39
Transerve International Group

Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

  • Upload
    phamdat

  • View
    216

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Transerve International Group

Page 2: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Transerve International Group

Page 3: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Transerve International Group

Page 4: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Transerve International Group

Page 5: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Transerve International Group

Page 6: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Transerve International Group

Page 7: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Transerve International Group

Page 8: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Transerve International Group

Page 9: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Transerve International Group

Page 10: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Areas Of Industry Involved

Transerve International Group

Page 11: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Our Program

Pipeline Services:

• Pipeline Pre-Commissioning• Pipeline Mechanical and Chemical Cleaning• Pipeline Geometry and Location (XYZ) Surveys• Pipeline Inspection Services (with ILI suppliers)• Pipeline Maintenance and Abandonment• Pipeline Hydrostatic and Strength Testing• Pipeline Mechanical and Nitrogen Drying• Pipeline Freezing• Pipeline & Tank Leak Testing

(Above and Underground)

Process Services:

• Nitrogen Purging, Drying & Product Displacement

• Nitrogen / Helium Leak Testing• Integrated Pre Commissioning Services• Enhanced Reactor Cooldown• Nitrogen Pumping & Vaporization• Hydrostatic & Pneumatic Strength Testing• Flange Management• Bolting Services (Torquing & Tensioning)• Pipe Freezing

Transerve International Group

Page 12: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Our Strength

• All People And Equipment Certified And Registered For Offshore

• New Equipment

• Experienced And Professional Staff

• We Can Exchange Key Personnel And Equipment From UK And Netherlands

• Go For High Quality Services

• Innovative, Understand Client Needs

Transerve International Group

Page 13: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Our Services

• Process Services• Pipeline Services• Boltworking Services• LNG Services

Transerve International Group

Page 14: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Process Services

Methods• Nitrogen Purging, Drying & Product Displacement

• Nitrogen / Helium Leak Testing

• Integrated Pre-commissioning Service

• Enhanced Nitrogen Reactor Cool Down

• Nitrogen Pumping & Vaporization

• Hydrostatic & Pneumatic Testing

Transerve International Group

Page 15: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Nitrogen Purging, Drying & Product Displacement

• The hydrocarbon processing industry deals with many hazardous products which need tobe removed from the facilities before any maintenance or cleaning work can beexecuted.

• Systems will be drained of fluids and any remaining gases need to be purged usingnitrogen.

• After the shut-down work the same systems often need drying.

• In most cases the plant utility nitrogen does not have sufficient capacity to dry systems asquickly as needed.

Transerve International Group

Page 16: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Nitrogen / Helium Leak Testing

Uncontrolled emissions, loss of containment, release of hazardous petrochemicals are a direct danger to Health, Safety and Environment.

Experience proves that LEAKS do occur, mostly during plant start-up, after commissioning of new facilities or after the execution of maintenance on existing facilities.

Helium Leak Testing Services:

• Improves safety by preventing escape of flammable toxic product.

• Eliminates leaks and emissions.

• Simulates operational conditions.

• Reduces the water content of the processing facilities.

• Reduces oxygen levels and provides an inert blanket.

• Prevents loss of production due to unplanned shutdowns.

Transerve International Group

Page 17: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Process Services

Integrated Pre-commissioning Service

Transerve International Group

Page 18: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Integrated Pre-commissioning Service

Prior to the start-up of any new process plant or module there are certain requirementsthat must be met before hydrocarbons or product can be introduced safely.

TIG will, together with input from the client, provide procedures and risk assessmentsbased on industry knowledge and experience for each service offered.

These include but are not limited to the following:

• Controlled Bolting activities

• Flange management

• Hydrotesting services

• Pneumatic testing services

• Camera Inspection

• Nitrogen purging of pipework to remove Oxygen in order to create an inert atmosphere

• Nitrogen leak testing

• Nitrogen Helium Leak testing of all joints and connections

• Drying of pipework systems to client specified dew point

• Liquid nitrogen cooldown activities

• Integrated shutdown and pre-commissioning services

Transerve International Group

Page 19: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Enhanced Nitrogen Reactor Cooldown

•The hydrocarbon processing industry employs a complex group of processes to reduce crude to usable end products.

•Historically, many of these processes have utilized catalysts to improve effectiveness and efficiency.

•The use of catalysts has increased as the quality of crude has decreased.

•This increasing use of catalysts has focused more attention on catalyst turnaround and handling and the time associated with these activities.

•Enhanced nitrogen reactor cooldowns are executed tospeed up the reactor cooldown process.

Transerve International Group

Page 20: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Nitrogen Pumping & Vaporisation

Nitrogen Pumping is used in numerous applications to solve many industrial problems.

Our pump units are of the latest design and manufacture and have the versatility tomeet various pressure, flow and temperature requirements.

PNS vaporization unit types:

• N2 HP Pump unit

• Steam Vaporizer

• Ambient Vaporizer

Transerve International Group

Page 21: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

360K Nitrogen Pump Unit

Engine• The Detroit engine equipped with Zone II

exhaust cooling and engine shutdown systemsfor on- and offshore usage.

• The unit is noise level tested according ISO3746.

• Acoustic enclosure to be rated for 80 dBA.

Cryogenic Pump• The CS&P triplex high pressure pump, driven

by a Denison hydraulic motor.

• Maximum output flow 10.000 Nm3/hr

• Maximum operating pressure 400 bar(g)

• Hose connections NIT 150

Certification• ATEX

• DNV 2.7-1

• EN 12079, RID, ADR, IMO-IMDG

• Lifting Certification in accordance with DNV2.7-1

Dimensions Nitrogen UnitWidth 5,020 mm

Length 2,440 mm

Height 2,600 mm

Weight 15 TON

Transerve International Group

Page 22: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

180 K Nitrogen Pump Unit

Engine•Caterpillar 3406 DITA engine equipped with Zone IIexhaust cooling and engine shutdown systems.

•Acoustic enclosure to be rated for 80 dBA.

Cryogenic Pump •CS&P triplex high pressure pump with 1 5/8” coldends, driven by a Denison hydraulic motor.

•Maximum output flow:

3000 SCF per minute @ 6000 PSI.

85 SCM per minute @ 400 Bar.

•Maximum operating pressure:

10000 PSI, 700 Bar.

•Hose connections NIT 150.

Certification•ATEX Directive 94/9/EC

•DNV 2.7.1 Offshore Container

•SI 913

•SI 2306 (Power)

Dimensions Nitrogen Unit

Width 2.500 meter

Length 5.890 meter

Height 2.650 meter

Weight 13,500 kg

Transerve International Group

Page 23: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Skid Mounted Steam Vaporizer

General The Pipeline Nitrogen Services steam vaporizers aredesigned in accordance with PED and CE markingand certified according ATEX with the followingcodes: Ex II 3 G T2.

Specifications •Nominal capacity Gn2: 15000 Nm3/hr

•Max. Working pressure: 40 bar N2

•Design temp. Gn2: -25°C / +200°C

•Design pressure Steam: 0 – 25 bar

•Design steam temp.: 0°C - 260°C

•Connection LIN: NIT 150/ 2” 300#

•Discharge connection: 3” 300# ANSI

•Steam connection: 2” 300# ANSI

•Max Steam requirement: 3000 kg/hr @ 7barg

Note: The nominal capacity for vaporizing LNG -10.500 Nm3/hr

Dimensions Nitrogen UnitWidth 1,900 meter

Length 2,435 meter

Height 2,077 meter

Weight 2,400 kg

Page 24: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Skid Mounted Ambient Vaporiser

GeneralThe natural draught ambient vaporizer is fitted ina container frame and is designed to vaporizeliquid to gaseous nitrogen.

The vaporizer is constructed from aluminum andis welded according to Euro-norm 287/288.

Specifications•Nominal capacity: 2 * 850 Nm3/hr

•Max. Working pressure: 40 bar

•Connections: LN2 = NIT 150, GN2 = 1” NPT

•The unit is designed and constructed according toPED 97/23/EEC module B and D. and includes CEmarking

Transerve International Group

Page 25: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Hydrostatic & Pneumatic Testing

•Hydrostatic testing of pipelines and vessels is performed to expose defective materialsthat have missed prior detection, ensure that any remaining defects are insignificantenough to allow operation at design pressures, expose possible leaks and serve as afinal validation of the integrity of the constructed system.

•For pneumatic test we use compressed air or nitrogen as a media, in case ofhydrostatic testing we use either water or client’s product as media.

Transerve International Group

Page 26: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Pipeline Services

Introduction

• Maintenance, support and inspection are becoming more and more important toextend the life cycle of the pipelines.

• But the steadily rising cost of fuel, materials and labor pressure operators toimprove efficiency on maintenance and support.

• Pipelines always involve work to be executed under the most difficult circumstancesdue to the lay out, location, age, and variations and non-pig ability.

• It is vital that pipelines are tested upon strength, are leak tight and cleaned andinspected regularly to secure the pipeline integrity.

• TIG has a complete pipeline service program from commissioning maintenance anddecommissioning package to safeguard safe and smooth pipeline operation duringthe whole life cycle of this valuable asset.

• Pipeline Services are executed during; Construction-, Commissioning-, Operation-,Maintenance-, Inspection and Abandonment.

Transerve International Group

Page 27: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Pipeline Services

Methods

• (Pre) Commissioning

• Pipeline Mechanical and Chemical cleaning

• Pipeline Geometry and location (xyz) surveys

• Pipeline Inspection Service

• Pipeline Decommissioning and Abandonment

• Pipeline Product and Gas Filtering

• Pipeline Hydrostatic and Strength Testing

• Pipeline Air or Nitrogen drying

• Pipe freezing

• Pipeline & Tank Leak Testing

(above and underground)

Transerve International Group

Page 28: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Pipeline Mechanical and Chemical Cleaning

• The Main purpose of gas pipelines is to transport product in an efficient manner.

• But most of the time debris and other product are also transported and canremain in the pipeline and reduce the capacity or harm the integrity of thepipeline.

• It is therefore important to clean the line from debris or condensate what canaffect other installations.

• We have years of experience in pipeline cleaning, mechanical and with chemicalsolutions, with the right designed PIG for it purpose.

Transerve International Group

Page 29: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Pipeline Geometry And Location (XYZ) Surveys

•The pipeline geometry or caliper pig survey is executed in close cooperation withpartners.

•The tool is purpose built to measure any deformations in the pipeline. The pipeline pigpre-determined traveling speed needs to be controlled for optimum Inline Inspectionprograms. Pipeline irregularities will be measured and pinpointed so that the defectscan be assessed and if needed repaired for production or Pigging ability purpose.

Transerve International Group

Page 30: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Pipeline Inspection Service

• Guaranteed integrity of pipelines is becoming more and more important for pipelineowners and operators.

• TIG can offer a complete inspection program from Traps, spools, pumps, tanks,cleaning programs and ILI inspection with one of our selected ILI suppliers.

• Our strength is to manage the complete program in order to be able to deliver agood inspection report for the client.

Transerve International Group

Page 31: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Pipeline Decommissioning and Abandonment

• The first step in abandonment of a pipeline is decommissioning, which is to take theline from its operating condition and render it clean and safe on the seabed.

• In some cases this process can cover a wide range of activities such as radioactive ormercury material handling, removal of debris from the pipeline and sampling of thesea water after cleaning of the line.

• With our offshore experience and equipment PNS is able to engineer, setup andexecute a decommissioning program for every individual project.

Transerve International Group

Page 32: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Pipeline Product and Gas Filtering

• During inline pipeline pigging or process cleaning, dust and debris can becomedislodged and requires separating from the rest of the installation.

• TIG has a professional designed mobile twin filter unit for inline pipeline piggingoperations.

• For every Pipeline and product specification, filters can be exchanged to suit thespecific requirement, making the unit ideal for several petrochemical products andinline pigging without production loss.

Transerve International Group

Page 33: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Boltworking Services

Introduction•The importance of planning the joint assembly, preparation ofall components, procedures, tooling and ensuring application ofthe correct methodology is essential.•The principle of a bolted joint is based on the induced bolt loaddelivering sufficient joint compression and gasket seating stressto withstand maximum service pressure and forces. This is whenthe bolting is under tensile load.•This load can be applied by various different methods but thereare certain constants that must always be in place to ensure aleak free joint.

1. Preparation – The sealing faces must be clean and freefrom serious damage. The bolting must be preparedcorrectly (lubrication if torqueing, thread protrusion ifbolt tensioning).

2. Equipment – Should be fit for purpose and have validcalibration certification.

3. Personnel – All personnel engaged in the tightening ofbolted connections should be trained in theequipment being used and have the appropriatequalifications.

Transerve International Group

Page 34: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Torque Tightening (Hand & Hydraulic)

•This is the most widely used/recognized form oftightening. This is due to the diverse range of toolingavailable which enables accurate tightening of awkwardand straightforward flanges alike and requires no specialistbolting (e.g. longer studs as required with Tensioning).

•By utilizing the elastic properties of the bolting materials,gasket manufacturers seating stresses, and lubricantspecific coefficient of friction, we can calculate and applythe correct torque to achieve the desired bolt load toguarantee a long term leak free joint.

Transerve International Group

Page 35: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Hydraulic Bolt Tensioning

•With this method of tightening the load is applied direct through axial extension of the bolts. Usually this is done with 50% coverage of the threaded fasteners at a time (25% and 100% are occasionally used).

•As a result of this, the load applied is distributed uniformly ensuring that the bolted connection is pulled up evenly. This method also eliminates the issue of friction which occurs during torqueing.

•Bolt Tensioning is often specified as being the preferred method of tightening throughout the Oil & Gas Industry for all fasteners of 1 1/8”Ø and above.

Transerve International Group

Page 36: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

LNG Services

Introduction

• TIG engineers fully understand the unique challenges imposed by the cryogenicnature of the LNG industry.

• We have an experienced team of specialists who have successfully engineered thecommissioning and cool-down on some of the largest LNG installations throughoutEurope and Asia.

• Our early involvement through construction and into start-up has enabled us totailor our service offerings to improve safety, efficiency and quality during thecomplete project.

Transerve International Group

Page 37: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

HSE

Transerve International Group

Page 38: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

HSE

Transerve International Group

Page 39: Transerve International Grouptranservegroup.com/download/TRANSERVE Company Pr… ·  · 2017-11-30• Nitrogen / Helium Leak Testing • Integrated Pre Commissioning Services

Client Base

Transerve International Group