in doubt concerning the safety of a free duty lift stop and consult with the competent person in charge of the operation. Some cranes are better suited than others to travel over rough surfaces. Always check the cranes load chart and manufacturer’s recommendations before carrying out any lift that requires Free on wheels duties.

Page 19: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

19

Cranes are more likely to overturn “off road”. Before carry out a free on wheels lift check:

• For potholes and soft or rough ground

• For overhead obstructions

• For power lines

• For personnel working in the area

• Blind corners

• Traffic flow

• Underground services Always check grassy surfaces for potholes or drains hidden by long grass. Walk over the whole area before guiding a crane across Make sure cranes suspension units are locked and pinned Do not direct the driver to slew unless the surface is firm and level Do not walk heavy loads with crawler cranes unless the ground is firm and level Travel slowly to prevent excessive swings

TANDEM LIFTS

• Your company should have an restriction on tandem lifts

• The only tandem lifting should be engineered through the office

• The dangers in tandem lifts are the cranes are going to side load each other

• It’s impossible to swing a load without side loading one of the cranes

• Crane jibs must be kept parallel

• Tandem lifts are dangerous

• They can be done safely if they are planned and every one involved are properly trained

• If you get in trouble “CAN WE GET OUT OF IT”?

IF IN ANY DOUBT GET HELP FROM YOUR OFFICE OR SUPERVISOR

CRANES MUST BE SET UP AS PER CRANE DUTY CHART,

RISK ASSESSMENT & METHOD STATEMENT

Page 20: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

20

Multiple Crane Lifting

INTRODUCTION: The use of two or more cranes to move and position loads can be very

hazardous and should not be considered where a single crane is capable of doing the job.

There are, however, occasions when multiple crane lifts are necessary.

They are often required during the construction and assembly of oil and gas rigs and in the construction of bridges and large-scale industrial projects such as power stations and refineries.

CERTIFICATION: The appointed person / competent person with direct responsibility for

coordinating and directing a multiple crane lift must hold a Banksman / slinger or a rigging certificate

For very complex lifts, the advice of an experienced structural engineer may

be required to properly plan the operation, but the certified rigger must maintain immediate supervision at all stages

PLANNING AND COORDINATING:

The importance of careful planning and the need for a thorough briefing of all personnel involved in the lift cannot be overstated. Many multiple crane lifts have come to grief through oversights, wrong selection of cranes, incorrect siting of cranes and misunderstandings between crewmembers.

If the weight of the load, it’s centre of gravity and the weight of the lifting gear is not known in advance, they must be carefully calculated.

Whenever possible, a “dummy run” should be staged prior to the lift to check that the cranes can perform all stages of the operation within radius while maintaining sufficient clearance from obstructions and power-lines. This exercise should also be used to confirm that the agreed communication method is under stood and is suitable.

CRANE SELECTION AND SITING:

Whenever possible, select cranes of equal capacity and similar Characteristics. This will make synchronisation of crane movements easier to achieve.

Each crane must have additional capacity over and above its share of the load at all times during the operation. This is to allow for the possibility of the hoist ropes deviating from vertical or other loads transferred through imperfect synchronisation of crane movements. The minimum capacity requirements for each crane are:

• When 2 cranes are used – 20% greater than the share of the load

• When 3 cranes are used – 33% greater than the share of the load

• When 4 cranes are used – 50% greater than the share of the load

Page 21: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

21

Crane siting must be carefully considered so that movements are reduced to the minimum necessary. The crane siting can be limited by the nature of the work site, the position of obstructions and power-lines, or the existing position of tower cranes

Wherever possible, site the cranes to avoid slewing motions. Always use luffing-up in preference to luffing-down. Luffing-down is dangerous because it can easily lead to the load swinging one or more of the cranes outside the safe operating radius. Wind loading adds to the dangers of luffing down.

Where the cranes are required to pick and carry, they must be aligned in the same direction. If they are out of alignment, the movement of one crane can push or pull the other cranes and stability may be lost.

CALCULATING LOAD-SHARE

Where the load to be lifted is beyond the capacity of any of the selected cranes, equalising gear may be required to ensure that each crane supports its correct portion of the load.

Equalising gear needed when the cranes are close together, such as for lifting large columns and similar objects. It also acts as a lever.

When cranes are of a differing capacity, the load to be lifted should be slung away from the centre of the equalising beam so that the load taken by each is proportional to its capacity. The load is slung closer to the end of the equalising beam supported by the larger capacity crane, to increase its share of the load and reduce the part of the load carried by the second crane.

WARNING: Tower cranes are prohibited from carrying out any form of tandem lifts NOTE: Always check own company safe system of work or method statement. SLINGS – SELECTION & INSPECTION. A sling is as important to a banksman / crane operator as is his crane. The correct type of sling used in lifting is very important to both the operator and the load that is being lifted. The correct sling should always be used and should be inspected before and after use. INSPECTION OF TACKLE. All lifting tackle by law has to be inspected every 6 months or as per company safety policy. Companies must have a log of all tackle to include inspection dates. Example: -

Steel Wire Ropes – chains – slings – hooks – shackles - eye bolts etc.

Page 22: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

22

Eyebolts are used for lifting loads, which are usually heavy and concentrated. They are used for general lifting and for permanent attachment to loads, which are to be moved occasionally. They are screwed into tapped location holes provided, and usually will not accept a hook, but must be used with a shackle.

Dynamo Eyebolt This has a large eye and a small collar diameter. Normally fitted By the manufacture to the item to which they are attached, they Need not be marked with a S.W.L, are not registered, and are not Examined six monthly. This type of eyebolt should only be used for Vertical lifts.

Collar Eyebolt This has a smaller eye, a larger collar diameter and the thread is Undercut on both the diameter and the collar face. They should Be marked with a S.W.L, registered as a piece of lifting tackle, And examined six monthly. This type may be used, in pairs, for Taking an angular pull, but the angle of pull must be in line with the plane of the eyebolt. Shims may be needed to allow This. The maximum washer thickness should not exceed half the Pitch of the thread.

Eyebolt with link This type has a link permanently attached to the eye and should be Marked, registered and examined. They may be used for taking an angular pull, but unlike collar eyebolts, The angular pull need not be in line with the plane of the eyebolt, this Renders the fitting of washers or shims unnecessary. NOTE The S.W.L marked on any eyebolt is only applicable to a vertical Lift. Whenever an angular pull is used, the rated S.W.L decreases as the Angle of pull from the vertical increase.

Eyebolts

Page 23: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

23

Eyebolt threads include Whitworth, BSF, UNC, UNF, or Metric

Extreme care must be taken to ensure that metric threaded eyebolts are not inserted in imperial threaded holes.

Although these might appear to match, it is an interference fit only. The mechanical strength may be almost nothing.

Eyebolt Type / Selection

Is the load applied Vertically only

Is load in plane of eye

Use Dynamo

Eyebolt

Use collar

Eyebolt

Use Eyebolt With link

Eyebolts Collar & Dynamo

YES

NO

YES

NO

Page 24: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

24

Dynamo or plain eyebolt Collar eyebolt

Eyebolts are made to screw into or through a load and may be Plain (Dynamo) or have collars (collar eyebolt)

The plain eyebolt is good only for vertical loading.

Even when a collard eyebolt is used, the safe working load is reduced with angular loading

When installed, the collar must be at right angles to the hole and Must be in full contact with the surface of the load and be properly Tightened.

The load should always be applied to the plain of the eye and never in The other direction. If necessary, Shims should be inserted Below the collar to ensure that the eye is correctly aligned when tight.

Collared eyebolts with links may be used providing angle

Of The load to axis of eyebolt thread does not exceed 15°°°°

Over 15°°°° safe working loads must be de-rated in Accordance with BS 4278. (See weight reduction chart below)

Eyebolts Collar & Dynamo

Page 25: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

25

Maximum shim thickness not to exceed ½ the pitch of the thread

Maximum angle allowed out of plain is 5°°°°

No more than ½ turn to align to correct plain of eye

Hand tight only do not over tighten

I.S.O METRIC COURSE THREAD (ALL DIMENSIONS IN mm.’s)

Diameter Pitch

10.00 1.50

12.00 1.75

14.00 2.00

16.00 2.00

18.00 2.50

20.00 2.50

22.00 2.50

24.00 3.00

27.00 3.00

30.00 3.50

33.00 3.50

36.00 4.00

39.00 4.00

42.00 4.50

48.00 5.00

NOTE:

ALL PITCH SIZES MUST BE HALVED TO GIVE CORRECT SHIM THICKNESS

Eyebolts

Page 26: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

26

Maximum angle allowed

90°°°°

1T 1T

2T

90°°°° REDUCE BY 75%%%%

60°°°° REDUCE BY 60%%%%

30°°°° REDUCE BY 40%%%%

Eyebolts with links maximum angle of 15°°°° from vertical when over 15°°°° reduce with table above

Collar Eyebolts

Page 27: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

27

Trunnion Lifting

Eyebolts screwed into the side of the load must be de-rated by

75% on each eyebolt

Collar & Dynamo Eyebolts

Page 28: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

28

30°°°° -40%%%%

60°°°° -60%%%%

90°°°° -75%%%%

Maximum angle allowed on slings when working with eyebolts is 45°°°° from

vertical (Included angle of 90°°°°)

Weight Reduction Chart Eyebolts

The flatter angle of pull, the greater the strain and leverage on the eyebolt

Page 29: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

29

Reeving through connections to load increases load on

Connection fitting by as much as twice

DO NOT REEVE

Collar Eyebolts

Page 30: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

30

SAFE WORKING LOAD TABLE FOR COLLARED LIFTING EYEBOLTS METRIC

SINGLE EYEBOLT SWL PER PAIR OF EYEBOLTS

NORMAL SIZE

AXIAL

TRUNNION MOUNTING

PERPENDICULAR

30 DEGREES

60 DEGREES

90 DEGREES

tonnes tonnes tonnes tonnes tonnes tonnes

M10 3/8” 0.25 0.25 0.06 0.06 0.13 0.13 0.32 0.32 0.2 0.2 0.13 0.13

M12 ½” 0.32 0.5 0.08 0.12 0.16 0.25 0.40 0.63 0.26 0.4 0.16 0.25

M16 5/8” 0.63 0.9 0.16 0.22 0.32 0.45 0.79 1.13 0.50 0.72 0.32 0.45

M20 ¾” 1.25 1.4 0.31 0.35 0.63 0.70 1.60 1.76 1.00 1.12 0.63 0.70

M22 7/8” 1.60 2.0 0.4 0.5 0.8 1.00 2.00 2.52 1.28 1.60 0.80 1.00

M24 1” 2.0 2.75 0.50 0.68 1.00 1.38 2.50 3.47 1.60 2.20 1.00 1.38

M30 3.2 0.80 1.60 4.00 2.60 1.60

M33 1 ¼”

4.0 4.5 1.0 1.12 2.0 2.25 5.00 5.67 3.20 3.60 2.0 2.25

M36 1 ½”

5.0 6.5 1.30 1.62 2.50 3.25 6.30 8.19 4.00 5.20 2.50 3.25

M42 1 ¾”

6.3 9.0 1.60 2.25 3.20 4.50 7.90 11.3 5.00 7.20 3.20 4.50

M48 2” 8.0 12.0 2.00 3.0 4.00 6.00 10.0 15.1 6.40 9.60 4.00 6.00

M56 12.0 3.00 6.00 15.0 9.60 6.00

M64 2 ½”

16.0 20.0 4.00 5.00 8.00 10.0 20.0 25.2 13.0 16.0 8.00 10.0

M72 20.0 5.00 10.0 25.0 16.0 10.0

M76 3” 25.0 30.0 6.25 7.50 12.5 15.0 31.5 37.8 20.0 24.0 12.5 15.0

The above table is derived from AS2317-1984 and BS4278-1984 or manufacturers specifications for the Safe Working Load of collared eyebolts when used in the correct manner as described in "

Care and use of eyebolts". The loads indicated are for "General Purpose Use"

Page 31: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

31

• Self aligns to direction of force • Higher WLL capacity than standard eyebolts • Load rated for side pull • Rotates 360 degrees • Integrated key for quick and easy installation and removal

• Compact design • Rotates to direction of pull • Fold down flat • Ideal for side pull application • Grade 80 belts are interchangeable for through hole

application • Holding springs reduce vibration • WLL from 660 lbs. to 44,000 lbs. • Metric and UNC threads

• WLL from 17,600 lbs. to 33,000 lbs. in any direction o Ball bearing swivel rotates 360 degrees o Larger ring for hook and shackle attachment o Clearly marked WLLs o Tested and certified - certificates available

Great Britain

RUD Star Point Swivel Eyebolt

Page 32: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

32

Rud Chains Ltd. John Wilson Business Park

Units 10-14 Thanet Way

Whitstable, Kent CT5 3QT Phone: 011 44 1227 276 611 Fax: 011 44 1227 276 586

www.rud.com.uk

RUD Star Point Swivel Eyebolt Chart

Page 33: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

33

Red UNC thread

•••• Rated at 100% at 90°°°°

•••• 360°°°°Swivel and 180°°°° Pivot Action

•••• •••• No need for washers or shims

Silver Metric thread

Used with chains slings

Used with webbing slings

Crosby Swivel Hoist Ring

Page 34: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

34

Lifting heavy concentrated loads Electric motors / Machinery

Pre cast concrete IE. Floors / Stairs

Eyebolts Weaknesses & Reasons for

Failure

Eyebolts have severe limitations of use Corrosive damage / non use of shims Eyebolts not screwed home properly

Using wrong eyebolts / Incorrect thread size Using eyebolts in acidic environments

Lifting loads out of plain & Using bent or damaged eyebolts

Eyebolts Care and maintenance

Do not store in-situ return to tackle store Protect threads from damage

Slightly oil or grease to prevent corrosion Clean threads of debris with wire brush

Eyebolts Reasons for use

Page 35: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

35

Spreader beams are used to support long or wide loads during lifts

They eliminate the hazard of load tipping, as well as wide sling angles and any tendency of the sling to crush the load

Equaliser beams are used to equalise the load in the sling legs and to keep equal loads when making multiple leg lifts

Care must be taken not to exceed the S.W.L at the various slinging points

Spreader Beam

Equaliser Beam

Multiple attachments

The capacity of a beam with multiple attachments will be specified by markers.

Generally it depends on the distance between the parts, if the distance between attachment points is doubled the capacity is halved

Lifting & Spreader Beams

General Information

Page 36: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

36

Areas of Low headroom Avoids wide sling angles that would crush a load

Lifting unbalanced loads Tandem lifts on loads

Spreader Beams Weaknesses & Reasons for

Failure

Unstable with loads with a low centre of gravity Corrosive damage

Damage to bolted or welded areas / attachments Lifting loads outside design spec Overloading attachment points

Spreader Beams Care and maintenance

Store beams in dry conditions Store beams on stands or adequate packing If beams are dismantled store all parts together

& Reassemble correct components

Lifting / Spreader Beams Reasons for use

Page 37: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

37

Bow shackles should be used when one or more attachment is made, or to allow movement on the plain of the shackle

Dee shackles are usually joining shackles

Only use shackles that are marked with their safe working load

Never use bolts instead of

Proper shackle pins

Shackles

Page 38: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

38

In line 100% of rated capacity

45°°°° from in line 70% of rated capacity

90°°°° from in line 50% of rated capacity

Shackles symmetrically loaded with two leg slings having a maximum

included angle of 120°°°° can be utilized to full working load

This applies to Crosby shackles only unless stated by your supplier

Shackles

Page 39: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

39

Point loading of Crosby shackle bow is acceptable

Point loading of Crosby shackle pins is acceptable as long as load is reasonably

centred on the pin

Although point loading is acceptable a pad eye width of 80% or more of shackle spread

is best practice.

This applies to Crosby shackles only unless stated by your supplier

Crosby Shackles

Page 40: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

40

Shackles should be fitted in a manner that allows the shackle body to take the load in a true line along its centre line.

Correct Incorrect

Correct Incorrect

Shackle pin cannot turn Shackle pin can work loose

Incorrect Correct

Safe Use Of Shackles

Page 41: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

41

Working Range Link plate (Joining shackles)

Web sling saver Spool Wide body sling saver

Crosby Europe ltd Unit 10, Fall Bank Industrial Estate

Dodworth / Barnsley South Yorkshire S75 3LS Telephone 01226 290516

WEB: thecrosbygroup.com

Crosby Shackles & Fittings

Page 42: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

42

Shackles Reasons for use

Shackles are used in the main for attaching Lifting gear to the crane hook

Lifting gear to the load Bow shackles for more than one attachment

Dee shackles for joining

Shackles Weaknesses & Reasons for

Failure

Shackles have no apparent weaknesses under normal use as long as they are looked after properly

The main reason for failure is overloading, eccentric loads and misuse

Check for distortion and damage to the pin

Check that it is the correct pin for the shackle That the pin is seated correctly

Shackles Care and maintenance

Maintenance of shackles are minimal Keep clean protect from corrosion and ensure that

threads are protected from damage

Page 43: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

43

There are usually lines of black stitching on webbing slings the amount of lines denotes SWL i.e. two lines of stitching = 2 tonne SWL

I.D. tag

Webbing slings are issued with a statement of conformity confirming the safe working load

Due to the materials used in webbing slings they would be unsuitable for proof testing

Webbing Slings

Page 44: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

44

Various attachments available for webbing slings

• Blue label: 100% Polyester

• Nylon: Resists Weak Alkalis

• Polyester: Resists Weak Acids

• Polypropylene: Resists Both (but will stretch easy)

• Nylon: When Wet Must Reduce SWL by 50%

NOTE: No natural fibre slings will be used on a construction site

Webbing Slings

Page 45: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

45

Any damage to webbing slings disregard

Feel Internal strands in slings Damage or cuts to sleeve For damage

• Protect from sharp edges of load

• Do not tow or drag any loads

• Keep away from Acids or Alkalis

• Keep away from frost or extreme cold

• Keep away from heat

• Keep away from any U.V. Light

• Keep away from mildew

• Always store in dry clean place

Damage to Webbing Slings

Page 46: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

46

Chemical Resistance Chart

Chemical Polyester Acid *

Alcohols OK

Aldehydes NO

Strong Aldalis **

Bleaching Agents OK

Dry cleaning Solvents OK

Ethers NO

Halogenated Hydrocarbons OK

Hydrocarbons OK

Ketones OK

Oils, Crude OK

Oils, Lubricating OK

Soap and Detergents OK

Water and Seawater OK

Weak Alkalis OK

THIS IS A GENERAL GUIDELINE ONLY *Disintegrated by concentrated sulphuric acid.

**Degraded by strong alkalis at elevated temperatures.

Webbing Slings Resistance

Spanset Webbing Sling Chart

Page 47: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

47

Webbing Slings Reasons for use

Light in weight for given capacity Easier to handle than Wire or Chain Can be pushed thought narrow gaps

Unaffected by Grease or Rust

Webbing Slings Weaknesses & Reasons for

Failure

Durability and storage deterioration is poor Prone to abrasion damage

Can be contaminated by alkalis and acids Affected by heat

Web slings are inclined to stretch and may not be suitable for precise positioning

Webbing Slings Care and maintenance

Webbing slings char or decompose over a range of temperatures, NEVER! Dry slings near a fire or

heating pipes, as overheating will cause embrittlement Can be cut by loads if unprotected

Page 48: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

48

Wire rope slings are available in a wide range of capacities and sizes

Danger do not use if

Any wires broken at collar area or Stretch or damage to thimble

Pressed metal sleeve Soft eye

It is crucial that the SWL stamped upon The sling is adhered to

Wire Rope Slings

Page 49: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

49

WIRE ROPES: Type identified by a number 6/7, 6/12, 6/24 the first figure Refers to the number of strands to the rope and the second Figure to the number of wires in the strands. Wire ropes may be fibre cores or steel cores. Fibre cores Are more flexible steel core are stronger. Note: Steel cored rope must be used in hot works condition only Types of lay: The two most common types of lay are: - LANGS LAY: Where the wires in the strands are twisted In the same direction as the strand in the rope (Running

Rope)

ORDINARY LAY: Where the wires in the strand are twisted in the opposite direction to the strands in the rope. (Pendant Rope)

Safety Factor Mobile Crane Hoist Rope 4.5 - 6 to 1 Overhead Crane (Gen. Duties) 6 to 1 Wire Rope Slings 6 to 1 Multi Leg Slings 8 to 1 Lifts and Hoists (Goods) 6 to 1 Lifts and Hoists (Passenger) 12 to 1 The Regulations State: -

A wire rope shall not be used when more than 5%%%% Or one in twenty of the wires, can be seen to be damaged

In any ten diameter length.

Wire Rope

Page 50: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

50

Rope dia. (mm)

1 Leg Tonnes

Endless Tonnes

2 Leg Tonnes

3&4 Leg Tonnes

5 0.2 0.4 0.4 0.5

6 1.4 0.6 0.5 0.8

7 0.5 0.8 0.7 1.1

8 0.7 1.1 1.0 1.6

9 0.9 1.4 1.3 2.0

10 1.2 1.8 1.7 2.5

11 1.4 2.1 1.9 2.9

12 1.7 2.5 2.4 3.5

13 2.0 3.0 2.8 4.2

14 2.3 3.5 3.2 4.8

16 3.0 4.5 4.2 6.3

18 3.8 5.7 5.3 8.0

19 4.3 6.4 6.0 9.0

20 4.7 7.1 6.6 9.8

22 5.7 8.6 8.0 9.8

24 6.8 10.2 9.5 14.3

26 8.0 12.0 11.0 16.8

28 9.3 14.0 13.0 19.5

32 12.1 18.2 16.9 25.4

35 14.5 21.8 20.3 30.4

36 15.4 23.1 21.5 32.3

38 17.1 25.7 23.9 36.0

Wire Rope Chart

Page 51: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

51

Lighter than chain for given capacity Can be applied where no lifting points are on the load Can be hooked into lifting points i.e. Lugs, Shackles

Flexible

Wire rope Slings Weaknesses & Reasons for Failure

Wire rope

Slings may be Damaged when Kinked sharply Or put under Stress when Twisted

Never use if more than 5% of the wires, can be seen to be broken in any 10 Diameter lengths

Wire rope Slings Care and maintenance

Steel wire may be damaged by corrosion through poor care and storage

As with all lifting gear do not leave ropes laying around on floor

Wire rope Slings Reasons for use

Page 52: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

52

Master link Capacity of sling Identification No. Maximum sling angle

Chain Reach

Auxiliary Link C hook Safety catch

Regularly examine Chains for

Stretch – are both chains of equal length Legible markings

Worn, Stretched or twisted links Cuts, Nicks, Gouges, Cracks, Corrosion

Heat discoloration Or any other defect apparent to the fittings

Maximum wear

on a link 10%

Chain Slings

Page 53: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

53

Stress on link

Dead end

Wrong Correct

• Load bearing legs must go through bottom of clutch

• Chains should be kept the same length

• Dead ends of chain must be kept together

• Remember the shorter the chain slings are the wider sling angle, therefore causing more stress

Working Angle

Chain Sling Shorting Clutches

Page 54: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

54

• Maximum sling angle 90°

• Chains can be used up to a 120° angle if tested for such a use

• Avoid sling angles less than 15° this could cause load instability

• Do not use multi leg slings at angles within the shaded area

When slings are used in choke hitch

the working load limit should be reduced by 20%

Sling Temperature

Reduction in Working Load Limit

Grade 8 Grade 10

-40°°°°C to 200°°°°C None None

200°°°°C to

300°°°°C

10%

300°°°°C to

400°°°°C

25%

Above 400°°°°C Do Not Use

Do Not Use

Chain Sling Sling Angles

Page 55: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

55

* Not to be used for lifting purposes

* Wrought Iron:

Very little mechanical strength unless heat-treated periodically.

* Mild Steel Grade 30:

Low carbon content producing a soft chain with high ductility. High Tensile Steel Grade 40:

Medium carbon steel has good wear and shock absorbing properties also used for shackles, eyebolts & other lifting gear

Alloy Steel Grade 60:

Alloy steel of this grade produces a chain 50%%%% stronger than high tensile steel and does not suffer from brittleness in extreme cold

Alloy Steel Grade 80:

Harder than lower grades and more resistant to wear, allowing for a lighter sling for given load.

Alloy Steel Grade 100 (8 + 10): 25% better lifting properties than a grade 80 chain sling

Grade S.W.L Proof Breaking Factor of Load Load Safety

* Wrought 6 tons 12 tons 27 tons 4.5 to 1

* Mild steel (G30) 6 tons 12 tons 30 tons 5 to 1

High tensile (G40) 8 tons 16 tons 40 tons 5 to 1 Alloy steel (G60) 12 tons 24 tons 60 tons 5 to 1 Alloy steel (G80) 20 tons 40 tons 80 tons 4 to 1

Due to risk of embrittlement alloy steel grade (t) chain slings must not be used in acid or acid laden atmospheres.

Grades of Chain Slings

Page 56: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

56

Page 57: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

57

Straight lift: Each leg will carry 5 tons of stress

Increased sling angle = increased stress on slings

To ensure you stay within SWL of slings follow guide below

Load vs Sling Angles

5.0t 5.0t

10 ton

30°

5.2t 5.2t

10 ton

90°

7.1t 7.1t

10 ton

5.8t 5.8t

60°

10 ton

Page 58: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

58

Calculating Load vs. Sling Angle

One leg sling = Mode factor 1

Two leg sling = Mode factor 1.4 Three or four leg sling = Mode factor 2.1

To calculate what SWL is needed for slings vs load angle use the magic sevens system If you are using a sling with 2 legs @ a 90º angle the formula would be: 2 (leg sling) x 7 = 14 place decimal point between the 1 and 4 = mode factor of 1.4

Or 3 (leg sling) x 7 = 21 place decimal point between the 2 and 1 = mode factor of 2.1 So if you are using a sling with 2 legs @ an 90º angle and the weight of your load is 20tonne ÷ 20 (Load weight) by your mode factor of 1.4 (2 leg sling used) = 14 tonne slings needed to complete lift safely

BS 1290 Working Load Limits Of Slings

Magic Sevens 1 x 7 = 7 2 x 7 = 1.4 3 x 7 = 2.1 4 x same as 3

Page 59: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

59

90°

16 ton

Calculating Load vs. Sling Angle

Two leg sling = Mode factor 1.4

To calculate what SWL is needed for both slings

Divide 16 by mode factor 1.4

16 ÷ 1.4 = 11.4 tonne slings for lift

So each sling leg must be capable of lifting 11.4 tons each

BS 1290 Working Load Limits Of Slings

Magic Sevens 1 x 7 = 7 2 x 7 = 1.4 3 x 7 = 2.1 4 x same as 3

÷ Load to sling

Page 60: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

60

Calculating Load vs. Sling Angle

Three or four leg sling = Mode factor 2.1

To calculate what SWL is needed for sling to be used

Divide 35 by mode factor 2.1

35 ÷ 2.1 = 16 tonne slings for lift So each sling leg must be capable of lifting 16 tons each

35t

Note: when using 4 leg chains formula is the same as for 3 legs: 2.1

BS 1290 Working Load Limits Of Slings

Magic Sevens 1 x 7 = 7 2 x 7 = 1.4 3 x 7 = 2.1 4 x same as 3

÷ Load to sling

Page 61: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

61

225°c 250°c 275°c 300°c 320°c 350°c 375°c 400°c

The special fluorescent pink powder coating permanently highlights the maximum temperature at which the VIP-chain has been used.

The pink colour changes to black when the chain is used at more than 400° C (forbidden).

Less sensitive to notching and hydrogen embrittlement than quality Grade 80.

Rud Chains Ltd. John Wilson Business Park

Units 10-14 Thanet Way

Whitstable, Kent CT5 3QT Phone: 011 44 1227 276 611 Fax: 011 44 1227 276 586 http://www.rud.com.uk

RUD VIP Chain Slings

Page 62: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

62

When using 4 legged chain slings it is important to check the tension on each sling leg each slack leg you must reduce SWL of chain sling by 25%

When slewing with the load because of the weight transfer on the load, Or you are not using 2 of the 4 chain legs you should reduce SWL of chain sling by 50%

Remember: Any slack legs are not taking a full load bearing weight of the lift they are only acting as stabilisers.

4 Legged Chain Sling

Page 63: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

63

Quick guide on selecting the correct sling lengths

Sling level or just beyond attachment point = 60º Angle ¾ of sling attachment point = 90º Angle

2/3 of sling attachment point = 120º Angle

Sling Lengths

Page 64: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

64

6,375 IBS / 3000kgs 11,200 IBS / 5600Kgs

12,500 IBS / 6250Kgs

15,675 IBS / 7837Kgs

Shock loading: Crane drivers and slingers should be made aware of the dangers of shock loading. Shock loading may break a sling even though the weight of the

load being lifted is well below the working load limit for that sling. High acceleration forces, or shock loads, may be caused by the sudden operation of the crane, by not taking up the slack before starting to lift, or by sudden impact of

falling loads. Crane drivers should always lift and lower slowly.

Shock Loading

Total load At Rest A

Talking up 3” Slack at Full Speed B

Talking up 6” Slack at Full Speed C

Talking up 12” Slack at Full Speed D

Page 65: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

65

Chain Slings Reasons for use

Can be applied where no Lifting points are on Load Where more than one Lifting point on Load is required Can be hooked into Lifting points i.e. Lugs, Shackles.

Length Adjustable. Flexible

Chain Slings Weaknesses & Reason for

Failure

Links and hooks may become distorted and fracture if Subjected to excessive stress Chain can be subject to stretch

Chain Slings Care and Maintenance

Keep clean and protect from corrosion. Do not leave chains lying around on the floor where

they are liable to be damaged. If left out side slightly oil

Page 66: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

66

NOTE: THE WEIGHT OF ALL ATTACHMENTS USED MUST BE ADDED TO THE LOADS WEIGHT TO ARRIVE AT THE TOTAL WEIGHT BEING LIFTED

Single drum Lift Double Drum Lift Pipe Clamp

Plate Clamp Segment Lifting Finger Coil lifter

Brick Forks Vacuum Lifting Device Plate Clamp

Various Lifting Aids

Page 67: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

67

Out of balance loads Some loads are asymmetrical and therefore, do not balance about their centre point and some require more careful handling it is essential for the slinger to acquire the skill of estimating the position of the centre of gravity and then place the crane hook immediately above this estimated point.

The sling nearer the heavy end will be supporting

All of the load and the second leg is only acting As a steadying leg. In most cases a sling capable of 100% of the load bearing weight on one sling

leg should be used

Straight lift

Single leg Choke lift single leg Choke lift two legs

100% of WLL Only Use 80% of WLL (Note: some company policies reduce by 50% of WLL)

When using a single eyebolt for lifting purposes (Fig1) care should be taken to ensure the eyebolt cannot unscrew if the load starts to revolve or twist. A swivel

type eyebolt should be used instead

Choke hitching forms a loop, which tightens as the load is lifted. Do not attempt to force the hook into closer contact with the load. Allow the chain to assume its

natural angle. Single leg chains are not suitable for lifting long loads, which might tilt.

Kuplex Slinging Methods

Page 68: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

68

Single Leg Slings In Basket Hitch

100% of WLL for single leg sling 100% of WLL for single leg sling

A single leg sling, back hooked to form a basket hitch, assumes the appearance of a two leg sling but it should never be rated as such. The master link is only

designed for single leg loading. Endless Slings

100% of WLL

Note: No need to de-rate For choke hitch configuration

Kuplex Slinging Methods

Page 69: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

69

Two Single Leg Slings Used Together

Two sling legs in straight lift Two single legs in choke hitch Two single legs in basket hitch

Rate as two leg sling Use only 80% of two leg sling Rate as two leg sling

Two sling legs should not be used together to form a pair unless:

A. They are of same type, grade, size and length B. They are both marked with the same WLL

C. The included angle between the two legs does not exceed 90° D. The crane hook is large enough to comfortably accept both upper terminal fittings of the slings

Two Leg Slings Straight Lift Basket Hitch Drum Sling Two leg sling with only one leg in use

Rate as two leg sling Rate as two leg sling Should be rated as a single Leg Rate at 50% of WLL

Kuplex Slinging Methods

Page 70: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

70

Three Leg Slings

Straight lift Choke Hitch

Rate as Three leg sling Only use 80% of WLL

Rate as indicated only in cases where the load appears to be reasonably

distributed between all three legs. If two are obviously supporting most of the load, Rate at 2/3 of the marked working load.

Four Leg Slings Straight lift Choke lift Two, two leg slings used as four leg

Rate WLL as four leg sling Only use 80% of WLL Rate as four leg slings See comment for slings used together

Kuplex Slinging Methods

Page 71: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

71

Tag Lines

When lifting long loads, particularly in confined spaces, slingers should attach a rope or tag line to one or both ends of the load so that rotational movement may be controlled. Tag lines should be kept as short as possible slingers should also look out for overhead electric cables or weather conditions lighting strikes can

conduct electricity down through tag lines.

Landing loads

Before a load is lifted, a place should be prepared where it is to be put down. The nature of the load will determine the type of preparation necessary loads should be lowered onto timber battens. The slings can then be easily withdrawn. The load

should never be landed directly on to the slings.

Kuplex Slinging Methods

Page 72: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

72

ROUND LOADS SQUARE OBJECTS Formula: Die x Die x 3 = Formula: Height x Width x 4 = LBS. per foot length LBS. per foot length Example: Object 2.75” Diameter Example: Object 3.5 x 2.5” 12 feet long 12 feet long 2.75 x 2.75 x 3 x 12 3.5 x 2.5 x 4 x 12 Simplified = 3 x 3 x 3 x 12 Simplified = 4 x 3 x 4 x 12 Answer: 300 LBS. Answer: 576 LBS. When simplifying always move up to the next whole number, for ease of calculation

100lbs = 1cwt. When selecting a sling, the operator / Slinger should add a further

50%%%% on the weight of the load to determine the safe working load of the sling / lifting gear.

Example: 300 IBS SWL of sling = 450Ibs

WEIGHT TABLES

MATERIAL KILOGRAMS PER POUNDS PER Cubic metre Cubic foot ---------------------------------------------------------------------------------

1. In some cases weights Aluminium 2700 170 may vary depending on Brass 8500 530 the actual composition Brick 2100 130 of mixed Liquids. Coal 1450 90 Copper 8800 550 2. All figures have been Concrete 2400 150 rounded for convenience Earth 1600 100 of use. Iron – Steel 7700 480 Lead 11200 700 3. When dealing with a Magnesium 1750 110 hollow body. Check to Oil 800 50 see if it contains any Paper 1120 70 loose objects / liquids Water 1000 62 which may move when Wood 800 50 Lifted.

Estimating Loads

Page 73: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

73

Signals given by the banksman to the crane operator must be clear and precise to avoid confusion and to prevent accidents. They also need to be standardised so that any operator can understand any banksman. Special signals used locally are

dangerous and should be avoided

IMPORTANT If an operator does not understand a signal or is uncertain, he should keep the

crane stationary until he can get the signal clarified in some other way.

Hand Signals

Page 74: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

74

Hand Signals CONT.

Page 75: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

75

DO’S, DON’TS: Go through them and think about the ones you do and The ones you don’t.

Ask yourself why you do them, and what would be the consequences if you ignored certain ones. NEVERX.

• Allow the load to pass over people’s heads.

• Drag a chain or sling from under a load.

• Roll loads over with a sling.

• Allow the load to rest on slings, as they may be crushed and become unsafe.

• Drag or lift the load out of plumb, the crane is not designed for this purpose and serious damage may occur.

• Stow lifting Gear away and regard it as private property.

(This may lead to such tackle being overlooked for examination)

• Attempt to raise or lower the load unless it is completely free from obstructions.

• Cross-, twist, links or knot any slings.

• Hammer a chain to straighten a link or force a link into position.

• Use any lifting tackle, which appears faulty.

• Allow personnel to ride on loads.

• Overload slings due to the weight of the load or mode of use.

• Load tip of the hook.

ALWAYS THINK BEFORE YOU ACT DON’T OVERLOOK SAFETY

NEVER TAKE A CHANCE

Page 76: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

76

AlwaysX • Plan the lift

• Know the weight of the load being lifted

• Check all equipment is free from damage or defects

• Connect the sling securely to the load and position hooks to face outwards

• Apply the correct mode factor for slinging arrangement.

• Protect lifting gear from sharp edges of the load with packing.

• Use steadying lines on long loads to obtain complete control.

• Use lifting gear of adequate strength.

• Take the weight of the load gradually and ensure the slings are complete straight before lifting the load to avoid shock loading. (See shock load chart)

• Ensure the load is balanced and will not tilt or fall.

• Make sure the load is unhampered and may be lifted clear.

• Select slings long enough to avoid a wide sling angle between the legs of a multi-leg sling.

• Remain in sight of the crane operator when given hand signals.

• Use spreader where a sling is continuous around a load and there is a danger of the load being crushed.

• Ensure that cranes & loads are clear of all obstructions before giving movement signals.

• Keep fingers and toes clear when lifting or loading loads.

• Back hook free legs onto master link.

• Inspect lifting gear after use and store correctly.

Remember always work safely

Page 77: Training For The Future - Ritchies Training Centre · Training For The Future TRAINING COURSES DRIVER TRAINING ... Lifting equipment must be of adequate strength and stability for

77

Ritchies Training Centre Ltd Hobden Street, Glasgow G21 4AQ

Tel: 0141 557 2212 Fax: 0141 558 8252 Please visit our website www.ritchiestraining.co.uk